Loading...
HomeMy WebLinkAbout1994 02 22 - Permit CorrespondenceOT. JONIV9 RIVER WATER MANAGEMENT DISTRICT February 22, 1994 Henry Dean, Executive Director John R. Wehle, Assistant Executive Director POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429 TELEPHONE 9041329-4500 SUNCOM 9041880.4500 FAX(E%ECUTIVEILEOAL) 220/125 (PERWITING) 320/315 (ADWRISTRATIOHMNANCE) 3294508 FIELD STATIONS 018 E. Smith SIMM 7775 SaymeWd Way RMII'flNti: OPERATIONS: OrlarEo, F6d& 8801 SUN. 102 205 East Dfl" 2t33 N. Wickham Road 40710743W JacksonNM, FI 32250 MeW me, Fbdda 32901 We rne, Fbdda W9350109 901/"04270 4079844940 407854-1762 CERTIFIED NUMBER: P 365 425 926 City of Sebastian ATTN: Dan Eckis 1225 Main Street Sebastian, FL 32958 Re: Sebastian Sport Complex, Permit #42-061-0332NG Section 24, Township 31, Range 38 Indian River County (Please reference Permit number on all submittals.) Dear Mr. Eckis: 0 n on February 18, 1994, District staff inspected the above -referenced permitted project. Based upon this inspection, the following discrepancies with the stormwater system were found: Northeast Retention Area; 1. A four (4) inch PVC pipe is located in the west berm connecting the retention area to the Rosebush Lane Swale. 2. Standing water, algae growth and dead grass is in the bottom of the retention area, an indication of a recovery problem. Northwest Retention Area; 1. A breech is located within the east berm connecting the retention area to the Rosebush Lane Swale. 2. Wetland type vegetation is growing in the retention area, an indication of a recovery problem. 3. The type "C" inlet with a 15 inch C.A.P is not constructed in the east end of the retention area. The pipe between the east and west retention areas is not in place. The trench drain with a type "C" inlet within the center of the project could not be located. Patricia T. Harden, CHAIR Lenore N. McCullagh. VICE CHAIR Jesse J. Parrish, III, TREASURER William Segal, SECRETARY SANFORD ORANGE PARK TITUSVILLE MAITLAND Reid Hughes Dan Roach Denise M. Prescod Joe E. Hill James H. Williams DAYTONA BEACH FERNANOINABEACH JACKSONVILLE LEESBURG OCALA To bring this project into compliance with the permitted design plan, you must: 1. Remove the PVC pipe from the west berm of the Northeast Retention area. 2. Fill in the breech in the berm of the Northwest Retention area and construct the type "C" inlet with the 15 inch C.A.P. as depicted on the permitted plans dated July 181 1993. 3. Determine the cause of the recovery problem within both retention areas and submit a corrective proposal to the Melbourne office for a permit determination. 4. Place the pipe between the two retention areas as depicted in the permitted plan 5. Locate or construct the trench drain with the type "C" inlet within the center of the project. 6. Notify the Melbourne office when the corrective work is completed so that a follow-up inspection may be arranged. Also be reminded that the operation phase of the permit shall not become effective until a Florida Registered Professional Engineer certifies that all facilities have eistrict constructed Within 30 daccordance with the design approved by the ays after completion of construction of the surface water management system, the permittee shall submit the certification of completion or one (1) set of plans which reflect the system as acturally constructed and notify the District that the facilities are ready for inspection and approval. Within 15 days of receipt of this notice, please notify the District of your intention to correct these descrepancies. If you have any questions, please contact Janice Unger or Eddie Carr at 407/984-4940. sincerely, f «� % Janice V. Compliance Department EC:ec Unger Manager of Resource Mgmt cc: John Juiliann4o, PDS -Rufus Borom 4_J�� Eddie Carr Field Representative Department of Resource Mgmt