HomeMy WebLinkAboutPermit# 4-061-0088M3WATER
D
DISTRICT
NOVEMBER 9, 1993
HENRY A. FISCHER, D.D.S.
P.O. BOX 730068
SEBASTIAN, FL 32978
Henry Dean, txecutive —
John R. Wehle, Assistant Executive Director
POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429
TELEPHONE 90413294500 SUNCOM 90418604500
FAX (EXECUTIVEILEGAL) 3294125 (PERNI15 (ADMINISTRATIOWFINANCE) 329-1509
FIELDSTAT
7775 Baymeadows Way PERMITTING: OPERATIONS:
819 E. South Street 305 East Drhm 2133 N. Wkknem Road
Orlando, Florida 32801 Suite 102
4071897-4300 Jacksonville, Florida 32256 Melbourne, Florida 32901 07/2541782 ride 32935-81'9OW30.6270 407t9844940
SUBJECT: MANAGEMENT AND STORAGE OF SURFACE WATERS
INDIVIDUAL PERMIT NUMBER 4-061-008BM3
DEAR SIR:
ENCLOSED IS YOUR PERMIT AS AUTHORIZED BY THE GOVERNING BOARD OF THE
ST. JOHNS RIVER WATER MANAGEMENT DISTRICT DN.NDVE143ER 9, 1993.
THIS PERMIT WILL EXPIRE ON NOVEMBER '9. 1998: is
THIS PERMIT IS A LEGAL DOCUMENT AND SHOULD BE KEPT WITH YOUR OTHER
IMPORTANT DOCUMENTS. THE ATTACHED COMPLETION REPORT SHOULD BE FILLED
IN AND RETURNED TO THE PALATKA OFFICE WITHIN THIRTY DAYS AFTER THE
WORK IS COMPLETED. BY SO DOING, YOU WILL ENABLE US TO SCHEDULE A
PROMPT INSPECTION OF THE PERMITTED ACTIVITY.
IN ADDITION TO THE COMPLETION REPORTS YOUR PERMIT ALSO CONTAINS
C040ITIONS WHICH REQUIRE SUBMITTAL OF ADDITIONAL INFORMATION. ALL
. OORMATION SUBMITTED AS COMPLIANCE TO PERMIT CONDITIONS MUST SE
SUBMITTED TO THE PALATKA OFFICE ADDRESS.
PERMIT ISSUANCE DOES NOT RELIEVE YOU FROM THE RESPONSIBILITY'
JF OBTAINING PERMITS FROM ANY FEDERALP STATE AND/OR LOCAL AGENCIES
ASSERTING CONCURRENT JURISDICTION FOR_THIS WORK.
IN THE EVENT YDU SELL YOUR PROPERTYP:THE PERMIT WILL BE
TRANSFERRED TO THE NEW OWNER. IF WE ARE NOTIFIED BY YOU WITHIN
THIRTY DAYS OF THE SALE. PLEASE ASSIST•US IN THIS MATTER SO AS
TO MAINTAIN A VALID PERMIT FOR THE NEW PROPERTY OWNER.
THANK YOU FOR YOUR COOPERATION AND IF THIS OFFICE CAN BE OF ANT
FURTHER ASSISTANCE TO YOU,, PLEASE DO NOT HESITATE TO CONTACT US.
SINCERELY
QUEN JOHN SON, DATA CONTROL TECHNICIAN
PERMIT DATA SERVICES DIVISION
ENCLOSURES: PERMIT WITH CDMPLETION,REPORT
CC: DISTRICT PERMIT FILE
j LORI DOWDY
ll MOSBY AND ASSOCIATES, INC.
N/A
Joe E. Hill, CHAIRMAN Patricia T. Harden, VICE CHAIRMAN J0558 J. PTITUSVILLErrish, III, TREASURER Lenore N.O�GEPSECRETARY
AR
LEESBURG SANFORD De _ nise " - ^^ u lnrlliam:
Reid Hughes Dan Roach William Segal INA BEACH JAC T�
FERNANDMARLAND V
DAITONA BEACH j:�XMblt
I
n
+� ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
POST OFFICE BOX 1429
PALATKAr FLORIDA 32178-1429
PERMIT NO. 4_Q¢1_0Q4$33-
A PERMIT AUTHORIZIN"u:
DATE ISSUED b4YEC12ER _2. 1223-
MODIFICATION OF AN EXISTING SURFACE WATER.MANAGEMENT SYTEM. THE
MODIFICATION WILL INCLUDE THE ENLARGEMENT OF AN EXISTING SAID
MINE.
