HomeMy WebLinkAboutCSA-05 (complete)CIT, r OF fA S °i -.r HOME OF PELICAN ISLAND 1225 MAIN STREET • SEBASTIAN, FLORIDA 32956 TELEPHONE: (772) 589-5330 • FAX (772) 680-5570 NOTICE TO PROCEED DATE: October 3, 2017 TO: Mr. Aaron Bowles, P.E. MBV Engineering, Inc. 1835 20'h Street Vero Beach, FL 32960 You are hereby notified to commence work on 10/2/2017 in accordance with the provisions of your non-exclusive Continuing Professional Services Agreement, dated July 12, 2017 and in accordance with Work Authorization No.CSA-5 for the Relocation of the Public Works Building. City Manager, Joseph Griffin, will be the project manager. All substantial communication pertaining to this project should be directed to Mr. Griffin at jgriffin@cityofsebastian.org or by telephone at 772-388-8200. We look forward to working with you on this project Date: Jo es ph Griffin City Manager Aaron Bowles, P.E. MBV Engineering, Inc. CITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) MBV ENGINEERING, INC. 1835 20" Street Vero Beach, FL 32960 Work Authorization No: CSA -5 Project Identification: Public Works Building Relocation IT IS AGREED to undertake the following work in accordance with the provisions of the MBV Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement for Engineering Dated July 12, 2017. Description of Assignment: It is understood the City of Sebastian is looking to relocate its Public Works facility currently located at 100 Veterans Memorial Way to a property on the Sebastian Airport, more specifically located at southwest comer of Roseland Road and Corporate Park Drive. Proposed improvements will consist of new building facilities, parking lots, storage yards, and other required miscellaneous site improvements. As such, please find below our scope for conceptual layout and coordination between the City, Architect and Engineer followed by final design and permitting services. Work Scope: Suryey - Establish a minimum of (2) horizontal and vertical control points at or near site. - Depict right of way lines on survey. - Locate pavement abutting site with elevations at both edges and center. - Provide sufficient existing ground elevations to establish current drainage patterns. - Locate all drainage structures and culverts with size, material and invert, lying within or serving site. - Locate all aboveground utilities within or serving site which may be an obstruction or cause a conflict. - Locate significant desirable trees within right of way limits and 10 feet beyond. - Provide 6 certified copies of the topographic survey. - Provide PDF file or CAD file if requested. Phase I: Conceptual Desien and Coordination - Site meeting with City, Architect and MBV Engineering to evaluate existing uses and proposed future uses and needs - Proposed Building Needs Evaluation study and coordination by architect (scope and fees for this task not included and are to be provided by others) - Conceptual Site Layout - Preliminary Cost Estimate Phase II: Final Design and Permitting 1. Project coordination with the following regulatory agencies: a. City of Sebastian (COS) b. Indian River County (IRC) C. Sebastian River Improvement District (SRID) d. St. John's River Water Management District (SJRWMD) e. Florida Department of Environmental Protection (FDEP) 2. Project coordination and review of the required boundary, topographic and tree survey. The cost of survey work has been included in this proposal. 3. Project coordination and evaluation of the required subsurface soils investigation. The cost of geotech work has not been included in this proposal. 4. Finalization of the site plan layout. 5. Preliminary meeting with the City of Sebastian Planning Department. 6. Design of the paving and drainage systems. 7. Design of the on-site utilities. We assume that water and sewer service is available. No cost of off- site utility improvements are included in this proposal. 8. Preparation of the site construction drawings. 9. Coordination with traffic consultant, if needed. No cost of traffic studies or off-site roadway improvements are included in this proposal. 10. Preparation of a code compliant landscape plan. . 11. Coordination with environmental consultant, if necessary. No costs of mitigation design or permitting are included in this proposal. 12. Preparation of the following permit applications: a. City of Sebastian Major Site Plan b. IRC Utilities C. IRC Concurrency d. IRC Fire Review e. Sebastian River Improvement District (SRID) f SJRWMD Environmental Resources Permit g. FDEP Wastewater Collection h. FDEP NPDES Notice of Intent 13. Attendance at Planning and Zoning Meeting. 