Loading...
HomeMy WebLinkAbout2004 - Stormwater Credit ApplicationSEBASTIAN STORMWATER UTILITY APPLICATION FOR STORMWATER CREDIT I. Auolicant's Name and Mailing Address• 2. Parcel Identification Number of Subject Property 20-31-39-00004-0000-00001.0 r 3. Type ofdevelooment Commercial water & drainage retention system. Summarize Basis for Requested Credit: Privately built and maintained retention system. * All applications must include any applications and supporting documentation for a stormwater management permit, as well as the permit, from St. John's River Water Management District, a site plan, a boundary survey and, if available, topographical and soil surveys. Additional documentation and data may be needed to adequately review the request. Signature: Received By: Date: l/ //ell Date: Taken: Credit Denied Credit Approved for %, with the following special conditions: Sebastian Stormwater Utility by: Date: acceptance of the credit granted herein, the undersigned agrees to be bound by the special :d above and the general policies of the Sebastian Stormwater Utility. Landowner ate Property Number Search Results LIVING — LKARNING 4 WORKING — PLAYING Vero Beach — Sebastian — Felismere — Indian River Shores — Orchid Parcel Number M 20-31-39-00004-0000-00001.0 Property Information - Year 2001 Location: INDUSTRIAL BLVD SEBASTIAN 32958 Subdivision: FISCHER INDUSTRIAL PARK SUB Use Code: 4800 - Warehousing Improvements: Year Built: 1990 BSF-38,500 GSF-38,788 Land: Total Acres: 3.12 Sale Data: N/A N/A Transaction Code - N/A Deed Type - N/A Just Value: $643,200 ( Land -$99,450 Imp -$471,500 Misc-$72,250) Taxes: $18,946.16 Tax Code: 2 Page 1 of 1 Legal: FISCHER INDUSTRIAL PARK SUB BLK/BLDG : LOT/UNIT : LOT 1 PBI/OR BK: PBI 14-58 Owner Information Owner(s): FISCHER,HENRYA Address: PO BOX 780068 SEBASTIAN FL 32978-0068 Former Owner: Not Available View this Subdivision List Information from Indian River County Property Appraiser's File Real Estate in Indian River County — Property Search Page Living I Learning * Working I Playing The Living Centers: Vero Beach I Sebastian •.n� �thzr Indian River County omim.iniha:er: ice S¢ r.�n The CrossRoads by The Internet Division Q Vetrol Data Systems, Inc. CopyrightO http://ircpa.irene.net/scripts/ircpa/PID_detail.idc 1/28/02 HT_ JOHNS RTVEn WATER r � s MANAGEMENT .3 4i I' 01STRICT May 13, 1997 FISCHER & SONS, INC. ATTN: DR. HENRY A. FISCHER P. 0. BOX 780068 SEBASTIAN, FL 32978 Henry Dean, Executive Director John R. Wehle. Assistant Executive Director POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429 TELEPHONE 904-3294500 SUNCOM 9044604500 TDD 904-3294450 TDD SUNCOM 8604450 FAX (Exeeulive) 3294125 (Legal) 3294485 (Pe0n18ing) 3294315 3294503 SERVICE CENTERS 818 E South Street RIS 6eymaa4. Way PERMITTING: OPERATIONS: Orlando. Florae 32W 1 Sole 102 Ue East Drive 2193 N. Wirkhmn Rand 107.8974300 Jeek. dle. Fbka 322W MN6curne. Fbdda 329W Wocurne. Floado 32935-8100 TOD 407897 -SM 904430-6270 407-98449x0 407-7523100 TDD 90x-44&7900 Too 407-722-5386 TDD 407-752-3102 CP �1 n SUBJECT: Permit Number 4 -061 -0088M5 -ERP Dear Sir: Enclosed is your permit as authorized by the Governing Board of the St. Johns River Water Management District on May 13, 1997. This permit is a legal document and should be kept with your other important documents. The attached MSSW/Stormwater As -Built Certification Form should be filled in and returned to the Palatka office within thirty days after the work is completed. By so doing, you will enable us to schedule a prompt inspection of the permitted activity. In addition to the MSSW/Stormwater As -Built