Loading...
HomeMy WebLinkAbout1989 10 - Stormwater management reportSTORMWATER MANAGEMENT REPORT FOR VICKERS GROVE SUBDIVISION FOR DR. HENRY A. FISCHER INDIAN RIVER COUNTY FLORIDA October 1989 PREPARED BY: MASTELLER & MOLER ASSOCIATES, INC. POST OFFICE BOX 781045 SEBASTIAN, FLORIDA 32978-1045 (407 ) a89-4800 Sianle�F pfie d, P.E. FL 41997 r NOV 2 0 1989 1 IL AM A GENERAL .. This Stormwater Management Report has been prepared to describe the stormwater facilities to be constructed for treatment and control of stormwater runoff from the proposed Vickers Grove Subdivision. The Vickers Grove Subdivision consists of approximately 117 acres of land west of U.S. Highway #1 and the Florida East Coast Railroad, which is located just north of Vickers Road in Indian River County, Florida. The site may further be described as being located in Section 17, Township 31 South, Range 39 East, in Indian River County. The location of the project site is depicted on a portion of a U.S.G.S. map attached in Appendix. This project will consist of industrial, duplex and single family lots. The project site is currently an active sand mine operation which is permitted under St. Johns River Water Management District MSSW �. permit No. 4-061-0088. This report and supporting p p calculations are intended to modify this existing permit to include the above referenced subdivision. Due to the magnitude of the lake that will be the result ■+ of the land mine operation, all post developed stormwater runoff will be contained on-site and the project will have no formal stormwater outfall. SITE SOILS The project site is situated on the Atlantic Sand Ridge which runs parallel to the East Coast of Florida, just west of U.S. Highway #1. The project site soils have been classified as Astatula Sand (Hydrologic Group A) as indicated on the Map Panel No. 7 by the U.S. Department of Agriculture Soil Conservation Service in their soils survey of Indian River County. As discussed above, the existing site soils are currently being mined due to these soils exhibiting excellent characterictics for use as fill for construction. Prior to initiation of the sand mine operation at the project site, Empire Engineering & Testing performed soil borings which confirmed that the entire upper soil strata at the project site consists of Astatula Sand. Additional data which supports these findings can be found within the on-going Groundwater Monitoring Plan as performed by Geraghty & Miller, Inc., Groundwater Consultants, dated May 1988. At the time the soil boring tests were completed, the groundwater elevation was determined to be elevation +- 14.0 msl, as depicted on a plan of the subject site by Mosby & Associates, Inc., drawing #88-137, dated June 1988. In addition, existing ground surface elevations for the project site ranged from 23.0 to 37.0 msl. As such, the depth to the groundwater is a minimum of nine (9') feet. ON an AO*A r1 FLOOD HAZARD INFORMATION The project site is situated in Zone X, based upon information as depicted on Map Panel 12061C -0079E as prepared by the Federal Emergency .