LOCATIOk:
SECTIDN 17P TDWNSHIP 31 SOUTH. RANGE 39 EAST
INDIAN RIVER COUNTY
ISSUED TO:
(OMER)
HENRY A. FISCHERP D.D.S.
P.O. BOX 780068
SEBASTIAN. FL 32973
)PER4ITTEE AGREES TO HOLD AND SAVE THE ST. JOHNS RIVER WATER MANAGEMENT
DISTRICT AND ITS SUCCESSORS HARMLESS FROM ANY AND ALL DAMAGES. CLAIMS.
OR LIABILITIES dHICH MAY ARISE FROM PERMIT ISSUANCE. SAID APPLICATION.
IACLUDING ALL PLANS AND SPECIFICATIONS ATTACHED THERETO• IS BY REFERENCE
MADE A °ART HEREOF.
THIS PERMIT DOES NOT CONVEY TO PERMITTEE ANY PROPERTY RIGHTS NOR ANY
FIGATS OR PRIVILEGES OTHER THAN THOSE SPECIFIED HEREIN. NOR RELIEVE THE
PERMITTEE FROM COMPLYING WITH ANY LAWi REGULATION OR RERUIREMENT
AFFECTI4G THE RIGHTS OF OTHER BODIES OR AGENCIES.: ALL STRUCTURES AND
WORMS INSTALLED BY PERMITTEE HEREUNDER SHALL REMAIN THE PROPERTY OF THE
PERIITTEE.
THIS PER, -IIT MAY BE REVOKED MODIFIED OR TRANSFERRED AT ANY TIME PURSUANT
TO THE APPROPRIATE PROVISIONS OF CHAPTER 373. FLORIDA STATUTES:
PERMIT IS CONDITIONED UPON:
SEE CONDITIONS ON ATTACHED 'EXHIBIT A'. DATED NOVEMBER 9, 1993
AJT40RIZED 3Y: ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
DEPARTMENT OF RESOURCc IA14AGEMENT GOVERN G �
j tDIREC7 R) LASSETARY)
EFF ELL_ GE HENRYNDEAN
11_xHI3IT A"
C)NDITI)NS FOR IS3UANCE OF PERMIT NUMBER 4-051-0388M3
3 NEVRY A. FISCHER, D.D.S.
DATED NDVEM3ER 9r 1993
1. PRIOR TO _OT )R UVIT 3ALESr OR UPON C)MPL;TIOV OF CONSTRU:TION
OF THE SYSTEM, WHIC4EVER )[CURS FIRST• THE DISTRICT MJST
R:C_IJE TiE FiNAL OPERATI)N AVD MAINTENANCE D)CUMENT(S) A'PROYED.
Ef THE DISTRICT AVD RECORDED, IF THE' LATTER IS APPROPRIATE, FOR
TAOSE SYSTEMS WHICH ARE PROPOSED TO B= MAINTAINED BY :OUNiY OR
MINICIP4L ENTITIES, FINAL OPERATION AND MAINTENANCE DOCUMENTS
MJST 3E RECEIVED 3Y TiE DISTRICT VHEN MAIVTENANCE AND OPERATIDN
OF THE SYSTEM IS ACCEPTED BY THE LOCAL GOVERNMENT ENTITY.
FAILURE TO 'sU3MLT THE APPROPRIATE FINAL D)CUMENT VILL RESJLT IN
TiE PERMIiTEE R-MAIVIVG PERSOVALLY LIABLE FOR CARRYINS OUT
MAINTENANCE AND OPERATION OF THE PERMITTE) SYSTEM -
2. A_L C)NSTRUCTIONP OPERATION AYD MAINTENANCE S4ALL'BE AS SET',
F)RTH IN THE ?LANSr S'ECIFICATIDNS AND PERFORMANCE CRITERIA -
AS APPROVED BY THIS PERMIT.
3. DISTRICT AUTHDRIZED SiAFFr UPON PROPER IDENTIFICATIONr `
WILL HAVE PERMISSION TO EVTERr INSPECT AND OBSERVE THE
SYSTEM TO I4SJRE :OVF)RMITY WIT4 THE 'LAN"P AND SPECIFICATIONS
\ APPROVED 3Y TiE PERMIT.
