CERTIFICATE OF PROJECT COMPLETION
Date Accepted:
02/28/19
Project Name & #:
BSSC Football Restrooms # A1724
Total Project Expenditures:
$ 153,696.95
Project Location:
Barber Street Sports Complex
Contractor(s): Builder's Showcase / Schulke,Bittle & Stoddard / Misc (see attached)
l7S0-a
Contract Amount(s): $ 135,910.00 / $ 13,088.00 / $ 4,698.95
Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify
that this project is complete.
Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract
as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All
contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the
contractually stipulated period of time. In no way does the issuing of this certificate release the Contractor from
all legal obligations as stipulated in Chapter 713 of the Florida Statutes.
Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the
segment as being complete.
/roject Ma6aager Date
*gicial Buildi(if appfl Is Date
Cc v
�L2 t
'(,(�c QQc�i rrlA
City ct55 Date
PROJECT ID A1724 Barber Street Sports Complex Football Field Restrooms
4/1)2019
DATE
CHECK#
PO#
DESCRIPTION
VENDOR
04/07/17
94594
8043
BSSC Restroom Facility Design (2126/17-0/01/17)
Hoyle, Tanner & Assoc
05/05/17
94726
8043
BSSC Restroom Facility Design (4/2/17-4/29/17)
Hoyle, Tanner& Assoc
06/30/17
95102
8043
BSSC Restroom Facility Design (5/28/17-6/24/17)
Hoyle, Tanner& Assoc
02/26/18
96521
8184
Engineering Services
Schulke, Bittle, & Stoddard
04/16/18
96915
8184
Engineering Services
Schulke, Bittle, & Stoddard
06/05/18
97220
8184
Engineering Services
Schulke, Bittle, & Stoddard
08/02/18
AmEx
Notice of Invitation to Bid
Treasure Coast Newspapers
08/16/18
98151
8184
Engineering Services
Schulke, Bittle, & Stoddard
09/27/18
98151
Engineering Services
Schulke, Bittle, & Stoddard
12/06/18
98218
8566
BSSC Restroom Renovation -work thru 12/5/18
Builders Showcase
01/04/19
98359
8566
BSSC Restroom Renovation - work 12/6/18-01/04/19
Builders Showcase
02/04/19
98521
8566
BSSC Restroom Renovation - work 01105/19-02/04119
Builders Showcase
02/26/19
98690
8566
BSSC Restroom Renovation - work 02/05/19-02/26/19
Builders Showcase
02/26/19
98690
8566
BSSC Restroom Renovation - retainage
Builders Showcase
02/28/19
98758
8666
Engineering Services
Schulke, Bittle, & Stoddard
FY17 FY18 FY19
AMOUNT AMOUNT AMOUNT TOTALS
2,000.00 2,00000
900.00 90000
1.60000 1,600.00
6,312.00 6,31200
778.00 778.00
1,950.00 1,95000
198.95 198.95
2,423.00 2,42300
625.00 62500
32,455.00 32,45500
51,930.00 51,930.00
14,372.00 14,372.00
23,562.00 23,562.00
13,591.00 13,591.00
1,000.00 1.00000
000
4,500.00 12,286.95 136, 910.00 153,696.95
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
SCHULKE, BITTLE & STODDARD, LLC
1717 Indian River Blvd., Suite 201
Vero Beach, FL 32960
Work Authorization No: CSA -2
Project Identification: City of Sebastian Barber Street Recreation Park renovations to existing
bathrooms.
IT IS AGREED to undertake the following work in accordance with the provisions of the Master
Agreement entitled Non -Exclusive Continuing Professional Services Agreement for Engineering Dated
July 20, 2017.
Description of Assignment:
Schulke, Bittle & Stoddard, LLC will provide professional engineering services necessary for the site
development of new improvements to Barber street sports / recreation facility adjacent to the main football
filed, including renovations (primarily cosmetic) to the existing restrooms housed in the existing building
and sidewalk extension to the skate park parking area. The work shall include architectural drawings for the
renovations to the existing bathrooms, and civil drawings for requisite site work.
Work Scope:
• See detailed Scope of Work attached (Exhibit A)
Deliverable:
• Construction plans prepared for building department review, contract procurement, and
construction purposes, approved by the City of Sebastian.
• Contract/bid documents for construction contract procurement purposes
• Construction administration services and construction inspections
Basis of Compensation/Period of Services:
The above referenced Professional Engineering Services for CSA -2 will be performed for a fee not to
exceed the amount of $10,500.00. See Exhibit B for detailed fee schedule.
