Loading...
HomeMy WebLinkAbout1998 09 03 - Flow in Blossom DitchFEB -13-04 09:38AM FRCM-cDM 407675'151 T-472 P.00'/102 F-657 CDM Fax 2301 Maitland Center Parkway, Suite 300 Maitland, FL 32751 (407)660 -2552 -phone (407) 875-1161 - fax To: Ken Jones From: Doug Moulton Organization: City of Sebastian — Sto!mwater Department Date: February 13, 2004 Fax No.: 772 589.6209 Time: 9:34 AM Re: Flow in Blossom Ditch Job #: 20852-3959$ # of Pages: 2 (ndLdog over sreet'I Message: �_cA, P.- :EB -1 3-04 00:36AM F4CM-CDM 401 M!Ic1 T-472 P.002/002 F-657, Ms. Martha Campbell, P.E. Mr. James W. Davis. P.E. 09/03/98 Page 3 of 4 The _Nodes within the CR512 stomiwater model are connected by LINKS. A summary of the NODE I LINK relationship for the Sebastian Highlands Unit 5 area is listed below: UPSTREAM DOWNSTREAM NODE LINK NODE NRIVU RPRIV NRI'VV NR.IND RCBLSI NBLOSSU NBLOSSU RCBLS2 NS44D NS44D RCI3LS3 NS4D NS41) RCBLS4 NBLOSSD NBLOSSD RCSSS] NSSSIU It should be noted that NODE NBLOSSD receives contributing flow in the CR512 model front. both the Sebastian Mgblands Unit 5 area and the CR512 uaversin; works system at Station 318+11. The downstream LINK from NODE NBLOSSD is designated as RMS I (Le. (R)each I (C)hannel / (S)an (S)ebasdan (S)prings (1). It is the LINK which rec;:ives contn'buting flows ftom both the Sebastian highlands Unit 5 Blossom Ditch system and CR512 traversing works at Station 318+11. Modeling of the Sebastian l iighlands Unit 5 area within the CR512 project for the 24 HR storm duration model produced the following peak cormtbuting flow results to NODE NBLOSSD for the modeled stonus: Computed O Iv. 'QP ir'�A�1lS TeaMko f - Event n/� t✓�c !-S l 91 s' Mean 34.60 ofs to I I a ei 25 YR 84.02 cfs $ 8 1 1 O 100 YR 113.67 cfs 14 In order to not ddversely increase the Peak Stages within the Sebastian highlands Unit 5 area and specifically the Blossom Ditch system. it is recommended that the diversion system be designed for the 100 -Year Storm Event Peak Stage of the upstream end of the diversion system should not exceed the Peak stage of the Cdsring system for the 100 -YR event which has been estimated at 17.45 NCrVD at NODE NS44D,