4. TJR3I)ITY BARRIERS MUST BE INSTALLED AT ALL"LOCATIONS WHERE
TiE P3SSI3ILITY OF TRANSF_RRIVG SJSPEVDED SOLIDS INTO THE
RECEIVING WATERBODY EXISTS DUE TO THE PROPOSE) WOMK. '
TJR3I)ITY BAR3IERS MU57 R_MAIV IN PLACE AT ALL LOLATI)NS
UVTIL CONSTRUCTIOV IS COMPLETED AVD SOILS ARE STA3ILIEED
AVD V_GETATIOV HAS BEEN E3TAB_ISHED. THEREAFTER THE
PERMITTEE WILL BE RESPONSIBLE FOR THE REM)VAL OF THE
BARRIERS.
5. TiE O'ERATION PHASE OF THE PERMIT SHALL N)T BECOME EFFECTIVE
UVTIL A FLORIDA REGISTERE) PR)FESSI)NAL EVGINEER CERTIFIES THAT
A_L,FACILITIES HAVE BEEN CONSTRUCTED IN ACCORDANCE WITH TiE
D_SIGV APPROVED 6Y THE DISTRICT- WITHIN 30 DAYS AFTER COMPLETION
OF COVSTR-JCTI)N OF THE SURFACE 4ATER MANASEMEVT SYSTEMr TiE
PERMITTEE SHALL SJBMIT THE F0_LOWING: C04PLETIDN CERTIFICATION
REPORT SIGNED AVD SEA—ED 3Y TiE P.E.i AND WHEY THE COMPLETED
SYSTEM SU3STA4TIA:LY )IFFERS FROM PERMITTEDPLANS• TW) SETS OF
I R:COPD (AS 3UILT) PLAYS WJICH REFLECT THE SURFACE WATER'
MANAG_M=NT SYSTEM AS ACTUALLY CONSTRUCTED. TRIS SUBMITTAL WILL
SERVE TD VOiIFY TiE DISTRICT STAFF THAT THE FACILITIES ARE READY
F)R IVSPECTIOV AN) APPROVAL. THE PERMIT CANNOT BE TRANSFERRED TO
TiE R=SPOVSIB_E OPERATION AND MAINTENANCE ENTITY APPROVED BY THE
DISTRICT JNiI'_ COVSTRICTI)N OF THE COMPLETED SURFACE /ATEt
MANAGEMENT SYSTEM IS APPR)VED EY THE DISTRICT.
6. I= ANY OTTER REGU_ATORY ASENCY SHOULD REQJIRE REVISIOVS
FICATION T) THE PERMITTED PROJECT, THE DISTRICT IS
02 .MO>I
T) 3E FI: AID OF THE REVLSIO'1S SO THAT A DET_RMIVATION CAN'•
a_ MADE WHETHER A PERMIT MODIFICATION IS REQUIRED.
-0)83M3
7. TIE DISTRICT +UST ?H 40TIFIED. IN WRITING. WITHIN 30 DAYS OF ANY
S1LEi CONVEYA4CE. OR 3THE2 TRANSFER OF A PERMITTED SYSTEM OR
FACILITY )R. WIT4I4 30 DAYS OF ANY TRA4SFER OF OWN'_RSHIP 02
C)NTR)L OF THE REAL PROPERTY AT WHICH THE PERSITTED SfSTEI OR
FACILITY IS LDCATED. ALL TRANSFERS OF OW4ERSIIP OR TRANSFERS OF
A PERMIT ARE SU3JECT TO TIE REQUIRE4E4TS OF CIAPTER 43C-1.
TO REVIEW
8. AiC)PfROFTTHISM?SRMIT•UCONPLETECWITHAALLRA
CONDITIOVSrATTACH9ENTSi
EKHIBITSP AID PERMIT IODIFICATIDNS IN GOOD CONDITION AND POSTED
AT THE SANE LOCATION AS OTHER AGEiICY PERM ITS )N TIE UCTION
SITE. THE COMPLETE PERHIT COPY SHALL BE AVAI'_A3L° FORRREEgVIEW
U204 REQUEST 3Y DISTRICT REPRESENTATIVES.
9. TiIS PERMIT FOR C)NSTRUCTION TILL EXPIRE FIVE YEARS F20A THE
DATE OF ISSUA.4C=.
10. P:RNITTEE MUST SELECT. IMPLEM=NT. AND OPERATE ALL -EROSION AND
S4DIMENPREVENTT �OOVI)LATIONS OFQiATER QUALITYTO ISTANDARDSTASM PIiE
SPECIFIED IN CHAPTERS 17-301. 17-3021 AND 17-4. F.A.C. TAE PERMITTEE
IS ENCOURAGED TO JS= APPROPRIATE 3EST MANAGEMENT PRACTICES FOR
EROSION A4D SEDIMENT CONTROL AS DESCRIBED IN THE FLORIDA _AND.
