Swale/Ditch Cleaning 2004-2005 Fiscal Year
Street
From
To
Location
Length (ft.)
Easy St
Columbus
Kumquat
East side
621
Backditch
Seagrape
Lime
center
950
Backditch
Lime
Park
center
670
Toledo
Seagrape
Columbus
both sides
4306
Pine
Orange
Hibiscus
both sides
1554
Albatross
Clearmont
2 houses east
both sides
508
Clearmont
Albatross
2 houses north
both sides
462
Capon
Clearmont
Croquet
both sides
2706
Bayfront
Clearmont
Croquet
both sides
2706
Bayharbor
Clearmont
2 houses east
both sides
530
Clearmont
Capon
Bayharbor
East side
445
Clearmont
Bayfront
Bayharbor
West side
225
Croquet
Capon
Bayharbor
West side
445
S. Wimbrow
Faith
2 houses east of S. Easy
both sides
1080
S. Easy
S. Wimbrow
3 houses north of Zane
East side
606
Zane
S. Easy
Jenkins
North side
300
Jenkins
Zane
3 houses north of Zane
West side
346
S. Wimbrow
Del Monte
3 houses east
both sides
578
S. Wimbrow
Keen
3 houses west
North side
448
Faith
Del Monte
bend in road
both sides
1954
Tulip
Laconia
Bevan
South Side
771
Wimbrow
Krogel
South to bend
both sides
1444
Seamist Lane
Lots 19-24
Lots 6-10
both sides
878
George Street
790
Topsail
Landsdown
7 lots one side, 5 on the other
both sides
983
Road Crossing Culverts Replaced FY 2004-05
Bayfront & Clearmont
Bayharbor & Fairfield
Brookedge & Laconia
Breakwater & Clearbrook
Albatross & Clearmont
1325 Clearbrook
Franciscan & Stonecrop
Powerline & Barber
1032 Topsail
Bayfront & Clearbrook
Clearbrook & Brookedge
542 Sanders
500 Feet of 30" & 36" pipe from Grandeur/Larkspur to CR512
1/19/2006
Total 26306 ft.
4.98 mi
S tAgnm a ry
of 2. OU 4 •2V.)T
014L;A 4414trice
I &C'er S
Swale Cleaning 2005 w culverts
Stormwater Quarterly Accomplishment Report
First Quarter FY 2004-05
1. Worked in conjunction with Public works on Hurricane yard waste and
construction debris cleanup. (Frances and Jeanne)
2. Hurricane debris cleanup of major drainage ditches, channels and rear swales to
prevent flow blockage.
3. Installation of temporary drainage culvert to replace Hurricane damaged
(collapsed) culvert on Schumann Drive south of Thunderbird Drive.
4. Replacement of hurricane damaged road -crossing culverts on Seamist, Rosebush
Clearmont at Concho, Clearmont at Cavern, Main St. at Thomas.
5. Completed rear lot line swale rehabilitation between Forester and Doctor Ave
from Barker to Smith.
6. Continued swale rehabilitation in conjunction with new sidewalk installation on
Barber Street between Vocelle and Beard.
7. Continued installation of 36" drainage pipe from Larkspur to CR 512.
(Installation interrupted by hurricanes.)
1/19/2006
Stormwater Quarterly Accomplishments
2nd Qtr FY 04-05
1. Replacement of failing road -crossing culvert on Rosebush @ Seamist and
associated swale rehabilitation, Schumann Drive between Barber and
County Line and Caravan @ Glentry.
2. Replacement of failing road -crossing culvert on Gladiola @ Sunport and
associated swale rehabilitation.
3. Replacement of failing road -crossing culvert on Caravan @ Glentry and
associated swale rehabilitation.
4. Swale rehabilitation on Dewitt, Caravan and Glentry.
5. Swale rehabilitation at 242 South Wimbrow west to Easy Street.
6. Swale rehabilitation on Gallilean from Franciscan to Coral Reef.
7. Swale rehabilitation on Fatima from Gallilean to Stonecrop.
8. Swale rehabilitation on Stonecrop from Sunport to Gladiola.
9. Completed installation of 30" and 36" drainage pipe from Larkspur to CR
512.
10. Routine cleaning maintenance of various road crossings pipes with Vac -
Truck.
