HomeMy WebLinkAbout1997 07 17 - Permit ModificationLOCATION: Section 13, 24; Township 31S; Range 38EAST Indian River COUNTY ISSUED TO: CITY OF SEBASTIAN ATTN: THOMAS FRAME, CITY MANAGER 1225 MAIN ST. SEBASTIAN, FL 32958 This document shall serve as the formal permit for construction and operation of stormwater management system in accordance with Chapter 40C-42, F.A.C., issued by the staff of the St. Johns River Water Management District on July 17, 1997. This permit is subject to the standard limiting conditions and other special conditions approved by the staff. These conditions are enclosed. This permit is a legal document and should be kept with your other important records. The permit requires the submittal of an As -built certification and may require submittal of other documents. All information provided in compliance with permit conditions should be submitted to the District office from which the permit was issued. An As -built certification form is attached. Complete this form within 30 days of completion of construction of the permitted system, including all site work. Upon receipt of the As -built certification, staff will inspect the project site. Once the project is found to be in compliance with all permit requirements, the permit may be converted to its operation phase and responsibility transferred to the operation and maintenance entity in accordance with chapter 40C-42.028, F.A.C. Permit issuance does not relieve you from the responsibility for obtaining permits from any federal, state, and/or local agencies asserting concurrent jurisdiction over this work. William M. Segal, CHAIRMAN Dan Roach, VICE CHAIRMAN James T. Swann, TREASURER Clis Mason, SECRETARY IWTIAND Ftl1NNNW1aFALN CCCM ST, AUGNSTWE Kathy Chinoy Griffin A. Greene James H. Williams Patricia T. Harden Reid Hughes JACKSONVILLE VERO REACH OCALA SANFORD DAYTONA BEACH Henry Dean, Executive Director John R. Wehle, Assistant Executive Director "**T *T JO n inivan POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429 TELEPHONE 804-3204500 SUNCOM &MA60.<500 TDD 804-328-4450 TDD SUNCOM 6OD 4450 2122 2 ATEA FAX (Execudve) 328.4125 (Legal) 329448.5 (Permitting) 3284315 (Adminlstr46eNFinance) 329.4508 sEMACECENTERS "AGEMENT DI 618ESWh Steel 77758e„neadoes Way PERMITTING: OPERATIONS: AIGT OrMndo. PbrlOe 32601 SWe 102 305 EeM OMe 2133 N. Wlaewn Road . 407-874300 Jedvemib.%dda 32256 McDanr. FlMft 32904 MCOoune, P4rWS 32935-8109 n TOD 407-897-5960 9047304r170 407-9844940 407-7523100 e� \1\�1J:7� Too 904448-7900 TOO 407-722-5368 TOO 407-7523102 LO Ju n RULATION OF STORMWATER MANAGEMENT SYSTEMS Ct1y f)1Yicey( �"OZ CHAPTER 40C-42, F.A.C. O �S8i*., PERMIT NO. 42-061-0332NGMF-ERP DATE ISSUED JULY 17, 1997 AUTHORIZATION: A MODIFICATION TO EXISTING SYSTEM WITH STORMWATER TREATMENT CONSISTING OF WET DETENTION TO SERVE BARBER STREET SPORTS COMPLEX, A 13.13 ACRE PROJECT TO BE CONSTRUCTED AS PER PLANS RECEIVED BY THE DISTRICT ON JUNE 25, 1997 AND AS AMENDED BY SHEETS PD -1 AND PD -4 RECEIVED BY THE DISTRICT ON JULY 2, 1997. LOCATION: Section 13, 24; Township 31S; Range 38EAST Indian River COUNTY ISSUED TO: CITY OF SEBASTIAN ATTN: THOMAS FRAME, CITY MANAGER 1225 MAIN ST. SEBASTIAN, FL 32958 This document shall serve as the formal permit for construction and operation of stormwater management system in accordance with Chapter 40C-42, F.A.C., issued by the staff of the St. Johns River Water Management District on July 17, 1997. This permit is subject to the standard limiting conditions and other special conditions approved by the staff. These conditions are enclosed. This permit is a legal document and should be kept with your other important records. The permit requires the submittal of an As -built certification and may require submittal of other documents. All information provided in compliance with permit conditions should be submitted to the District office from which the permit was issued. An As -built certification form is attached. Complete this form within 30 days of completion of construction of the permitted system, including all site work. Upon receipt of the As -built certification, staff will inspect the project site. Once the project is found to be in compliance with all permit requirements, the permit may be converted to its operation phase and responsibility transferred to the operation and maintenance entity in accordance