Loading...
HomeMy WebLinkAboutImprovement DescriptionProject PA#6: Middle Stonecrop Stormwater Improvements Description: Project #6 is associated with the lack of conveyance in the east -west channel south of the residential properties on the south side of Majestic Avenue from Laconia Street to the Stonecrop stormwater best management practice wetland treatment facility. Hydraulic modeling indicates insufficient capacity in the culvert crossings at Laconia Street, Bevan Drive and Stonecrop Street. The objective of this project is to replace the road crossings at Laconia Street, Bevan Drive and Stonecrop Street to provide increased capacity at each of the road crossings to alleviate flooding. In addition, the modeling indicates insufficient capacity in the Majestic Channel upon replacement of the existing insufficient road crossing culverts. It was determined the top -of -ditch width of the Majestic Channel was equal to the width of the right-of-way. The only alternative to obtain the required capacity in the channel is to excavate vertical walls and line this portion of the ditch with sheet walls or other vertical structure from Laconia Street to Stonecrop Street, which would also be included in this project. The current conceptual budget estimate for this project is $1,366,000, including design and construction. This number may change based on final design specifications and market conditions. Problem Aw No. 6 Middle Stonecrop Stormwater Improvement