� Management Agency (FEMA), Flood Maps for Indian River County, Florida, dated effective May 4, 1989. EXISTING SITE CONDITIONS For purposes of this report, we consider that the existing conditions of the project site will be the site in its final condition following completion of the permitted sand mine operation. Following completion of the lake to be built under the sand mine operation, it is anticipated that discharge of stormwater runoff from the project site in its pre -development state, will be insignificant due to the large storage volume within the lake and extremely permeable soils throughout �+ the site. M POST DEVELOPMENT CONDITIONS The proposed subdivision site will contain approximately 30 industrial lots, 57 duplex or multi -family lots and 43 single family lots. In order to develop stormwater runoff computations for the proposed subdivision area, we have assumed that industrial and duplex .� lots will be 70% impervious, and single family lots will be 40% impervious. The post developed land uses are tabulated as follows: PROPOSED LAND USE SINGLE FAMILY LOTS 10.7 AC MULTI -FAMILY LOTS 24.1 AC INDUSTRIAL LOTS 12.7 AC LAKE 55.4 AC M ROADWAY 60' R/W 8.5 AC OPEN SPACE M 5.0 AC I1 oom*� STORMWATER COMPUTATIONS In order to provide adequate stormwater treatment and to meet the requirements of the St. Johns River Water Management District, the first 1/2" of rainfall over all developed areas will be retained in a perimeter swale system. The balance of all stormwater runoff will be directed and retained in the interior lake. Treatment volumes, both required and provided, for all drainage sheds are tabulated as follows (refer to the drainage shed map in the accompanying set of plans): TREATMENT VOLUME REQUIRED EXAMPLE CALCULATION: SHED NO. 1 AREA SF = 135,182 REQUIRED VOLUME = 1/2"/(12'/1')*135,182 SF = 5632 CF M SWALE VOLUME PROVIDED USING AVERAGE END AREA METHODS am VOLUME = 6040 CF DRAINAGE AREA SWALE RETENTION SWALE VOLUME SHED NO. SF VOLUME REQ. CF PROVIDED CF 1 135,182 5,632 6,040 2 273,202 11,383 13,087 3 183,975 7,666 7,725 4 154,255 6,427 8,400 5 191,476 7,978 13,200 6 232,401 9,684 12,300 7 242,296 10,125 14,625 8 79,711 3,321 11,250 9 297,343 12,389 12,600 10 171,527 7,147 9,413 11 230,095 9,587 9,750 Aoft� Aaft� STORMWATER MANAGEMENT SYSTEM As indicated previously, the normal water surface elevation of the proposed 55.4 acre lake is anticipated at elevation 14.0 msl. Stormwater computations are included in Appendex "A" to verify that the lake system will have adequate capacity to contain a 100-year/24 hour duration storm event without causing subdivision streets to be inundated. Additionally, the entire storm event will be retained on-site. These computations have been developed based upon soil conservation service stormwater methods described in Technical Release #55, and an assumed curve number of 100 for the lake system. The ^. following post -developed curve numbers were determined using the previously outlined land uses: W POST -DEVELOPED CN SINGLE FAMILY CN = 61 9.2% MULTI -FAMILY CN = 81 20.7,% INDUSTRIAL LOTS CN = 81 10.9% LAKE CN = 100 47.6% ROADWAY 60' R/W CN = 83 7.3% OPEN/COMMON SPACE. CN = 40 4.3% WEIGHTED CN (CN=61)(9.2%)+(CN=81)(20.7%)+(CN=81)(10.9%)+(CN=100)(47.6%)+ (CN=83)(7.3%)+(CN=40)(4.3%) 100% .