with chapter 40C-42.028, F.A.C. Permit issuance does not relieve you from the responsibility for obtaining permits from any federal, state, and/or local agencies asserting concurrent jurisdiction over this work. William M. Segal, CHAIRMAN Dan Roach, VICE CHAIRMAN James T. Swann, TREASURER Clis Mason, SECRETARY IWTIAND Ftl1NNNW1aFALN CCCM ST, AUGNSTWE Kathy Chinoy Griffin A. Greene James H. Williams Patricia T. Harden Reid Hughes JACKSONVILLE VERO REACH OCALA SANFORD DAYTONA BEACH l 6i t WATER DISTpICT CITY OF SEBASTIAN 42-061-0332NGMF-ERP Henry Dean, Executive Director John R. Wahl., Assistant Executive Director POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429 TELEPHONE 904329-4500 SUNCOM 304-660.4500 700904329.1450 TOO SUNCOM 860.1450 FAX (E.x ) 329-4125 (Le9aq 3294485 (Permit ing) 328.4315 (Adminlstra0on/Finanw) 32945W SERVICE CENTERS 818 ES SF 7775 eaynmdoes Way PERMITTING: OPERATIONS or1M16,Fbd6328D1 SI11e 102 305 EW GINS 2133 N. WIrJdeln Rood 407.897-4300 JetlaaMb, Fbdb 32256 Mebasro. FWW. 32904 Mebane, Fblb 32935-8109 TO0407-697-5360 9047304270 407-984. 6 407-752-3100 TOD 904 7900 TOO 407-722-5389 TDD407-752-3102 Please note that if dewatering is to occur during any phase of construction or thereafter and the surface water pump(s), wells, or facilities are capable of withdrawing one million gallons of water per day or more, or an average of 100,000 gallons per day or more over a year, and any discharge is to be off-site, you must apply for and obtain a Consumptive Use Permit (40C-2) from the District prior to starting the dewatering. Please contact the District if you need additional information or application materials. Permittee agrees to hold and save the St. Johns River Water Management District and its successors harmless from any and all damages, claims, or liabilities which may arise from permit issuance. Said application, including all plans and specifications attached thereto, is by reference made a part hereof. This permit does not convey to Permittee any property rights nor any rights or privileges other than those specified herein, nor relieve the Permittee from complying with any law, regulation or requirement affecting the rights of other bodies or agencies. All structures and works installed by Permittee hereunder shall remain the property of the Permittee. This Permit may be revoked, modified, or transferred at any time pursuant to the appropriate provisions of Chapter 373, Florida Statutes. In the event you sell your property, the permit will be transferred to the new owner, if we are notified by you within thirty days of the sale. Please assist us in this matter so as to maintain a valid permit for the new property owner. Thank you for your cooperation and if this office can be of any further assistance to you, please do not hesitate to contact us. /'j�-� Ralph Brown, P.E., Lead Engineer - Melbourne Department of Resource Management Enclosures: As -built Certification Form Limiting Conditions and Special Condition Sheet CC: District Permit File CRAVEN THOMPSON AND ASSOCIATES, INC. ATTN: JOHN V. HILL, P.E. 2770 INDIAN RIVER BLVD., SUITE 203 WiIII(IFvWtQegg,Fth�Ran FL -VaMah, VICECHAIRMAN James T. Swann, TREASURER Otis Mason, SECRETARY WITLOID FERNVIDHA9FA01 COCOA ST.NIGIASTNE Kathy Chinoy Gr'If in A. Greene James H. Williams Patricia T. Harden Reid Hughes JACKSONVILLE VENO BEACH OC SANFORD DAYTONA BEACH ENVIRONMENTAL RESOURCE PERMITTING STORMWATER GENERAL CONDITIONS 1.This permit for construction will expire 5 years from the date of issuance unless otherwise specified by a special condition of the permit. 2. Permittee must obtain a permit from the District prior to beginning construction of subsequent phases of any other work associated with this project not specifically authorized by this permit. 3. Stormwater retention and detention storage must be excavated to rough grade prior to building construction or placement of impervious surface within the area served by those systems. Adequate measures must be taken to prevent siltation of these treatment systems and control structures during construction or siltation must be removed prior to final grading and stabilization. 