D=V`_L)PWE4T MANUAL:[ A GUIDE TO SDU4D LAND AND WATER MANA;EMENT
CER. 1983).
R)
p )
TIE OPERATION AHD MAINTENANCE ENTITY SHALL SU3MIT INSPECTION
REPORTS TO THE DISTRICT Ti0 YEARS AFTER TIE OPERATION
PiASE PERMIT 3EC04ES EFFECTIVE AND EVERY TWO fEARS THEREAFTER
OV DISTRICT FDRN EN -45. THE INSPECTION F)RM LUST BE SIGNED
AVD SEALED BY AN APPR)PRIATE REGISTERED PROFESSIONAL.
11. TiIS PERMIT FOR C)NSTROCTION TILL EXPIRE ON JANUARY 9. 1975.
CONDITIONS 12-18 APPLY TO PERMIT #4-061-UORBM
(VICKER'S GROVE SU3DIVISI04):
12. C)NSTRUCTION OR A_TERATI04 OF THE SURFACE WATER MANAGEMENT
SfSTEN MUST BE COMPLETED AND ALL DISTURBED AREAS MUST BE
STABILIZED IN ACC)RDA4CE JITH PER4ITTED PLANS AND PERIIT
C)NDITIONS PRIOR TO ANY OF THE FOLLOWING EVENTS (iHICiEVER
OCCJkS FIRST): I3SUA4CE )F A CERTIFICATE OF )CCUDANCIP USE OF
TIE INFRASTRUCTURE FOR ITS INTE4DED USE, OR TRANSFER )F
R=SD0471BILITY FOR DPERATION AND 14AINTE4A4CE TO A LOCAL
G)VER4MENT DR OTHER R2SPO4SI8_E E4TITY.
13. AT A +IININU4i ALL.RETENTI)N ARD DETENTION STORAGE AREAS MJST 9E
EKCAVATED TO RCJG4 GRADE PRIOR TO BUILDING CO4STRUCTI3N 02
P_ACE4ENT OF !MPERVIOJS SJRFACE WITHI4 THE AREA T) BE SERVED 3Y
TiOSE F4CILITIES. TO PREVENT REDJCTI)N I4 ST)RAGE VO'_UME AND
P7RCO_ATI3N RATES• AL_ ACCUMU_ATED SEDIMENT M'JST 3E REMOVED.FROM
TIE SIORA;E AREA PRIOR TO FINAL GRADING AND STA3ILIZATION.
J8EPF, 3
OOF
14. TIE D6.TA COLLECTE) FOR THE NATER QUALITY 40NITORI4G PQOGRIM'MUST
EE SU3M!TTED TO TIE DISTRICT ANNUALLY BY JANUARY 30 OF EACH YEAR
F)P. TIE PRECEDING CALENDAR YEAR USING THE APPROPRIATE DISTRICT
F)R9 (EN -16-E4-20) )R AN EQUIVALENT F)RMAT APPROVED BY THE,'
DISTRICT STAFF.
15. PRIOR TO SALE OR CONSTRUCTIDN OF THE INDUSTRIAL AVD R=SIDENTIAL
L)TSP THE PER4ITTEE MJST SUBMIT C)NSTRUCTION PLANS FOR THE WATER
DISTP.IBJTI09 SYSTESI I1DICATIN3 THAT TIE WATER SUPPLY IS• FROM AN
OFF-SITE MUNICIPAL SOJRCE.
16. PERMITTEE MUST C04TINJE T) MO'1ITOR THE EXISTING TEST JELLS FOR
CiLDFIDE C04TENTr PHP MAJ)R I)NSr AND MSL WATER E'-EVATIONS
QJARTERLY DURING THE REMAINDER OF THE SAND MINING OPERATI)N AND
DJRINP THE CONSTRJCTI)N AVD OPERATION OF THE SURFACE TATER.
MANAGEMENT SYSTEM. PRIOR TO TAKING SAMPLESr,EACH MONITORING
WELL MUST BE FLUSHED JITH 5 WELL VOLUMES OF WATER.
17. LANDSCAPE IRRIGATION SHAL: BE DONE ON A L)T-BY-LOT BASIS LITH A
MAXIMJM OF )NE 2 -INCH WELL PER LOT. ALL JELLSP WITH THE
E(CEPTION OF THOSE 'JEST OF THE LA(Er SHALL BE INSTALLED.N)
DEEPER THAN TIE T)P OF,THE CLAY CDNFI4ING UNIT IN THE CONSULTANT
REPORT DVERLYING THE TAMIAMI-I4ESTDNE IDENTIFIED (FIGURES 2A
AND 2)P GERAGHTY AND MILLERr MAY 1968).