� CN = 86.6 _ TIME OF CONCENTRATION (POST -DEVELOPED) SWALE PIPE tc = (2000') x (1 min) + (600) X (1 min) + 20 min. initial 42' 150' abstraction = 72 MINUTES .+ REGENERATION OF STORMWATER RETENTION VOLUME As the project site is located on the Atlantic Sandridge and contains soils which are extremely permeable, and due to the tremendous volume of storage provided in excess of the required volumes, it is clear that regeneration of stormwater retention volume need not be considered for this project. Stage -storage data are tabulated as follows: MSL STORAGE STAGE ACRE -FT. 14 - 0 - _ 15 59.2 r. 16 118.5 17 177.7 18 237.0 19 296.2 20 355.5 21 414.7 22 747.0 SUMMARY POST -DEVELOPED ACRES = 116.4 CN = 86.6 to = 72 MIN. TOTAL RAINFALL = 13.0 INCHES PEAK DISCHARGE = 560.66 CFS (to on-site lake) VOLUME RUNOFF AC/FT = INITIAL WATER ELEVATION = PEAK STAGE _ (assuming no percolation) — 109.789 AC/FT 14.0 MSL 15.83 MSL CONCLUSION The Stormwater Management System for the Vickers Grove Subdivision has been designed to provide treatment and controlled stormwater runoff in accordance with the Standards of the City of Sebastian and the St. Johns River Water Management District. Respectfully submitted, OR MASTELLER & MOLER ASSOCIATES -INC.- ., � -=== Stanl F. Mayfield, PSE: =i-.., 4SJ97- M W M m APPENDIX m m m HYDROGRAPH 8Y SCS M�iF. Project VICKER'S GROVE POST -DEVELOPED HYDROGRAPH - 0.75 1.00 Discharge in cfs Date: 09-28-1989 0.00 Time: 15:07:09 0.00 0.00 Volume in ac -ft 0.00 Drainage area in acres 0.00 = 116.40 - Time in hours 1.25 1.50 Runoff curve number 2.00 = 86.60 No Time of concentration in minutes = 72.00 - 0.00 0.00 Volume in ac -ft Total rainfall in inches 0.00 = 13.00 - Storm distribution curve number = 3.00 2.50 Peaking factor, K 3.00 = 484.00 - Peak: discharge in cfs = 560.66 Time of peak discharge in hours = 12.61 .r 1.17 1.86 Volume in ac -ft Volume of runoff in ac - ft = 109.78 Time in hours 0.00 0.25 0.50 0.75 1.00 Discharge in cfs 0.00 0.00 0.00 0.00 0.00 Volume in ac -ft 0.00 0.00 0.00 0.00 0.00 Time in hours 1.25 1.50 1.75 2.00 2.25 No Discharge in cfs 0.00 0.00 0.00 0.00 0.00 Volume in ac -ft 0.00 0.00 0.00 0.00 0.00 Time in hours 2.50 2.75 3.00 3.25 3.50 Discharge in cfs 0.04 0.20 0.58 1.17 1.86 Volume in ac -ft 0.00 0.00 0.01 0.03 0.06 - Time in hours 3.75 4.00 4.25 4.50 4.75 Discharge in cfs 2.57 3.33 4.21 5.22 6.25 Volume in ac -ft 0.11 0.17 0.25 0.34 0.46 Time in hours 5.00 5.25 5.50 5.75 6.00 Discharge in cfs 7.13 7.86 8.61 9.51 10.61 Volume in ac -ft 0.60 0.75 0.92 1.11 1.32 Time in hours 6.25 6.50 6.75 7.00 7.25 Discharge in cfs 11.76 12.85 13.80 14.61 15.48 Volume in ac -ft 1.55 1.80 2.08 2.37 2.68 Time in hours 7.50 7.75 8.00 8.25 8.50 Discharge in cfs 16.64 18.13 19.58 20.96 22.52 Volume in ac -ft 3.02 3.38 3.77 4.18 4.63 9.75 33.13 7.48 11.00 55.69 11.84 12.25 469.04 28.75 13.50 219.40 7"2.51 14.75 74.77 85.64 16.00 45.11 91.57 17.25 34.39 95.57 18.50 26.21 98.83 19.75 24.34 101.49 21.00 20.98 103.83 22.25 19.48 105.90 23.50 16.88 107.78 24.75 9.55 109.35 26.00 0.77 109.73 Time in hours /"q/%F 9.00 9.25 50 Discharge in cfs .4. 