HomeMy WebLinkAbout1990 10 15 - Transmittal from IRC Utilitiesjr
F',EIVED A Ti 0 2 11990
INDIAN RIVER COUNTY
UTILITIES DEPARTMENT
1840 25TH STREET
VERO BEACH FL, 32960
TO_MASTELLER & MOLER ASSOC., INC.
POST OFFICE BOX 781045
SEBASTIAN, FL 32978-1045
WE ARE SENDING YOU
UTIL (TRANS.FMT)
LETTER OF TRANSMITTAL
DATE: OCTOBER 15, 1990
JOB NUMBER: CDS/CS-367
ATTENTION: STANLEY F. MAYFIELD, P.E.
RE: VICKERS GROVE SUBDIVISION
_X Attached _ Under separate cover via the following items: _ Shop drawings _ Prints
_ Plans _ Samples _ Specifications _ Copy of letter _ Change order
THESE ARE TRANSMITTED AS CHECKED BELOW:
For approval _ Approved as submitted _ Resubmit _copies for approval
% For your use _ Approved as noted _ Submit _copies for distribution
As requested _ Returned for corrections _ Return `corrected prints
For review and comment
FOR BIDS DUE
PRINTS RETURNED AFTER LOAN TO US
COPY TO: SIGNED/st
IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE JOSE A2
PRI TE PROJECT ENGINEER
DEPARTMENT OF UTILITY SERVICES
Telephone: (407) 567-8000
n
BOARD OF COUNTY COMMISSIOAjeRS
1840 25th Street, Vero Beach, Florida 32960
Suncom Telephone: 2241011
Masteller and Moler Associates, Inc. TERRANCE G. PINTO
Post Office Box 781045 DIRECTOR OF UTILITY SERVICES
Sebastian, FL 32978-1045
WATER DISTRIBUTION SYSTEM AND
WASTEWATER COLLECTION/TRANSMISSION SYSTEM
CONSTRUCTION PERMIT
DATE: OCTOBER 15, 1990
PROJECT: VICKERS GROVE SUBDIVISION
PROJECT NO.: CDS/CS-367
ENGINEER OF RECORD: MASTELLER AND MOLER ASSOCIATES, INC.
DESCRIPTION: THESE UTILITIES SYSTEMS ARE BEING DESIGNED FOR
A PROPOSED LAND SUBDIVISION/INDUSTRIAL AREA ON
THE SOUTHEAST SECTION OF THE CITY OF SEBASTIAN
This Utility Construction Permit authorizes the above-named
owner/developer to construct a Water Distribution System and a
Wastewater Collection/Transmission System for the project as shown on
plans by Masteller and Moler Associates, Inc., and approved on October
15, 1990, provided all construction is performed by personnel
currently licensed in the State of Florida to perform such work. All
work is to be performed in accordance with Indian River County
Utilities Standards (December 1989). The limits of construction are
delineated by these plans. This permit shall be valid for a period of
twelve months from the date of issuance and is subject to the following
provisions; this permit does not constitute a permit for operation.
1. The owner or his duly authorized representative shall have a
pre -construction meeting with Indian River County Department of
Utility Services (IRCDUS) a minimum of five working days before
beginning construction.
2. The contractor shall notify Customer Service, IRCDUS, at (407)
567-8000, Extension 462, a minimum of 48 hours prior to beginning
construction or performing any system tests.
3. The Utilities Systems shall be constructed, flushed, disinfected
and tested in accordance with the current IRCDUS Specifications.
4. All equipment, materials, and workmanship shall meet or exceed all
current Indian River County Water and Wastewater Utility Standards
and shall be subject to the unconditional inspection and approval
of the Indian River County Department of Utility Services.
Page two:
A� k
WATER DISTRIBUTION SYSTEM AND
WASTEWATER COLLECTION/TRANSMISSION SYSTEM
CONSTRUCTION PERMIT
DATE: OCTOBER 15, 1990
PROJECT: VICKERS GROVE SUBDIVISION
PROJECT NO.: CDS/CS-367
ENGINEER OF RECORD: MASTELLER AND MOLER ASSOCIATES, INC.
DESCRIPTION: THESE UTILITIES SYSTEMS ARE BEING DESIGNED FOR
A PROPOSED LAND SUBDIVISION/INDUSTRIAL AREA ON
THE SOUTHEAST SECTION OF THE CITY OF SEBASTIAN
5. The Engineering firm shall have a full time, on-site inspector who
shall witness and document all materials used, installation
procedures, problems encountered, and all tests specified by the
Operation Permit checklist. Daily construction reports shall. be
submitted monthly to IRCDUS and no later than seven days after
completion of the construction. Indian River County has
unconditional rights to inspect the construction and materials at
any time.
6. All connections to IRCDUS utility systems and operation of utility
system valves or equipment shall be made under the direct
inspection of personnel from IRCDUS. Where water outages will
occur, a minimum of a 48 hour notice to IRCDUS and the public is
required. A 48 hour notice is required for access to private
property.
7. The property owner, developer, engineering firm, and contractor
shall hold IRC harmless in any suits, claims, and/or liabilities
arisina from subiect construction.
S. Upon completion of construction and prior to placing the utility
system into service, the requirements of the water and wastewater
system checklist shall be satisfied.
9. This Utility Construction Permit does not eliminate the necessity
to obtain a right-of-way permit from Indian River County Public
Works Department or other permits that are required by the Florida
Department of Environmental Regulation or any other county,
state, or federal agencies.
10. No non -approved appurtenances are to be used in this construction.
11. No construction shall begin until all necessary easements, if any,
have been acquired.
Page three
WATER DISTRIBUTION SYSTEM AND
WASTEWATER COLLECTION/TRANSMISSION SYSTEM
CONSTRUCTION PERMIT
DATE: OCTOBER 15, 1990
PROJECT: VICKERS GROVE SUBDIVISION
PROJECT NO.: CDS/CS-367
ENGINEER OF RECORD: MASTELLER AND MOLER ASSOCIATES, INC.
DESCRIPTION: THESE UTILITIES SYSTEMS ARE BEING DESIGNED FOR
A PROPOSED LAND SUBDIVISION/INDUSTRIAL AREA ON
THE SOUTHEAST SECTION OF THE CITY OF SEBASTIAN
If you have any questions, please do not hesitate to contact the
undersigned at telephone (407) 567-8000, Extension 297.
Sincerely/
�.ZP-
E R. D AZ
ivat Projects Engineer
Department of Utility Services
JRD/c
Attachments: 2 sets of Construction Plans
cc: Terrance G. Pinto, Director of Utility Services (w/o attachments)
Board of County Commissioners (w/o attachments)
Stan Boling, Community Development Agency (w/o attachments)
James Davis, Director of Public Works (w/o attachments)
Daniel Burton, Chief Inspector (w/attachments) (2 sets)
(CLOTVGRV.JRD)