December 12, 1994
CERTIFIED NO.: Z 121 717 239
Mr. Steve Cooper, P.E.
Mosby & Associates
2455 14th Street
Vero Beach, FL 32960
516 E. South Bmat 7775 Saymeadoxs Way PERMITTING: OPERATIONS:
O,h ds, Florida 32601 Sebe 102 305 Eau Omm 2133 N. Wickham Road
107/6974300 Jadwondlle, Florida 32256 Meboume, Florida 32906 Meboume, Fbdda 329356109
906/730$270 407/9844940 4072541762
Re: Sebastian Sports Complex
Application No. 42-061-0332ANGM
Dear Mr. Cooper:
,10516 b,_
The District is in receipt of your Stormwater Management System
Permit application under the status of general permit application.
Upon preliminary review of the proposed project, the following
technical information is required to sufficiently review the
possible impacts the project may have on the surrounding area. This
information is being requested pursuant to the authority vested in
the St. Johns River Water Management District under chapter 373,
Florida Statutes (F.S.), and sections 40C-42.023 and 40C-42.024,
Florida Administrative Code (F.A.C.).
In order to expedite the review of your application, please use
the application number referenced above on all correspondence, and
submit three (3) copies of all requested information unless
otherwise indicated by a specific information request.
1. Please be advised that since the proposed stormwater
management system consists mainly of two retention ponds,
the system will be considered under the dry retention
criteria. Please demonstrate that the minimum required
treatment volume has been provided below the weir elevation
without taking infiltration into account. [40C-42.026,
F.A.C.]
2. Please demonstrate the recovery of the proposed treatment
volume within the maximum allowed recovery time. Please
also demonstrate all input parameters used to demonstrate
the system's recovery. [40C -42.026(1)(c), F.A.C.]
3: Please provide detailed drawings of all retention areas,
conveyance swales, and control structures associated with
the stormwater management system. Please include top,
bottom, and control elevations as applicable. [40C -
42.026(1)(b), F.A.C.]
4. Please provide erosion and sediment control Best Management
Practices to be implemented during construction. [40C-
42.025(1), F.A.C.]
Patricia T. Harden. CHAIRMAN Lenore N. McCullagh, VICE CHAIRMAN Jesse J. Parrish, III, TREASURER William Segal, SECRETARY
SANFORD ORANGE PARK
TITUSVILLE MAITLAND
Reid Hughes Dan Roach Denise M. Prescod Joe E. Hill James H. Williams
DAYTONA BEACH FERNANDINA BEACH JACKSONVILLE LEESBURG OCALA
Page 2
If the applicant desires to dispute the necessity for any
information requested on an application form or in a letter
requesting additional information, pursuant to section 40C-1.605(5),
F.A.C., he or she may request an administrative hearing in
accordance with section 120.57, F.S. Any petition for
administrative hearing must comply with sections 40C-1.511 and 40C-
1.521,> F.A.C., must be filed within fourteen (14) days of receipt of
the request for additional information, and must be filed with the
District Clerk, in Palatka.
Please be advised, pursuant to subsection 40C-1.605(5), F.A.C.,
any application which has not been technically completed within
sixty (60) days from the date of receipt of a request for additional
information by the District, will be prepared for an Intent to Deny
at the next timely Governing Board meeting. If you require more
than the allotted sixty (60) days, please indicate this to the
staff.
In addition, no construction shall begin on the proposed
project until a permit is issued by the St. Johns River Water
Management District. This is pursuant to subsection 40C-40.042(2),
E.A.C., which states, "no construction, operation, maintenance,
alteration, abandonment or removal shall be commenced until the
permittee receives a written authorization to proceed from the
District; and subsection 40C-42.024(1), F.A.C., which states in
relevant part, .. no construction, alteration, removal, operation,
maintenance, or abandonment of a stormwater management system shall
be undertaken without a valid general or individual permit as
required pursuant to this section."
If you have any questions, please do not hesitate to call me at
(407)984-4940.
Sincerely
Nabil Muhaisen, Engineer
Department of Resource Management
NM:jo
cc: PDS
John Juilianna
Ralph Brown
City of Sebastian