HomeMy WebLinkAbout1986 - Installation InfoL. GENE HARRIS
Mayor
Citti) of Sebastian
POST OFFICE BOX 127 ❑ SEBASTIAN, YtORIDA
TELEPHONE (305) 589f5330
October 10, 1986
TO: Mayor and City Council
FROM: Hector Franco
City Engineer
As per your request fin attached all the paperwork
done in reference to t installation of traffic light
at Schumann and U.S. ghway #1.
Concerning the mayor's specific question the following
are the answers.
Hector A. Franco
City Engineer
1) FDOT operation center at Fort Lauderdale is still
reviewing the project. As of today, Mr. W. Lewis's letter
points out that a small change has to be made to the signal
design and a permit application is needed. County Traffic
Engineer, Michael Orr, will take care of this change.
In addition, there will be required changes on turning lanes
and a detailed cross section of the Schumann Drive -U.S. High-
way #1 intersection. A roadway alteration permit needs to be
filled in. The city will take care of that part.
2) All the Engineering is completed for this project
except for the above minor changes.
3) So far the only money spent is the county preliminary
design cost of $206.71.
4) FDOT at Fort Lauderdale has only two (2) Engineers to
review all the projects coming to this district according to
the information provided by them. Right now, the project
is a little behind schedule. Mr. Michael Orr estimates the
completion date to be around June instead of January or
February 1987 (see Mr. Orr's letter dated March 13, 1986.
He points out past experiences shows him the FDOT is
six (6) months behind schedule in most cases. ;
Finally under the Departments Equipment Procuremed
program for FY86-87 the equipment was ordered from
Tallahassee last month.
Please call if you have additional questions.
cc; Michael Orr
L. Gene Harris
Mayor
City of Sebastian
POST OFFICE BOX 127 ❑ SEBASTIAN, FLORIDA 32958-0127
TELEPHONE (305) 589-5330
October 2, 1986
TO: Hector Franco
City Engineer
FROM: Mayor L. Gene Harris 1
RE: Installation of Traffic Light/Schumann Drive & U.S. #1
Elizabeth H. Reid
City Clerk
Please provide me with the following information concerning the installation
of the traffic light at the intersection of U.S. #1 and Schumann Drive:
LGH/jmt
What has been completed by D.O.T. up until this
point?
Is all engineering completed for this project?
What amount of money has been spent so far?
What is the estimated completion date by
D.O.T. for this project?
Florida
BOB GRAHAM
GOVERNOR
Department of Transportation
THOMAS E DRAWDY
SECRETARY
780 Southwest 24 Street
Fort Lauderdale, Florida 33315-2696
Telephone: 305-524-8621
Mr. Michael Orr, P.E.
Traffic Engineer
Indian River County
1840 - 25 Street
Vero Beach, Florida 32960
Dear Mr. Orr:
Re: Section 88010,
Schumann Drive,
Traffic Signal
October 6, 1986
S.R. 5 (U.S. 1) at
Sebastian -
0CT 4�
n�N
���i4tT'Y.Y` .7ggs
This is in response to your letter of September 5, 1986
with enclosed data.
We have reviewed the data submitted by you and stil'
maintain that two-phase operation is appropriate. Enclosed, lease
find revised signal timing incorporating a two-phase operation.
Upon completion of this plan modification, please submit
three originally signed permit forms with three copies of the
signal plans to Ms. Beth Coe, Florida Department of Transportation
District Permit Office for final approval.
In response to your questions concerning the proper
course of action in obtaining approval for lengthening storage
lanes on S.R. 5, we recommend that you contact Ms. Coe at
Suncom 421-1310.
Sincerely,
William A. Lewis r., P.E.
Assistant District
Traffic Operations Engineer
WAL:hg
e
BOARD OF COUNTY COMMISSIONERS
1840 25th Street, Veru Reach, Florida 32960
Telephone. (7051 507.8000
September 5, 1986
William Lewis, Jr. P.E.
Assistant District Traffic
Operations Engineer
780 S.W. 24th Street
Fort Lauderdale, 33315-2696
Suncom Telephone: 424.1011
Re: Section 88010; State Road 5 at Schumann Drive,
City of Sebastian; Traffic Signal
Dear Mr. Lewis:
Enclosed is a revised plan set for the referenced signal.
Pole B and the span have been relocated and the stop bar
for the westbound approach moved back to provide forty feet
of distance to signal head 8. In addition, traffic counts
obtained for both AM and PM peaks with their left -turn
analyses are enclosed as jusitification for the State Road 5
left -turn phases.
It is my understanding that the equipment for this signal
will be requisitioned by your office through the Equipment
Procurement Program. Please call if you have any questions.
