HomeMy WebLinkAboutCO#4CITY OF SEBASTIAN CHANGE ORDER
CHANGE ORDER A
CONTRACTORNAME: L.R. Tanner Construction Corp
PROJECT NAME: Police Evidence Bonding
CONTACT NAME: Dan Acosta — City Representative
CONTRACT DATE: Notice to Proceed: May 19, 2017
By the signature affixed below, both the City and the Contractor agree to the changes as stipulated herein. Upon proper
execution of this document, the Contractor is hereby notified to commence work. All changes stated below are hereby
incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are
enjoined and in full force while executing the change(s) stipulated as follows:
DESCRIPTION:
A) CONTRACT PRICE PRIOR TO THIS CHANGE S 371.475.72
NET INCREASE (DECREASE) RESULTING FROM THIS CHANGE S 9,690.98
NEW CONTRACT PRICE INCLUDING UDING THIS CHANGE ORDER
S _381.166.60
B) CONTRACT TME PRIOR TO THIS CHANGE (NUMBER OF DAYS) 257
NET INCREASE (DECREASE) RESULTING FROM THIS CHANGE (NUMBER OF DAYS) 22
NEW COMPLETION DATE INCLUDING THIS CHANGE Febnrsy 21.2018
AGREED: fCONJ
COF SEB TiAN:/ No-r/I�/_8' /7 �L...�. Aut dd Signature Autho a Ity M,44jer
inager Authorization —cumulative amount less than 15% of contract price or 515,000 single change order.
until Authorization — cumulative amount exceeds 15% of contract price or $15,000 single change order.
date )
CITY OF SEBAST ,(
Date:
City Mani g
Finance Director
JeWhette Nllilams, MMC, City Clerk
------
City Attorney
Procurement \ - '
CONTRACTOR'S NAME: LH. Tanner Construction Corporation
Date 11/617
Job 6 17-804
ADDRESS: 2300 Avocado Ave, Melbourne, FL 32935Sebastian
Poll" Evidence
LIC #: CGC 1511228
Project Name Building
Owner City of Sebesban
Contract Rep, Dan Acosta
Change Order # 4
C.R. Email Addre dacosta@etyorsebastian.org
Project Address 1201 Main Street
CITY Sebastian
State Florida
Zip 32958
B1
Additional Days Are
Nature rid Na Change: Bund Ra
Raceway for A/C Ductwork and AIC Stand
,� RegWred for This Change
InS=Pa.
Oescrbtion
Ovantlty Un8
TOTAL
7/16' OSB
8 Sheet
5324.00
10' PT 2x4
6 Each
$121.50
3/4' PT Plywood
1 Sheet
5701.25
1 Agree to the Above Described Scope and Price
5546.75
Date OWNER OR OWNER'S AGENT'S SIGNATURE
02
Additional Days Ars
Nature or the Change: Design i Instan Air Condfti
In Scopeoning .t,� .dor This Change
In Scop.
Description
Ouanely unit
TOTAL
Provide Energy Cabs
i Each
S703S0
Layout Ductwork d Pro-Ada Shop Drawing
1 Each
Install Distribution System per Shop Drawing
/ Each
$568.50
54,416.00
Install d1d' Concrete AC Pad
1 Each
$636.00
Install 3 Ton Trane l6SEFR Spin System (Model It 4TTR6036J1)
1 Each
Credit for AC Mini Sprit System from Original Contract
2 Each
$6.508.50
3/4' PVC Condensate Drain d Safe T Switch
1 Each
•55.500.00
$467.25
20720 Finer Back Grill for AID Sbrq
1 Each
$568.50
Install Fresh Air Makeup at Intake Vent at Soffit to Supply Side of DucN.ark
1 Each
SM.So
So
Install Programmable Thermostat
1 Each
5207.38
I Agree to the Above Described Scope and Price
$9,144.13
Date OWNER OR OWNER'S AGENTS SIGNATURE
Total Change Order Amount: $9,690.88
Total Additional Days Required For Change Order Work:
22 Additional Days
CONTRACTOR'S SIGNATURE