AGREED:
NT: , �t/�-� CITY OF BASTIAN: U�
Date: —L�Date:
Joetniffin
City Manager
Attest:
Je a-`Villiams,-MMC,'City Clerk
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
I
Cynthia V. Hall, Interim City Attorney
SCOPE OF WORK — EXHIBIT A
General Description
Schulke, Bittle & Stoddard, LLC shall provide engineering services required for the site development of
improvements to Barber Street sports / recreation facility adjacent to the main football filed, including
renovations (primarily cosmetic) to the existing restrooms housed in the existing building to
update/refresh, and to make ADA compliant to the extent feasible and practical. The work will also
include design and permitting of a sidewalk from the existing building to the skate park parking area.
1.0 Preliminary Engineering
Not Applicable. The city has prepared a survey of the site, and has determined the scope of
improvements required at the Barber Street sports / recreation facility. Conceptual Planning and
preliminary engineering is not required and not provided within the scope of services herein.
2.0 Final Engineering
2.1 Existing Building Renovations:
Scope: Design renovations/layout to meet current ADA accessibility (to the extent practical
and feasible), including: new toilet partitions, new floor finish, new paint on walls and
ceiling, replace wall hung laminate vanity counter and sinks/faucets, replacement of toilet
accessories, misc. other as needed.
Architectural Drawings:
1. Floor plan of existing conditions showing items to be demolished.
2. Floor plan of proposed layout showing new work.
3. Room finish schedule showing new interior finishes required.
4. Specifications for new products
Civil Drawings
1. Site plan depicting existing building location and proposed sidewalk extension.
3.0 Permitting
3.1 Construction plans, engineering calculations and reports, and supporting documentation will be
submitted to the appropriate agencies for the following construction permits:
a. St. Johns River Water Management District - exemption
b. City of Sebastian Site Plan
C. City of Sebastian Land Clearing and Tree Removal (if needed)
d. City of Sebastian Building Department — Plan Review
3.2 Follow up with permitting agencies via telephone, e-mail or written correspondence. Review and
address and review comments and revise the plans accordingly. Resubmit as required.
4.0 Contract Administration and Inspections
4.1 Contract procurement
a. In general, SBS will assist the City with bid procurement including assistance in the
preparation of bidding and procurement documents and information for a competitive
public bid. Services may include:
(i) Description of time, place and conditions of bidding and construction
(ii) Assist with preparation of bidding and proposal forms (use standard City forms)
(iii) Assist with preparation of Forms of Agreement — between owner and contractor (use
standard City forms)
Page 1 of 2
(iv) Assist with preparation of Conditions of the Contract — standard, supplementary, and
other special conditions (use standard City forms)
b. SBS will assist the City with Construction Procurement services, including:
(i) Prepare and provide bid sets for competitive bidding
(ii) Coordinate and attend pre-bid meeting; respond to RFI's sent by bidders, and prepare
Addendums / plan modifications, if necessary
(iii) Bid validation
(iv) Assist City in finalizing construction contract
4.2 Construction Administration: SBS will assist the City with the Contract Administration and
Inspections, including: attend progress meetings, review shop drawings and contractors'
submittals, and provide routine inspections to verify the work is proceeding in accordance with
the plans and specifications for the purposes of certification upon completion of the work.
Inspections shall be documented with written reports and digital photographs. SBS will
coordinate the responsibility for document review, meeting attendance, and inspections with civil
engineer, and other consultants. The construction period is estimated to be one (1) month, and
CA and inspection fees have been estimated by SBS based on this time frame, and the tasks
and frequency of services listed below. Anticipated tasks / services include:
a. Coordinate and attend pre -construction meetings (1)
b. Attend progress meetings with contractor (1/wk)
C. Review shop drawings (1)
d. Review contractor's pay requests (3)
e. Periodic inspections of the site work (4 hr wk)
f. Substantial completion inspection / punch list (1)
g. Review as-builts for adequacy and completeness (1)
h. Final inspection / final completion determination (1)
I. Prepare final certification submittals for site permits
Page 2 of 2
FEE SCHEDULE — EXHIBIT B
2.0 Final Engineering
2.1 Existing building Renovations (SBS/ Mathews) $ 3,500.00
3.0 Permitting (SBS/ Mathews) $1,000.00
SUB -TOTAL: $ 4,500.00
4.0 Contract Procurement Administration and Inspections
4.1 Contract Procurement (SBS) $ 2,500.00
4.2 Construction Administration (SBS) $3,000.00
SUB -TOTAL: $ 5,500.00
"Reimbursables Direct Reimbursement
GRAND TOTAL:
$ 500.00 (Estimate)
$10,500.00
Reimbursables will be billed direct to the client at cost or paid direct by the client, and include, surveying,
or other required field tests, prints, copies, mailings/ FedEx, archeological or environmental consultation
and studies, traffic analysis/ consultation, traffic counting, application/permit fees, etc.
