Loading...
HomeMy WebLinkAbout2016 CSA 1 Schulke - Pickle Ball CourtCITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) Work Authorization No: #CSA -1 Project Identification: City of Sebastian — Friendship Park Recreation Improvements Description of Assignment: Schulke, Bittle & Stoddard, LLC will provide conceptual planning and preliminary cost estimating for the site development of new improvements to Friendship Park including 8 pickle ball courts, relocation of ADA compliant playground, 10 +/- parking spaces and driveway, lighting, and necessary modifications to existing pavement and drainage facilities. See detailed Scope of Work (Exhibit A). Deliverable and Fee: The project plans and documents will be delivered as follows: Conceptual Planning and Cost Estimating See detailed Fee Schedule (Exhibit B) Period of Services: 60 days AGREED: /L Date: W)4/(;7 & Stoddard, LLC $15,200.00 City of Seba tian: Date: Joe ri m, CiW Manager Approved as to Form and Content for Reliance by the City of Sebastian Only: tette Wgil2rri ,MMC, City Clerk ���/`�` �?, _� Robert A. Ginsburg, Attorney SCOPE OF WORK — EXHIBIT A General Description Schulke, Bittle & Stoddard shall provide civil engineering for the site development of new improvements to Friendship Park including 8 pickle ball courts, relocation of ADA compliant playground, 10 +/- parking spaces and driveway, lighting, and necessary modifications to existing pavement and drainage facilities. Conceptual Planning and Design Development 1.0 Preliminary Engineering 1.1 Title Work — Research IRC Records: Title search will be performed on the following properties to ascertain existence of access rights of way or easements along the City's east property line (Cross Street): • Parcel No. 31390600000001000011.0 / Owner: Tracy Sabol / 2.5 acres • Parcel No. 31390600000001000012.0 / Owner: Gary and Nicki Lachowicz / 1.5 acres • Parcel No. 31390600000001000014.0 / Owner: 1s' Presbyterian Church of Sebastian, Inc. / 5.64 acres • Parcel No. 31390600000001000014.1 / Owner: City of Sebastian / 0.73 acres 1.2 Survey: A specific purpose survey will be prepared for this project. The survey will include: a. Boundary survey of City parcels: • Parcel No. 31390600005000200001.0 / 17.56 acres • Parcel No. 31390600000001000014.1 /0.73 acres Location of improvements will not be provided, except as included within description of topographyfimprovements in b. and c. below. b. Topography/Improvements: Topographical survey and location of all readily visible improvements will be provided within a limited development area, including all areas north, east and west of the Boys and Girls Club. C. Access/Rights-of-Way survey: A specific purpose survey depicting record rights-of-way or access easements along the City's east property line and providing topography and location of improvements within these areas. 1.3 Environmental Site Review: N/A (not necessary) 1.4 Soils Testing: N/A (existing geotechnical data of record will be referenced) 1.5 Conceptual Plan Preparation: a. Prepare up to three (3) conceptual development plans of the new recreation facilities, incorporating the boundary survey and existing site conditions. The plan will include existing and proposed paving / access / parking lot configuration, building locations, recreation improvements, and conceptual utilities and drainage, and other proposed on- site improvements. b. Coordinate with applicable utility providers and the City of Sebastian Public Works departments to determine required on-site utility, roadway and drainage infrastructure and determine necessary construction required. C. Submit plans to staff for review and comment. d. Lighting plan 1. Site investigation to determine existing fixture types, electrical supply, and possible locations of new equipment such as light fixtures, electrical outlets, water fountain, and other basic electrical loads. 2. Prepare 2 or 3 schematic design layouts for the electrical and lighting equipment with an estimated equipment and installation cost for each design. Page 1 of 2 1.6 Conceptual Cost Estimate: Prepare site development construction cost estimate for each of the three (3) conceptual development plans and schematic electric and lighting equipment. 1.7 Presentation/Parks & Recreation Committee Meeting and City Council Meeting: Attend Parks & Recreation Committee meeting and City Council meeting to present conceptual plans and cost estimates for consideration. Page 2 of 2 FEE SCHEDULE — EXHIBIT B Conceptual Planning and Design Development Section Description Amount 1.0 Preliminary Engineering $200.00 1.1 Title Work $ 1,000.00 1.2 Survey $ 4,400.00 1.3/1.4 Environmental/Soils N/A 1.5 Conceptual Plan $ 8,500.00 1.6 Cost Estimates $ 900.00 1.7 Presentations (2) $ 400.00 The following consultants will be retained by SBS to provide all necessary services. The consultant fee is included in SBS cost above: Attorney Bruce Barkett $1,000.00 Surveyor— Meridian Land Surveying $4,250.00 Electrical Engineer—TBD $4,050.00 Reimbursables will be billed direct to the client at cost or paid direct by the client, and include permit application fees, surveying, soils and/or other required field tests, prints, copies, mailings/ FedEx, mileage, archeological or environmental consultation and studies, traffic analysis/ consultation, traffic counting, etc. Prints - $2.00/sheet Xerox Copies - $0.15/page Mileage - $0.54/mile Other Reimbursables —at cost Invoices shall be submitted monthly, and the invoice amount shall be in proportion to the percentage of the Scope of Work complete. All payments must be received by the Engineer within 30 days of the date of an invoice. Any payments received after said date will be subject to a late interest fee of one and one half percent (1-1/2%) per month. The client shall be responsible for all attorney's fees, court costs, and related expenses incurred in the event that payment is not timely made and proceedings are brought by the Engineer to collect sums owed. RATE SCHEDULE The following rates will apply to actual time devoted by Schulke, Bittle & Stoddard, L.L.C. staff to this project computed to the nearest % hour. Personnel Hourly Rate Principal $200.00 Project Manager/Engineer $150.00 Design Tech $120.00 Construction Manager $ 85.00 Draftsman $ 85.00 Inspector $ 75.00 Clerical $ 60.00