HomeMy WebLinkAbout1998 Barber St. Bridge over ElkcamCity of Sebastian
1225 MAIN STREET 0 SEBASTIAN, FLORIDA 32958
TELEPHONE (561) 589-5490 0 FAX (561) 589-6209
June 2, 1998
Mr. James Davis
Director of Public Works
Indian River County
1840 25th Street
Vero Beach, FL 32960-3394
Re: Barber St. Bridge Over Elkham
Dear Mr. Davis:
In follow-up to our conversation from May 27, 1998, this letter is to request impact fee funding for capacity and
safety improvements for the Barber Street bridge over Elkham waterway. Though Barber Street is included in the
2020 Transportation Plan for 4 laning, bridge improvements are planned by the City for FY98/99 due to the City's
overall bridge rehabilitation program. Therefore, it is desired that the capacity improvements be accomplished at
this time. It is requested that you program $50,000 in engineering for FY98/99 and $500,000 in construction costs
for the earliest possible funding availability. These are worse case estimates, as we do not have an engineers cost
estimate for the construction improvements. When proposals and estimates are received, the budget may be
adjusted.
We will look forward to working with you to execute an interlocal agreement to fund this project. Thank you for
assistance.
Sincerely,
Martha S. Campbell,'P.E.
City Engineer
cc:
T. Frame
t�
City of Sebastian
1225 MAIN STREET 0 SEBASTIAN, FLORIDA 32958
TELEPHONE (561) 589-5330 n FAX (561) 589-2566
MEMORANDUM
DATE: July 24,1998
TO:- Terry O'Brien, IRC - Attorney's Office
FROM: Martha S. Campbell, P.E. City Engineerca-S . fx
i
SUBJECT: Interlocal Agreement - Barber Street Bridge
The City of Sebastian wishes to enter into an interlocal agreement with
Indian River County to provide Transportation Impact Fee funding for the
construction of Barber Street Bridge. It is requested that your office draft
such an agreement for our review.
The agreement should have the following stipulations:
1. The City agrees to design and construct widening and safety
improvements for Barber Street Bridge over Elkcam waterway.
2. The County agrees to provide impact fee funding for design and
construction.
3. The City will provide proposals and bids prior to subcontracting for
design and construction.
4. The City agrees to provide County designs for County review prior to
construction.
5. The County agrees to provide $35,000 for design.
6. The County agrees to provide $100,000 for construction.
7. These values may be amended with mutual agreement.
Thank you for helping with this matter. I'm sure Mr. Davis, IRC Public
Works Director will have input into this agreement, therefore, please feel
free to get his comments. If you have any questions or concerns, please let
me know. We would like to have this agreement for Council sometime in
September 1998.
Cc:
T. Frame
INTERLOCAL AGREEMENT
between
INDIAN RIVER COUNTY, FLORIDA
and
CITY OF SEBASTIAN, FLORIDA
This Interlocal Agreement, entered into this day , 1998, by
ZUG
and between INDIAN RIVER COUNTY, FLORIDA, a political subdivision -of the state of
Florida, hereinafter referred to as COUNTY, and the CITY OF SEBASTIAN, FLORIDA, a
municipal corporation of the State of Florida, hereinafter referred to as CITY, for the purpose
of road improvements.
WITNESSETH:
WHEREAS, the COUNTY and CITY agree that widening and safety improvements
to the Barber Street Bridge are in the public interest; and
WI -AREAS, the use of impact fees would facilitate this needed improvement; and
WHIF-REAS, an undertaking of this nature is in keeping with the "Florida Interlocal
Cooperation Act of 1969" as set forth in Chapter 163, F.S.
NOW, THEREFORE, in consideration of the mutual terms, conditions, promises,
covenants and premises hereinafter set forth and pursuant to the statutory authority contained
in Chapter 163, F.S., the COUNTY and CITY agree as follows:
1. The CITY agrees to design and construct widening and safety improvements for
Barber Street Bridge over Elkcam waterway.
2. The COUNTY agrees to provide impact fee funding for design and construction.
3. The CITY will provide proposals and bids prior to subcontracting for design and
construction.
4. The CITY agrees to provide COUNTY designs for COUNTY review prior to
construction.
5. The COUNTY agrees to provide $135,000 for design and construction. These
values may be amended with mutual agreement.
