Loading...
HomeMy WebLinkAbout1994 07 20 - Permit CorrespondenceRe: Sebastian Sport Complex, Permit #42-061-0332NG,,, Section 24, Township 31, Range 38 Indian River County (Please reference Permit number on all submittals.) Dear Mr. Koford: On July 19, 1994, District staff re -inspected the above -referenced permitted project. Based upon this inspection, the following discrepancies have yet to be resolved with the stormwater system: Northeast Retention Area: 1. A four (4) inch.PVC pipe is located in the west berm connecting the retention area to the Rosebush Lane Swale. 2. Standing water, algae and cattail growth are in the retention area, an indication of a recovery problem. Northwest Retention Area; 1. A breech is located within the east berm connecting the retention area to the Rosebush Lane swale. 2. Wetland type vegetation is growing in the retention area, an indication of a recovery problem. 3. The type "C11 inlet with a 15 inch C.A.P is not constructed in the east end of the retention area. Within 30 days of receipt of this letter the following must be completed to resolve the above referenced discrepancies: 1. Remove the PVC pipe from the west berm of the Northeast Retention area. Patricia T. Harden, CHAIRMAN Lenore N. McCullagh. VICE CHAIRMAN Jesse J. Panish, III, TREASURER William Segal. SECRETARY SANFORD ORANGE PARK TITUSVILLE MAITLAND Reid Hughes Dan Roach Denise M. Prescod Joe E. Hill James H. Williams DAYTONA BEACH FERNANDINA BEACH JACKSONVILLE LEESBURG OCALA Henry Dean, Executive Director ST. JOHNS FIVER John R. Wehle, Assistant Executive Director Charles T. Myers III, Deputy Assistant Executive Dlrector WATER POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429 MANAGEMENT TELEPHONE 904/329-4500 SLINCOM 904/860-4500 DISTRICT FAX(EXECU71VE/LEGAL) 3294125 (PERMITTING)3294315 (ADWNISTRATION/FINANCE)32945M FIELD STATIONS 818 E. South St.M 7775 Baymeadorre Way PERMITTING: OPERATIONS: Orlando, Roil& 32801 Suke 102 305 Eaet Drive 2133 N. Wickham Road 907/9974300 JacksonvlM, Florida 32256 Meboume, Ficdda 32904 Mebourne, Fbrida 329359109 July 20, 1994 904/730-9270 407/9844940 40]254-1792 CERTIFIED NUMBER: Z 757 311 749 AA T City of Sebastian JUL 1394 ATTN: Mr. Joel Koford, City Manager ReCeit/Pr; 1225 Main Street City Manage,; Sebastian, FL 32958 Office Re: Sebastian Sport Complex, Permit #42-061-0332NG,,, Section 24, Township 31, Range 38 Indian River County (Please reference Permit number on all submittals.) Dear Mr. Koford: On July 19, 1994, District staff re -inspected the above -referenced permitted project. Based upon this inspection, the following discrepancies have yet to be resolved with the stormwater system: Northeast Retention Area: 1. A four (4) inch.PVC pipe is located in the west berm connecting the retention area to the Rosebush Lane Swale. 2. Standing water, algae and cattail growth are in the retention area, an indication of a recovery problem. Northwest Retention Area; 1. A breech is located within the east berm connecting the retention area to the Rosebush Lane swale. 2. Wetland type vegetation is growing in the retention area, an indication of a recovery problem. 3. The type "C11 inlet with a 15 inch C.A.P is not constructed in the east end of the retention area. Within 30 days of receipt of this letter the following must be completed to resolve the above referenced discrepancies: 1. Remove the PVC pipe from the west berm of the Northeast Retention area. Patricia T. Harden, CHAIRMAN Lenore N. McCullagh. VICE CHAIRMAN Jesse J. Panish, III, TREASURER William Segal. SECRETARY SANFORD ORANGE PARK TITUSVILLE MAITLAND Reid Hughes Dan Roach Denise M. Prescod Joe E. Hill James H. Williams DAYTONA BEACH FERNANDINA BEACH JACKSONVILLE LEESBURG OCALA 2. Fill in the breech in the berm of the Northwest Retention area and construct the type "C" inlet with the 15 inch C.A.P. as depicted on the permitted plans dated July 18, 1993. 3. Determine the cause of the recovery problem within both retention areas and submit a corrective proposal to the Melbourne office for a permit determination. 4. Notify the Melbourne work is completed so that be arranged. Office when the corrective a follow-up inspection may Please find attached correspondence to Mr. Dan Eckis and from Mr. Randy Mosby pertaining to this project. Also be reminded that the operation phase of the permit shall not become effective until a Florida Registered Professional Engineer certifies that all facilities have been constructed in accordance with the design approved by the District. Within 30 days after completion of construction of the surface water management system, the permittee shall submit the certification of completion or one (1) set of plans which reflect the system as actually constructed and notify the District that the facilities are ready for inspection and approval. If you have any questions, please contact Janice Unger or Eddie Carr at 407/984-4940. Si cerely, nice V. Unger / Compliance Manager Department of Resource Mgmt EC:ec CC: John Juilianna PDS Attachments: 3 4�'C61'111-14 Eddie Carr Field Representative Department of Resource Mgmt