HomeMy WebLinkAbout2018 Construction PlansAPRIL 2018 TAXIWAY "C" PREPARED BY: BID DOCUMENTS CONSTRUCTION PLANS FOR: TAMPA, FL 33634 5550 W. IDLEWILD AVENUE, SUITE 102 (813) 330-2704 CERTIFICATE OF AUTHORIZATION NO.: 30862 SHEET INDEX SHEET. No.DESCRIPTION COVER SHEET PROJECT LAYOUT PLAN KEY SHEET STAKING AND DEMOLITION PLANS TYPICAL SECTIONS AND DETAILS G1.1 C1.0-C1.1 C3.1-C3.5 G0.0 C2.0 MARKING AND SIGNAGE PLANS AND DETAILSC7.1-C7.11 GRADING AND DRAINAGE PLANSC4.1-C4.5 PHASING PLAN STORMWATER POLLUTION PREVENTION PLAN PROFILESC5.1-C5.4 C6.0 G1.2 GENERAL AND PHASING NOTESG2.1 FAA AIP PROJECT No.: 3-12-0145-014-2018 FDOT FM NO. : 434633-1-94-01 DRAINAGE DETAILSC6.1-C6.2 JUNCTION BOX, DUCT BANK AND RUNWAY EDGE LIGHT DETAILSC8.1 SEBASTIAN, FLORIDA MUNICIPAL AIRPORT PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. ENGINEER OF RECORD: ROFZROFZ ROFZROFZROFZROFZ ROFZROFZ ROFZROFZ ROFZ ROFZROFZ ROFZ ROFZ ROFZ ROFZ ROFZROFZ ROFZ ROFZROFZ ROFZROFZ ROFZ ROFZ ROFZOFZOFZOFZOFZOFZOFZ OFZ OFZ OFZ OFZ OFZ ROFZ ROFZROFZ ROFZHYDGV 17.08 16.93 (2) 18" R.C.P.CB B1CB B2CB B3 CB B4CB B5 CB B6CB B7CB B8CB B9CB B12 CB B10CB B11 NEW TAXIWAY C NEW TAXIWAY E NEW TAXIWAY C1 CONNECTOR NEW TAXIWAY D EXISTING GATE EXISTING GATE EXISTING GATE EXISTING GATE CLOSED RUNWAY MARKER DURING PHASES 2 & 4 ℄RUNWAY 10-28℄RUN WAY 5-23℄RUNWAY 5-23CLOSED RUNWAY MARKER DURING PHASE 3 TAXIWAY A℄TAXIWAY BTAXIWAY APHASE 4 BARRICADES CLOSED RUNWAY MARKER DURING PHASE 3 CLOSED RUNWAY MARKER DURING PHASES 2 & 4 ℄RUNWAY 10-28 PHASE 4 BARRICADES CONTRACTOR'S STAGE AREA (TYP.) 20:1 APPROACH SLOPE NEW TAXIWAY C CONNECTOR TAXIWAY C TAXIWAY CNEW TAXIWAY C2 CONNECTOR File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\002-G1.1-PROJECT-LAYOUT PLAN.dwg Date: 4/20/2018 12:33 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C TAXIWAY C PROJECT LAYOUT PLAN CONTRACTOR'S STAGING AREA N.T.S. TYPE II LOW PROFILE BARRICADE DETAIL LEGEND CONTRACTOR'S HAUL ROUTE TYPE II LOW PROFILE BARRICADES G1.1 RUNWAY CLOSURE NOTES: 1.TEMPORARY CLOSED RUNWAY MARKERS ARE TO BE YELLOW AND MADE OF FABRIC, COLORED PLASTIC, PAINTED SHEETS OF PLYWOOD OR SIMILAR MATERIAL APPROVED BY THE ENGINEER. THEY ARE TO BE SECURED TO PREVENT MOVEMENT BY DROP WASH OR WIND USING SAND BAGS OR OTHER MEANS APPROVED BY THE ENGINEER. N.T.S. CLOSED RUNWAY MARKER 0 400200100 ESB CB B1 CB B2 CB B3 CB B4 C B B 1 2 ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZOFZ O F Z OFZOFZOF Z O F Z OFZOFZ℄RUNWAY 5-23 CLOSED RUNWAY MARKER DURING PHASES 2 & 4 TAXIWAY C PHASES 3 & 4 BARRICADES AFTER TAXIWAYS C AND C1 HAVE BEEN OPENED 200'125'6 5 . 5 '℄TAXIWAY A PHASE 2 BARRICADES PHASE 4 BARRICADES ℄TAXIWAY BPHASE 2 BARRICADES PHASE 3 BARRICADES℄R U NW A Y 1 0 - 2 8 (TO BE REMOVED) (TO BE REMOVED) (TO BE REMOVED) (TO BE REMOVED)(2) 18" R.C.P.CB B5 CB B6 CB B7 CB B8 CB B9 (TO BE REMOVED) (TO BE REMOVED) (TO BE REMOVED) ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZROFZ ROFZR O F ZOF Z OFZROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ OFZCLOSED RUNWAY MARKER DURING PHASES 2 & 4 ℄ R U NW A Y 1 0 - 2 8 ℄RUNWAY 5-23 ℄ T A X IW A Y B TAXIWAY C65.5'200'PHASE 2 BARRICADES PHASE 4 BARRICADES PHASE 2 BARRICADES PHASE 4 BARRICADES PHASE 3 BARRICADES PHASE 2 BARRICADES 65.5'65.5'PHASE 3 BARRICADES PHASE 1 BARRICADES PHASE 1 BARRICADES File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\003-G1.2-CSPS PLAN.dwg Date: 4/20/2018 12:36 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C TAXIWAY C PHASING PLAN 0 20010050 0 20010050 LEGEND PHASE 1 CONSTRUCTION PHASE 2 CONSTRUCTION PHASE 3 CONSTRUCTION PHASE 4 CONSTRUCTION PHASE 5 CONSTRUCTION MATCH LINE A-A THIS SHEETMATCH LINE A-A THIS SHEET1.SEE SHEET G1.1 FOR BARRICADE DETAILS AND ADDITIONAL BARRICADE LOCATIONS. 2.SEE SHEET G2.1 FOR ADDITIONAL SECURITY, SAFETY AND PHASING NOTES. TYPE II LOW PROFILE BARRICADES G1.2 File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\004-G2.1-GENERAL AND PHASING_NOTES.dwg Date: 4/20/2018 12:40 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C GENERAL AND PHASING NOTES GENERAL NOTES 1.EACH CONTRACTOR SHALL OBTAIN, HAVE KNOWLEDGE OF, AND INCORPORATE THE FOLLOWING SAFETY PROVISIONS INTO THE CONSTRUCTION PROJECT: ~ OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION - AC 150/5370-2F ~ AIRPORT SAFETY SELF-INSPECTION - AC 150/5200-18C ~ PAINTING, MARKING, AND LIGHTING OF VEHICLES USED ON AN AIRPORT - AC 150/5210-5D ~ FEDERAL AVIATION REGULATIONS, PART 139 2.FOR OTHER CONDITIONS RELATING TO SAFETY, SEE SPECIFICATIONS. 3.NOTICE TO AIRMEN (NOTAMS) - THE CONTRACTOR WILL PROVIDE THE NECESSARY INFORMATION ON CONSTRUCTION CONDITIONS (PAVEMENT CLOSURE, TIE-INS, ETC.) TO THE OWNER A MINIMUM OF SEVEN (7) DAYS PRIOR SO THAT A NOTAM CAN BE ISSUED IN ACCORDANCE WITH ESTABLISHED CRITERIA BY THE OWNER TO THE F.A.A. FLIGHT SERVICE STATION. 4.CONTRACTOR SHALL MONITOR THE AIRPORT 2-WAY UNICOM RADIO FREQUENCY (123.05) AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR WILL HAVE A WORKING RADIO ON SITE AT ALL TIMES DURING CONSTRUCTION AND SHALL ASSIGN RESPONSIBLE PERSONNEL INCLUDING ALL FLAG MEN TO CONTINUOUSLY MONITOR THE APPROPRIATE FREQUENCY. THE RADIOS SHALL BE AS SPECIFIED IN SECTION 01510 OF THE PROJECT MANUAL. 