6. The resulting bridge widening will provide at least two additional through traffic
lanes and/or one additional left tum lane that effectively provides left turn
storage/transition for connecting roadways so that additional roadway capacity is
provided.
7. The bridge after widening will have an effective design life of at least twenty years
after completion.
8. The bridge shall meet current DOT safety, loading, and geometric standards after
widening and rehabilitation is complete.
9. The resulting bridge will contain pedestrian facilities.
IN WITNESS WHEREOF, the parties hereto have caused this interlocal agreement to
be executed by their duly authorized officials on the day and year first written above.
ATTEST CITY OF SEBASTIAN
/ B(:4y
rk
INDIAN RIVER COUNTY
BOARD OF COUNTY COMMISSIONERS
:4
r
Indian River County s ?peroved
Dote
•:; �•:� :�u. i i
1Q 3v
1
s
�.-. 1.
Divisicfi
y
IZT
City of Sebastian
1225 MAIN STREET 0 SEBASTIAN, FLORIDA 32958
TELEPHONE (561) 589-5490 ❑ FAX (561) 589-6209
March 17, 1999
Mr. Jim Davis
Indian River County
1840 250' Street
Vero Beach, FI 32958
RE: Barber Street Bridge Widening
Dear Mr. Davis:
In accordance with our Interlocal Agreement for the Barber Street Bridge repairs, please
find attached 90% completed drawings for the improvements for your review and comments.
Your comments and concerns would be appreciated as soon as possible. Should you
have any questions or need any further information, please feel free to contact me.
Sincerely,
Martha S. Campbell, P.E.
City Engineer
MSCAk
City of Sebastian
1225 MAIN STREET 0 SEBASTIAN, FLORIDA 32958
TELEPHONE (561) 589-5490 o FAX (561) 589-6209
November 12, 1999
Mr. James Davis
Director of Public Works
Indian River County
1840 25th Street
Vero Beach, FL 32960-3394
Re: Barber St. Bridge Widening
Dear Mr. Davis:
The plans for Barber Street Bridge widening have been finalized and are 100% complete. The
project is now ready for bid. There have been two reviews by the County and believe the
enclosed drawings reflect all of the comments made. During the review process, the scope of
the project was more fully defined, providing for three 11' lanes, an 8' shoulder and 6'
sidewalk that meet an ultimate 5 lane design width. The construction estimate at the 100%
design complete stage is $274,415. Therefore, the interlocal agreement will need to be
modified to reflect the current project cost estimates.
It is assumed that the funding from this transportation impact fee area would be available for
an anticipated Spring/Summer 2000 construction. As we are anxious to proceed with the
project, bids will be solicited, however, not awarded until a modified agreement is executed.
Then, it would be possible to have actual contractor bid figures to insert into the interlocal
agreement. It is hoped that this procedure is acceptable.
Thanking you in advance for your consideration and affirmative concurrence.
Sincerely,
Martha S. Campbell, P.E.
City Engineer
Enclosure: Plans & Estimates
cc:
City Manager
BOARD OF COUNTY COMMISSIONERS
1840 25th Street, Vero Beach, Florida 32960
Telephone: (561 ) 567-8000
November 18, 1999
Ms. Martha Campbell, P.E.
City Engineer
City of Sebastian
1225 Main Street
Sebastian, FL. 32958
Subject: Barber Street Bridge Widening
Ref. Letter: M.S. Campbell to James Davis dated Nov. 12, 1999
Dear Martha:
As we discussed in our meeting with Terrence Moore, City Manager, yesterday, there are not
sufficient funds in the District 3 Traffic Impact Fee fund for allocating $274,415 to the Barber Street
bridge widening and also proceeding with Phase 3 of the CR512 Widening between Roseland Road
and CR510 (approximately $2.5 million). We discussed jointly preparing a recommended 5 -year or
10 -year plan to address both the CR512 project and Barber Street project. I stand ready to assist.
It was suggested that $2 million/mile would be a good preliminary budget for Barber Street, assuming
that the existing right of way is sufficient.
Please contact me if your understanding is different.
Sincerely,
C�-
James W. Davis, P.E.,
Public Works Director
JWD:rt
cc: Terrence Moore, City Manager
Robert M. Keating, AICP, Director, Community Development
FAPubric Wor1a\Rebem\data"\barber st bridge. nov