Very truly s,
i ichaelL. Orr,
Traffic Engineer
MLO: rt
cc: Hector Franco, City Engineer
Floridan Department of Transportation
ROR GRAHAM
GOVERNOR THOMASE DRAWDY
SECRETARY
780 Southwest 24 Street
Fort Lauderdale, Florida 33315-2696
Telephone: (305) 524-8621
August 22, 1986 -
Mr. Michael L. Orr
Traffic Engineer
Indian River County
1840 - 25th Street
Vero Beach, Florida 32960
Dear Mr. Orr:
Re: Section 88010; State Road 5 (U.S. 1)
at Schumann Drive,
Sebastian, Indian River County -
Traffic Signal
This is in response to your letter with enclosed signal plans of
May 23, 1986. Please forgive our delay in responding.
We have reviewed your plans and have two comments, as follows:
• Pole A should be moved north in order to develop the minimum 40
feet distance from the east stop bar to signal head 8 & 2.
• Traffic volumes on file in this office do not indicate a
justification for more than two phases at this intersection.
Mr. Toufic Khayat of this office will contact you to confirm
your request for signal equipment as soon as this Fiscal Year's money
is confirmed.
We will provide the necessary authorization for this signal upon
receipt of modified plans and the appropriate permit forms.
Sincerely,
'l ,
William Lewis, Jr., .E.
Assistant Distric
Traffic. Operations Engineer
WAL:hf
City e f ' Sebastian
L. CLINE HARRIS POST OFFICE BOX 127 ❑ SEBASTIAN, FLORIDA 32958-0127 Hector A. Franco
Mayor TELEPHONE (305) 589-5330 City Enyineei
July 16, 1986
TO- MAYOR HARRIS AND CITY COUNCIL
FROM: HECTOR FRANCO
CITY ENGINEER
RE: TRAFFIC SIGNAL SC6RIMANN DRIVE
Please find attached a copy of a letter I received
from Michael Orr,,Traffic Engineer, Indian River County
in answer to my request for an update on this project.
As you can see the plans are in the hands of the FDOT now
and that is the hold up.
Should you have any further questions, please feel
free to contact me.
4
BOARD OF COUNTY COMMISSIONERS
1840 25th Street, Vero Beach, Florida 32960
Telephone: (305) 557-8000
July 15, 1986
Hector Franco
City Engineer
City of Sebastian
P.O. Box 127
Sebastian, Florida 32958-0127
RE: Traffic Signal, SR 5 at Schumann Drive
Dear Mr. Franco:
Suncom Telephone: 424-1011
Plans for the referenced traffic signal are being reviewed
by the FDOT in Ft. Lauderdale. I spoke with Mr. Bill lewis,
Assistant District Traffic Operations Engineer, on July 14
and was advised that their review should be complete by the
end of August.
In addition, funding levels for the Equipment Purchase
Program during FY86-87 have not yet been finalized.
Please call if you have any questions.
Very trulVyours,
Michael L. Orr,
Traffic Engineer
MLO: rt
City of - Sebastian
L. (,ENE HARRIS POST OFFICE BOX 127 ❑ SEBASTIAN, FLORIDA 32958-0127 Hector A. Franco
Mayor TELEPHONE (305) 589.5330 City Engineer
July 9, 1986
Michael Orr
County Administration Building
1890 25th Street
Vero Beach F1 32960
Dear Mr. Orr:
Please advise the a us the Schumann Drive traffic
signal and the es imated co
etion date.
Thank you for your assistance in•this matter.
Sincerely, I\
Hect(/r A. Franco
Cit Engineer
C
r
BOARD OIC COUNTY COMMISSIONERS
1840 251h Street, Vero Beach, Florida 32960
Telephone: (305( 567-6000
May 23, 1986
Mr. E.11 Lewis
Assistant District
Traffic Operations Engineer
780 S.W. 24th Street
Fort Lauderdale, FL. 33315-2696
RE: Section 88010, SR 5 ( U.S. 1)
At Schumann Drive;
City of. Sebasti.an, Indian River County
TRAFFIC SIGNAL
Dear Hill,
Suncom Telephone 424-1011
The City of Sebastian has asked me to be their agent in
constructing the referenced traffic signal. A copy of the
proposed signalizat.ion design is enclosed for your review
and permit application.
It is requested that the material for the signal be provided
through the Department's Equipment Procurement Program for
FY86-87. Please forward the appropriate order forms when
they are ready.
Please call my office at Suncom 424-1234 if you have any
questions.