5.CONSTRUCTION STAKE-OUT SHALL BE PERFORMED BY CONTRACTOR IN ACCORDANCE WITH ARTICLE 50-06 OF THE GENERAL PROVISIONS OF THE CONTRACT DOCUMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MEASUREMENTS THAT MAY BE REQUIRED TO LAY OUT THE CONSTRUCTION. THE COST OF STAKING WILL NOT BE PAID FOR DIRECTLY AND SHALL BE INCLUDED IN THE UNIT PRICES FOR THE VARIOUS ITEMS OF WORK. 6.THE CONTRACTOR WILL BE RESPONSIBLE FOR THE CLEANUP AND DISPOSAL OF ALL TRASH AND DEBRIS CREATED BY HIS WORK OR PERSONNEL. NO BURNING IS ALLOWED ON SITE. ALL TRASH AND DEBRIS MUST BE DISPOSED OF OFFSITE. 7.THE CONTRACTOR SHALL MAKE HIS OWN ARRANGEMENTS FOR ASPHALT AND OR CONCRETE BATCH PLANT LOCATIONS WHICH MUST BE LOCATED OFF AIRPORT PROPERTY. 8.THE CONTRACTOR SHALL VISIT SITE TO DETERMINE EXISTING CONDITIONS PRIOR TO SUBMITTING BID. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ANY VARIATIONS FROM THE INFORMATION SHOWN ON THE CONSTRUCTION PLANS. 9.APPROVED CUTS IN PAVEMENT OR CONCRETE SHALL BE MADE USING A PAVEMENT SAW, AND SHALL BE PATCHED TO MATCH THE EXISTING SURFACE IN A MANNER APPROVED BY THE ENGINEER. 10.EXISTING EASEMENTS TO OTHER PROPERTIES SHALL BE MAINTAINED AT ALL TIMES. 11.AIRFIELD PAVEMENTS SHALL BE KEPT FREE OF ALL DEBRIS, DIRT, ETC., AT ALL TIMES. ANY SPILLAGE OF EXCAVATION OR OTHER MATERIAL SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR WITH A MOTOR DRIVEN SWEEPER OR VACUUM AS REQUIRED BY THE ENGINEER. A PROGRAM OF REGULAR AIRFIELD PAVEMENT INSPECTION WILL BE PLANNED BY THE CONTRACTOR, AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE. SWEEPERS ARE TO BE EQUIPPED WITH NON-METALIC BROOMS. 12.ALL NON-PAVED AREAS OUTSIDE THE LIMITS OF CONSTRUCTION WHICH ARE DISTURBED BY THE CONTRACTOR'S OPERATIONS, SUCH AS THE CONTRACTOR'S ACCESS ROAD, STAGING AREA, HAUL ROUTES, ETC., SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AND GRASSED PER ITEM T-901 UPON COMPLETION OF THE PROJECT. 13.ANY DAMAGES DONE TO AIRPORT PROPERTY OR UTILITIES (SUCH AS RUNWAY, TAXIWAYS, APRONS, FENCING, EXISTING CABLES) WILL BE REPAIRED BY THE CONTRACTOR TO THE APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY MANNER. THE CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS. 14.THE CONTRACTOR SHALL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES. NO UNAUTHORIZED PERSONNEL SHALL BE ALLOWED ON THE SITE. 15.CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT LINES, FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED STAKES OR FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO SUBMIT PLAN SHOWING LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR PROJECT DURATION TO THE ENGINEER FOR APPROVAL. 16.THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE COMPLETION OF THIS PROJECT. 17.THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL ENVIRONMENTAL RULES AND REGULATIONS OF THE CITY, COUNTY, STATE, ARMY CORPS OF ENGINEERS, AND ANY OTHER JURISDICTIONAL AGENCIES, AND ALL CONDITIONS SET FORTH IN ENVIRONMENTAL PERMITS. 18.AIRCRAFT OPERATING ON THE AIRFIELD MAKE THE CONSTRUCTION AREA A ZONE OF HIGH LEVEL NOISE. THE CONTRACTOR IS ADVISED TO TAKE THE NECESSARY PRECAUTIONS, SUCH AS THE USE OF EAR PLUGS AND EAR MUFFS TO PREVENT EAR INJURY TO ANY PERSONNEL WORKING IN THE AREA. 19.ALL DISPUTES ARISING FROM THE CONTRACTOR SHALL BE DECIDED BY THE ENGINEER, WHOSE DECISION SHALL BE FINAL. 20.BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY. 21.ALL DEMOLISHED MATERIALS BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE SHOWN IN THE CONTRACT DOCUMENTS. CONSTRUCTION AND DEMOLITION DEBRIS SHALL BE LEGALLY DISPOSED OF OFF AIRPORT PROPERTY. 22.THE CONTRACTOR SHALL KEEP A WATER TRUCK ONSITE AT ALL TIMES FOR THE PURPOSE OF CONTROLLING DUST AS REQUIRED BY THE CONTRACT DOCUMENTS. HAUL ROUTE / STAGING 23.THE CONTRACTOR WILL BE RESPONSIBLE FOR THE STORAGE AND SECURITY OF HIS MATERIAL AND EQUIPMENT AND SHALL ERECT STORAGE FACILITIES AND FENCING AS NECESSARY. THE CONTRACTOR'S STORAGE AND STAGING AREA SHALL BE IN THE LOCATION SHOWN ON DRAWING G-102-1. 24.THE CONTRACTOR'S STAGING AREA(S) AND HAUL ROUTES SHOWN ON THE PLANS ARE GENERAL AND FOR INFORMATIONAL PURPOSES ONLY. THE ACTUAL SIZE AND LOCATION OF STAGING AREAS AND HAUL ROUTES WILL BE APPROVED BY THE OWNER PRIOR TO CONSTRUCTION. 25.CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING RUNWAYS OR TAXIWAYS AS PART OF THE HAUL ROAD UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER'S REPRESENTATIVE. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR CROSS ANY RUNWAY AT ANY TIME WITH CONSTRUCTION VEHICLES OR EQUIPMENT. 26.ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA THROUGH THE PROJECT ACCESS ROUTES APPROVED BY THE ENGINEER ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY OF ALL GATES HE USES FOR ACCESS ONTO AIRPORT PROPERTY. THE CONTRACTOR SHALL POST A GUARD AT ANY ACCESS GATE THAT IS NOT LOCKED. 27.THE EXISTING AIRPORT PAVEMENTS ACCESS ROADS AND HAUL ROUTES MAY NOT BE CAPABLE OF SUPPORTING CERTAIN TYPES OF CONSTRUCTION EQUIPMENT. PRIOR TO BIDDING, THE CONTRACTOR SHALL FULLY SATISFY HIMSELF AS TO THE ABILITY OF THE EXISTING AIRPORT PAVEMENTS TO SATISFACTORILY SUSTAIN THE TYPE OF EQUIPMENT HE PLANS TO USE. CONTRACTOR SHALL SIZE THE EQUIPMENT USED FOR CONSTRUCTION ACCORDINGLY. ANY DAMAGE CAUSED BY HAULING OR ANY OTHER CONSTRUCTION ACTIVITY TO EXISTING PAVEMENT SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 28.THE OWNER'S REPRESENATIVE SHALL DESIGNATE AREAS TO BE USED BY THE CONTRACTOR FOR THE PARKING OF CONSTRUCTION EQUIPMENT AND VEHICLES WHEN NOT ENGAGED IN THE CONSTRUCTION DURING NON-WORKING DAYS AND NIGHTS AS WELL AS AREAS FOR CONTRACTOR'S EMPLOYEES AUTO PARKING. 