HomeMy WebLinkAboutCO#3CITY OF SEBASTIAN CHANGE ORDER CHANGE ORDER M 3 PROSECT NAME: Police Evidence Building CONTRACTOR NAME: L.A. Tanner Construction Corp CONTACINAME: Dan Acosta—City Representative CONTRACT DATE: Notice to Proceed: May 19, 2017 By the signature affixed below, both the City and the Contractor agree to the changes as stipulated herein. Upon proper execution of this document, the Contractor is hereby notified to commence work. All changes stated below are hereby incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are enjoined and in full force while executing the change(s) stipulated as follows: DESCRIPTION - A) CONTRACT PRICE PRIOR TO THIS CHANGE 5 UJ1947 NET INCREASE (DECREASE) RESULTING FROM THIS CHANGE S M 13625 NEW CONTRACT PRICn nVr'r UDIN THIS CHANGE ORDER S 371.475.72 81 CONTRACT TIME PRIOR TO THIS CHANGE (NUMBER OF DAYS) 240 NET INCREASE (DECREASE) RESULTING FROM THIS CHANGE (NUMBER OF DAYS) 17 NEW COMPLETION DATE INCLUDING THIS CHANGE Jammy 31, 2018 AGREED: C CITY OF SEB TIAN: Date: o ed Si atare eDste: gn Autha City eager Aeorovals By City of Sebastian Staff-, ✓Elty Manager Authorization — cumulative amount less than 15% of contract price or 515,000 single change order. _City Council Authorization — cumulative amount exceeds 15% of contract price or 515,000 single change order. (Meeting date ) CITY OF SEBASTIAN:(, A / Date: / ✓ / City Manager Finance Director ,—_ - ene W101ams.M MC, City Clerk City Attorney - Procurement - - c • • ` NO CONTRACTOR'S NAME: LH. Tanner Conslruclion Corpora8on ADDRESS: 2300 Avocado Ave, Melbourne, FL 32935 LIC #: CGC 1511228 Change Order # 3 at Nature of the Change: Provide Underground Pover from FPL Hendhole to Date 1118117 Joh # 17404 Sebastian Police Evidence Project Name Building Owner City of Sebastian Contract Rep. Dan Acosta CAL Email Add dacoet8@cffyefsebas8an.org Project Address 1201 Main Street City Sebastian State Florida AddWam] Days An 1 Required for Thl3 Change sen.. r Electrical FPL Electrical Conduit for Main Service FeederWoes V ewe. 90 L.F. $675.00 Install 4q Feeder When to Service Meter at New Building 330 LF azzz7so I Agree to tin Above Described S pe and Price Date OWNER 92 92 Nature of the 0 Stucco Finish SIGNATURE FIR In Masonry Openings for Fen 6 Lower S Install Additional Days Ara 2 Required for This Change in Senn. Masonry Minimum Charge 2 Each Install MedaObn $202.50 2 Each 3875.00 I Agree to the Above Described Smile and Prim _ Date "3 Nature of the Change: Protide Electrical Plan h Install Electric In the Additional Days Ars Building 14 Requlrad forThis Change In scope. Description Qllannly anti TOTAL Provide E,ewie,,,ayour ren Install Standard 8'T8 Florescent Fivtures in Building 1 Each $223.00 Install 60 Amp 220v CktW for Air Handler 8 Each $1,800.00 Install 30 Amp 220v Circuit far Condenser with Disconnect 1 Each 750.00 IneteO Weatherproof GFI 110v Outlet within 5 of AC Ped 1 Each 3750.00 Install 3 -Way Sv4tehas 1 Each 3300.00 Install 4 -Way Swrhm 2 Each $225.00 Install Dedicated 11 Ov Circuit to Data Board with Quad Receptacle 1 Each 1 Each $127.50 Instant SM"x 10' Ground Rod, Clamp 8 410 Bene Copper Ground Wire for $26250 Independent Grounding of the Data Center 2 Each Install Quad Outlets $600.00 Instant Standard OR Outlet In Bahroom 0 Each $900.00 t Each $112.50' 1 Agree to the Alxrve Described Scope and Price $8.052.50 Dab OWNER OR OWNER'S AGENTS 91GNAT1Ra fx Nature of the Change: Provide (3) Fin Fatingulshers at Access Door Locations O Additional Days An Requited for This Change In Scope. DescriptionQuantiy Provide d Install Fire Ezdnguisher I Agree to the Above Described Snipe and Price Urdl 3 Each TOTAL $303.75 $303.75 Date OWNER OR OWNER•SAGENT-SSIGNATURE 95 Addlflonal Days An Netute of the Change: Provide Attic AccessRequited 0 for This Change In Scope. Descripfon Ouantiy Unit TOTAL Provide d install Provide Attic Access t Each $0.00 1 Agree to the Above Described Scopa and PCce $0.00 Date OWNER OR OWNER'S AGEN i 5 SIGNATURE Total Change Order Amount: $10.136.25 Total Additional Days Required For Change Order Work: 17 Additional Days CONTRACTORS SIGNATURE Date