HomeMy WebLinkAboutCulvert - Clearbrook near CavernFederal Emergency Management Agency
Project Worksheet
Declaration No.
FEMA- 1545 OR- FL
Project No.
3
FITS No.
061-64825-00
Date
10/08/04
Category
C
Damaged Facility:
Culvert - Clearbrook near Cavern
Work- Completed m of:
Date:
10/8/2004
Per Cent:
0%
Applicant:
City of Sebastian
County
Indian River
Location:
Culvert - Clearbrook near Cavern
Latitude:
27.80265
Longitude:
-80.49392
Damage Description & Dimensions:
Heavy rains and flooding washed out the bedding material around and under the culvert causing: (1)collapse of 44 LF culvert; (2)
failurelloss of the overlying pavement section (24' x 20', 55 SY); (3) loss of fill in shoulder (2 at 6'x3'xl.5'. 2 CY).
tlScope of Work:
(1) furnish and install 15" CMP (44 LF); (2) construct headwall and endwall using Class A concrete (4 CY); Q) perform excavation and
backfill (60 CY); (4) place aggregate base (30 CY); (5) place 1" asphalt binder course (3 Ton)-, (6) place 1/2" asphalt surface course (2 Ton);
(7) City employee labor.
1
E
(SEE CONTINUATION SHEET
Does the Scope of Work change the pre-disaster conditions at the site?
Special Considerations issues included?
Hazard Mitigation proposal included?
Is there insurance coverage on this facility?
Lj YES / NO
❑ YES NO
EIYES ❑✓ NO
Q YES ❑ NO
Project Costs
Item Code Narrative Quant.
Unit Unit Price Cost
1 3050 CMP 15" (FURNISH AND INSTALL) 44
LF 28.00 1.232.00
2 3040 CONCRETE CLASS A (STRUCTURAL) 4
CY 540.00 2.160.00
3 3050 EXCAVATION AND BACKFILL 60
CY 7.50 450.00
4 3091 AGGREGATE BASE COURSE 30
CY 26.00 780.00
5 3120 BITUMINOUS CONCRETE BINDER CASE 3
TON 28.00 84.00
6 3130 BITUMINOUS CONCRETE SURFACE CASE 2
TON 40.00 80.00
7 9007 LABOR 1
LS 0.00
Total Cost $4.786.00
PREPARED BY: Gregory C. Schell TITLE:
Project Officer
APPLICANT: City of Sebastian JDAM
10/812004
FEDERAL EMERGENCY MANAGEMENT AGENCY
SPECIAL CONSIDERATIONS QUESTIONS
APPLICANT: City of Sebastian DATE: 10/8/2004
FIPS #: 061-64825-00 PROJ. # 3
1. Does the damaged facility or item of work have insurance and/or is it an insurable risk? (e.g.'buildings,equipment, vehicles, etc . )
[I YES [ONO ❑UNSURE
Continents:
2. Is the damaged facility located within a floodplain or coastal high hazard area, or does it have an impact on a floodplain or wetland?
QYES El NO El UNSURE
Comments: Verified by check of FEMA FIRM No. 120123-0090-E
3. Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource System Unit or an otherwise protected area?
❑YES QNO El UNSURE
Comments. Verified by check of FEMA FIRM No. 120123-0090-E
4. Will the proposed facility repairs/reconstruction change the pre -disaster condition? (e.g., footprint, material, location, capacity, use or (miction)
❑YES QNO []UNSURE
Comments:
5. Does the applicant have a hazard mitigation proposal or would the applicant like technical assistance for a hazard mitigation proposal?
[I YES QNO El UNSURE
Comments: The applicant has not expressed interest in hazard mitigation.
6. Is the damaged facility on the National Register of Historic Places or the state historic listing? Is it older then 50 years? Are there more, similar
buildings near the site?
[I YES 2ND ❑UNSURE
Comments:
7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts of forestland?
E] YES JZ NO ❑UNSURE
Comments:
8. Are there any hazardous materials at or adjacent to the damaged facility and/or item of work?
e
[I YES [0 NO ❑UNSURE
Comments:
9. Are there any other environmentally or controversial issues associated with the damaged facility and/or item of work?
[I YES ED NO ❑UNSURE
Comments: j!