29.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL PERMANENT AND TEMPORARY UTILITY CONNECTIONS TO THE STAGING AREA. MOVEMENT ON AIRFIELD 30.AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS. THE CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY TIME, UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER'S REPRESENTATIVE OR AIRPORT OPERATIONS. 31.THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS AS SHOWN ON THE CONSTRUCTION SAFETY & PHASING PLAN, AND HIS APPROVED PHASING PLAN. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE OWNER'S REPRESENTATIVE TO MINIMIZE INTERFERENCE TO AIRCRAFT OPERATIONS DURING CONSTRUCTION. 32.NO CONTRACTOR VEHICLES, EQUIPMENT, OR PERSONNEL SHALL CROSS OR BE WITHIN ANY RUNWAY SAFETY AREA OR WITHIN ANY TAXIWAY OBJECT FREE AREA AS DELINEATED IN THE PLANS. THE CONTRACTOR SHALL NOT PARK OR LEAVE UNATTENDED ANY EQUIPMENT WITHIN THE RUNWAY OBJECT FREE AREA (ROFA) OR THE RUNWAY PROTECTION ZONE (RPZ). EQUIPMENT NOT MANNED AND BEING USED SHALL NOT BE ALLOWED WITHIN THE ROFA OR RPZ. 33.ALL VEHICLES USED ON THE AIRFIELD SHALL MEET FAA REQUIREMENTS FOR MARKINGS AND LIGHTING. (SEE AC 150/5210-5D). 34.ALL ACTIVE AIRPORT OPERATIONAL AREAS WHICH ARE ADJACENT TO A CONSTRUCTION WORK AREA SHALL BE SEPARATED BY TYPE II LOW PROFILE BARRICADES OR OTHER BARRIER APPROVED BY THE ENGINEER. NO CONSTRUCTION TRAFFIC WILL CROSS ACTIVE AIRPORT OPERATIONAL AREAS. THE CONTRACTOR SHALL PROVIDE AND INSTALL THE BARRIERS AS SHOWN ON THE DRAWINGS AND WHERE DIRECTED BY THE ENGINEER. SEE SPECIFICATION 01030 AND 01530 FOR ADDITIONAL INFORMATION. 35.THE CONTRACTOR SHALL WORK WITH THE ENGINEER IN SCHEDULING ALL TAXIWAY OPENINGS/CLOSINGS TO BE CONSISTENT WITH AIRFIELD OPERATIONS. WHEN THE CONTRACTOR'S OPERATIONS CROSS ACTIVE TAXIWAYS, HE SHALL BE REQUIRED TO PROVIDE A FLAGMAN ON EACH SIDE OF THE ACTIVE CROSSING TO DIRECT VEHICULAR TRAFFIC AND PROTECT AIRCRAFT TRAFFIC. THE CONTRACTOR SHALL ALSO HAVE SUITABLE EQUIPMENT APPROVED BY THE ENGINEER AT EACH CROSSING TO KEEP THE CROSSING CLEAN OF ALL DIRT AND DEBRIS AND SAFE FOR AIRCRAFT TRAFFIC. BURIED UTILITIES 36.PRIOR TO DIGGING ANY TRENCHES, THE CONTRACTOR SHALL NOTIFY ALL UTILITIES (ELECTRIC, GAS, TELEPHONE, WATER, SEWER) AND OBTAIN LOCATIONS OF UNDERGROUND UTILITIES. 37.CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL EXISTING UTILITIES AND UNDERGROUND PIPELINES IN CONSTRUCTION AREA. ANY DAMAGES TO EXISTING UTILITIES OR UNDERGROUND PIPELINES ON OR OFF AIRPORT PROPERTY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL REPAIR WORK SHALL MEET THE APPROVAL OF THE OWNER OF THE DAMAGED UTILITY. NO REIMBURSEMENT WILL BE ALLOWED FOR UTILITY/PIPE REPAIR OR REPLACEMENT. 38.THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES, AIRFIELD LIGHTING AND NAVAIDS NOT CALLED OUT TO BE REMOVED OR ABANDONED. ANY DAMAGES DONE TO AIRPORT PROPERTY OR UTILITIES (INCLUDING, BUT NOT LIMITED T0 RUNWAYS, TAXIWAYS, APRONS, FENCING, EXISTING CABLES, LIGHTING, SIGNS, NAVAIDS) WILL BE REPAIRED BY THE CONTRACTOR TO THE APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY MANNER. THE CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS. 39.ANY UNPLANNED, UNAPPROVED, OR ACCIDENTAL SHUTDOWN OR INTERRUPTION OF SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES IMMEDIATE NOTIFICATION OF AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. THE COST OF MATERIALS AND LABOR REQUIRED TO REPAIR THE LIGHTING CIRCUIT SHALL BE BORNE BY THE CONTRACTOR. G2.1 PHASING NOTES TAXIWAY C THESE NOTES REFER TO THE PHASING PLAN ON SHEETS G1.1 AND G1.2. PHASE 1: PHASE 1 CONSISTS OF ALL WORK OUTSIDE OF 200' FROM THE RUNWAY 5-23 CENTERLINE AND 125' FROM THE RUNWAY 10-28 CENTERLINE (ROFZ'S) AND OUTSIDE 65.5' FROM THE TAXIWAY A AND B CENTERLINES (TOFA). PHASE 1 WORK CAN BE DONE ANYTIME DURING THE TOTAL CONTRACT TIME. PHASE 2: PHASE 2 CONSISTS OF ALL WORK WITHIN 200' OF THE RUNWAY 5-23 CENTERLINE (ROFZ) AND 65.5' OF THE TAXIWAY A CENTERLINE (TOFA) AND OUTSIDE 65.5' FROM THE TAXIWAY B CENTERLINE (TOFA). RUNWAY 5-23 SHALL BE CLOSED DURING THIS PHASE. THE CONTRACTOR SHALL HAVE 42 CONSECUTIVE CALENDAR DAYS FROM THE DATE RUNWAY 5-23 IS CLOSED TO COMPLETE ALL WORK IN THIS PHASE AND RE-OPEN THE RUNWAY. PHASE 3: PHASE 3 CONSISTS OF ALL WORK WITHIN 125' OF THE RUNWAY 10-28 CENTERLINE (ROFZ). RUNWAY 10-28 IS TO BE CLOSED DURING THIS PHASE. WORK IN THIS PHASE CANNOT BE DONE CONCURRENT WITH WORK IN PHASE 2. THE CONTRACTOR SHALL HAVE 14 CONSECUTIVE CALENDAR DAYS FROM THE DATE RUNWAY 10-28 IS CLOSED TO COMPLETE ALL WORK IN THIS PHASE AND RE-OPEN THE RUNWAY. PHASE 4: PHASE 4 CONSISTS OF ALL WORK WITHIN 65.5' OF THE TAXIWAY B CENTERLINE (TOFA) AND WITHIN 200' OF THE RUNWAY 5-23 CENTERLINE (ROFZ) EAST OF TAXIWAY B. RUNWAY 5-23 AND TAXIWAY B ARE TO BE CLOSED DURING THIS PHASE. WORK IN THIS PHASE CANNOT BEGIN UNTIL WORK IN PHASE 1 SOUTH