HomeMy WebLinkAboutCO#3CITY OF SEBASTIAN CHANGE ORDER
CHANGE ORDER M 3 PROSECT NAME: Police Evidence Building
CONTRACTOR NAME: L.A. Tanner Construction Corp
CONTACINAME: Dan Acosta—City Representative
CONTRACT DATE: Notice to Proceed: May 19, 2017
By the signature affixed below, both the City and the Contractor agree to the changes as stipulated herein. Upon proper
execution of this document, the Contractor is hereby notified to commence work. All changes stated below are hereby
incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are
enjoined and in full force while executing the change(s) stipulated as follows:
DESCRIPTION -
A) CONTRACT PRICE PRIOR TO THIS CHANGE 5 UJ1947
NET INCREASE (DECREASE) RESULTING FROM THIS CHANGE S M 13625
NEW CONTRACT PRICn nVr'r UDIN THIS CHANGE ORDER S 371.475.72
81 CONTRACT TIME PRIOR TO THIS CHANGE (NUMBER OF DAYS) 240
NET INCREASE (DECREASE) RESULTING FROM THIS CHANGE (NUMBER OF DAYS) 17
NEW COMPLETION DATE INCLUDING THIS CHANGE Jammy 31, 2018
AGREED:
C CITY OF SEB TIAN:
Date:
o ed Si atare eDste:
gn Autha City eager
Aeorovals By City of Sebastian Staff-,
✓Elty Manager Authorization — cumulative amount less than 15% of contract price or 515,000 single change order.
_City Council Authorization — cumulative amount exceeds 15% of contract price or 515,000 single change order.
(Meeting date )
CITY OF SEBASTIAN:(, A /
Date: / ✓ /
City Manager
Finance Director ,—_ -
ene W101ams.M
MC, City Clerk
City Attorney -
Procurement - -
c
• • ` NO
CONTRACTOR'S NAME: LH. Tanner Conslruclion Corpora8on
ADDRESS: 2300 Avocado Ave, Melbourne, FL 32935
LIC #: CGC 1511228
Change Order # 3
at
Nature of the Change: Provide Underground Pover from FPL Hendhole to
Date
1118117
Joh #
17404
Sebastian Police Evidence
Project Name
Building
Owner
City of Sebastian
Contract Rep.
Dan Acosta
CAL Email Add dacoet8@cffyefsebas8an.org
Project Address 1201 Main Street
City
Sebastian
State
Florida
AddWam] Days An
1 Required for Thl3 Change
sen..
r Electrical FPL Electrical Conduit for Main Service FeederWoes V ewe.
90 L.F. $675.00
Install 4q Feeder When to Service Meter at New Building 330 LF
azzz7so
I Agree to tin Above Described S pe and Price
Date OWNER
92
92
Nature of the 0
Stucco Finish
SIGNATURE
FIR In Masonry Openings for Fen 6 Lower S Install
Additional Days Ara
2 Required for This Change
in Senn.
Masonry Minimum Charge 2 Each
Install MedaObn $202.50
2 Each 3875.00
I Agree to the Above Described Smile and Prim _
Date
"3
Nature of the Change: Protide Electrical Plan h Install Electric In the
Additional Days Ars
Building
14 Requlrad forThis Change
In scope.
Description
Qllannly anti
TOTAL
Provide E,ewie,,,ayour ren
Install Standard 8'T8 Florescent Fivtures in Building
1 Each
$223.00
Install 60 Amp 220v CktW for Air Handler
8 Each
$1,800.00
Install 30 Amp 220v Circuit far Condenser with Disconnect
1 Each
750.00
IneteO Weatherproof GFI 110v Outlet within 5 of AC Ped
1 Each
3750.00
Install 3 -Way Sv4tehas
1 Each
3300.00
Install 4 -Way Swrhm
2 Each
$225.00
Install Dedicated 11 Ov Circuit to Data Board with Quad Receptacle
1 Each
1 Each
$127.50
Instant SM"x 10' Ground Rod, Clamp 8 410 Bene Copper Ground Wire for
$26250
Independent Grounding of the Data Center
2 Each
Install Quad Outlets
$600.00
Instant Standard OR Outlet In Bahroom
0 Each
$900.00
t Each
$112.50'
1 Agree to the Alxrve Described Scope and Price
$8.052.50
Dab OWNER OR OWNER'S AGENTS 91GNAT1Ra
fx
Nature of the Change: Provide (3) Fin Fatingulshers at Access Door
Locations
O
Additional Days An
Requited for This Change
In Scope.
DescriptionQuantiy
Provide d Install Fire Ezdnguisher
I Agree to the Above Described Snipe and Price
Urdl
3 Each
TOTAL
$303.75
$303.75
Date OWNER OR OWNER•SAGENT-SSIGNATURE
95
Addlflonal Days An
Netute of the Change: Provide Attic AccessRequited
0
for This Change
In Scope.
Descripfon
Ouantiy Unit
TOTAL
Provide d install Provide Attic Access
t Each
$0.00
1 Agree to the Above Described Scopa and PCce
$0.00
Date OWNER OR OWNER'S AGEN i 5 SIGNATURE
Total Change Order Amount:
$10.136.25
Total Additional Days Required For Change Order Work: 17
Additional Days
CONTRACTORS SIGNATURE
Date