Certification Form, your permit also contains conditions which require submittal of additional information. All information submitted as compliance to permit conditions must be submitted to the Palatka office address. Permit issuance does not relieve you from the responsibility of obtaining permits from any federal, state and/or local agencies asserting concurrent jurisdiction for this work. In the event you sell your property, the permit will be transferred to the new owner, if we are notified by you within thirty days of the sale. Please assist us in this matter so as to maintain a valid permit for the new property owner. Thank you for your cooperation and if this office can be of any further assistance to you, please do not hesitate to contact us. Sincerely, Gloria Lewis, Director Permit Data Services Division Enclosures: Permit with EN form(s), if applicable cc: District Permit File MOSBY & ASSOCIATES, INC. Wtlliam M. Segal. CHAIRW%I Dan Roach, VICECHAIRMAN James T. Swann, TREASURER Otis Mason, SECRETARY :AtiLl•C 7Paa 0448Fd James H. Williams coxv, IAl18TWE Kathy Chinoy Gr'�n A. Greene Patricia T. Harden ST AReid Hughes .,.Jf SOWILLE ;ERG BEAut OGLA SANfbRD DA'RONA BEACH ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Post Office Box 1429 Palatka, Florida 32178-1429 PERMIT NO. 4 -061 -0088M5 -ERP DATE ISSUED May 13, 1997 PROJECT NAME: VICKERS GROVE LAND MINE/SUBDIVISION A PERMIT AUTHORIZING: M AN EXISTING SURFACE WATER MANAGEMENT SYSTEM. THE PROPOSED ODIFICATION W L INCLUDE EXPANSION OF AN EXISTING 95.4 ACRE BORROW PIT TO 107.7 ACRES. LOCAT Section 17, Township 31 South, Range 39 East Indian River County ISSUED TO: (owner) FISCHER & SONS, INC. P. 0. BOX 780068 SEBASTIAN, FL 32978 Permittee agrees to hold and save the St. Johns River Water Management District and its successors harmless from any and all damages, claims, or liabilities which may arise from permit issuance. Said application, including all plans and specifications attached thereto, is by reference made a part hereof. This permit does not convey to permittee any property rights nor any rights or privileges other than those specified herein, nor relieve the permittee from complying with any law, regulation or requirement affecting the rights of other bodies or agencies. All structures and works installed by permittee hereunder shall remain the property of the permittee. This Permit may be revoked, modified or transferred at any time pursuant to the appropriate provisions of Chapter 373, Florida Statutes: PERMIT IS CONDITIONED UPON: See conditions on attached "Exhibit A", dated May 13, 1997 AUTHORIZED BY: St. Johns River Water Management District DepartmenMfesource Mangement By: ]RECTOR) �— JEFF ELLEDGE "EXHIBIT A" CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 4 -061 -0088M5 -ERP FISCHER & SONS, INC. DATED MAY 13, 1997 All activities shall be implemented as set forth in the plans, specifications and performance criteria as approved by this permit. Any deviation from the permitted activity and the conditions for undertaking that activity shall constitute a violation of this permit. This permit or a copy thereof, complete with all conditions, attachments, exhibits, and modifications, shall be kept at the work site of the permitted activity. The complete permit shall be available for review at the work site upon request by Discrict staff. The permittee shall require the contractor to review the complete permit prior to commencement of the activity authorized by this permit. Activities approved by this permit shall be conducted in a manner which do not cause violations of state water quality standards. Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with the guidelines and specifications in chapter 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988), which are incorporated by reference, unless a project specific erosion and sediment control plan is approved as part of the permit, in which the practices must be in accordance with the plan. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment, beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with the specifications in chapter 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988). The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. 5. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than days after the construction activity in that portion of the site has temporarily or permanently ceased. 6. At least 48 hours prior to commencement of activity authorized by this permit, the permitted shall submit District a Construction Commencement Notice Form No. 40C-4.900(3) indicating the actual start date and expected completion date. to the the 7. When the duration of construction will exceed one year, the permittee shall submit construction status reports to the District on an annual basis utilizing an Annual Status Report Form No. 40C-4.900(4). These forms shall be submitted during June of each year. 8. For those systems which will be operated or maintained by an entity which will require an easement or deed restriction in order to provide that entity with the authority necessary to operate or maintain the system, such easement or deed restriction, together with any other final operation or maintenance documents as are required by subsections 7.1.1 through 7.1.4 of the Applicants Handbook: Management and Storage of Surface Waters, must be submitted to the District for approval. Documents meeting the requirements set forth in these subsections of the Applicants Handbook will be approved. Deed restrictions, easements and other operation and maintenance documents which require recordation either with the Secretary of State or the Clerk of the Circuit Court must be so recorded prior to lot or unit sales within the project served by the system, or upon completion of construction of the system, whichever occurs first. For those systems which are proposed to be maintained by county or municipal entities, final operation and maintenance documents must be received by the District when maintenance and operation of the system is accepted by the local governmental entity. Failure to submit the appropriate final documents referenced in this paragraph will result in the permittee remaining liable for carrying out maintenance and operation of the permitted system. 9. Each phase or independent portion of the permitted system must be completed in accordance with the permitted plans and permit conditions prior to the initiation of the permitted use of site infrastructure located within the area served by that portion or phase of the system. Each phase or independent portion of the system must be completed in accordance with the permitted plans and permit conditions prior to transfer of responsibility for operation and maintenance of that phase or portion of the system.to a local government or other responsible entity. 