Prints - $2.00/sheet
Xerox Copies - $0.15/page
Other Reimbursables — at cost
The city will pay all application and plan review fees directly. This is NOT included in the above listed
estimated reimbursable amount
Invoices shall be submitted monthly, and the invoice amount shall be in proportion to the percentage of
the Scope of Work complete.
All payments must be received by the Engineer within 30 days of the date of an invoice. Any payments
received after said date will be subject to a late interest fee of one and one half percent (1-1/2%) per
month. The client shall be responsible for all attorney's fees, court costs, and related expenses incurred
in the event that payment is not timely made and proceedings are brought by the Engineer to collect
sums owed.
RATE SCHEDULE
The following rates will apply to actual time devoted by Schulke, Bittle & Stoddard, L.L.C. staff to this project
computed to the nearest % hour.
Personnel
Hourly Rate
Principal
$200.00
Project Manager/Engineer
$150.00
Design Tech
$120.00
Construction Manager
$ 85.00
Draftsman
$ 85.00
Inspector
$ 75.00
Clerical
$ 60.00
Page 1 of 1
Z
W
0
Z
W
SORIN,,,,,,,,,,,,,,,,,,,,,,,,,,,.,.,,,,,,,,,
Z
W
0
Z
W
ebQ5�G
1�21e �04 dl
IJP `` ` r
SCHULKE, BITTLE St STODDARD, L.L.C.
JOB
CIVIL & STRUCTURAL ENGINEERING • LAND PLANNING • ENVIRONMENTAL PERMITTING
SHEET NO.
CERTIFICATION OF AUTHORIZATION N0;00008668
CALCULATED BY
DATE
Q Z01-7
TEL 772 / 770-9622 www.sbsengineers.com
Fu 772 / 7749496 1717 INDIAN RIVER BLVD.. SUITE 201
CHECKED BY
DATE
Etua info@sbsengineers.com VERO BEACH, FLORIDA 32960
SCALE
Joseph Griffin IM I
From: Joseph Schulke <jschulke@sbsengineers.com>
Sent: Wednesday, October 04, 2017 5:13 PM
To: Joseph Griffin
Subject: FW: SEBASTIAN SPORTS COMPLEX FEE
Attachments: CSA-2.pdf; PROPOSED PLANS 10-4-17.pdf; SBS FIELD MEASUREMENTS.PDF
Joe—attached is CSA -2 for the bathroom renovations at Barber Street. I have removed the proposed new building, and
now the scope includes only the existing bathroom renovations and add a sidewalk from the building to the skate park
parking lot (design, permitting, bidding and CAI). The fee has been reduced drastically from over $32,000 to around
$10,500.
Also, I have attached a rough sketch of the existing bathrooms, and a conceptual plan of the lay -out which we believe
will be ADA compliant. Take a look at the attached plans showing a rework of the stalls to make them hdcp compliant
with today's codes. I was worried that it would be difficult to get them to work so we spent a little time on it. They seem
to work ok. In both restrooms, the sink in the hdcp stalls are new and will have to be plumbed.
I have eliminated the need for a mechanical / Electrical engineer, since the only new plumbing to be done is the two
sinks and replacement of some existing fixtures.
I'm assuming we will replace the existing lights and fans. Our MEP will give me the product spec number to use for them.
(no fee from them). As long as Wayne does not require a mechanical or electrical engineer's involvement (which I doubt
he would), we should be good with this scope and fee.
Best regards,
Joseph W. Schulke, P.E., LEED AP
Schulke, Bittle & Stoddard LLC
1717 Indian River Boulevard, Ste. 201
Vero Beach, Florida 32960
(772) 770-9622 phone
(772) 770-9496 fax
www.sbsenaineers.com
Connect with us...
PLEASE NOTE:
SCHULKE, BITTLE & STODDARD LLC is providing CAD files to the owner, contractor and/or surveyor for its convenience only.
Only the signed and sealed drawings shall be considered to have pertinent information for the construction of this project.
Your reliance on the attached electronic file(s) is at your sole risk, since electronic files can be corrupted, edited, or may have additional
data within the files that is not pertinent to the final design as reflected In the signed and sealed drawings.
SCHULKE, BITTLE & STODDARD LLC makes no representations or warranties, either express or implied, as to its suitability for any
specific purpose. While we believe this drawing file to be accurate at the time of retrieval, this media and its contents can be easily
altered or corrupted either purposely or inadvertently through any number of sources.
For this reason, SCHULKE, BITTLE & STODDARD LLC, its managers and or employees shall be indemnified and held harmless from any
and all liability that may arise or result from the use of this information by your firm, employees, agents or sub -contractors.
Any use of the file provided herein constitutes acceptance of the provisions stated herein.
The information contained in this email is privileged and confidential and intended for the addressee only. If you are not the intended recipient,