Loading...
HomeMy WebLinkAboutAirport - CSA -3 Taxiway D & E Construction (complete)�BASTI� MUNICIPAL AIRPORT WORK AUTHORIZATION FORM Work Authorization #03 - Sebastian Municipal Airport Construction Management Engineering, Inspection and Services for Taxiways "D" and "E" Construction City Project # FDOT 434633-1 FAA X2617 The City of Sebastian hereby assigns to Infrastructure Consulting & Engineering (ICE), a Sebastian Municipal Airport commissioned consultant, approval to perform the work outlined in the attached Taxiway "D" and "E" Construction Management Services document dated 06/0112017 with respect to the Design and Construct Taxiway "C, D & E" (Phase -1) project at Sebastian Municipal Airport. Description of Assignment: See Attached Scope of Work Basis of Completion / Period of Services: Services shall be provided for a payment not to exceed $177,328.18. Work will commence upon execution of this Work Authorization by the parties and continue in accordance with Exhibit "A" provided in the Scope of Work. Services shall be completed before the specified FAA/FDOT close out deadlines. AGREED as to scope of services, time schedule and budget this 11'' day of October, 2017. CITY OF SEBASTIAN Infrastructure Consulting & Engineering A Florida Municipal Corporation \ By: 2cz—�—Z� _ - - _ _ By: Jos h GrIff n,. City Manager Dou Hambrecht, P.E, Vice President (seal) - Attest; Approved as to Form and Content for Reliance By the City of Sebastian only: Je ette Williams, MMC, City Clerk Cyn— th,Hall, Interim City Attorney Staff Approvals: t f Administrative Services `�- -. `V I ` �`t�- as to budget 1E INFRASTRUCTURE NN$LLENG a [SciHtR... EXHIBIT "A" 9 1 0 0] TAXIWAY "D" AND "E" CONSTRUCTION MANAGEMENT SERVICES Project Description SE�T�AN MUNICIPAL AIRPORT Sebastian Municipal Airport (Airport) and the City of Sebastian (CITY) are planning to construct The estimated construction of this project is approximately $1.9M. This scope and fee for services provided by Infrastructure Consulting and Engineering (ICE) will be for Construction Management Services and Construction Inspection for said project. Construction Inspection shall consist of a full time (50 hours per week) Resident Project Representative (RPR). The construction duration estimated for this project is 180 calendar days. Bidding Services The Consultant shall perform general coordination with the City and Bidders and will: o Maintain project FTP site. Distribute Plans and specifications to potential bidders. o Prepare for and attend the Pre -Bid Conference; o Prepare and distribute addenda as necessary; 06/01/2017 Page A-1 of A-3 o Attend the bid opening; o Assist the City in tabulating and evaluating bids; and o Assist the City for the re -bid of the project if the City rejects the bids for any reason. This work will be performed as an additional service requiring a negotiated contract; o Prepare and submit Grant Application to the FAA; and o Assist in the contract award and preparation of construction contract documents (to the FAA's requirements). Construction Management /Administration Services CONSULTANT'S Engineer will perform general coordination with the CITY, FDOT, FAA, Subconsultants, Contractor, and subcontractors. Engineer will monitor Contractor's progress, ensure Contractor's compliance with Plans and Specification during the construction phase and will: o prepare for and attend the Pre -Construction Conference and prepare meeting minutes; o Preparation of the construction management plan o review shop drawings/ submittals and coordinate subconsultants' review of shop drawings; o maintain submittal log with item status updated continuously; o review