3 26.37 28.42 x.65 Volume in ac -ft 5.12 5.64 6.21 6.82 Time in hours 10.00 10.25 10.50 10.75 Discharge in cfs 35.88 39.08 43.18 48.64 Volume in ac -ft 8.19 8.96 9.81 10.76 Time in hours 11.25 11.50 11.75 12.00 Discharge in cfs 65.45 79.33 133.70 277.76 Volume in ac -ft 13.09 14.59 16.79 21.04 Time in hours 12.50 12.75 13.00 13.25 Discharge in cfs 55.98 517.73 402.68 293.40 Volume in ac -ft 39.38 50.52 60.03 67.22 Time in hours 13.75 14.00 14.25 14.50 Discharge in cfs 166.15 130.19 104.87 87.19 Volume in ac -ft 76.50 79.56 81.99 83.97 m Time in hours 15.00 15.25 15.50 15.75 Discharge in cfs 65.81 59.10 53.38 48.78 Volume in ac -ft 87.10 88.39 89.55 90.60 Time in hours 16.25 16.50 16.75 17.00 Discharge in cfs 41.92 39.22 37.03 35.52 Volume in ac -ft 92.47 93.31 94.10 94.85 A Time In hours 17.50 17.75 18.00 18.25 Discharge in cfs 33.38 32.25 30.98 29.61 ,. Volume in ac -ft 96.27 96.95 97.60 98.23 Time in hours 18.75 19.00 19.25 19.50 Discharge in cfs 26.BB 25.82 25.13 24.70 Volume in ac -ft 99.39 99.94 100.46 100.98 Time in hours 20.00 20.25 20.50 20.75 �. Discharge in cfs 23.77 23.01 22.31 21.69 Volume in ac -ft 101.96 102.47 102.93 103.39 Time in hours 21.25 21.50 21.75 22.00 Discharge in cfs 20.28 19.94 19.94 Volume in ac -ft 104.26 104.67 105.08 f1V9.8E 1`•5.50 ^` Time in hours 22.50 22.75 23.00 23.25 Discharge in cfs 19.00 18.51 17.88 17.20 Volume in ac -ft 106.30 106.69 107.06 107.42 Time in hours 23.75 24.00 24.25 24.50 Disc=harge in cfs 16.92 16.78 15.84 13.20 Volume in ac -ft 108.13 108.47 108.81 109.11 Time in hours 25.00 25.25 25.50 25.75 Discharge in cfs 6.13 3.64 2.18 1.31 Volume in ac -ft 109.51 10.3.61 109.67 109.71 Time in hours 26.25 26.50 26.75 Discharge in cfs 0.46 0.27 0.16 Volume in ac -ft 109.74 109.75 109.75 9.75 33.13 7.48 11.00 55.69 11.84 12.25 469.04 28.75 13.50 219.40 7"2.51 14.75 74.77 85.64 16.00 45.11 91.57 17.25 34.39 95.57 18.50 26.21 98.83 19.75 24.34 101.49 21.00 20.98 103.83 22.25 19.48 105.90 23.50 16.88 107.78 24.75 9.55 109.35 26.00 0.77 109.73 AOMWN AM4, Date : 09-28-1989 Project . vicKErL`S SQgpviSIOPi Initial water surface elevation in feet. 14.00 Initial inflow to the reservoir in cfs. 0.00 Initial outflow from the reservoir in cfs. 0.00 Stage -storage relationship for the reservoir �. Stage in feet 14.00 15.00 16.00 Storage in ac -ft. 0.00 59.25 118.50 Stage in feet 18.00 19.00 20.00 .. Storage in ac -ft. 237.00 296.25 355.50 Stage in feet 22.00 2.50 2.75 Storage in ac -ft. 474.00 0.04 0.20 M Time : 15:45:37 Stage -discharge relationship for the reservoir Stage in feet 14.00 18.00 23.00 Discharge in cfs 0.00 0.00 0.00 Inflow hydrograph to the reservoir 17.00 177.75 21.00 414.75 Time in hours 0.00 0.25 0.50 0.75 Discharge in cfs 0.00 0.00 0.00 0.00 ., Time in hours 1.00 1.25 1.50 1.75 Discharge in cfs 0.00 0.00 0.00 0.00 Time in hours 2.00 2.25 2.50 2.75 ^' Discharge in cfs 0.00 0.00 0.04 0.20 Time in hours 3.00 3.25 3.50 3.75 Discharge in cfs 0.58 1.17 1.66 2.57 Time in hours 4.00 4.25 4.50 4.75 Discharge in cfs 3.33 4.21 5.22 6.25 .. Time in hours 5.00 5.25 5.50 5.75 M M Discharge in cfs /"Q/"6 7.86 '"4.61 9.51 Time in hours 6.00 6.25 6.50 6.75 .. Discharge in cfs 10.61 11.7E 12.85 13.81" Time in hours 7.00 7.25 7.50 7.75 Discharge in cfs 14.61 15.48 16.64 18.13 _ Time in hours 8.00 8.25 8.50 8.75 Discharge in cfs 19.58 20.96 22.52 24.38 Time in