14. Attendance at City Council Meeting. Basis of Compensation/Period of Services: The above referenced Professional Engineering Services for CSA #5 will be performed for a lump sum fee, including direct costs but excluding permit fees, as described below: Survey $ 15,000 Phase I: Conceptual Design and Coordination $ 7,500 Phase II: Final Design and Permitting $ 34,500 AGREED: ENGINEERING CONSULTANT: ate: 9-20-17 Aaron Bowles, P.E. MBV Engineering, Inc. Attest: WitX.X.(�L1'ylA� 1b, ette Williams, MMC, City Clerk CITY OF SEBASTIAN: Date P Joe Griffin City Manager Approved as to Form and Content for Reliance by the City of Sebastian Only: Cynthia V. Hall, Interim City Attorney CITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) M 3V ENGINEERING, INC. 1835 20m Street Vero Beach, FL 32960 Work Authorization No: CSA -5 Project Identification: Public Works Building Relocation IT IS AGREED to undertake the following work in accordance with the provisions of the MBV Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement for Engineering Dated July 12, 2017. Description of Assignment: It is understood the City of Sebastian is looking to relocate its Public Works facility currently located at 100 Veterans Memorial Way to a property on the Sebastian Airport, more specifically located at southwest corner of Roseland Road and Corporate Park Drive. Proposed improvements will consist of new building facilities, parking lots, storage yards, and other required miscellaneous site improvements. As such, please find below our scope for conceptual layout and coordination between the City, Architect and Engineer followed by final design and permitting services. Work Scope: Survev - Establish a minimum of (2) horizontal and vertical control points at or near site. - Depict right of way lines on survey. - Locate pavement abutting site with elevations at both edges and center. - Provide sufficient existing ground elevations to establish current drainage patterns. - Locate all drainage structures and culverts with size, material and invert, lying within or serving site. - Locate all aboveground utilities within or serving site which may be an obstruction or cause a conflict. - Locate significant desirable trees within right of way limits and 10 feet beyond. - Provide 6 certified copies of the topographic survey. - Provide PDF file or CAD file if requested. Phase I: Conceptual Design and Coordination - Site meeting with City, Architect and MBV Engineering to evaluate existing uses and proposed future uses and needs Proposed Building Needs Evaluation study and coordination by architect (scope and fees for this task not included and are to be provided by others) Conceptual Site Layout Preliminary Cost Estimate Phase II: Final Desien and Permitting 1. Project coordination with the following regulatory agencies: a. City of Sebastian (COS) b. Indian River County (IRC) C. Sebastian River Improvement District (SAID) d. St. John's River Water Management District (SJRWMD) e. Florida Department of Environmental Protection (FDEP) 2. Project coordination and review of the required boundary, topographic and tree survey. The cost of survey work has been included in this proposal. 3. Project coordination and evaluation of the required subsurface soils investigation. The cost of geotech work has not been included in this proposal. 4. Finalization of the site plan layout. 5. Preliminary meeting with the City of Sebastian Planning Department. 6. Design of the paving and drainage systems. 7. Design of the on-site utilities. We assume that water and sewer service is available. No cost of off- site utility improvements are included in this proposal. 8. Preparation of the site construction drawings. 9. Coordination with traffic consultant, if needed. No cost of traffic studies or off-site roadway improvements are included in this proposal. 10. Preparation of a code compliant landscape plan. 11. Coordination with environmental consultant, if necessary. No costs of mitigation design or permitting are included in this proposal. 12. Preparation of the following permit applications: a. City of Sebastian Major Site Plan b. IRC Utilities C. IRC Concurrency d. IRC Fire Review e. Sebastian River Improvement District (SRID) f. SJRWMD Environmental Resources Permit g. FDEP Wastewater Collection h. FDEP NPDES Notice of Intent 13. Attendance at Planning and Zoning Meeting. 14. Attendance at City Council Meeting. Basis of Compensation/Period of Services: The above referenced Professional Engineering Services for CSA #5 will be performed for a lump sum fee, including direct costs but excluding permit fees, as described below: Survey $ 15,000 Phase I: Conceptual Design and Coordination $ 7,500 Phase II: Final Design and Permitting $ 34,500 Evil:121:1 ENGINEERING CONSULTANT: Aaron Bowles, P.E. MBV Engineering, Inc. Attest: < 6Lw- e LcJ Jojnette Wil liarnc MMC, City Clerk CITY OF SEBASTIAN:44, � /LDate: oe Grif City Manager Approved as to Form and Content for Reliance by the City of Sebastian Only: Robert A. Ginsburg, City Art mey