4. The permittee must maintain a copy of this permit complete with all conditions, attachments, exhibits, and permit modifications in good condition at the construction site. The complete permit must be available for review upon request by District representatives. The permittee shall require the contractor to review the complete permit prior to commencement of the activity authorized by this permit. 5. All activities shall be implemented as set forth in the plans, specifications, and performance criteria as approved by this permit. Any deviation from the permitted activity and the conditions for undertaking that activity shall be considered a violation of this permit. 6. District authorized staff, upon proper identification, must be granted permission to enter, inspect, and observe the system to insure conformity with the plans and specifications approved by the permit. 7. Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with the guidelines and specifications in chaper 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988), which are hereby incorporated by reference, unless a project specific erosion and sediment control plan is approved as part of the permit, in which case the practices must be in accordance with the plan. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment, beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with the specifications in chapter 6 of the Florida Land Development Manual: A Guide of Sound Land and Water Management (Florida Department of Environmental Regulation 1988). The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. 8. If the permitted system was designed by a registered professional, within 30 days after completion of the stormwater system, the permitte must submit to the District the following: District Form EN -45 (As Built Certification By a Register Professional), signed and sealed by a appropriate professional registered in the State of Florida, and two sets of "As Built" drawings when a) required by a special condition of this permit, b) the professional uses "As Built" drawings to support the As Built Certification, or c) when the completed system substantially differs from permitted plans. This submittal will serve to notify the District staff that the system is ready for inspection and approval. 9. If the permitted system was designed by a registered professional, within 30 days after completion of the stormwater system, the permittee must submit to the District the following: District Form En -44 (As Built Certification), signed by the permittee and two sets of "As Built" drawings when required by a special condition of this permit, or when the completed system substantially differs from permitted plans. This submittal will serve to notify the District staff that the system is ready for inspection and approval. 10. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than seven (7) days after the construction activity in that portion of the site has temporarily or permanently ceased. 11. Should any other regulatory agency require changes to the permitted system, the permittee shall provide written notification to the District of the changes prior to implementation so that a determination can be made whether a permit modification is required. 12. Within thirty days after sale or conveyance other permitted stormwater management system or the real property on which the system is located, the owner in whose name the permit was granted shall notify the District of such change of ownership. Transfer of this permit shall be in accordance with the provisions of section 40C-1.612, Florida Administration Code. All terms and conditions of this permit shall be binding upon the transferee. The permittee transferring the permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to such sale, conveyance or other transfer. 13. The stormwater management system must be completed in accordance with the permitted plans and permit conditions prior to the initiation of the permitted use of site infrastructure. The system must be complete in accordance with the permitted plans and permit conditions prior to transfer of responsibility for operation and maintenance of the stormwater management system to a local government or other responsible entity. 