10. Within 30 days after completion of construction of the permitted system, or independent portion of the system, the permittee shall submit a written statement of completion and certification by a registered professional engineer or other appropriate individual as authorized by law, utilizing As Built e Certification Form 40C-1.181(13) or 40C-1.181(14) supplied with this permit. When the completed system differs substantially from the permitted plans, any substantial deviations shall be noted and explained and two copies of as -built drawings submitted to the District. Submittal of the completed form shall serve to notify the District that the system is ready for inspection. The statement of completion and certification shall be based on on-site observation of construction (conducted by the registered professional engineer, or other appropriate individual as authorized by law, or under his or her direct supervision) or review of as -built drawings for the purpose of determining if the work was completed in compliance with approved plans and specifications. As -built drawings shall be the permitted drawings revised to reflect any changes made during construction. Both the original and any revised specifications must be clearly shown. The plans must be clearly labeled as "as -built" or "record" drawing. All surveyed dimensions and elevations shall be certified by'a registered surveyor. The following information, at a minimum, shall be certified on the as -built drawings: A. Dimensions and elevations of all discharge structures including all weirs, slots, gates, pumps, pipes, and oil and grease skimmers; B. Locations, dimensions, and elevations of all filter, exfiltration, or underdrain systems including cleanouts, pipes, connections to control structures, and points of discharge to the receiving waters; C. Dimensions, elevations, contours, or cross-sections of all treatment storage areas sufficient to determine stage -storage relationships of the storage area and the permanent pool depth and volume below the control elevation for normally wet systems, when appropriate; D. Dimensions, elevations, contours, final grades, or cross-sections of the system to determine flow directions and conveyance of runoff to the treatment system; E. Dimensions, elevations, contours, final grades, or cross-sections of all conveyance systems utilized to convey off-site runoff around the system; F. Existing water elevation(s) and the date determined; and G. Elevation and location of benchmark(s) for the survey. 11. The operation phase of this permit shall not become effective until the permittee has complied with the requirements of general condition No. 9 above, the District determines the system to be in compliance with the permitted plans, and the entity approved by the District in accordance with subsections 7.1.1 through 7.1.4 of the Applicants Handbook: Management and Storage of Surface Waters, accepts responsibility for operation and maintenance of the system. The permit may not be transferred to such an approved operation and maintenance entity until the operation phase of the permit becomes effective. Following inspection and approval of the permitted system by the District, the permittee shall request transfer of the permit to the responsible approved operation and maintenance entity, if different from the permittee. Until the permit is transferred pursuant to section 7.1 of the Applicants Handbook: Management and Storage of Surface Waters, the permittee shall be liable for compliance with the terms of the permit. 12. Should any other regulatory agency require changes to the permitted system, the permittee shall provide written notification to the District of the changes prior to implementation so that a determination can be made whether a permit modification is required. 