Very truly,yeuts,
X '
Michael
L. Orr,
Traffic
Engineer
MLO: rt
Enclosures
cc: hector Franco, City Engineer
L. GENE HARRIS
Mayor
City of Sebastian
POST OFFICE BOX 127 ❑ SEBASTIAN, FLORIDA 32958-0127
TELEPHONE (305) 589-5330
May 16, 1986
Michael L. Orr
County Traffic Engineer
Indian River County
1840 25th Street
Vero Beach F1 32960
RE: Traffic Signal Schumann Drive
Dear Mr. Orr:
Thank you for your help in the design of the
traffic light for Schumann Drive.
I have recommended approval of the design to the City
Council and they in turn approved the design at
their last meeting.
Please consider this your authorization to submit the
plan set to the FDOT for review and place an order
for the signal equipment to be furnished by the FDOT
through their FY86-87 procurement program.
Should you havey furthe
hesitate to conta t me.
Very truly yours,
Hecto�y A. Franco
City ngineer
HAT: lk
CC: Mayor Harris
tions, please do not
Hector A. Franco
City Engineer
BOARD OF COUNTY COMMISSIONERS
1840 25th Street, Vero Beach, Florida 32960
Telephone: (305) 587-6000
May 15, 1986
Mr. Ken Roth, Councilman
City of Sebastian
1225 Main Street
Sebastian, F1. 32958
RE: Traffic Signal, US 1 at Schumann Drive
Dear Mr. Roth:
As you requested prior to
Planning Committee, enclosed
improvements related to the
Drive.
Suncom Telephone: e2e-1011
the May 13th Transportation
is a cost estimate for all
signalization of US1/Schumann
Upon approval of the signalization plan sent to Mr. Franco
on April 22, 1986, we can submit the plan set to the FDOT '
for review and place an order for the signal equipment to be
furnished by the FDOT through their FY86-87 procurement
program.
Please call if you have any questions.
Very, truly ys
Michael L. Orr,
Traffic Engineer
MLO: rt
cc: James W. Davis, P.E., Public Works Director
.Hector Franco, City Engineer, City of Sebastian
Cost (estimate)
Item FDO'P Sebastian
Traffic Signal:
Controller Assembly 4,500
Concrete Poles (2) 1,600
Signal Heads (8) 1,400
Head Accessories (8) 1,600
Loop Detectors (8) 800
Loops (17) 2,500
Misc. - Grounding, Cable, Elec.
Service, Span Wire, Labor, etc. 8,000
Guardrail 5,000
Improve Northbound Left -turn Lane 10,000
Modify Schumann Drive 5,000
Totals $9,900 $30,500
rOT — TRRFF( G OFE2n-n0,J5
aQ�p SoOTHwEsT
14. STl Foer 4vaDO&PALIE
FLS 33 a' �-
fit City of Sebastian
_ BOX 127 ❑ SEBASTIAN, FLOBIDA 32958-0127 Hector A. Franco
Mayor TELEPHONE (305) 589- 30 City Engineer
April 28, 1986
TO: Mayor and City Council
FROM: Hector A. Franco
City Engineer
RE: Traffic Signal US dl a Schumann Drive
For your information an further action, please find attached a
letter from Michael L, rr, County Traffic Engineer. The letter is
pelf explandtpry,
I have ,reviewed the design and can recommend the city council to
approve it and authorize the City Engineering Department to follow
all the -required steps in order to complete the project and get the
traffic light installed. It is necessary to point out that this
gxpendi,turp. i:$ included on the federal revenue sharing money.
Telephone: (305) 567.8000
BOARD OF COUNTY COMMISSIONERS
1840 25th Street, Vero Beach, Florida 32960 lj
r .III
NEERcn _
4��///����.'''��yyyy
SunCom Telephone: 424.1011.......
April 22, 1986
Mr. Hector Franco
City Engineer
City of Sebastian
1225 Main Street
Sebastian, F1.'32958
Re: Traffic Signal, US 1 at Schumann Drive
Dear Mr. Franco:
Enclosed is a print of the traffic signal plans for the
intersection of US 1 and Schumann Drive for your review.
The next step is to submit the plans to FDOT Traffic
Operations in Fort Lauderdale and subsequently order the
necessary equipment through the FDOT. Please let us know if
you desire assistance.
Total cost for this project by Indian River County through
preliminary design is $206.71.