14. The operation phase of the permit shall not become effective until the requirements of Condition No. 8 or 9 have been met, the District determines that the system complies with the permitted plans, and the entity approved by the District in accordance with section 40C- 42.027, F.A.C., accepts responsibility for operation and maintenance of the system. The permit cannot be transfereed to such an approved responsible operation and maintenance entity until the requirements of section 40C- 42.028, F.A.C., are met and the operation phase of zhe permit becomes effective. Following inspection and approval of the permitted system by the District in accordance with section 40C-42.028, F.A.C., the permittee shall request transfer of the permit to the responsible approved operation and maintenance entity, if different from the permittee. Until the permit is transferred pursuant to subsection 40C-42.028(4), F.A.C., the permittee shall be liable for compliance with the terms of the permit. 15. Prior to lot or unit sales, or upon completion of construction of the system, whichever occurs first, the District must receive the final operation and maintenance document(s) approved by the District and recorded, if the letter is appropriate. For those systems which are proposed to be maintained by county or municipal entities, final operation and maintenance documents must be received by the District when maintenance and operation of the system is accepted by the local government entity. Failure to submit the appropriate final document will result in the permittee remaining personally liable for carrying out maintenance and operation of the permitted system. 16. This permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations prior to the start of any activity approved by this permit. This permit does not convey to the permittee or create in the permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the permit and Chapter 40C-42, F.A.c. 17. The permittee shall hold and save the District harmless from any and all damages, claims, or liabilities which may arise by reason of the activities authorized by the permit or any use of the permitted system. 18. The permittee shall immediately notify the District in writing of any previously submitted information that is later discovered to be inaccurate. 19. Activities approved by this permit shall be conducted in a manner which do not cause violations of state water quality standards. "EXHIBIT A" CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 42-061-0332NGMF-ERP CITY OF SEBASTIAN DATED JULY 17, 1997 20. The operation and maintenance entity shall submit inspection reports to the District two years after the operation phase permit becomes effective and every two years thereafter on District form EN -46. The inspection form must be signed and sealed by an appropriate registered professional. NOTICE OF RIGHTS 1. A person whose substantial interests are or may be determined has the right to request an administrative hearing by filing a written petition with the St. Johns River Water Management District (District). Pursuant to District rule 40C-1.511, Florida Administrative Code, the petition must be filed at the office of the District Clerk at District Headquarters, Highway 100 West, Palatka, Florida 32178-1429 within nineteen (19) days of the District depositing notice of its intent in the mail (for those persons to whom the District mails actual notice) or within fourteen (14) days of newspaper publication of the notice of its intent (for those persons to whom the District does not mail actual notice). Such a petition must comply with District rule 40C-1.521, Florida Administrative Code. 2. If the Governing Board took action which substantially differs from the notice of intent to grant or deny the permit application, a person whose substantial interests are or may be determined has the right to request an administrative hearing. Pursuant to District rule 40C-1.511, Florida Administrative Code, the petition must be filed at the office of the District Clerk at District Headquarters, Highway 100 West, Palatka, Florida 32178-1429, within nineteen (19) days of the District depositing notice of final agency action the the mail (for those persons to whom the District mails actual notice) or within fourteen (14) days of newspaper publication of the notice of its final agency action (for those persons to whom the District does not mail actual notice). Such a petition must comply with District rule 40C-1.521, Florida Administrative Code. 3. A substantially interested person has the right to a formal administrative hearing pursuant to Section 120.57(1), Florida