HomeMy WebLinkAbout2004 - 2005 Stormwater Maintenance RecordsStormwater City of Sebastian Swale/Ditch Cleaning 2004-2005 Fiscal Year Street From To Location Length (ft.) Easy St Columbus Kumquat East side 621 Backditch Seagrape Lime center 950 Backditch Lime Park center 670 Toledo Seagrape Columbus both sides 4306 Pine Orange Hibiscus both sides 1554 Albatross Clearmont 2 houses east both sides 508 Clearmont Albatross 2 houses north both sides 462 Capon Clearmont Croquet both sides 2706 Bayfront Clearmont Croquet both sides 2706 Bayharbor Clearmont 2 houses east both sides 530 Clearmont Capon Bayharbor East side 445 Clearmont Bayfront Bayharbor West side 225 Croquet Capon Bayharbor West side 445 S. Wimbrow Faith 2 houses east of S. Easy both sides 1080 S. Easy S. Wimbrow 3 houses north of Zane East side 606 Zane S. Easy Jenkins North side 300 Jenkins Zane 3 houses north of Zane West side 346 S. Wimbrow Del Monte 3 houses east both sides 578 S. Wimbrow Keen 3 houses west North side 448 Faith Del Monte bend in road both sides 1954 Tulip Laconia Bevan South Side 771 Wimbrow Krogel South to bend both sides 1444 Seamist Lane Lots 19-24 Lots 6-10 both sides 878 George Street 790 Topsail Landsdown 7 lots one side, 5 on the other both sides 983 Road Crossing Culverts Replaced FY 2004-05 Bayfront & Clearmont Bayharbor & Fairfield Brookedge & Laconia Breakwater & Clearbrook Albatross & Clearmont 1325 Clearbrook Franciscan & Stonecrop Powerline & Barber 1032 Topsail Bayfront & Clearbrook Clearbrook & Brookedge 542 Sanders 500 Feet of 30" & 36" pipe from Grandeur/Larkspur to CR512 1/19/2006 Total 26306 ft. 4.98 mi S tAgnm a ry of 2. OU 4 •2V.)T 014L;A 4414trice I &C'er S Swale Cleaning 2005 w culverts Stormwater Quarterly Accomplishment Report First Quarter FY 2004-05 1. Worked in conjunction with Public works on Hurricane yard waste and construction debris cleanup. (Frances and Jeanne) 2. Hurricane debris cleanup of major drainage ditches, channels and rear swales to prevent flow blockage. 3. Installation of temporary drainage culvert to replace Hurricane damaged (collapsed) culvert on Schumann Drive south of Thunderbird Drive. 4. Replacement of hurricane damaged road -crossing culverts on Seamist, Rosebush Clearmont at Concho, Clearmont at Cavern, Main St. at Thomas. 5. Completed rear lot line swale rehabilitation between Forester and Doctor Ave from Barker to Smith. 6. Continued swale rehabilitation in conjunction with new sidewalk installation on Barber Street between Vocelle and Beard. 7. Continued installation of 36" drainage pipe from Larkspur to CR 512. (Installation interrupted by hurricanes.) 1/19/2006 Stormwater Quarterly Accomplishments 2nd Qtr FY 04-05 1. Replacement of failing road -crossing culvert on Rosebush @ Seamist and associated swale rehabilitation, Schumann Drive between Barber and County Line and Caravan @ Glentry. 2. Replacement of failing road -crossing culvert on Gladiola @ Sunport and associated swale rehabilitation. 3. Replacement of failing road -crossing culvert on Caravan @ Glentry and associated swale rehabilitation. 4. Swale rehabilitation on Dewitt, Caravan and Glentry. 5. Swale rehabilitation at 242 South Wimbrow west to Easy Street. 6. Swale rehabilitation on Gallilean from Franciscan to Coral Reef. 7. Swale rehabilitation on Fatima from Gallilean to Stonecrop. 8. Swale rehabilitation on Stonecrop from Sunport to Gladiola. 9. Completed installation of 30" and 36" drainage pipe from Larkspur to CR 512. 10. Routine cleaning maintenance of various road crossings pipes with Vac - Truck. 11. Coordination with CDM on Stormwater Master Plan projects for the Collier Creek Canal, Twin Ditches and Middle Stonecrop. CDM submittal of permit for Twin ditches project. 12. Coordination with WCG for the Davis Street Nutrient Bafflebox Grant project. 