hours 9.00 9.25 9.50 9.75 Discharge in cfs 26.37 28.42 30.65 33.13 Time in hours 10.00 10.25 10.50 10.75 Discharge in cfs 35.88 39.08 43.18 48.64 Time in hours 11.00 11.25 11.50 11.75 Discharge in cfs 55.69 65.45 79.33 133.70 Time in hours 12.00 12.25 12.50 12.75 Discharge in cfs 277.7E 469.4 559.98 517.73 Time in hours 13.00 13.25 13.50 13.75 Discharge in cfs 402.68 293.40 219.40 166.15 Time in hours 14.00 14.25 14.50 14.75 �+ Discharge in cfs 130.19 104.87 87.19 74.77 Time in hours 15.00 15.25 15.50 15.75 Discharge in cfs 65.81 59.10 53.38 48.78 Time in hours 16.00 16.25 16.50 16.75 Discharge in cfs 45.11 41.92 39.22 37.03 Time in hours 17.00 17.25 17.50 17.75 Discharge in cfs 35.52 34.39 33.38 32.25 Time in hours 18.00 16.25 16.50 18.75 Discharge in cfs 30.98 29.61 28.21 26.86 Time in hours 19.00 19.25 19.50 19.75 Discharge in cfs 25.82 25.13 24.70 24.34 Time in hours 20.00 20.25 20.50 20.75 Discharge in cfs 23.77 23.01 22.31 21.69 Time in hours 21.00 21.25 21.50 21.75 Discharge in cfs 20.98 20.28 19.94 19.94 Time in hours 22.00 22.25 22.50 22.75 Discharge in cfs 19.86 19.48 19.00 18.51 Time in hours 23.00 23.25 23.50 23.75 wo Discharge in cfs 17.88 17.20 16.88 16.92 Time in hours 24.00 24.25 24.50 24.75 Discharge in cfs 16.78 15.84 13.20 9.55 on Time in hours 25.00 25.25 25.50 25.75 M Discharge in c fs ' -.A' s3 3.64 ^t. 18 1.31 Time in hours 26.00 26.25 26.50 26.75 ., Discharge in cfs 0.77 0.4E 0.27 0.16 M on M w MR w w M u M w ., No .. MR OR No No .. No .. MR ON No No No MR ON 2111 OW.,.ft� Routing of hydrograph through the reservoir Time Inflow Stage Outflow Storage (hr.) Ccfs) (ft) Ccfs> (ac.ft) ----------------------------------------------------------------- 0.00 0.00 14.00 0.00 0.0000 0.17 0.00 14.00 0.00 0.0000 0.33 0.00 14.00 0.00 0.0000 0.50 0.00 14.00 0.00 0.0000 0.67 0.00 14.00 0.00 0.0000 0.83 0.00 14.00 0.00 0.0000 1.00 0.00 14.00 0.00 0.0000 1.17 0.00 14.00 0.00 0.0000 1.33 0.00 14.00 0.00 0.0000 1.50 0.00 14.00 0.00 0.0000 1.67 0.00 14.00 0.00 0.0000 1.83 0.00 14.00 0.00 0.0000 2.00 0.00 14.00 0.00 0.0000 2.17 0.00 14.00 0.00 0.0000 2.33 0.01 14.00 0.00 0.0001 2.50 0.04 14.00 0.00 0.0005 2.67 0.15 14.00 0.00 0.0018 2.83 0.33 14.00 0.00 0.0050 3.00 0.58 14.00 0.00 0.0113 3.17 0.98 14.00 0.00 0.0220 3.33 1.40 14.00 0.00 0.0384 3.50 1.8E 14.00 0.00 0.0609 3.67 2.33 14.00 0.00 0.0897 3.83 2.82 14.00 0.00 0.1253 4.00 3.33 14.00 0.00 0.1676 4.17 3.92 14.00 0.00 0.2176 4.33 4.55 14.00 0.00 0.2759 4.50 5.22 14.01 0.00 0.3431 4.67 5.91 14.01 0.00 0.4198 4.83 6.55 14.01 0.00 0.5056 5.00 7.13 14.01 0.00 0.5998 5.17 7.62 14.01 0.00 0.7014 5.33 8.11 14.01 0.00 0.8097 5.50 8.61 14.02 0.00 0.9249 5.67 9.21 14.02 0.00 1.0477 5.83 9.86 14.02 0.00 1.1791 6.00 10.61 14.02 0.00 1.3202 6.17 11.38 14.02 0.00 1.4716 6.33 12.13 14.03 0.00 1.6335 6.50 12.85 14.03 0.00 1.8055 6.67 13.48 14.03 0.00 1.9868 6.83 14.07 14.04 0.00 2.1765 7.00 14.61 14.04 0.00 2.3741 7.17 15.19 14.04 0.00 2.5793 7.33 15.87 14.05 0.00 2.7932 7.50 16.64 14.05 0.00 3.0171 7.67 17.63 14.05 0.00 3.2532 7.83 18.61 14.06 0.00 3.5028 8.00 19.58 14.06 0.00 3.7658 8.17 20.50 14.07 0. ("MN "1 4.0418 8.33 21.48 14.07 0.01 4.3309 8.50 22.52 14.08 0.00 4.6339 .. 