Statutes, where there is a dispute between the District and the party reqarding an issue of material fact. A petition for formal hearing must comply with the requirements set forth in Section 40C- 1.521(2), Florida Administrative Code. 4. A substantially interested person has the right to an informal hearing pursuant to Section 120.57(2), Florida Statutes, where no material facts are in dispute. A petition for an informal hearing must comply with the requirements set forth in Section 40C- 1.521(2), Florida Administrative Code. S. A petition for an administrative hearing is deemed filed upon delivery of the petition to the District Clerk at the District headquarters in Palatka, Florida. (Section 40C-1.013, Florida Administrative Code) 6. Failure to file a petition for an administrative hearing, within the requisite time frame shall constitute a waiver of the right to an administrative hearing. (Section 40C-1.511, Florida Administrative Code) 7. The right to an administrative hearing and the relevant procedures to be followed are governed by Chapter 120, Florida Statutes, and Chapter 40C-1, Florida Administrative Code. NOTICE OF RIGHTS B. An applicant with a legal or equitable interest in real property who believes that a District permitting action is unreasonable or will unfairly burden the use of his property, has the right to, within 30 days of receipt of notice of the District's intent to grant or deny a permit application, apply for a special master proceeding under section 70.51, Florida Statutes, by filing a written request for relief at the office of the District Clerk located at District headquarters, Highway 100 West, Palatka, Florida 32178-1429. A request for relief must contain the information listed in subsection 70.51(6), Florida Statutes. 9. A timely filed request for relief under section 70.51, Florida Statutes, tolls the time to request an administrative hearing under paragraph no. 1 or 2 above. (Paragraph 70.51(10)(b), Florida Statutes) However, the filing of a request for an administrative hearing under paragraph no. 1 or 2 above waives the right to a special master proceeding. (Subsection 70.51(10)(b), Florida Statutes) 10. Failure to file a request for relief within the requisite time frame shall constitute a waiver of the right to a special master proceeding. (Subsection 70.51(3), Florida Statutes) 11. Any substantially affected person who claims that final action of the District constitutes an unconstitutional taking of property without just compensation may seek review of the action in circuit court pursuant to Section 373.617, Florida Statutes, and the Florida Rules of Civil Procedures, by filing an action in circuit court within 90 days of the rendering of the final District action, (Section 373.617, Florida Statutes). 12. Pursuant to Section 120.68, Florida Statutes, a person who is adversely affected by final District action may seek review of the action in the district court of appeal by filing a notice of appeal pursuant to the Florida Rules of Appellate Procedure, within 30 days of the rendering of the final District action. 13. A party to the proceeding before the District who claims that a District order is inconsistent with the provisions and purposes of Chapter 373, Florida Statutes, may seek review of the order pursuant to Section 373.114, Florida Statutes, by the Florida Land and Water Adjudicatory Commission, by filing a request for review with the Commission and serving a copy on the Department of Environmental Protection and any person named in the order within 20 days of adoption of a rule or the rendering of the District order. 14. For appeals to the District courts of appeal, a District action is considered rendered after it is signed on behalf of the District, and is filed by the District Clerk. NOTICE OF RIGHTS 15. Failure to observe the relevant time frames for filing a petition for judicial reviews described in paragraphs #11 and #12 or for Commission review as described in paragraph #13 will result in waiver of that right to review. CERTIFICATE OF SERVICE I HEREBY CERTIFY that a copy of the foregoing Notice of Rights has been sent by U.S. Mail to: CITY OF SEBASTIAN ATTN: THOMAS FRAME, CITY MANAGER 1225 MAIN ST. SEBASTIAN, FL 32958 at 4:00 p.m. this 17th day of (lam JULY, 1997 40'rut 6A'& P)6,fmit Data Services rector, Gloria Lewis St. Johns River Water Management District Post Office Box 1429 Palatka, FL 32178-1429 (904) 329-4566 42-061-0332ANGMF-ERP .t � AIV.. Henry Dea•E•ewu.