pay applications, payrolls, schedules, and DBE expenditure reports; o coordinate Quality Assurance Testing; o review Quality Assurance and Quality Control test results; o make periodic site visits to monitor progress and review any issues with construction; o attend weekly construction progress meetings; o coordinate and/or review and respond to Requests for Information (RFIs); o make clarifications of the construction plans to the Contractor; o interpret the contract for the CITY, RPR, and Contractor; o monitor the construction schedule and the Contractor's progress; o review and prepare change orders, if necessary; o perform final inspection with CITY, RPR(s), Contractor and FAA and / or any other necessary agencies; o perform punchlist completion verification inspection with the CITY; o review record drawings prepared by the Contractor and submit them to the CITY; o review contract closeout documents submitted by the Contractor; o prepare DBE reporting form; o prepare final summation of all Quality Assurance Testing results; o prepare final closeout books for submittal to the CITY, FAA, and FDOT, and o submit final report to FAA and assist CITY with closeout of grant. The CONSULTANT will manage the construction contract for the CITY and maintain project record documentation. The CONSULTANT will bean extension of the CITY, assisting the CITY and providing up to date information on the project as may be needed throughout the project duration. Management of the contract will also include preparing final project documentation including contractor warrantees, release of liens, consent of surety, and other City required forms. Closeout 06/01/2017 Page A-2 of A-3 documents shall also include as-builts, pay requests, change orders, final project quantities and costs, copies of submittals, summation of all ClA testing results, photo logs, and a project narrative. Construction Inspection CONSULTANT will provide one (1) full time Resident Project Representative (RPR) for site work and overall project accountability. The RPR shall: o be on site daily to monitor the progress of the project and be able to assist the Airport Manager for the project when needed; o serve as a direct liaison between the Contractor and the Airport Manager and the Engineer; o coordinate site work and building construction with the part time RPR and Contractors / Subcontractors; o assist with the coordination and scheduling of quality assurance testing for the project; o inspect the site work to verify it is in accordance with the plans and specifications; o notify Engineer of defective work or materials and make recommendation for corrective action(s); o review progress schedules with work completed; o field verify and measure daily quantities for pay requests; o maintain daily project diary, photo log, and record drawings; o review and document siltation device inspections and recommendations; o perform Contractor's employee interviews to meet Davis -Bacon Act (29 CFR Part 5) requirements; o assist the CITY with DBE requirements; o conduct weekly progress construction meetings; and o maintain project records for submittal to the CITY and FAA. Quality Assurance Testing The CONSULTANT shall employ the services of a qualified geotechnical firm to conduct Quality Assurance testing for the project. This will include materials testing for assurance that the Contractor's methods, materials, and techniques have produced a quality finished product that will meet the requirements of the plans and specifications. These tests shall include all requirements to meet FAA, CITY or FDOT specifications including such items as asphalt placement, earthwork and base course density testing, concrete testing, and other tests as required in the contract documents. 