OF RUNWAY 10-28 AND PHASE 2 HAVE BEEN COMPLETED, WITH THE EXCEPTION THAT WORK IN THIS PHASE OUTSIDE THE TAXIWAY B TOFA MAY BE DONE CONCURRENT WITH PHASE 2. THE CONTRACTOR SHALL HAVE AN ADDITIONAL 21 CONSECUTIVE CALENDAR DAY RUNWAY 5-23 CLOSURE PERIOD TO COMPLETE WORK IN THIS PHASE. PHASE 5: PHASE 5 CONSISTS OF ALL GRADING AND PAVEMENT DEMOLITION WORK LOCATED IN THE AREA BOUNDED BY BOTH RUNWAYS, TAXIWAY B AND THE EXISTING SECTION OF TAXIWAY C. WORK IN THIS PHASE MUST BE PERFORMED AT NIGHT WITH BOTH RUNWAYS CLOSED AND CANNOT BEGIN UNTIL PHASES 1 AND 2 HAVE BEEN COMPLETED. AT THE END OF EACH NIGHTTIME WORK SHIFT THE AREA WITHIN 60' OF THE RUNWAY 10-28 CENTERLINE AND 75' OF THE RUNWAY 5-23 CENTERLINE (RSA) MUST BE GRADED SMOOTH TO A MAXIMUM 5% SLOPE WITH NO DROP-OFF GREATER THAN 2” AT THE EDGE OF THE RUNWAY PAVEMENT AND PERSONNEL AND EQUIPMENT REMOVED FROM THE ROFZ'S BY SUNRISE SO THAT BOTH RUNWAYS CAN BE RE-OPENED. AFTER RECEIVING A NOTICE TO PROCEED THE CONTRACTOR MUST PREPARE A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) SHOWING HOW THE CONTRACTOR WILL COMPLY WITH THE CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) CONTAINED IN APPENDIX B OF THE PROJECT MANUAL. SEVEN DAYS PRIOR TO THE PRECONSTRUCTION CONFERENCE, THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS FOR APPROVAL BY THE ENGINEER WHICH INCLUDES DATES FOR RUNWAY AND TAXIWAY CLOSURES. LIQUIDATED DAMAGES LIQUIDATED DAMAGES AS PRESCRIBED IN SECTION 01010 - SUMMARY OF WORK, OF THE CONTRACT DOCUMENTS SHALL BE ASSESSED FOR: 1.EACH DAY BEYOND THE SPECIFIED CONTRACT TIME THE ENTIRE PROJECT IS NOT SUBSTANTIALLY COMPLETE AND READY FOR USE BY THE OWNER. 2.EACH DAY BEYOND 42 DAYS FROM THE DATE RUNWAY 5-23 IS FIRST CLOSED THAT WORK IN PHASE 2 IS NOT COMPLETE AND READY FOR RUNWAY 5-23 TO BE RE-OPENED TO AIRCRAFT OPERATIONS. 3.EACH DAY BEYOND 14 DAYS FROM THE DATE RUNWAY 10-28 IS FIRST CLOSED THAT WORK IN PHASE 3 IS NOT COMPLETE AND READY FOR RUNWAY 10-28 TO BE RE-OPENED TO AIRCRAFT OPERATIONS. 4.EACH DAY BEYOND 21 DAYS FROM THE DATE RUNWAY 5-23 IS FIRST CLOSED (AFTER THE INITIAL 42 DAY CLOSURE PERIOD) THAT WORK IN PHASE 4 IS NOT COMPLETE AND READY FOR RUNWAY 5-23 TO BE RE-OPENED TO AIRCRAFT OPERATIONS. 5.EACH MINUTE BEYOND SUNRISE EVERY MORNING DURING PHASE 5 THAT THE AREA WITHIN 60 FEET OF THE RUNWAY 10-28 CENTERLINE AND 75 FEET OF THE RUNWAY 5-23 CENTERLINE IS NOT CLEARED, GRADED SMOOTH WITH NO DROP-OFFS GREATER THAN 2” AT THE RUNWAY PAVEMENT EDGE, AND READY FOR THE RUNWAY TO BE OPENED TO AIRCRAFT OPERATIONS IN ACCORDANCE WITH SECTION 01030 OF THE CONTRACT DOCUMENTS. PROFILE GRADE POINT 1.0%1.0% CL RECESSED SOD 1.5" (TYP) 17.5' 10' SOD 17.5' VARIES 5%5% 6"6" 3" BITUMINOUS SURFACE COURSE (P-401) PLACED IN 2 EQUAL LIFTS PRIME COAT (P-602) 8" STABILIZED SUBGRADE- LBR 40 (P-160) COMPACTED SUBGRADE (P-152) GRASSED SLOPE 1.5% GRASSED SLOPE 1.5%4:110' SOD MATCH EXISTING GROUND 12'12' 22'22' (VARIES AT INTERSECTIONS)(VARIES AT INTERSECTIONS)TAXIWAY SAFETY AREA TAXIWAY SAFETY AREA 4: 1 VARIES 3% MATCH EXISTING GROUND 3% VARIES PROFILE GRADE POINT 1.0%1.0% RECESSED SOD 1.5" (TYP) 17.5' 10' SOD 17.5' VARIESVARIES 5%5% 6"6" 3" BITUMINOUS SURFACE COURSE (P-401) PLACED IN 2 EQUAL LIFTS PRIME COAT (P-602) 4" SHELL (P-212) OR RECYCLED CONCRETE AGGREGATE (P-219) BASE COURSE 8" STABILIZED SUBGRADE- LBR 40 (P-160) COMPACTED SUBGRADE (P-152) GRASSED SLOPE 1.5% GRASSED SLOPE 1.5%4:110' SOD MATCH EXISTING GROUND 12'12' 22'22' (VARIES AT INTERSECTIONS)(VARIES AT INTERSECTIONS)TAXIWAY SAFETY AREA TAXIWAY SAFETY AREA 4: 1 MATCH EXISTING GROUND ONSITE EXCAVATION ESTIMATE TOPSOIL STRIPPING: 10168 CY EXCAVATION: 10623 CY (MEASURED IN ITS ORIGINAL POSITION AT THE JOB SITE) CL 4" SHELL (P-212) OR RECYCLED CONCRETE AGGREGATE (P-219) BASE COURSE 5' TYPICAL TAXIWAY "C" SECTION STA. 101+20.00 TO STA. 112+50.00 TYPICAL TAXIWAY "C" SECTION STA. 112+50.00 TO STA. 122+00.00 VARIES VARIES 4:15'File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\005-C1.0-TYP-SECTIONS.dwg Date: 4/20/2018 12:41 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C1.0 TYPICAL SECTIONS AND DETAILS 6" TYPICAL TIE-IN TO EXIST PAVEMENT VERTICAL SAWCUT AT EDGE OF REMOVAL SEE NOTE 1 3" BITUMINOUS SURFACE COURSE (P-401) PLACED IN 2 EQUAL LIFTS PRIME COAT (P-602) 2' ASPHALT SURFACE REMOVAL SLOPE VARIES 8" STABILIZED SUBGRADE LBR 40 (P-160) COMPACTED SUBGRADE (P-152) 4" SHELL (P-212) OR RECYCLED CONCRETE AGGREGATE (P-219) BASE COURSE EXISTING BASE REMOVAL TACK COAT (P-603) ON SAWCUT SURFACES TRENCH THROUGH EXIST. ASPHALT PAVEMENT DETAIL SLOPE VARIES 3" BITUMINOUS SURFACE COURSE (P-401) PLACED IN 2 EQUAL LIFTS PRIME COAT (P-602) 4" SHELL (P-212) OR RECYCLED CONCRETE AGGREGATE (P-219) BASE COURSE 8" STABILIZED SUBGRADE- LBR 40 (P-160) COMPACTED SUBGRADE (P-152) CL TAXIWAY 'B' VERTICAL SAW CUT REMOVE EXIST. BASE AS REQUIRED REMOVE EXIST. ASPHALT SURFACE TYPICAL TAXIWAY "B" SECTION 25' SCARIFY EXIST. BASE SURFACE AND COMPACT PER ITEM P-212 SLOPE VARIES REMOVE EXIST. ASPHALT SURFACE SEE TAXIWAY "B" 25' LT PROFILE File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\005-C1.0-TYP-SECTIONS.dwg Date: 4/20/2018 12:41 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C1.1 TYPICAL SECTIONS AND DETAILS HYDGV1 7 . 