<Pma P 0 emvwsswam E•ewo c Precu canes I Mven p m P..ry Ass•sum E•«N•ve Prtn Dear Permittee: Please be advised that the District has not published a notice in the newspaper advising the public that it is issuing a permit for this proposed project. Publication, using the District form, notifies members of the public (third parties) of their rights to challenge the issuance of the permit. If proper notice is given by publication, third parties have a 14 day time limit on the time they have to file a petition opposing the issuance of the permit. If you do not publish, a party's right to challenge the issuance of the general permit extends for an indefinite period of time. If you wish to have certainty that the period for filing such a challenge is closed, then you may publish, at your own expense, such a notice in a newspaper of general circulation within the affected area. A copy of the form of the notice and a list of newspapers of general circulation, usually used by the District, is attached for your use, however, you do not have to use only those newspapers listed. This publication need only occur once. Enclosed is a sample package used for newspaper noticing by the District. The package includes: • Page 1 - The name, address, telephone number and facsimile for newspapers of general circulation are provided. This is the newspaper typically used by the District to advertise permits that are issued by the Governing Board. . Page 2 - A copy of a sample notice that District staff uses is included to provide guidance on the language to be used in the notice. This language satisfies the legal requirements for noticing. • Page 3 - A copy of a sample affidavit of publication is also included. The affidavit is provided to you by the newspaper to provide proof of publication. The original affidavit should be submitted to: Gloria Lewis, Director Division of Permit Data Services P.O. Box 1429 Palatka, FL 32178-1429. If I can be of further assistance, please contact me at (904) 329-4235 or Lori Dowdy at (904) 329-4267. Sincerely, Gloria Lewis, Dirdctor Division of Permit Data Services William Segal. c....n Dart Roach, NCE c.RMAN James T SWZykn. TREASURED 0415 Wail, SECRETARY 1MITVJO EERNVONA6EAM cacoL ST.0 T`4 Reid Hug Kathy Chinoy Griffin A Greene James H. Williams Patricia T. Harden wnoRA at YCKS LLE vERO DEAC. O('.TN SAni ORD POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1425 WATER TELEPHONE 904.029 4500 Top 904.029-1450 SUNC04. 904460.580 TOO SUNCOM 660..50 MANAGEMENT FAA IEAECOOVEkEGAL1829. 4125 PERMITT"Gl 029.615 1ADMVISTRATQ WIANCEi 1]9..5G DISTRICT SERNCE CENTERS 616E Sam 51-t 7115 Way PERMITTw OPERATq S Holders of General Permits 6 ,Fbrq. 02601 S,n, 102 101491.X10 ,.dLAaM4.. F.nw 02256 X15 E4a10me 213314 V .Ro.6 Ue .Flo 334 Ye0an,.. Faro49293=610 100.01491-5960 90 4- 6210 101.9644940 .01.2544262 T00904100-1900 TM401.12.'-5]66 TW.07-2511203 Dear Permittee: Please be advised that the District has not published a notice in the newspaper advising the public that it is issuing a permit for this proposed project. Publication, using the District form, notifies members of the public (third parties) of their rights to challenge the issuance of the permit. If proper notice is given by publication, third parties have a 14 day time limit on the time they have to file a petition opposing the issuance of the permit. If you do not publish, a party's right to challenge the issuance of the general permit extends for an indefinite period of time. If you wish to have certainty that the period for filing such a challenge is closed, then you may publish, at your own expense, such a notice in a newspaper of general circulation within the affected area. A copy of the form of the notice and a list of newspapers of general circulation, usually used by the District, is attached for your use, however, you do not have to use only those newspapers listed. This publication need only occur once. Enclosed is a sample package used for newspaper noticing by the District. The package includes: • Page 1 - The name, address, telephone number and facsimile for newspapers of general circulation are provided. This is the newspaper typically used by the District to advertise permits that