06/01/2017 Page A-3 of A-3 EXHIBIT "B" 1E MANHOUR AND FEE ESTIMATE TAXIWAY D AND E INFRASTRUCTURE rmwm..r. a mr,*Mw, CONSTRUCTION MANAGEMENT SERVICES SUMMARY Page- B-2 B-3 B4 Bidding Civil Constr. Inspection RATES HOURS Admin HOURS HOURS ncipal $225.00 0 0 Iject Manager $175.00 11 129 gineer $150.00 22 69 signer $90.00 6 42 chnical Assistant $55.00 31 37 TOTAL HOURS 70 277 LUMP SUM COSTS $7,470.00 $38,740.00 NOT TO EXCEED COSTS NOT TO EXCEED COSTS MANHOURS AND $7,470.00 $38,740.00 $107,360.00 SUBCONSULTANTS TOTAL= Administrative Fee (5%) Expenses $1,000.00 $18,318.18 MUNICIPAL AIRPORT B-5 Project Closeout 4 5 21 20 $4,440.00 $158,01 $1,000.00 LP SUM COSTS $0.00 $0.00 $0.00 $0.00 $0.00 NUMOT TO EXCEED COSTS $19,318.18 $19,318.18 TOTAL LUMP SUM COSTS $7,470.00 $38,740.00 $0.00 $4,440.00 $50,650.00 TOTAL NOT TO EXCEED COSTS $0.00 $126,678.18 $0.00 $126,678.18 CONSTRUCTION MANAGEMENT SERVICES AMOUNT (NTE) _ $177,328.18 06/01/2017 Page B-1 of B-5 EXHIBIT B TAXIWAY D AND E 26 Week Construction Contract CONSTRUCTION MANAGEMENT SERVICES Bidding General Coordination 4 2 6 Maintain project FTP site- Distribute Plans 2 2 4 Prepare Pre -Bid Agenda 3 4 7 Attend Pre -Bid Conference 5 4 9 Prepare Minutes to Pre -Bid 2 3 5 Answers to Bidders/Issue Addenda 5 4 4 13 Attend Bid Opening 4 4 Review Bids for Responsiveness 2 4 6 Certified Bid Tabs 1 1 4 6 Prepare and submit Grant Application 2 4 4 10 Total: 0 11 22 6 31 70 Rate/Hour: $225.00 $175.00 $150.00 $90.00 $55.00 Total Labor: $0.00 $1,925.00 $3,300.00 $540.00 $1,705.00 $7,470.00 Total Civil Construction Administration = $7,470.00 Page B-2 of B-5 EXHIBIT B TAXIWAY D AND E 26 Week Construction Contract CONSTRUCTION MANAGEMENT SERVICES Construction Administration General Coordination with the City General Coordination with the Contractor Coordination with Subconsultants Plan Clarifications Contract Interpretation Monitor Schedule 8 Contractor Progress Prepare FAA Reports Pre -Construction Conference Review Shop Drawings/Submittals Review Pay Applications Review Payrolls, DBE reports, EEO reports Review Quality Assurance Test Results Construction Meetings - Monthly Periodic Site Visits (4) Review and Respond to RFI's Prepare Change Orders Punch List Inspection Final Inspections/ Punch List items Total: Rate/Hour: 10 4 5 19 13 8 4 25 6 4 10 2 3 10 15 4 4 8 3 3 6 6 4 4 4 12 4 8 10 2 24 2 4 3 9 4 1 5 3 18 21 40 40 26 26 2 8 4 4 18 2 2 2 6 8 8 2 18 6 6 12 0 129 69 42 37 277 $225.00 $175.00 $150.00 $90.00 $55.00 Total Labor: $0.00 $22,575.00 $10,350.00 $3,780.00 $2,035.00 $38,740.00 Total Civil Construction Administration = $38,740.00 Page B-3 of B-5 1377R7II7 TAXIWAY D AND E CONSTRUCTION MANAGEMENT SERVICES Construction Inspection (RPR) 26 weeks 1) DIRECT SALARY COSTS Airport Inspector: = 26 Weeks @ 50 Hrs/Week @ $30 per Hour = 2) LABOR X 2.8 Multiplier = TOTAL LABOR (Not to Exceed) _ 3) Per Diem $50/ day = 4) On Site Vehicle use = $800/ month* _ 5) Lodging $2,300/ Month = TOTAL EXPENSES (not to Exceed) = * includes mileage, insurance, wear and tear, maintenance, fuel, oil, engine idling $31,200.00 $87,360.00 $87,360.00 $6,500.00 $4,727.27 $7,090.91 $18,318.18 Page 8-4 of 8-5 EXHIBIT B TAXIWAY D AND E CONSTRUCTION MANAGEMENT SERVICES Project Closeout Orginize Contractors submittals 2 5 4 11 Compile Project Documentation 8 8 16 Organize Closeout Books & Copies 8 8 16 Permit Closeout 2 5 7 Total: 0 4 5 21 20 50 Rate/Hour: $225.00 $175.00 $150.00 $90.00 $55.00 Total Labor: $0.00 $700.00 $750.00 $1,890.00 $1,100.00 $4,440.00 Total Closeout Construction Administration = $4,440.00 Page B-5 of B-5