0 816.93ESB (2) 18" R.C.P. ROFZROFZROFZROFZROFZ ROFZRO F Z ROFZ ROFZ ROFZ ROFZ ROFZOF Z OF Z OFZOFZOF Z ROFZ ROFZ ℄ TAXIWAY "C" C3.5 C4.5 C7.6 C3.4 C4.4 C7.5 C3.3 C4.3 C7.4 C3.2 C4.2 C7.3 C3.1 C4.1 C7.2C7.1 BENCHMARK #15 TRAV/SET PK EL.=19.14 N: 1265051.5560 E: 819472.7600 BENCHMARK #18 FND/CM L227 1965 EL.=19.84 N: 1265559.4770 E: 820098.0870 BENCHMARK #17 FND/PK & D PSM 5469 EL.=21.57 N: 1266331.8090 E: 820534.1850 File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\006-C2.0-KEY SHEET.dwg Date: 4/20/2018 12:47 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C2.0 KEY SHEET 0 400200100 CB B1℄ TAXIWAY "C" R25.00' N44°51'11"E 3718.39' ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ STA.103+64.00 OFF. 26.00'LT STA.102+89.00 OFF. 50.00'LT STA.102+74.57 OFF. 84.84'LT STA.103+10.64 OFF. 154.84'LT STA.103+65.22 OFF.214.73' LT STA.101+33.50 OFF. 35.00'RT STA.103+61.00 OFF. 17.50'RT STA.105+47.00 OFF. 17.50'LT STA.100+50.00 OFF. 106.36'RT R75.00'200'100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 TO RUNWAY 5-23 CENTERLINESEE PAVEMENT TIE-IN DETAIL (TYP.) N 1263806.49 E 817683.25 STA.103+50.06 OFF.228.48' LT STA.100+29.32 OFF.89.55' RT File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\007_C3.1-C3.5-STAKING & DEMOLITION PLANS.dwg Date: 4/2/2018 8:14 AMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C3.2 STA. 107+50.00C3.1 STAKING AND DEMOLITION PLAN NO. 1 0 603015 1. SEE THIS SHEET FOR LEGEND. LEGEND ASPHALT PAVEMENT TSA PROPOSED RUNWAY SAFETY AREA TOFA PROPOSED RUNWAY OBJECT FREE AREA SOIL BORING LOCATIONCB B8 REMOVAL ROFZ RUNWAY OBJECT FREE ZONE FULL DEPTH PAVEMENT REMOVAL ASPHALT SURFACE COURSE REMOVAL CB B2 R65.00'R 6 5 . 0 0 'R65.00 'R65.00'202+58200+00201+00202+00STA. 110+95.13 CL TW C = STA. 200+17.50 CL TW CONNECTOR C1 N:1264582.8491 E:818455.6356 190.00'75.00' 190.00'75.00' N44°51'11"E 3718.39'S45°08'49"E257.50'℄ TAXIWAY "C"℄ CONNECTORTAXIWAY "C1"ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ STA.109+70.13 OFF. 27.00'RT STA.110+45.13 OFF. 50.00'RT STA.111+45.13 OFF. 50.00'RT STA.112+20.13 OFF. 27.00'RT STA.114+10.13 OFF. 17.50'RT STA.201+37.50 OFF. 28.00'RT STA.201+37.50 OFF. 28.00'LT STA.202+07.50 OFF. 50.00'RT STA.202+19.98 OFF. 90.70'RT STA.202+19.92 OFF. 90.49'LT STA.202+07.50 OFF. 50.00'LT 200.00'108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 TO RUNWAY 5-23 CENTERLINESEE PAVEMENT TIE-IN DETAIL (TYP.) STA.202+57.50 CL TW CONNECTOR C1 = CL R/W 5-23 N:1264413.58 E:818625.78 (TO BE REMOVED) (TO BE REMOVED)File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\007_C3.1-C3.5-STAKING & DEMOLITION PLANS.dwg Date: 4/2/2018 8:17 AMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C3.3 STA. 115+30.00C3.2MATCH LINE SHEET C3.1 STA. 107+50.00STAKING AND DEMOLITION PLAN NO. 2 0 603015 1. SEE SHEET C3.1 FOR LEGEND. CB B3 CB B4 R25. 0 0 ' R25 . 0 0 ' R 7 5 . 0 0 'R75.00'3 0 0 + 0 0 301+003 0 2 + 0 0 303+00303+68R75.00 ' R75.0 0' STA. 119+57.16 CL TW C= STA. 300+29.21 CL TW CONNECTOR C2 ALIGNMENT N:1265193.9596 E:819063.6174 N44°51'11"E 3718.39'N89°52'37"E368.48'℄ TAXIWAY "C"OFZOFZOF Z OFZOFZOF Z ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ OFZOFZOF Z STA.117+15.16 OFF. 17.50'RT STA.119+42.66 OFF. 35.00'RT STA.120+51.43 OFF. 26.00'LT STA.121+26.43 OFF. 50.00'LT STA.121+94.95 OFF. 28.31'RTSTA.121+27.16 OFF. 50.00'RT STA.122+69.67 OFF. 34.06'RT STA.121+30.29 OFF. 105.55'LT STA.301+29.60 OFF. 27.96'RT STA.301+98.48 OFF. 50.00'RT STA.302+12.95 OFF. 84.92'RT STA.301+94.22 OFF. 121.31'RT STA.302+67.05 OFF. 28.29'LT STA.303+50.14 OFF. 34.67'LT STA.301+99.74 OFF. 49.83'LT 200'R75.00'℄ CONNECTOR TAXIWAY "C2"125'116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 TO RUNWAY 5-23 CENTERLINESEE PAVEMENT TIE-IN DETAIL (TYP.) STA. 122+96.43 CL TW C= CL R/W 10-28 N:1265434.47 E:819302.90 STA. 303+68.48 CL TW CONNECTOR C2 ALIGNMENT= CL R/W 5-23 N:1265194.6875 E:819402.8851 (TO BE REMOVED) TO BE REMOVED) STA.121+34.21 OFF. 109.94'LT STA.122+77.25 OFF. 41.62'RT STA.122+81.73 OFF. 37.12'RT File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\007_C3.1-C3.5-STAKING & DEMOLITION PLANS.dwg Date: 4/2/2018 9:08 AMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C3.4 STA. 123+00.00C3.3MATCH LINE SHEET C3.2 STA. 115+30.00STAKING AND DEMOLITION PLAN NO. 3 0 603015 1. SEE SHEET C3.1 FOR LEGEND. (TO BE REMOVED) (TO BE REMOVED) (TO BE REMOVED) (TO BE REMOVED) R25. 0 0 ' N44°51'11"E 3718.39' ℄ TAXIWAY "C" ROFZ ROFZ ROFZ ROFZ ROFZ ROFZOFZOF Z OF Z STA.126+48.74 OFF. 35.00'LT STA.402+44.16 OFF. 32.38'LT STA.128+76.24 OFF. 17.50'LT STA.128+79.24 OFF. 26.00'RTSTA.128+04.24 OFF. 50.00'RT STA.127+89.78 OFF. 84.89'RT STA.405+37.60 OFF. 26.09'LT STA.405+95.48 OFF. 23.43'LT 200'30' STA.401+39.77 OFF. 24.31'LT STA.400+24.22 OFF. 65.41'LT STA.400+65.71 OFF. 24.03'LT 65.50'123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 STA.401+39.77 OFF. 0.05'RT STA.405+71.93 OFF. 0.11'LT STA.125+27.43 OFF. 27.81'RT STA.126+44.54 OFF. 46.51'RT STA.402+09.62 OFF. 65.47'LT STA.401+49.39 OFF. 124.55'LT S E E P A V EM E N T T I E - I N D E T A I L ( T Y P . ) ℄ T A X IW A Y " B " 4 0 0 + 0 0 4 0 1 + 0 0 402+004 0 3 + 0 0 4 0 4 + 0 0 4 0 5 + 0 0 4 0 6 + 0 0 4 0 6 + 3 2 STA. 126+34.23 CL TW C = STA. 402+92.61 CL TW B ALIGNMENT N:1265673.9492 E:819541.1496 STA.406+31.81 CL TW B = CL R/W 5-23 N:311576.89 E:1475484.95 STA. 400+00.00 CL TW B N:1265673.3805 E:819248.5440 SAW CUT OUTSIDE LIMITS OF EXIST. RUNWAY EDGE STRIPES File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\007_C3.1-C3.5-STAKING & DEMOLITION PLANS.dwg Date: 4/4/2018 9:33 AMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C3.5 STA. 130+50.00C3.4MATCH LINE SHEET C3.3 STA. 123+00.00STAKING AND DEMOLITION PLAN NO. 4 0 603015 1. SEE SHEET C3.1 FOR LEGEND. BENCHMARK #17 FND/PK & D PSM 5469 EL.