are issued by the Governing Board. . Page 2 - A copy of a sample notice that District staff uses is included to provide guidance on the language to be used in the notice. This language satisfies the legal requirements for noticing. • Page 3 - A copy of a sample affidavit of publication is also included. The affidavit is provided to you by the newspaper to provide proof of publication. The original affidavit should be submitted to: Gloria Lewis, Director Division of Permit Data Services P.O. Box 1429 Palatka, FL 32178-1429. If I can be of further assistance, please contact me at (904) 329-4235 or Lori Dowdy at (904) 329-4267. Sincerely, Gloria Lewis, Dirdctor Division of Permit Data Services William Segal. c....n Dart Roach, NCE c.RMAN James T SWZykn. TREASURED 0415 Wail, SECRETARY 1MITVJO EERNVONA6EAM cacoL ST.0 T`4 Reid Hug Kathy Chinoy Griffin A Greene James H. Williams Patricia T. Harden wnoRA at YCKS LLE vERO DEAC. O('.TN SAni ORD NOTICE OF AGENCY ACTION TAKEN BY THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Notice is given that the following permit was issued on 11/27/95: ACME HOMES CO., INC., 1201 W. 15TH STREET, Palatka, FL 32177, permit # 42- 107-0001 The project Is located in Putnam County Section 23 Township 07 South, Range 34 East The permit authorizes A SURFACE MANAGEMENT SYSTEM ON 20 ACRES TO SERVE A SINGLE-FAMILY RESIDENTIAL SUBDIVISION known as Blue Meadows. The receiving waterbody is ST. JOHNS RIVER. The file(s) containing the application for the above listed permit is available for inspection Monday through Friday except for legal holidays, 8:00 a.m. to 5:00 p.m. at the St. Johns River Water Management District (District) Headquarters, Hwy 100 W., Palatka, FL -32178-1429. A person whose substantial interests are affected by the District perrnittIng decision may petition for an administrative hearing in accordance with section 120.57, F.S.. Petitions must comply with the requirements of Florida Administrative Code Rule 40C-1.511 and 40C-1.521 and be filed with (received by) the District Clerk located at District Headquarters, Highway 100 West, Palatka, Florida 32177. Petitions for administrative hearing on the above application(s) must be filed within fourteen (14) days of publication of this notice or within nineteen (19) days of the District depositing notice of this Intent in the mail for those persons to whom the District malls actual notice. Failure to file a petition within this time period shall constitute a waiver of any right(s) such person(s) may have to request an administrative determination (hearing) under section 120.57, F. S., concerning the subject permit. Petitions which are not filed in accordance with the above provisions are subject to dismissal. COUNTY ALACHUA The Alachua County Record Legal Advertising P. O. Box 806 Gainesville, FL 32603 904377-2444/fax 904-338-1986 BAKER Baker County Press Legal Advertising P. O. Box 598 Madenny, FL 32063 904259-2499/fax 904-259-6502 BRADFORD Bradford County Telegraph Legal Advertising P.O. Drawer Starke, FL 32901 904-964-63051fax 904-964-8628 BREVARD Florida Today Legal Advertising P. O. Box 363000 Melbourne, FL 32936 407-242-3832/fax 407-242-6618 CLAY Clay Today Legal Advertising P. O. Box 1209 Orange Park, FL 32073 904-2643200/fax 904-269-6958 DUVAL Florida Times Union Legal Advertising P. O. Box 1494-F Jacksonville, FL 32231 904-3594321Rax 904-3594180 FLAGLER Flagler Tribune Legal Advertising P. O. Boz 2831 Daytona Beach, FL 32115 904-437-2555/fax 904437-0139 INDLAN RIVER Vero Beach Press Journal Legal Advertising P. O. Box 1268 Vero Beach, FL 32960 407562-2611/fax 407-5625517 LAKE Daily Commercial Legal Advertising P. O. Drawer 7 Leesburg, FL 34748 904-787-M2/fax 904365-1951 MARION Ocala Star Banner Legal Advertising P. O. Box 490 Ocala, FL 32670 904732-9565Ifax 904-8674126 NASSAU News -Leader Legal Advertising 511 Ash Street Fernandina Bch, FL 32034 9042613696Rax 904-261-3698 OKEECHOBEE Okeechobee Neva Legal Advertising P. O. Box 638 Okeechobee, FL 33472 ORANGE Sentinel Conununi cellons Legal Advertising P. O. Boz 2833 Odande, FL 32802 407420-5160/fax 407420-5011 OSCEOLA Little Sentinel Legal Advertising P. O. Bax 2833 Orlando. FL 32802 407420-51601fax 407-020.5011 POLK. Lakeland Ledger Pub. Co. Legal Advertising P. O. Box 408 Lakeland, FL 33802 PUTHAM Palatka Daily News Legal Advertising P. O. Boz 777 