Loading...
HomeMy WebLinkAbout1990 10 15 - Transmittal from IRC Utilitiesjr F',EIVED A Ti 0 2 11990 INDIAN RIVER COUNTY UTILITIES DEPARTMENT 1840 25TH STREET VERO BEACH FL, 32960 TO_MASTELLER & MOLER ASSOC., INC. POST OFFICE BOX 781045 SEBASTIAN, FL 32978-1045 WE ARE SENDING YOU UTIL (TRANS.FMT) LETTER OF TRANSMITTAL DATE: OCTOBER 15, 1990 JOB NUMBER: CDS/CS-367 ATTENTION: STANLEY F. MAYFIELD, P.E. RE: VICKERS GROVE SUBDIVISION _X Attached _ Under separate cover via the following items: _ Shop drawings _ Prints _ Plans _ Samples _ Specifications _ Copy of letter _ Change order THESE ARE TRANSMITTED AS CHECKED BELOW: For approval _ Approved as submitted _ Resubmit _copies for approval % For your use _ Approved as noted _ Submit _copies for distribution As requested _ Returned for corrections _ Return `corrected prints For review and comment FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US COPY TO: SIGNED/st IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE JOSE A2 PRI TE PROJECT ENGINEER DEPARTMENT OF UTILITY SERVICES Telephone: (407) 567-8000 n BOARD OF COUNTY COMMISSIOAjeRS 1840 25th Street, Vero Beach, Florida 32960 Suncom Telephone: 2241011 Masteller and Moler Associates, Inc. TERRANCE G. PINTO Post Office Box 781045 DIRECTOR OF UTILITY SERVICES Sebastian, FL 32978-1045 WATER DISTRIBUTION SYSTEM AND WASTEWATER COLLECTION/TRANSMISSION SYSTEM CONSTRUCTION PERMIT DATE: OCTOBER 15, 1990 PROJECT: VICKERS GROVE SUBDIVISION PROJECT NO.: CDS/CS-367 ENGINEER OF RECORD: MASTELLER AND MOLER ASSOCIATES, INC. DESCRIPTION: THESE UTILITIES SYSTEMS ARE BEING DESIGNED FOR A PROPOSED LAND SUBDIVISION/INDUSTRIAL AREA ON THE SOUTHEAST SECTION OF THE CITY OF SEBASTIAN This Utility Construction Permit authorizes the above-named owner/developer to construct a Water Distribution System and a Wastewater Collection/Transmission System for the project as shown on plans by Masteller and Moler Associates, Inc., and approved on October 15, 1990, provided all construction is performed by personnel currently licensed in the State of Florida to perform such work. All work is to be performed in accordance with Indian River County Utilities Standards (December 1989). The limits of construction are delineated by these plans. This permit shall be valid for a period of twelve months from the date of issuance and is subject to the following provisions; this permit does not constitute a permit for operation. 1. The owner or his duly authorized representative shall have a pre -construction meeting with Indian River County Department of Utility Services (IRCDUS) a minimum of five working days before beginning construction. 2. The contractor shall notify Customer Service, IRCDUS, at (407) 567-8000, Extension 462, a minimum of 48 hours prior to beginning construction or performing any system tests. 3. The Utilities Systems shall be constructed, flushed, disinfected and tested in accordance with the current IRCDUS Specifications. 4. All equipment, materials, and workmanship shall meet or exceed all current Indian River County Water and Wastewater Utility Standards and shall be subject to the unconditional inspection and approval of the Indian River County Department of Utility Services. Page two: A� k WATER DISTRIBUTION SYSTEM AND WASTEWATER COLLECTION/TRANSMISSION SYSTEM CONSTRUCTION PERMIT DATE: OCTOBER 15, 1990 PROJECT: VICKERS GROVE SUBDIVISION PROJECT NO.: CDS/CS-367 ENGINEER OF RECORD: MASTELLER AND MOLER ASSOCIATES, INC. DESCRIPTION: THESE UTILITIES SYSTEMS ARE BEING DESIGNED FOR A PROPOSED LAND SUBDIVISION/INDUSTRIAL AREA ON THE SOUTHEAST SECTION OF THE CITY OF SEBASTIAN 5. The Engineering firm shall have a full time, on-site inspector who shall witness and document all materials used, installation procedures, problems encountered, and all tests specified by the Operation Permit checklist. Daily construction reports shall. be submitted monthly to IRCDUS and no later than seven days after completion of the construction. Indian River County has unconditional rights to inspect the construction and materials at any time. 6. All connections to IRCDUS utility systems and operation of utility system valves or equipment shall be made under the direct inspection of personnel from IRCDUS. Where water outages will occur, a minimum of a 48 hour notice to IRCDUS and the public is required. A 48 hour notice is required for access to private property. 7. The property owner, developer, engineering firm, and contractor shall hold IRC harmless in any suits, claims, and/or liabilities arisina from subiect construction. S. Upon completion of construction and prior to placing the utility system into service, the requirements of the water and wastewater system checklist shall be satisfied. 9. This Utility Construction Permit does not eliminate the necessity to obtain a right-of-way permit from Indian River County Public Works Department or other permits that are required by the Florida Department of Environmental Regulation or any other county, state, or federal agencies. 10. No non -approved appurtenances are to be used in this construction. 11. No construction shall begin until all necessary easements, if any, have been acquired. Page three WATER DISTRIBUTION SYSTEM AND WASTEWATER COLLECTION/TRANSMISSION SYSTEM CONSTRUCTION PERMIT DATE: OCTOBER 15, 1990 PROJECT: VICKERS GROVE SUBDIVISION PROJECT NO.: CDS/CS-367 ENGINEER OF RECORD: MASTELLER AND MOLER ASSOCIATES, INC. DESCRIPTION: THESE UTILITIES SYSTEMS ARE BEING DESIGNED FOR A PROPOSED LAND SUBDIVISION/INDUSTRIAL AREA ON THE SOUTHEAST SECTION OF THE CITY OF SEBASTIAN If you have any questions, please do not hesitate to contact the undersigned at telephone (407) 567-8000, Extension 297. Sincerely/ �.ZP- E R. D AZ ivat Projects Engineer Department of Utility Services JRD/c Attachments: 2 sets of Construction Plans cc: Terrance G. Pinto, Director of Utility Services (w/o attachments) Board of County Commissioners (w/o attachments) Stan Boling, Community Development Agency (w/o attachments) James Davis, Director of Public Works (w/o attachments) Daniel Burton, Chief Inspector (w/attachments) (2 sets) (CLOTVGRV.JRD)