Loading...
HomeMy WebLinkAbout2002 - On Site Inspectionit Flinn Construction, Inc.t �� iiJUN 112002 GENERAL CONTRACTOR u " 1 CGC017670 ---- —______________________ June 11, 2002 David Fisher City Engineer 1225 Main Street Sebastian, FL 32958 Dear Mr. Fisher: Flinn Construction performed an on-site inspection of the restrooms located at Hardee Park, Barber Street Sports complex and the Sebastian Yacht Club, based on the deficiency report submitted by Holeman Suman Architects, dated February 20, 2002. Based on discussions with your 94 a large portion of the report deals with cosmetic problems which will be. repaired "in house". We propose to famish materials, equipment and labor to repair the major problems as follows: Hardee Park: 1. Chip and grind concrete floors to achieve a proper pitch towards drain in both women's and men's rooms; prepare floor for new tile surface; supply and install new ceramic tile; reset floor drain. (Color of tile to be selected from samples provided.) 2. Remove existing hardware, install new push plates and reinstall hardware on entrance doors. 3. Replace shorted -out electric lock on men's room entry door 4. Clean paint from handicap bars. 5. Patch holes in stall doors. Total cost estimated to be less than $5.000.00 Sincerely, James E. Flinn