)1CONDITI04S 16-25 APPLY TO PERMIT #4 -D61 -3038M2
/(VICKER'S PROVE SA0 MINE AND SUBDIVISION):
18. T4IS PERMIT FDR C)NSTRUCTION TILL EXPIRE -3N FEIBRUARY lZ 1996:
19. MININS RUST BE ACCOMP_ISHED BY NET DREDGE ONLY.- IF D=WATERING
IS TO OCCJR WITHI4 THE PR)JECT AREA, A MODIFICATI)N T) THIS
P'_RIIT AND A CONSJMPTIVE JSE PERMIT MJST 3E 03T.AIIED xRIOR TO
AVY DEWATERINS.
2D. TJO NEN M)NIT)R WELLS'SHA_L.1,BE INSTALLED,.AT T4E L)CATIONS OF
EKISTING MONITOR JELLS VH -1 A0' VM -2.' THESE MUST'HAVE 20 FEET
OF SCREEN AND THE 83TTOM )F THE SCREENED INTERVAL MUST BE PLACED
AT THE BASE OF THE ANASTASIA FORMATIOV.
21. 'TIE Tao NEW M)NIT)R W?LLS SHA-L.BE ANALYZED F)UR TI9ES PEI YEAR
F)P. MAJOR I)NS: :HLORIDESr SJLFATEr CALCIUMr MAGNESIJMr SODIUM.
P)TASSIJMr CARBJNiT'_ (FIE -D AVD LAB) AND iICAIBDNATEI PLUS.;
TEMPERATURE (FI=L))r SPECIFIC CONDUCTANCE (FIELD). PH (FIELD AND
LAO). THE MAJOR 101 ANAL(SES MUST 3ALANCE WITHIN 5% 2RIOI TO
SJBMITTAL.
TIE ANALYSES MUST BE CONDJCTE) 3Y AN FDER CERTIFIED LABDRATDRY
AVD TIE RESULTS SUBMITTED TO THE DISTRICT WIT'iI4 15 DAYS )F
R=CETT FROM THE '_A30RATOIY.
22. M)NIT)R w:LLS VM -5 AND VM -7 MIST 3E ANALYLED TWICE PEI YEAR FOR
TIE PAPAMETER LISTED IN C)NDITIDN 2 A30VE AND THE RESJLTS
SJ81ITTED TD THE )ISTRICT'S MEL309RNE OFFICE dITHIN 15 DAIS OF
RECEIPT FROM THE _A30.IAT02Y.
23. WATER LEVELS SHALL 3E MEASURE) IN ALL MONITOR WEL:S`WiEN DATER
GJALITY SAMPLES ARE C)LLE:TED. THESE MUST 3E SUBgITT_D T) THE
DISTRICT'S .ME�_BDUINE )FFI:E ON A QUARTERLY 3ASIS.
24. WATER LEVEL AND WATER QUA-ITY MONITORING SHALL. C04TINJE AS
DESCPI3ED IN CONDITIONS N). 2r 3. AAD 4 FOR A MINIMUM OF 10
YEARS AFTER TIE DATE )F PERMIT EXPIRATION.
25. TIE B)TTOM ELEVATION OF TIE LAKE MUST BE VO DEEPER THAN 43 MSL
OR THE 3OTTOM OF THE ANASTASIA FORMATION OR TIE TOP OF THE
TAMIA'AI F)RMATIONr 4HICHEJER IS S4ALLDWER. TIE PERMITTEE MUST
SJBMIT AS -BUILT P -ANS SIGVED 4ND SEALED BY A FLORIDA IEGISTERED
PROFESSIONAL ENGINEER WITiIN 30 DAYS AFTEI COMPLETIDN OF THE
MININS OPERATION :ERTIFYING TiAT THE 30TT3M E_EVATIDN OF THE
LAKE IS PER PER°IITTEp PLAYS.
:ONDITIONS 25-27 APPLY TO PERMIT #6-061—D088AM3
(VICCEI'S SAND MINE):
26. TIE PROPOSED SURFACE aATER MANAGEMENT SYSTEM MUST BE :ONSTRUCTED
AS PER PLANS RECEIVED BY THE DISTRICT ON SEPTEM3ER 20, 19i3 AVD
O:TOf;ER 4. 19J3.