Feel free to call me at 567-8000 ext. 234 if you have any
questions.
very truly yo ,
Michael L. Orr,
Traffic Engineer
MLO: rt
cc: Councilman Ken Roth
James W. Davis, P.E., Public Works Director
SUGGESTED BUDGET
FEDERAL REVENUE SHARING
Fiscal Year 1985/1986
REVENUE
Carryover from Previous Year $ 49,253.00
Anticipated Federal Grant 83,000.00
Interest Earned 250,00
$ 132,503.00
EXPENDITURES
Barber St. Fire Substation $ 46,836.00
Library Improvements 3,000.00
Handicapped Improvements 8,000.00
Lift, Pad 6 Cover for vehicle Maintenance 9,000.00
Traffic Light at Schumann s U.S. 1 25,900.00
Ballfield 25,000.00
Development of Hardee Lake Park (Parking Area) 15,000.00
Administrative Costs 167.00
$ 132,503.00
Jim Gallagher
Mayor
City of Sebastian
POST OFFICE BOX 127 D SEBASTIAN, FLORIDA 32958.0127 Hector A. Franco
TELEPHONE (305) 589-5330 City Engineer
March 20, 1986
T0: Mayor Gene Harris
Police Chief Nappi
Public Works Director,Peltier ✓
From: Hector A. Franco
City Engineer
Please find attached for y94r information a copy of a letter from the
Board of County Commissi0ers regarding the traffic signal at Schumann Drive
and U.S. N1,
Should you have any questions, please feel free to contact me.
9
BOARD OF COUNTY COMMISSIONERS
1840 250s Street, Vero Beach, h7orida 32960
1 ulnphone. 13051 567-UON
March 13, 1986
Vice Mayor Kenneth Roth
City of Sebastian
P.O. Box 127
3(,b,asti:ln, 1'1. 32958-01 2 %
Dear Mr. Roth:
Suncom Tobphone. 171-1011
A proposed schedule
for the Construction a
traffic signal
at
US 1 and Schumann
Drive is offered below.
As approved
by
the Transportation
Planning Committee on March
11
1986,
the
['raffia Engiru:ering
Department will assist
in your
effort
to
construct lite uignal
un a cost 1Jn611B.
Proposed Conutruction Schedule
1986-1907
March -April Design Signal
May -June FDOT Review and Permit
July -October Order Signal Equipment from FDOT
January -February Receive Equipment and Install
Signal.
Please feel free to call my office if you have any
questions.
Very truly yours
Michael L. Orr,
Traffic Engineer
MLO:rt
rc: James W. Ddvis, P.E., Public Works Director
Florida
�I ill l.I1 l.I1PM
Li1VL11NV11
Department of Transportation
780 SOUChWVNL 24 Street
Fort Lauderdale, Florida 33315-2696
Telephone: (305) 524-8621
Honorable .1im CaILagher
Ciry of Sebastial[
11.0. bux 127
Sebastian, Florida 32958-0127
Dear Mayor Callagher:
P VI N P^PPA•
Murch 4, 19135
Re: Sectlou 88UlUl Sit 5 (U.S. 1)
at Schumann Urivc
City of Subastian, Indian River County
Itlil llliS'1' 1'U It TRAFFIC SIGNAL
RECEIVrr) x.16 f
y
This IS In response to your letter of January 15, 1985.
We agree that a traliic Signal Is warranted lit this inter-
section. Uniortuuatuly, FlurLda Uupartmout of 'Transportation
funds are already coumtltted to other projects for the next two
to three years.
There is, however, an alternative method by which a signal
may be acquired. That 1S, Lhrough our 1?qulpntent Procurement
Urogram.
Under this program the Ciry of Sebastian is responsible for
the denigu and hl.aI lhlLloo of the Signal, with the Florida De-
partmeht of TratibpurLaLiuu pruvidiug Lite signal equipment re-
quired.
If the City desires to pursue chis uptlon, we will need a
letter of coumlittment to this installation. in addition it will
be necessary to provide a sketch of the proposed signal design.
Honorable Gallagher
Murch 4, 198
Page Two
11 you have any questluns or couments, please contact this
office.
Sincerely, �l
William A. Lewis, Jr„ P. ,E
AsslsLant D1sLrlct 'traffic`
Operations Engineer
WAL:hu
cc: Mrs. Lenora Barber
Mr. Michaul Orr
SIGNED '-J
DATE SIGNED
CFaEDIFORMJ, 4S 469
POLY PAA (50 SETS) 4P 469
SENO PARTS 1 AND 3 WITH CARBON INTACT. -
PART 3 WILL BB RETURNBD WITH REPLY,
DETACH AND FILE FOR FOLLOW
•
SUBIECT �,,.,. ��
pATE
SIGNED '-J
DATE SIGNED
CFaEDIFORMJ, 4S 469
POLY PAA (50 SETS) 4P 469
SENO PARTS 1 AND 3 WITH CARBON INTACT. -
PART 3 WILL BB RETURNBD WITH REPLY,
DETACH AND FILE FOR FOLLOW