13. This permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations prior to the start of any activity approved by this permit. This permit does not convey to the permittee or create in the permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the permit and chapter 40C-4 or chapter 40C-40, F.A.C. 14. The permittee shall hold and save the District harmless from any and all damages, claims, or liabilities which may arise by reason of the activities authorized by the permit or any use of the permitted system. 15. Any delineation of the extent of a wetland or other surface water submitted as part of the permit application, including plans or other supporting documentation, shall not be considered specifically approved unless a specific condition of this permit or a formal determination under section 373.421(2), F.S., provides otherwise. 16. The permittee shall notify the District in writing within 30 days of any sale, conveyance, or other transfer of ownership or control of the permitted system or the real property at which the permitted system is located. All transfers of ownership or transfers of a permit are subject to the requirements of section 40C-1.612, F.A.C. The permittee transferring the permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to the sale, conveyance or other transfer. V. 17. Upon reasonable notice to the permittee, District authorized staff with proper identification shall have permission to enter, inspect, sample and test the system to insure conformity with the plans and specifications approved by the permit. 18. If historical or archaeological artifacts are discovered at any time on the project site, the permittee shall immediately notify the District. 19. The permittee shall immediately notify the District in writing of any previously submitted information that is later discovered to be inaccurate. 20. This permit for construction will expire five years from the date of issuance. 21. The operation and maintenance entity shall submit inspection reports to the District two years after the operation phase permit becomes effective and every two years thereafter on District form EN -46. The inspection form must be signed and sealed by an appropriate registered professional. 22. The proposed surface water management system must be constructed and operated in accordance with the plans and calculations received by the District on February 20, 1997. 23. All conditions from permit no. 4-061-0088M4 are brought forward except condition #23. WATER Henry Dean, Executive Director MANAGEMENT John R. Wehle, Assistant Executive Director DISTRICT POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429 904/329-4500 SUNCOM 860-4500 FAX 904/329-4508 FEBRUARY 12, 1991 7775 Baymeadows Way 618 E. South Street Suite 102 Orlando, Florida 32801 Jacksonville, Florida 32256 407/894-5423 SEBASTIAN PARTNERSHIP, BFT 904/730-6270 P.O. BOX 68 OPERATIONS: PERMITTING: SEBASTIAN, FL 32958 2133 N. Wickham Road 305 East Drive Melbourne, Florida 32935-8109 Melbourne, Florida 32904 407/254-1761 407/984-4940 SUBJECT: MANAGEMENT AND STORAGE OF SURFACE MATERS PERMIT NUMBER 4-061-0088M2 ENCLOSED IS YOUR PERMIT AS AUTHORIZED BY THE GOVERNING BOARD OF THE ST. JOHNS RIVER MATER MANAGEMENT DISTRICT ON FEBRUARY 12, 1991. THIS PERMIT WILL EXPIRE ON FEBRUARY 12i 1996. THIS PERMIT IS A LEGAL DOCUMENT AND SHOULD BE KEPT WITH YOUR OTHER IMPORTANT DOCUMENTS. THE ATTACHED COMPLETION REPORT SHOULD BE FILLED IN AND RETURNED TO THE PALATKA OFFICE WITHIN THIRTY DAYS AFTER THE WORK IS COMPLETED. BY SO DOING, YOU WILL ENABLE US TO SCHEDULE A PROMPT INSPECTION OF THE PERMITTED ACTIVITY. IN ADDITION TO THE COMPLETION REPORT, YOUR PERMIT ALSO CONTAINS CONDITIONS WHICH REQUIRE SUBMITTAL OF ADDITIONAL INFORMATION. ALL INFORMATION