13. Coordination with WCG on Stormwater Master Plan projects for the Periwinkle wet detention, Lower Stonecrop improvements, Wentworth road crossing and the Potomac road crossing improvements. 14. Annual mowing of the main drainage channels including Tulip, Watercrest, Coverbrook, Rolling Hills, Majestic and Crystal Mist areas. Stormwater Quarterly Accomplishments 3rd Quarter EY 04-05 1. Replacement of failing road -crossing culvert on Laconia and Tulip swale rehabilitation 2. Replacement of failing road -crossing culvert on Tulip and Seahouse and associated swale rehabilitation. 3. Replacement of failing road -crossing culvert on South Wimbrow near Delmonte. 4. Replacement of failing road -crossing culvert on Clearbrook and Bayharbor. 5. Replacement of failing road -crossing culvert Coverbrook and Bayharbor. 6. Swale rehabilitation on S. Easy between Zane and S. Wimbrow. 7. Swale rehabilitation on S. Wimbrow Drive between Del Monte and Keen. 8. Swale rehabilitation on Zane and Jennings. 9. Rear ditch rehabilitation between Easy Street and Toledo between Columbus and Seagrape. 10. Swale rehabilitation on Toledo from Columbus to Seagrape. 11. Pre -permitting meetings with SJRWMD and Army Corp of Engineers. 12. Routine cleaning maintenance of various road crossings pipes with Vac -Truck. 13. Coordination and preparation of alternative options for the Collier Creek Canal Stormwater Master Plan project including presentations to the residents and City council. 14. Coordination with CDM for submittal replies to the Request for Additional Information from SJRWMD permitting process for Stormwater Master Plan Twin Ditches project. 15. Design drawings and permit application submitted to St. John's River Water Management District for the Indian River Lagoon Davis Street Nutrient Bafflebox Grant project. 16. Coordination with WCG on Stormwater Master Plan projects for the Periwinkle wet detention. 17. Commencement of front swale rehabilitation on Bay Harbor, Helicon, Capon, Bayfront and cleaning of associated road crossings between Croquet and Clearmont. 18. Commencement of ditch mowing in Unit #15 upon repair of trackhoe machine. Stormwater Quarterly Accomplishments 0' Quarter FY 04-05 1. Replacement of failing road -crossing culvert on Brookedge between Clearbrook and Laconia. 2. Replacement of failing road -crossing culvert on Bayfront Terrace between Laconia and Clearbrook. 3. Replacement of failing road -crossing culvert on Clearmont between Albatross and Tulip. 4. Swale rehabilitation rough grading, final grading and sodding at intersection of Clearmont and Albatross 5. Swale rehabilitation rough grading intersection of Brookedge and Laconia. 6. Final grading and sodding of swales on Jennings and Zane. 7. Swale rehabilitation rough grading, final grading and sodding on Capone Terrace from Clearmont to Croquet, 8. Swale rehabilitation rough grading, final grading and sodding on Capone Terrace from 9. Finished sodding on Toledo. 10. Swale rough grading on Helicon 11. Pre -permitting meeting with SJRWMD Biologist. 12. Routine cleaning maintenance of various road crossings pipes with Vac -Truck. 13. Coordination and preparation of alternative options for the Collier Creek Canal Stormwater Master Plan project including presentations to the residents and City council. 14. Received confirmation from Florida Department of Environmental Protection of Grant for Periwinkle Stormwater Project. 15. Ditch mowing units 9, 16 16. Ditch mowing and cleaning from Fairfield to Laconia on Tulip. 17. ditch mowing and cleaning from Tulip to Majestic on Laconia. 18. Ditch mowing and cleaning from Laconia to Stonecrop on Majestic 19. Mowing of all right of ways on main corridors and units 1,2,3,4,5,6,8,10,13,11, 17 20. Right of Way treeline cut back in units 6,8,10,13,