=21.57 N: 1266331.8090 E: 820534.1850 CB B5 CB B6 212+19TAXIWAY CURVE TABLE CURVE NO. C1 C2 C3 C4 C5 C6 C7 PI STATION 400+00.00 401+54.12 401+93.39 403+47.51 500+90.04 502+44.16 137+18.39 PI NORTHING/EASTING N: 1266002.6322 E: 819868.1499 N: 1266158.9023 E: 819867.7489 N: 1266188.2667 E: 819896.9629 N: 1266188.6677 E: 820053.2330 N: 1266252.4307 E: 819960.7985 N: 1266252.8317 E: 820117.0685 N: 1266488.6113 E: 820351.6410 DELTA 45° 00' 00" 45° 00' 00" 45° 00' 00" 45° 00' 00" 45° 00' 00" 45° 00' 00" 90° 00' 00" CHORD DIRECTION N22° 21' 11"E N22° 21' 11"E N67° 21' 11"E N67° 21' 11"E N67° 21' 11"E N67° 21' 11"E N89° 51' 11"E CHORD LENGTH 38.27' 38.27' 38.27' 38.27' 38.27' 38.27' 91.92' LENGTH 39.27' 39.27' 39.27' 39.27' 39.27' 39.27' 102.10' RADIUS 50.00' 50.00' 50.00' 50.00' 50.00' 50.00' 65.00' PC STATION 400+00.00 401+54.12 401+93.39 403+47.51 500+90.04 502+44.16 137+18.39 PT STATION 400+39.27 401+93.39 402+32.66 403+86.78 501+29.31 502+83.43 138+20.50 R65.00 ' 190.00'50.00' 28.00' 75.00'27.00'N44°51'11"E 3718.39'S45°08'49"E175.00'403+87400+00 401+00402+00 4 0 3 + 0 0 500+00 501+00 502+00502+83C1 C2 C 3 C4 C5 C 6 C 7 ℄ TAXIWAY "C" ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ STA.134+68.39 OFF. 17.50'RT STA.136+58.39 OFF. 27.00'RT STA.137+69.45 OFF. 43.79'RT STA.138+75.50 OFF. 28.00'RT STA.139+45.50 OFF. 50.00'RT STA.139+58.08 OFF. 91.04'RT STA.139+58.04 OFF. 17.50'LT STA.138+20.10 OFF. 17.50'LT STA.137+18.79 OFF. 17.50'LTSTA.134+63.34 OFF. 17.50'LT STA.130+85.34 OFF. 17.50'LT STA.131+27.19 OFF. 46.99'LT STA.131+84.88 OFF. 104.69'LT STA.134+21.49 OFF. 46.99'LT STA.133+63.79 OFF. 104.69'LT STA.133+19.59 OFF. 123.00'LT STA.133+25.12 OFF. 17.50'LT STA.132+15.87 OFF. 92.39'LT STA.132+42.34 OFF. 92.35'LT STA.131+79.06 OFF. 63.51'LT STA.131+33.05 OFF. 17.50'LT STA.132+29.08 OFF. 122.99'LT R62.50 'R62.50'R82. 0 0'200'139+95131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00139+00SEE PAVEMENT TIE-IN DETAIL (TYP.) N44°51'11"E 3718.39' N44°51'11"E 3718.39'S0°08'49"E114.85'S89°51'11"W114.85'STA. 139+95.50 CL TW C= CL R/W 5-23 N:1266319.3417 E:820521.7816 SAW CUT OUTSIDE LIMITS OF EXIST. RUNWAY EDGE STRIPE.File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\007_C3.1-C3.5-STAKING & DEMOLITION PLANS.dwg Date: 4/4/2018 9:36 AMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C3.5MATCH LINE SHEET C3.4 STA. 130+50.00STAKING AND DEMOLITION PLAN NO. 5 0 603015 1. SEE SHEET C3.1 FOR LEGEND. ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ℄ TAXIWAY "C"200'100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 17.60 17.60 17.40 17.20 17.4017.6017.8017.40 17.80 17.80 17.40 16.2016.40 16.20 16.80 18.00 17.60 17.60 17.6017.00 16.80 17.20 17.40 17.20 17.60 17.80 17.20 17.40 17.6017.40 17.60 17.00 17.20 17.40 17.0017.2017.4017.6016.6017.2017.40 17.00 17.20 17.40 17.60 17.80 16.00 16.40 17.00 16.8016.6016.40 16.60 16.20 17.2017.4015.00 15.00 16.00 17.00 15. 0 0 17.00 16.00 17.00 16.00 16.00 18.00 17.00 17.00ROFZROFZROFZROFZROFZROFZROFZROFZROFZ ROFZ CONSTRUCT 92 L.F. OF 18" CLASS V RCP CONSTRUCT TEMPORARY CHECK DAM CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 104+24.90 OFF. 52.77' LT INV. EL. 15.00 CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 104+24.83 OFF. 47.34' RT INV. EL. 15.10 ESB CB B1 18.00 17.00 16.00 LIMITS OF CONSTRUCTION AND GRASSING (TYP.) CONSTRUCT TEMPORARY CHECK DAM 3 %10 %SEE PAVEMENT TIE-IN DETAIL (TYP.)File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\008_C4.1-4.5-GRADING & DRAINAGE PLANS.dwg Date: 4/4/2018 2:11 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C4.2 STA. 107+50.00C4.1 0 603015 GRADING AND DRAINAGE PLAN NO. 1 1. SEE THIS SHEET FOR LEGEND. LEGEND ASPHALT PAVEMENT TSA PROPOSED RUNWAY SAFETY AREA TOFA PROPOSED RUNWAY OBJECT FREE AREA SOIL BORING LOCATIONCB B8 ROFZ RUNWAY OBJECT FREE ZONE NEW INLET NEW MITERED END SECTION M.E.S PROPOSED CONTOURS17.20 TEMPORARY SILT FENCE LIMITS OF CONSTRUCTION AND GRASSING ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ℄ TAXIWAY "C"℄ CONNECTORTAXIWAY "C1"200.00'200+00201+00202+00202+58108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 18.0 0 18.00 17.80 19.20 19.0018.80 18.6 0 18. 4 0 18. 2 0 17.80 19.40 19.40 19. 2 0 18.80 18.4017.40 18.00 18.00 17.80 17.80 17.40 17.80 18.0018.0017.8018.00 19.20 17.20 17.40 17.8017.40 18.0017.8017.4017.00 18.6018.40 18.20 18.0017.6017.4017.2016.8016.6015.8015.8016.2015.6016.20 16.00 15.80 15.60 17.00 17.20 17.40 17.60 17.2 0 17. 4 0 17. 6 0 1 7 . 8 0 1 8 . 0 0 1 8 . 2 0 1 8 . 4 0 1 8 .6 0 19.00 19.20 19.00 18.80 18.60 18.40 18.20 18. 4 0 18.2 0 18.60 18.80 19.00 17.20 17.40 17.6 0 17.80 18.00 18.20 18.40 18.60 18.80 19.00 19.20 19. 0 018. 