SUBMITTED AS COMPLIANCE TO PERMIT CONDITIONS MUST BE SUBMITTED TO THE PALATKA OFFICE ADDRESS. PERMIT ISSUANCE DOES NOT RELIEVE YOU FROM THE RESPONSIBILITY OF OBTAINING PERMITS FROM ANY fEDERAL, STATE, AND/OR LOCAL AGENCIES ASSERTING CONCURRENT JURISDICTION FOR THIS WORK. IN THE EVENT YOU SELL YOUR PROPERTY, THE PERMIT WILL BE TRANSFERRED TO THE NEW OWNER, IF WE ARE NOTIFIED BY YOU WITHIN NINETY DAYS OF THE SALE. PLEASE ASSIST US IN THIS MATTER SO AS TO MAINTAIN A VALID PERMIT FOR THE NEW PROPERTY OWNER. THANK YOU FOR YOUR COOPERATION AND IF THIS OFFICE CAN BE OF ANY FURTHER ASSISTANCE TO YOU, PLEASE DO NOT HESITATE TO CONTACT US. SIN RELY, awe LACT LIVINGSTON, DATA CONTROL TECHNICIAN DIVISION OF RECORDS LEL ENCLOSURES: PERMIT WITH COMPLETION REPORT Cetndra HoD�(1STR1f"N PE R"TE. PJLTE CHAIRMAN Thomas L. DUrrance, TREASURER Alice J. Weinberg, SECRETARY A AT: MR. ABjElk'WEITMAN DAYTONA BEACH LAKE MARY Minton Ralph E. Simmons Val M. Steele Joseph D. Collins Merritt C. Fore EACH FERNANDINA BEACH MELBOURNE BEACH JACKSONVILLE OCALA ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Post Office Box 1429 Palatka, Florida 32078-1429 ERMIT NO. 4-061-0088M2 PERMIT AUTHORIZING: )CATION: iUED TO: (ovmer) DATE ISSUED FEBRUARY 12, 1991 THE MODIFICATION OF A PERMITTED ON—GOING-SAND MINE OPERATION TO DEEPEN THE MINE FROM 5:1 MSL. NO OTHER MODIFICATION ARE PROPOSED. SECTION 17, TOWNSHIP 31 SOUTH, RANGE. 39 EAST INDIAN RIVER COUNTY SEBASTIAN PARTNERSHIP, BFT P.O'. BOX 68 SEBASTIAN, FL..32958 °ermittee agrees to hold and save the St. Johns River Water Management District and Its successors harmless from any and all damages, claims, of liabilities which may arise from permit issuance. Said application, including all plans and specifications attached thereto, is by reference made a part hereof. This permit does not convey to permittee any property rights nor any rights or privileges other than those specified herein, nor elieve the permittee from complying with any law, regulation or requirement affecting the rights of other bodies or agencies. 411 structures and works installed by permittee hereunder shall remain the property of the permittee. [his Permit may be revoked, modified or transferred at any time pursuant to the appropriate provisions of Chapter 373 or 403, =lorida Statutes and 40C-1, Florida Administrative Codes: 'ERMIT IS CONDITIONED UPON: SEE CONDITIONS ON ATTACHED "EXHIBIT All, DATED FEBRUARY 12, 1991. WTHORIZED BY: St. Johns River Water Management District )epartment of Resource Management ly: Governing Board By; (Assistant Secretary) HENRY DEAN "EXHIBIT A^ CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 4-061-0088MZ SEBASTIAN GENERAL PARTNERSHIP DATED FEBRUARY 12, 1991 1. PRIOR TO LOT OR UNIT SALES, OR UPON COMPLETION OF CONSTRUCTION OF THE SYSTEM, WHICHEVER OCCURS FIRST, THE DISTRICT MUST RECEIVE THE FINAL OPERATION AND MAINTENANCE DOCUMENT(S) APPROVED BY THE DISTRICT AND RECORDED. IF THE LATTER IS APPROPRIATE. FOR THOSE SYSTEMS WHICH ARE PROPOSED TO BE MAINTAINED BY COUNTY OR MUNICIPAL ENTITIES, FINAL OPERATION AND MAINTENANCE DOCUMENTS MUST BE RECEIVED BY THE DISTRICT WHEN MAINTENANCE AND OPERATION OF THE SYSTEM IS ACCEPTED BY THE LOCAL GOVERNMENT ENTITY. FAILURE TO SUBMIT THE APPROPRIATE FINAL DOCUMENT WILL RESULT IN THE PERMITTEE REMAINING PERSONALLY LIABLE FOR CARRYING OUT MAINTENANCE AND OPERATION OF THE PERMITTED SYSTEM. 2. ALL CONSTRUCTION, OPERATION AND MAINTENANCE SHALL BE AS SET FORTH IN THE PLANS, SPECIFICATIONS AND PERFORMANCE CRITERIA AS APPROVED BY THIS PERMIT. 