Loading...
HomeMy WebLinkAbout1999 - Estimated Cost Diversion SystemM MAST'ELLER & MOLER, INC. August 23, 1999 Ms. Martha Campbell, P.E. City Engineer City of Sebastian 1225 Main Street Sebastian, Florida 32958 RE: County Route 512 Blossom Ditch Diversion System Indian River County, Florida Dear Martha: Per your request we have developed a budget estimate in the amount of $250,000 for the Blossom Ditch Diversion System. The following outlines how we have obtained this sl c' - construction estimate. YhQ. $ , ell S{ 1. 1900 feet 54" RCP at $95/lineal foot equals $180,000.00 2. 54" diameter mitered end sections - 2 @ $5200 $ 10,400.00 3. Type "J" Manhole Storm Inlet — 5 @ $4500/ea. $ 22,500.00 4. Bathe Box -1 @ $5000 $ 5,000.00 5. Conflict Box — 1 @ $5500 $ 5.500.00 Subtotal $224,000.00 Plus 10% Contingency 22.400.00 Total $246,000.00 Use for Construction $250.000.00 Should you have any questions or comments regarding the above, please do not hesitate to contact our office. Sincerely yours, ELLER & MOLER, INC. Stephen E. Moler, P.E. Executive Vice President SEM/vk Fiel H9649k (=082399.dw) 0 2205 14eiAvenue ❑ 5211 Okeechobee Road Vero Beach, Florida 32960 Ft. Pierce, Florida 34947 Ph(561)567-5300 Ph(561)466-9200 Fax(561)794-1106 Fax(561)466-9230