i
COST SUMMARY
APPLICANT City of Sebastian
FIPS NO. 061-64825-00
PROJ. NO. 3
ITEM #
1
2
3
4
5
COST CODE UNIT $/ UNIT
3050 EA $28.00
3040 EA $540.00
3050 E4 $7.50
3091 EA $26.00
3120 LF $28.00
SITE 1
44
4
60
30
3
TOTAL UNITS TOTAL COST
44 $1,232
4 $2,160
60 $450
30 $780
3 $84
6
3130 EA $40.00
2
2
$80
7
9007 EA $0.00
1
1
$0
TOTAL
$4,786
ITEM #
DESCRIPTION
$/ UNIT
SOURCE OF COST
1
CMP 15" (FURNISH AND INSTALL)
$28.00
FEMA 1545 Florida Cost Codes
2
CONCRETE CLASS A (STRUCTURAL)
$540.00
FEMA 1545 Florida Cost Codes
3
EXCAVATION AND BACKFILL
$7.50
FEMA 1545 Florida Cost Codes
4
AGGREGATE BASE COURSE
$26.00
FEMA 1545 Florida Cost Codes
5
BITUMINOUS CONCRETE BINDER CASE
$28.00
FEMA 1545 Florida Cost Codes
6
BITUMINOUS CONCRETE SURFACE CASE
$40.00
FEMA 1545 Florida Cost Codes
7
LABOR
$0.00
City of Sebastian
HAZARD MITIGATION
SITE 1
$0
TOTAL
$0
City of Sebastian
Road Culvert
Greg Schell
10/18/2004
Quantity Estimate
1. Pavement Subbase
w ,24.00
L 120.00
ift
Area, A 480.00 isf
Area, A 53.33
!SY
th 18.00
lin _
th 0.50
LYD
Vol 26.67
ICY
Use 30 CY
2. Excavation and Backfill
_
trench base 14.50
ft
trench top 20.00
ft
trench depth 5.25
ft
trench area, to 64.31
Sf _
pipe area, pa 7.07
Sf _
fill area, fa = to - pa 57.24
Tsf
covered length, cl 39.00
Ift _
Vol Trench 2232.51
;cf
Vol Trench 82.69
CY
Volume Subbase 26.67
CY
Vol Exc &Backfill 56.02
CY _
Use 60 CY
3. Pavement - Base Course
w 124.00
ft
L 20.00
Ift
Area, A 480.00
sf
Area, A 53.33
SY _
th 1.00
in _
th 0.03
YD
Vol 1.48
CY
Weight 2.73
(asphalt = 1.84 ton/CY)
Use 3 Tons
4. Pavement- Surface Course
w 24.00
ft
L 2480.000.00
Area, A
sf
Area, A 153.33
SY
th 0.50
in
th 0.01
YD
Vol 0.74
CY
Weight 1.36
(asphalt = 1.84 ton/CY)
Use 2 Tons
67- -3L-1
to
CLIENT DATE GlArGI'F'fl
PROJEC',
CHF CKI-V 0"
DEI'AIL
io
c OMPLI IFP BY Z�v
[.,A1 E
12AGC NO
rt
�.
C
c OMPLI IFP BY Z�v
[.,A1 E
12AGC NO
rt
uc IAI� i— u i ZN'IL CHECKED BY
Cl.J
PAGE NO. '-Y
_�
CDM 5
FEDERAL EMERGENCY MANAGEMENT AGENCY
•06aw0I OM N le 01019 daW P001d Vrr3d 041 M08N0 clow P00Y MJ50J l
vauemwl Paew Nuo1)eN lnage uoaeuuvlul 1 --PP R -m ayl ioj M.A 1I
ayi uo elep 044 of I .nbacgnv vpaw uaeq eNy Aew yoj� vwvwp a
a laatlw pu coop dew v141 aup-u011W d Paiew)uo cvn
pony paouala)w awge eyl yo uory0d a W M.... o0 PIaWo ue el a lu
r ddew .w I.
b
I
daaary )uawareavyr bua31aw3lwapad
I
'
_
1
�
6061 'r AM
31v0 3AI103333
3 0600019021
I
—
:H38WNN dVW
6E lNH--___�`
IFol-sl
wavaol v.ra
�
(v
3 pyM YIIYYI Stl3YY 03L'YwtlmYlNa
Li
- _ rYa 2
3 0601 NIYYI !Y 111)'YwLWB3S
n31ns 13uva Y3ewnw unnwwm
M 1%'.
F
691 30 66 13Nvd
svaav a3ivaoaaoonu
' SYyjL1 lfatl fi y
^� ��h 1~,4 � ^ 3wud lyynds <
' ,gy p Y ^' .r s m
QNV vambld
✓ 0� Y " i�
II
'Ai Nf10J imra Nvium
w
3nN3Atl 3SnOILLNOII 1:,.1 t 1 � >1:19a 3NI"I 3Sb8
-- <, �, 1� w. :)nnvdanH
dVW 31VU 30NVIASNI U0�0w011
,
J k X 3(
•■v�
1'
3V4 1V3A IwOlt c
m3b/ 3NOZ
W ��a
®
3nN3AV IV1NV3 AVIAd"YM
W 3n_3AV NO"W3
tlH0
a , P"
rnl �� dy �
X 3NOZ
T�,
wrxnoxa 3axrxnsxl aoou lrxourx
0 °OO L
1\ °Cg
`l3y ym�
33 NI 31VOS 31VINIXONddV
-
\ �a dayav a� Wd
X 3N