3. DISTRICT AUTHORIZED STAFF, UPON PROPER IDENTIFICATION, WILL HAVE PERMISSION TO ENTER, INSPECT AND OBSERVE THE SYSTEM TO INSURE CONFORMITY WITH THE PLANS AND SPECIFICATIONS APPROVED BY THE PERMIT. 4. TURBIDITY BARRIERS MUST BE INSTALLED AT ALL LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE RECEIVING WATERBODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS MUST REMAIN IN PLACE AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED AND SOILS ARE STABILIZED AND VEGETATION HAS BEEN ESTABLISHED. THEREAFTER THE PERMITTEE WILL BE RESPONSIBLE FOR THE REMOVAL OF THE BARRIERS. 5. THE OPERATION PHASE OF THE PERMIT SHALL NOT BECOME EFFECTIVE UNTIL A FLORIDA REGISTERED PROFESSIONAL ENGINEER CERTIFIES THAT ALL FACILITIES HAVE BEEN CONSTRUCTED IN ACCORDANCE WITH THE DESIGN APPROVED BY THE DISTRICT. WITHIN 30 DAYS AFTER COMPLETION OF CONSTRUCTION OF THE SURFACE WATER MANAGEMENT SYSTEM, THE PERMITTEE SHALL SUBMIT THE FOLLOWING; COMPLETION CERTIFICATION REPORT SIGNED AND SEALED BY THE P.E.; AND WHEN THE COMPLETED SYSTEM SUBSTANTIALLY DIFFERS FROM PERMITTED PLANS, TWO SETS OF RECORD (AS BUILT) PLANS WHICH REFLECT THE SURFACE WATER MANAGEMENT SYSTEM AS ACTUALLY CONSTRUCTED. THIS SUBMITTAL WILL SERVE TO NOTIFY THE DISTRICT STAFF THAT THE FACILITIES ARE READY FOR INSPECTION AND APPROVAL. THE PERMIT CANNOT BE TRANSFERRED TO THE RESPONSIBLE OPERATION AND MAINTENANCE ENTITY APPROVED BY THE DISTRICT UNTIL CONSTRUCTION OF THE COMPLETED SURFACE WATER MANAGEMENT SYSTEM IS APPROVED BY THE DISTRICT. 6. IF ANY OTHER REGULATORY AGENCY SHOULD REQUIRE REVISIONS OR MODIFICATION TO THE PERMITTED PROJECT, THE DISTRICT IS TO BE NOTIFIED OF THE REVISIONS SO THAT A DETERMINATION CAN BE MADE WHETHER A PERMIT MODIFICATION IS REQUIRED. 7. THE DISTRICT MUST BE NOTIFIED, IN WRITING, WITHIN 30 DAYS OF ANY SALE, CONVEYANCE, OR OTHER TRANSFER OF A PERMITTED SYSTEM OR FACILITY OR WITHIN 30 DAYS OF ANY TRANSFER OF OWNERSHIP OR CONTROL OF THE REAL PROPERTY AT WHICH THE PERMITTED SYSTEM OR FACILITY IS LOCATED. ALL TRANSFERS OF OWNERSHIP OR TRANSFERS OF A PERMIT ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 40C-1. 8. THE PERMITTEE MUST REQUIRE THE CONTRACTOR TO REVIEW AND MAINTAIN A COPY OF THIS PERMIT, COMPLETE WITH ALL CONDITIONS. ATTACHMENTS. EXHIBITS. AND PERMIT MODIFICATIONS IN GOOD CONDITION AND POSTED AT THE SAME LOCATION AS OTHER AGENCY PERMITS ON THE CONSTRUCTION SITE. THE COMPLETE PERMIT COPY SHALL BE AVAILABLE FOR REVIEW UPON REQUEST BY DISTRICT REPRESENTATIVES. 4-061-0088M2 CONDITIONS 1-12 APPLY TO PERMIT NUMBERS 4-061-0088 THROUGH 4-061-0088M2: CONDITIONS 13-15 APPLY TO PERMIT NUMBERS 4-061-0088 (VICKERS LAND MINE): 9. THIS PERMIT FOR CONSTRUCTION WILL EXPIRE ON OCTOBER 11, 1993. 10. PERMANENT VEGETATIVE COVER MUST BE ESTABLISHED ON ALL EXPOSED LAND SURFACES WITHIN ONE YEAR FROM THE DATE THE CONSTRUCTION IS COMPLETE. 11. PERMITTEE MUST OBTAIN A GENERAL OR INDIVIDUAL PERMIT FROM THE DISTRICT PRIOR TO BEGINNING CONSTRUCTION OF SUBSEQUENT PHASES OR ANY OTHER WORK NOT SPECIFICALLY AUTHORIZED BY THIS PERMIT. 12. ALL DETENTION. RETENTION AND OUT -FLOW STRUCTURES MUST BE BUILT BEFORE ANY IMPERVIOUS AREA (PAVEMENT) IS PLACED. 13. THE MINING OPERATION MUST BE UNDERTAKEN USING A WET -MINING TECHNIQUE. DEWATERING OF THE MINE IS PROHIBITED. 14. UPLAND STORMWATER TREATMENT MUST BE PROVIDED BEFORE DISCHARGING ANY STORMWATER RUNOFF INTO THE LAKE. 15. REASONABLE ACCESS TO THESE MONITORING WELLS MUST BE PROVIDED TO DISTRICT STAFF IN ORDER TO TAKE READINGS. CONDITIONS 16-21 APPLY TO PERMIT #4-061-0088M (VICKER'S GROVE SUBDIVISION): 16. THIS PERMIT FOR CONSTRUCTION WILL EXPIRE ON JANUARY 9, 1995. 