8 0 18.00 18.20 18.40 18.60 18.80 19.00 17.00 17.20 17.40 17.60 17.80 18.00 18.20 18.40 17.60 17.40 17.20 17.00 16.80 16.60 16.40 17.80 17.60 17.40 16.80 17.00 17.20 17.40 17.60 17.80 18.8018.60 18.20 18.00 CL TW C ALIGNMENT STA. 110+95.15= CL CONNECTOR C1 ALIGNMENT STA. 200+17.50 N:1264582.8599 E:818455.6463 17.00 16.00 18.00 17.00 16.00 16.00 16.0017.0018.00 16.00 17.00 18.00 16.00 17.00 18.00 16.00 16.00 17.00 17.00 18.00 17.0 0 17.00 18.0 0 ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ CONSTRUCT 97 L.F. OF 18" CLASS V RCP CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 112+50.00 OFF. 49.02' LT INV. EL. 15.45 CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 112+50.00 OFF. 56.31' RT INV. EL. 15.55 CONSTRUCT TEMPORARY CHECK DAM CONSTRUCT TEMPORARY CHECK DAM CB B2 ENCASE EXIST 1WAY-2" CONDUITS IN 6" CONC. ENVELOPE TO 5' BEYOND THE EDGE OF PAVEMENT. PROTECT EXIST. COUNTERPOISE WIRE. SEE PAVEMENT TIE-IN DETAIL LIMITS OF CONSTRUCTION AND GRASSING (TYP.) INSTALL NEW L-852D SEMI-FLUSH MOUNT RUNWAY EDGE LIGHT ON EXIST. CONDUIT AND IN LINE WITH EXIST. RUNWAY LIGHTS. RE-USE EXIST. 5KV CABLES. INSTALL NEW L-868B JUNCTION CAN ON EXIST. CONDUITS. TOP OF COVER PLATE TO BE FLUSH WITH PAVEMENT SURFACE.File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\008_C4.1-4.5-GRADING & DRAINAGE PLANS.dwg Date: 4/4/2018 2:11 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C4.3 STA. 115+30.00C4.2MATCH LINE SHEET C4.1 STA. 107+50.000 603015 GRADING AND DRAINAGE PLAN NO. 2 1. SEE SHEET C4.1 FOR LEGEND. ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ OFZOF Z OF ZOF Z OF Z OFZOFZOFZOF Z ℄ TAXIWAY "C"200'3 0 0 + 0 0 301+003 0 2 + 0 0 303+00303+68116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 19.20 19.00 19.40 19.40 18.80 19. 0 0 18. 8 0 19.0019.00 18. 8 0 1 8 . 6 0 19.20 19.4019.2019.40 18.40 18.6019.2019.40 18.0018.00 17.6018.00 18.20 18.80 17.8017.4017.20 19.00 19.20 18.80 18.60 18.40 18.60 18.40 1 9 . 0 0 1 8 . 8 0 1 8 . 6 0 18. 4 0 1 8 . 0 0 1 8 . 2 0 18.40 19.20 19.00 18.80 18.60 18.4018.2018. 6 0 18. 4 0 19.00 19.20 19.4018 . 2 0 1 8 . 0 0 18.20 18.4 0 18. 6 0 1 8 . 8 0 19 . 0 0 1 9 . 2 0 19.40 1 9 . 4 0 1 9 . 2 0 19.00 18.80 18.6018.8019.0019.2019.40 1 9 . 4 0 18.20 18.40 18.60 18.80 18.6018.40 18.6018.0017.8017.6017.4017.20 17.0016.8017.40 18.80 19.00 19.20 18.80 19.00 19.20 18.80 18.60 1 9 . 0 0 19.00CL TW C ALIGNMENT STA. 119+57.16= CL CONNECTOR C2 ALIGNMENT STA. 300+29.21 N:1265193.9596 E:819063.6174 18.00 16.00 16.00 17.00 18.00 18.0017.00 16.00 16.00 17.00 18.00 1 8 . 0 0 1 7 . 0 0 1 6 . 0 0 1 6 . 0 0 1 8 . 0 0 1 7 . 0 0 18.00 18 . 0 0 18.0 0 ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ OFZOF Z OF ZOF Z OF Z OFZOFZOFZOF Z 18.60 ℄ CONNECTOR TAXIWAY "C2" CONSTRUCT TEMPORARY CHECK DAM CONSTRUCT TEMPORARY CHECK DAM CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 301+27.92 OFF. 61.03' RT INV EL. 15.65 CONSTRUCT 157 L.F. OF 18" CLASS III RCP CB B3 CB B4 LIMITS OF CONSTRUCTION AND GRASSING (TYP.) ENCASE EXIST 1WAY-2" CONDUITS IN 6" CONC. ENVELOPE TO 5' BEYOND THE EDGE OF PAVEMENT. PROTECT EXIST. COUNTERPOISE WIRE. CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 302+20.36 OFF. 75.55' LT INV EL. 15.75 CONSTRUCT TEMPORARY CHECK DAM INSTALL NEW L-852D SEMI-FLUSH MOUNT RUNWAY EDGE LIGHT ON EXIST. CONDUIT AND IN LINE WITH EXISTING RUNWAY LIGHTS. RE-USE EXIST. 5KV CABLES. INSTALL NEW L-868B JUNCTION CAN ON EXIST. CONDUITS. TOP OF COVER PLATE TO BE FLUSH WITH PAVEMENT SURFACE. SEE PAVEMENT TIE-IN DETAIL (TYP.)File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\008_C4.1-4.5-GRADING & DRAINAGE PLANS.dwg Date: 4/4/2018 2:11 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C4.4 STA. 123+00.00C4.3MATCH LINE SHEET C4.2 STA. 115+30.000 603015 GRADING AND DRAINAGE PLAN NO. 3 1. SEE SHEET C4.1 FOR LEGEND. OFZOFZOF Z ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ℄ TAXIWAY "C"200'123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 20.40 20.40 20.2 0 20.0 0 19.8 0 19.6 0 19.2019.4019.60 19.4 0 18.40 19.80 18.60 19.40 19.80 19.60 19.40 20.40 18.40 17.20 1 9 . 2 019.6019.80 19.00 18.00 18.00 17.00 18.0017.00 19.00 18.60 18.80 19.20 19.40 18.40 19 . 0 0 1 9 . 0 0 18.6 0 18.80 18.60 18.40 18.20 17.00 17.40 17.60 17.80 1 9 . 4 0 1 9 . 4 0 20.00 19.8019.6019.4019.2 0 19.0 0 1 8 . 8 0 1 8 . 6 0 18.6018.40 18.20 18.00 17.60 17.60 19.00 18.00 18.00 19.00 17.80 18.00 17.60 17.60 19.00 18.00 19.00 18.00 18.00 19.00OFZOFZ OF Z ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ CONSTRUCT TEMPORARY CHECK DAM 19.80 19.40 1 9 . 8 0 2 0 . 0 0 1 9 . 4 0 19.20 19.20 18.8 0 1 8 . 4 0 18.601 9 . 0 0 1 9 . 0 0 19.60 19.8020.00 1 8 . 8 0 ENCASE EXIST 1WAY-2" CONDUITS IN 6" CONC. ENVELOPE TO 5' BEYOND THE EDGE OF PAVEMENT CONSTRUCT 4:1 M.E.S. ON 15" RCP STA.124+90.83 OFF.70.43' RT INV.EL. 16.60 LIMITS OF CONSTRUCTION AND GRASSING (TYP.) LIMITS OF CONSTRUCTION AND GRASSING (TYP.) 19.4019.2 019.0 0 18.8 0 18.6 0 18.4 0 18.2 0 18.0 0 17.8 0 17.6 0 17.4 0 17.2 0 17 . 0 0 17.201 7 . 4 0 17.601 7 . 8 0 1 8 . 0 0 1 8 . 2 0 16.80 1 8 . 4 0 1 8 . 4 0 1 8 . 6 0 1 8 . 8 0 1 9 . 0 0 19.0018.80 18.60 1 8 . 6 0 18 . 8 0 19.00 1 8 . 6 0 1 8 . 8 0 1 9 . 0 0 1 9 . 2 0 1 9 . 4 0 1 9 . 6 0 1 9 . 