8.67 23.76 14.08 0.00 4.9526 B.83 .25.04 14.09 0.00 5.2887 9.00 26.37 14.10 0.00 5.6427 9.17 27.74 14.10 0.00 6.0154 .� 9.03 29.17 14.15 0.00 6.4073 9.50 30.65 14.12 0.00 6.8193 9.67 32.31 14.12 0.00 7.2529 9.83 34.05 14.13 0.00 7.7099 10.00 35.88 14.14 0.00 8.1914 10.17 38.01 14.15 0.00 8.7003 10.33 40.45 14.1E 0.00 9.2407 10.50 43.18 14.17 0.00 9.816E 10.67 46.82 14.18 0.00 10.4364 10.83 50.99 14.19 0.00 11.1099 .. 11.00 55.69 14.20 0.00 11.6446 11.17 62.19 14.21 0.00 12.6564 11.33 70.08 14.23 0.00 13.5674 11.50 79.33 14.25 0.00 14.5964 11.67 115.58 14.27 0.00 15.9387 11.83 181.72 14.30 0.00 17.9862 12.00 277.77 14.36 0.00 21.1508 .. 12.17 405.28 14.44 0.00 25.8550 12.33 499.35 14.54 0.00 32.0853 12.50 559.98 14.66 0.00 39.3809 12.67 531.81 14.79 0.00 '46.9002 12.83 479.38 14.91 0.00 53.8643 13.00 402.68 15.01 0.00 59.9391 .� 13.17 329.83 15.10 0.00 64.9839 13.33 268.73 15.17 0.00 69.1062 13.50 219.40 15.22 0.00 72.4680 13.67 183.90 15.27 0.00 75.2455 .. 13.63 154.16 15.31 0.00 77.5738 14.00 130.19 15.34 0.00 79.5321 14.17 113.31 15.37 0.00 81.2091 14.33 98.98 15.40 0.00 82.6711 14.50 87.19 15.42 0.00 83.9532 14.67 78.91 15.44 0.00 85.0971 14.83 71.78 15.45 0.00 86.1349 15.00 65.81 15.47 0.00 87.0825 15.17 61.34 15.46 0.00 87.9582 15.33 57.20 15.50 0.00 88.774E 15.50 53.38 15.51 0.00 89.5362 15.67 50.32 15.52 0.00 90.22504 15.83 47.56 15.53 0.00 90.9245 16.00 45.11 15.55 0.00 91.5626 16.17 42.98 15.5E 0.00 92.1693 16.33 41.02 15.57 0.00 92.7478 16.50 39.22 15.57 0.00 93.3004 16.67 37.76 15.58 0.00 93.8306 1E.B3 36.52 15.59 0.00 94.3422 17.00 35.52 15.60 0.00 94.8384 .. 17.17 34.76 15.61 0.00 95.3224 17.33 34.05 15.62 0.00 95.7963 17.50 33.38 15.62 0.00 96.2607 17.67 32.63 15.63 0.00 96.7153 17.83 31.83 15.64 0.00 97.1593 18.00 30.98 15.65 0.00 97.5919 " Note: Peak Discharge in cfs = 0.00 Time of Peak Discharge in hours = 0.00 Peak Elevation in feet = -I ."- Time of Peak Elevation in hours = 24.00 M 18.17 30.07 15. G5 0.:-40N ^ 98.0123 18.33 29.14 15.66 0.04• 98.4201 18.50 28.21 15.67 0.00 98.8151 18.67 27.32 15.67 0.00 99.1975 18.83 26.53 15.68 0.00 99.5684 19.00 25.82 15.69 0.00 99.9289 19.17 25.36 15.69 0.00 100.2814 .. 19.33 24.99 15.70 0.00 100.6281 19.50 24.70 15.70 0.00 100.9703 19.67 24.46 15.71 0.00 101.3089 19.83 24.15 15.72 0.00 101.6436 20.00 23.77 15.72 0.00 101.9736 20.17 23.27 15.73 0.00 102.2975 20.33 22.76 15.73 0.00 102.6146 20.50 22.31 15.74 0.00 102.9251 `:x.67 21.90 15.74 0.00 103.2296 20.83 21.45 15.75 0.00 103.5282-' 21.00 10.98 15.75 0.00 103.8204 21.17 20.51 15.76 0.00 104.1062 21.33 20.17 15.76 0.00 104.3863 21.50 19.94 15.77 0.00 104.6626 21.67 19.94 15.77 0.00 104.9373 21.83 19.92 15.78 0.00 105.2118 22.00 19.86 15.78 0.00 105.4857 22.17 19.61 15.78 0.00 105.7575 22.33 19.32 15.79 0.00 106.0256 22.50 19.00 15.79 0.00 106.2695 22.67 18.67 15.80 0.00 106.5489 22.83 18.30 15.80 0.00 106.8035 23.00 17.88 15.81 0.00 107.0527 23.17 17.43 15.81 0.00 107.2959 23.33 17.09 15.81 0.00 107.5336 23.50 16.88 15.82 0.00 107.7676 23.67 16.91 15.82 0.00 108.0003 23.83 16.87 15.83 0.00 108.2330 24.00 16.78 15.83 0.00 108.4648 " Note: Peak Discharge in cfs = 0.00 Time of Peak Discharge in hours = 0.00 Peak Elevation in feet = -I ."- Time of Peak Elevation in hours = 24.00 M