17. CONSTRUCTION OR ALTERATION OF THE SURFACE WATER MANAGEMENT SYSTEM MUST BE COMPLETED AND ALL DISTURBED AREAS MUST BE STABILIZED IN ACCORDANCE WITH PERMITTED PLANS AND PERMIT CONDITIONS PRIOR TO ANY OF THE FOLLOWING EVENTS (WHICHEVER OCCURS FIRST): ISSUANCE OF A CERTIFICATE OF OCCUPANCY, USE OF THE INFRASTRUCTURE FOR ITS INTENDED USE. OR TRANSFER OF RESPONSIBILITY FOR OPERATION AND MAINTENANCE TO A LOCAL GOVERNMENT OR OTHER RESPONSIBLE ENTITY. 18. AT A MINIMUM. ALL RETENTION AND DETENTION STORAGE AREAS MUST BE EXCAVATED TO ROUGH GRADE PRIOR TO BUILDING CONSTRUCTION OR PLACEMENT OF IMPERVIOUS SURFACE WITHIN THE AREA TO BE SERVED BY THOSE FACILITIES. TO PREVENT REDUCTION IN STORAGE VOLUME AND PERCOLATION RATES. ALL ACCUMULATED SEDIMENT MUST BE REMOVED FROM THE STORAGE AREA PRIOR TO FINAL GRADING AND STABILIZATION. 19. THE SURFACE WATER MANAGEMENT SYSTEM MUST BE CONSTRUCTED PER PLANS RECEIVED BY THE DISTRICT ON NOVEMBER 1p 1989. 20. PRIOR TO SALE OR CONSTRUCTION OF THE INDUSTRIAL AND RESIDENTIAL LOTS. THE PERMITTEE MUST SUBMIT CONSTRUCTION PLANS FOR THE WATER DISTRIBUTION SYSTEM INDICATING THAT THE WATER SUPPLY IS FROM AN OFF-SITE MUNICIPAL SOURCE. 21. LANDSCAPE IRRIGATION SHALL BE DONE ON A LOT -BY -LOT BASIS WITH A MAXIMUM OF ONE 2-I4CH WELL PER LOT. ALL WELLS. WITH THE EXCEPTION OF THOSE WEST OF THE LAKE. SHALL BE INSTALLED NO DEEPER THAN THE TOP OF THE CLAY EONFINING UNIT IN THE CONSULTANT REPORT OVERLYING THE TAMIAMI LIMESTONE IDENTIFIED (FIGURES 2A AND 2)r GERAGHTY AND MILLERP MAY 1988). 4-061-0088M2 CONDITIONS 22-30 APPLY TO PERMIT M4 -061-0088M2 (VICKER'S GROVE SAND MINE B SUBDIVISION): 22. THIS PERMIT FOR CONSTRUCTION WILL EXPIRE ON FEBRUARY 12, 1996. 23. THE PROPOSED PROJECT MUST BE CONSTRUCTED AS PER PLANS RECEIVED BY THE DISTRICT ON JULY 31. 1990. 24. MINING MUST BE ACCOMPLISHED BY WET DREDGE ONLY. IF DEWATERING IS TO OCCUR WITHIN THE PROJECT AREA. A MODIFICATION TO THIS PERMIT AND A CONSUMPTIVE USE PERMIT MUST BE OBTAINED PRIOR TO ANY DEWATERING. 25. TWO NEW MONITOR WELLS SHALL BE INSTALLED AT THE LOCATIONS OF EXISTING MONITOR WELLS VM -1 AND VM -2. THESE MUST HAVE 20 FEET OF SCREEN AND THE BOTTOM OF THE SCREENED INTERVAL MUST BE PLACED AT THE BASE OF THE ANASTASIA FORMATION. 26. THE TWO NEW MONITOR WELLS SHALL BE ANALYZED FOUR TIMES PER YEAR FOR MAJOR IONS: CHLORIDES, SULFATE, CALCIUM, MAGNESIUM. SODIUM, POTASSIUM. CARBONATE (FIELD AND LAB) AND BICARBONATE: PLUS. TEMPERATURE (FIELD), SPECIFIC CONDUCTANCE (FIELD), PH (FIELD AND LAB). THE MAJOR ION ANALYSES MUST BALANCE WITHIN 5% PRIOR TO SUBMITTAL. THE ANALYSES MUST BE CONDUCTED BY AN FDER CERTIFIED G LABORATIORY AND THE RESULTS SUBMITTED TO THE DISTRICT WITHIN 15 DAYS OF RECEIPT FROM THE LABORATORY. 27. MONITOR WELLS VM -6 AND VM -7 MUST BE ANALYZED TWICE PER YEAR FOR THE PARAMETERS LISTED IN CONDITION NO. 2 ABOVE AND THE RESULTS SUBMITTED TO THE DISTRICT'S MELBOURNE OFFICE WITHIN 15 DAYS OF RECEIPT FROM THE LABORATORY_ 28. WATER LEVELS SHALL BE MEASURED IN ALL MONITOR WELLS WHEN WATER QUALITY SAMPLES ARE COLLECTED. THESE MUST BE SUBMITTED TO THE DISTRICT'S MELBOURNE OFFICE ON A QUARTERLY BASIS. 29. WATER LEVEL AND WATER QUALITY MONITORING SHALL CONTINUE AS DESCRIBED IN CONDITIONS NO. 2, 3, AND 4 FOR A MINIMUM OF 10 YEARS AFTER THE DATE OF PERMIT EXPIRATION. 30. THE BOTTOM ELEVATION OF THE LAKE MUST BE NO DEEPER THAN - 40 MSL OR THE BOTTOM OF THE ANASTASIA FORMATION OR THE TOP OF THE TAMIAMI FORMATION, WHICHEVER IS SHALLOWER. THE PERMITTEE MUST SUBMIT AS -BUILT PLANS SIGNED AND SEALED BY A FLORIDA REGISTERED PROFESSIONAL ENGINEER WITHIN 30 DAYS AFTER COMPLETION OF THE MINING OPERATION CERTIFYING THAT THE BOTTOM ELEVATION OF THE LAKE IS PER PERMITTED PLANS.