HomeMy WebLinkAbout1994 02 22 - Permit CorrespondenceOT. JONIV9 RIVER
WATER
MANAGEMENT
DISTRICT
February 22, 1994
Henry Dean, Executive Director
John R. Wehle, Assistant Executive Director
POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429
TELEPHONE 9041329-4500 SUNCOM 9041880.4500
FAX(E%ECUTIVEILEOAL) 220/125 (PERWITING) 320/315 (ADWRISTRATIOHMNANCE) 3294508
FIELD STATIONS
018 E. Smith SIMM 7775 SaymeWd Way RMII'flNti: OPERATIONS:
OrlarEo, F6d& 8801 SUN. 102 205 East Dfl" 2t33 N. Wickham Road
40710743W JacksonNM, FI 32250 MeW me, Fbdda 32901 We rne, Fbdda W9350109
901/"04270 4079844940 407854-1762
CERTIFIED NUMBER: P 365 425 926
City of Sebastian
ATTN: Dan Eckis
1225 Main Street
Sebastian, FL 32958
Re: Sebastian Sport Complex, Permit #42-061-0332NG
Section 24, Township 31, Range 38
Indian River County
(Please reference Permit number on all submittals.)
Dear Mr. Eckis:
0
n
on February 18, 1994, District staff inspected the above -referenced
permitted project. Based upon this inspection, the following
discrepancies with the stormwater system were found:
Northeast Retention Area;
1. A four (4) inch PVC pipe is located in the west berm
connecting the retention area to the Rosebush Lane Swale.
2. Standing water, algae growth and dead grass is in the
bottom of the retention area, an indication of a recovery
problem.
Northwest Retention Area;
1. A breech is located within the east berm connecting
the retention area to the Rosebush Lane Swale.
2. Wetland type vegetation is growing in the retention
area, an indication of a recovery problem.
3. The type "C" inlet with a 15 inch C.A.P is not
constructed in the east end of the retention area.
The pipe between the east and west retention areas is not in place.
The trench drain with a type "C" inlet within the center of the
project could not be located.
Patricia T. Harden, CHAIR Lenore N. McCullagh. VICE CHAIR Jesse J. Parrish, III, TREASURER William Segal, SECRETARY
SANFORD ORANGE PARK TITUSVILLE MAITLAND
Reid Hughes Dan Roach Denise M. Prescod Joe E. Hill James H. Williams
DAYTONA BEACH FERNANOINABEACH JACKSONVILLE LEESBURG OCALA
To bring this project into compliance with the permitted design
plan, you must:
1. Remove the PVC pipe from the west berm of the
Northeast Retention area.
2. Fill in the breech in the berm of the Northwest
Retention area and construct the type "C" inlet with
the 15 inch C.A.P. as depicted on the permitted plans
dated July 181 1993.
3. Determine the cause of the recovery problem within
both retention areas and submit a corrective proposal
to the Melbourne office for a permit determination.
4. Place the pipe between the two retention areas as
depicted in the permitted plan
5. Locate or construct the trench drain with the type
"C" inlet within the center of the project.
6. Notify the Melbourne office when the corrective
work is completed so that a follow-up inspection may
be arranged.
Also be reminded that the operation phase of the permit shall not
become effective until a Florida Registered Professional Engineer
certifies that all facilities
have
eistrict constructed
Within 30 daccordance
with the design approved by the
ays after
completion of construction of the surface water management system,
the permittee shall submit the certification of completion or one
(1) set of plans which reflect the system as acturally constructed
and notify the District that the facilities are ready for
inspection and approval.
Within 15 days of receipt of this notice, please notify the
District of your intention to correct these descrepancies.
If you have any questions, please contact Janice Unger or Eddie
Carr at 407/984-4940.
sincerely,
f «�
% Janice V.
Compliance
Department
EC:ec
Unger
Manager
of Resource Mgmt
cc: John Juiliann4o,
PDS -Rufus Borom
4_J��
Eddie Carr
Field Representative
Department of Resource Mgmt