11. Coordination with CDM on Stormwater Master Plan projects for the Collier
Creek Canal, Twin Ditches and Middle Stonecrop. CDM submittal of
permit for Twin ditches project.
12. Coordination with WCG for the Davis Street Nutrient Bafflebox Grant
project.
13. Coordination with WCG on Stormwater Master Plan projects for the
Periwinkle wet detention, Lower Stonecrop improvements, Wentworth
road crossing and the Potomac road crossing improvements.
14. Annual mowing of the main drainage channels including Tulip, Watercrest,
Coverbrook, Rolling Hills, Majestic and Crystal Mist areas.
Stormwater Quarterly Accomplishments
3rd Quarter EY 04-05
1. Replacement of failing road -crossing culvert on Laconia and Tulip swale
rehabilitation
2. Replacement of failing road -crossing culvert on Tulip and Seahouse and
associated swale rehabilitation.
3. Replacement of failing road -crossing culvert on South Wimbrow near Delmonte.
4. Replacement of failing road -crossing culvert on Clearbrook and Bayharbor.
5. Replacement of failing road -crossing culvert Coverbrook and Bayharbor.
6. Swale rehabilitation on S. Easy between Zane and S. Wimbrow.
7. Swale rehabilitation on S. Wimbrow Drive between Del Monte and Keen.
8. Swale rehabilitation on Zane and Jennings.
9. Rear ditch rehabilitation between Easy Street and Toledo between Columbus and
Seagrape.
10. Swale rehabilitation on Toledo from Columbus to Seagrape.
11. Pre -permitting meetings with SJRWMD and Army Corp of Engineers.
12. Routine cleaning maintenance of various road crossings pipes with Vac -Truck.
13. Coordination and preparation of alternative options for the Collier Creek Canal
Stormwater Master Plan project including presentations to the residents and City
council.
14. Coordination with CDM for submittal replies to the Request for Additional
Information from SJRWMD permitting process for Stormwater Master Plan Twin
Ditches project.
15. Design drawings and permit application submitted to St. John's River Water
Management District for the Indian River Lagoon Davis Street Nutrient Bafflebox
Grant project.
16. Coordination with WCG on Stormwater Master Plan projects for the Periwinkle
wet detention.
17. Commencement of front swale rehabilitation on Bay Harbor, Helicon, Capon,
Bayfront and cleaning of associated road crossings between Croquet and
Clearmont.
18. Commencement of ditch mowing in Unit #15 upon repair of trackhoe machine.
Stormwater Quarterly Accomplishments
0' Quarter FY 04-05
1. Replacement of failing road -crossing culvert on Brookedge between Clearbrook
and Laconia.
2. Replacement of failing road -crossing culvert on Bayfront Terrace between
Laconia and Clearbrook.
3. Replacement of failing road -crossing culvert on Clearmont between Albatross and
Tulip.
4. Swale rehabilitation rough grading, final grading and sodding at intersection of
Clearmont and Albatross
5. Swale rehabilitation rough grading intersection of Brookedge and Laconia.
6. Final grading and sodding of swales on Jennings and Zane.
7. Swale rehabilitation rough grading, final grading and sodding on Capone Terrace
from Clearmont to Croquet,
8. Swale rehabilitation rough grading, final grading and sodding on Capone Terrace
from
9. Finished sodding on Toledo.
10. Swale rough grading on Helicon
11. Pre -permitting meeting with SJRWMD Biologist.
12. Routine cleaning maintenance of various road crossings pipes with Vac -Truck.
13. Coordination and preparation of alternative options for the Collier Creek Canal
Stormwater Master Plan project including presentations to the residents and City
council.
14. Received confirmation from Florida Department of Environmental Protection of
Grant for Periwinkle Stormwater Project.
15. Ditch mowing units 9, 16
16. Ditch mowing and cleaning from Fairfield to Laconia on Tulip.
17. ditch mowing and cleaning from Tulip to Majestic on Laconia.
18. Ditch mowing and cleaning from Laconia to Stonecrop on Majestic
19. Mowing of all right of ways on main corridors and units 1,2,3,4,5,6,8,10,13,11, 17
20. Right of Way treeline cut back in units 6,8,10,13,