Palatka, FL 32178 90432&9751/fax 904-325-0663 ST. JOHNS SL Augustine Record Legal Advertising P. O. Box 1603 SL Augustine, FL 32084 904829-6566/fax 904829-2368 SEMINOLE Sanford Herald Legal Advertising 300 North French Avenue Sanford, FL 32771 407322-2611 /fax 407323-9408 VOLUSIA News Journal Corporation Legal Advertising . P. O. Box 2831 Daytona Beach, FL 32120 904252-1511/fax 9042555735 Ma 13'y(o COPY OF ADVERTISEMENT i1Y01��� t�-**L PUBLISHED EVERYAFLERNOON MONDAYT HROUCH FRIDAY• SATURDAYAND SU"AY MOR.'ING ST. AUGUSTINE AND ST. JOHNS COUNTY, FLORIDA STATE OF FLORIDA,aWaitt* COUNTY OF ST. JOHNS do a° u'� Before the undersigned authority personally appeared /Aedb Se Sit. 44. \ Rd., Allm Julia Meeks who on oath says that she is The orale! AccountingClerk of the St Augustine Record, a J.hn. C., Tov hlo I of ° Starr daily newspaper published at St. Augustine in SL Johns &anty, Florida: a titntic°n 1.0 ocn, 1x' that the attached copy of advertisement, being a Notice of Agency Action in the matter of Permit 0 46-109-0193ERPs Slw:o Iran ' k�3a Th. ""olk dEa�e'Ihln r?oNeyo-'dm .-ehrounli'Ff D i!4 Rh¢ Wm . NiStrwcy; 1, - Fbrida.•A in the Court, was published in said newspaper in the ' wOslmlfdl `mean; a« issues Of Jan. 5, 1996 G. for on Aecrlro In, Seellm 110- dlet P.elllld -,In The r Affiant further says that the St. Augustine Record is a newspaper published at St. Augustine, in said St. Johns County, Florida, and that the said newspaper heretofore been continuously published in said SL Johns County, Florida, each day and has been entered as second class mail matter at the post office in the City of St_ Augustine, in said SL Johns County, Florida, for a period of one year next preceding the first publication of the copy of advertisement; and affiant further says that she has neither paid nor promised any person, firm or corporation any discount, rebate, commission or refund for the purpose of securing the advertisement for publication in the said newspaper. S�or�t(o Ialnd subscri ed bef re me this Stn day of Jan, 19 96 by 7 �� who is personally knoN to me or who has produced- personally known as (TlpeoCMfntiClcation) .. identification ."" •...... slp;:. (Sign lure [Notary Public) - _ - "•� ;Jea-D - <<:, rC SQZeSi I Zoe Ann Moss , y Fra „ — I — : (Print, Type or Stamp Commissioned Name of Novr�i,'u-6(it9:'�1-Irtse,?;., ae. a -Wdn v,r Brsl'. occult Foil°re to fik o. pe,111o, . wIINn this Ilene ... it,, MIT ewnslltule o wNv ot'dnr ri°M Sun, oerson mor lave 1? ".0-1 on adminalra.. rive delennhimlion (heor. Ing) -d-SecNm nOSJ Florid° SWOT. concern.. lno the soele<I permit. Fen - lion, MIrA art not like In cccorddn with she obdve orovi Sims are so0lecl to 111 S Jon. S. 1006 RECEIVED FEB 1 Z 1996 PAIR= j NOTICE OF AGENCY ACTION TAKEN BY THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Notice is given that the following permit was issued on permit # The project is located in County, Section Township South, Range East. The permit authorizes A SURFACE WATER MANAGEMENT SYSTEM ON _ ACRES TO SERVE known as The receiving waterbody is 1. The file(s) containing the application for the above listed permit is available for inspection Monday through Friday except for legal holidays, 8:00 a.m. to 5:00 p.m. at the St. Johns River Water Management District (District) Headquarters, Hwy 100 W., Palatka, FL 32178-1429. A person whose substantial interests are affected by the District permitting decision may petition for an administrative hearing in accordance with section 120.57, F.S. Petitions must comply with the requirements bf Florida Administrative Code Rule 40C-1.511 and 40C-1.521 and be filed filed with (received by) the District Clerk located at District Headquarters, Highway 100 West, Palatka, Florida 32177. Petitions for administrative hearing on the above application($) must be filed within fourteen (14) days of publication of this notice or within nineteen (19) days of the District depositing notice of this intent in the mail for those persons to whom the District malls actual notice. Failure to file a petition within this time period shall constitute a waiver of any right(s) such person(s) may have to request an administrative determination (hearing) under section 120.57, F. S., concerning the subject permit. Petitions which are not filed In accordance with the above provisions are subject to dismissal.