8 0 20.40 20.20 20.00 19.80 19.6 019.4 0 19.40 19.20 18.80 18.60 18.40 18.20 18.00 SEE PAVEMENT TIE-IN DETAIL (TYP.)File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\008_C4.1-4.5-GRADING & DRAINAGE PLANS.dwg Date: 4/4/2018 2:12 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C4.5 STA. 130+50.00C4.4MATCH LINE SHEET C4.3 STA. 123+00.000 603015 GRADING AND DRAINAGE PLAN NO. 4 1. SEE SHEET C4.1 FOR LEGEND. ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ℄ TAXIWAY "C"200'400+00 401+00402+00 4 0 3 + 0 0 403+87 500+00 501+00 502+00502+83 139+95131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00139+0020.2020.20 20.40 2 0 . 4 0 20.00 20.4020.60 20.80 20.60 18.8018.40 20.4020.4020.0020.40 20 . 4 0 17.6 0 2 0 . 2 0 20.4020.40 20.4018.80 18.00 17.00 2 0 . 2 0 19.40 20.2020.40 18.8020.80 20.402 0 . 4 0 21.00 20.0020.002 0 . 0 0 20.00 20.00 18.00 19.00 18.00 19.00 20.00 20.00 19.00 18.00 19.00 18.00 18.00 19.00 18.00 19.00 18.00 19.00 20.00 18.00 19.00 20.0019.00 19.0 0 19.0018.00 19.00 18.0019.8019.60 1 9 . 8 0 19.80 1 8 . 6 0 1 8 . 8 0 19.00 1 9 . 2 0 1 9 . 4 0 1 9 . 6 0 19.60 19.8 0 20.0 0 19.80 17.4019.0018.0019.0019.0 0 19.80 20.00 2 0 . 0 0 ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ CONSTRUCT 97 L.F. OF 18" CLASS V RCP CONSTRUCT 92 L.F. OF 18" CLASS V RCP CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 132+29.00 OFF. 47.63' RT INV. EL. 17.58 CONSTRUCT 4:1 M.E.S. ON 18" RCP STA. 131+63.00 OFF. 126.07' LT INV. EL. 17.41 CONSTRUCT TYPE D INLET STA. 132+29.00 OFF. 55.16' LT TOP EL. = 19.55 INV. EL. (N. & S.) =17.50 CONSTRUCT TEMPORARY CHECK DAM CONSTRUCT TEMPORARY CHECK DAM BENCHMARK #17 FND/PK & D PSM 5469 EL.=21.57 N: 1266331.8090 E: 820534.1850 CB B5 CB B6 TO RUNWAY 5-23 CENTERLINEENCASE EXIST 1WAY-2" CONDUITS IN 6" CONC. ENVELOPE TO 5' BEYOND THE EDGE OF PAVEMENT LIMITS OF CONSTRUCTION AND GRASSING (TYP.)PLACE TYPE III SILT FENCE SEE SHEET C6.0 FOR DETAILS SEE PAVEMENT TIE-IN DETAIL File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\008_C4.1-4.5-GRADING & DRAINAGE PLANS.dwg Date: 4/4/2018 2:13 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C4.5MATCH LINE SHEET C4.4 STA. 130+50.000 603015 GRADING AND DRAINAGE PLAN NO. 5 1. SEE SHEET C4.1 FOR LEGEND. 101+00 17.63102+0017.6617.69103+0017.7317.76104+0017.8017.83105+0017.8617.90106+0017.9317.97107+0018.0018.01108+00 0.068%PVI 101+18.70ELEV = 17.60PVI 107+00.00ELEV = 18.00L PROPOSED CENTERLINE PROFILE GRADE PROP. C ELEV.BEGIN PROPOSED CLTIE TO EXIST.PAVEMENT108+0018.0218.03109+0018.0418.04110+0018.0518.06111+0018.0918.29112+0018.4918.68113+0018.8819.08114+0019.2819.48115+0019.5019.50116+00 0.018% 0.397%PVI 110+95.13ELEV = 18.07PVI 114+55.00ELEV = 19.50L PROPOSED CENTERLINE PROFILE GRADE PROP. C ELEV.CL TAXIWAY CCL CONNECTOR "C1"STA. 200+17.50File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\009_C5.1-C-5.4 ( PROFILE).dwg Date: 4/20/2018 12:51 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C5.1 TAXIWAY "C" PROFILE HORIZ. SCALE VERT. SCALEMATCH LINE SEE STA. 108+00.00MATCH LINE SEE STA. 108+00.0010 12 14 16 18 20 22 24 26 MATCH LINE SEE STA. 116+00.0010 12 14 16 18 20 22 24 26 108+00 108+00 116+00 TAXIWAY "C" PROFILE TAXIWAY "C" PROFILE 12 14 16 18 20 22 24 26 10 12 14 16 18 20 22 24 26 10 CL TW C PROFILE VIEW 116+0019.5019.50117+0019.5019.50118+0019.5019.50119+0019.5019.50120+0019.4419.38121+0019.3119.25122+0019.3119.58123+0019.920.000%0.711%-0.131% 100' V.C.PVC 121+44.44ELEV = 19.25PVT 122+44.44ELEV = 19.54PVI 119+57.16ELEV = 19.50PVI 122+44.44ELEV = 19.54L PROPOSED CENTERLINE PROFILE GRADE PROP. C ELEV.TIE TO EXIST.R/W " 10-28" EOPCL TAXIWAY CCL CONNECTOR "C2"STA. 300+29.21126+0019.8719.63127+0019.5619.70128+0019.8920.09129+0020.2820.47130+0020.4720.47131+0020.4720.47132+0020.47-0.496% 0.382% 0.000% 100' V.C.PVC 126+34.30ELEV = 19.70PVT 127+34.30ELEV = 19.64PVI 129+50.00ELEV = 20.47L PROPOSED CENTERLINE PROFILE GRADE PROP. C ELEV.TIE TO EXIST.T/W "B" CLFile Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\009_C5.1-C-5.4 ( PROFILE).dwg Date: 4/20/2018 12:51 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C5.2 TAXIWAY "C" PROFILE HORIZ. SCALE VERT. SCALEMATCH LINE SEE STA. 116+00.0010 12 14 16 18 20 22 24 26 10 12 14 16 18 20 22 24 26 10 12 14 16 18 20 22 24 26 MATCH LINE SEE STA. 132+00.0010 12 14 16 18 20 22 24 26 116+00 132+00 TAXIWAY "C" PROFILE TAXIWAY "C" PROFILE 123+00 126+00 132+0020.4720.47133+0020.4720.47134+0020.4720.47135+0020.4720.47136+0020.4720.47137+0020.4720.47138+0020.4720.47139+0020.5620.930.000%0.000%0.000% 100' V.C.PVC 138+58.03ELEV = 20.47PVT 139+58.03ELEV = 21.01PVI 139+58.03ELEV = 21.01PVI 133+81.01ELEV = 20.47L PROPOSED CENTERLINE PROFILE GRADE PROP. C ELEV.TIE TO EXIST.PAVEMENTEND PROPOSED CLCL CONNECTOR C1 PROFILE VIEW 16 18 18.00201+0018.0718.37202+0018.91-0.300% 1.490% 190' V.C.PVC 200+28.57ELEV = 18.04PVT 202+18.57ELEV = 19.17CL CONNECTOR C1 STA. 200+17.50= CL TAXIWAY C STA. 110+95.13 ELEV = 18.07 LPROP. C ELEV. PROPOSED CENTERLINE PROFILE GRADE TIE TO EXIST.PAVEMENTEND PROPOSED CLCL CONNECTOR C2 PROFILE VIEW 19.43301+0019.2519.07302+0018.9719.10303+0019.420.647%-0.353% 100' V.C.PVC 301+62.69ELEV = 19.03PVT 302+62.69ELEV = 19.18CL CONNECTOR C2STA. 300+29.21=CL TAXIWAY CSTA. 119+57.16ELEV = 19.50STATION=303+15.42ELEV = 19.52LPROP. C ELEV. PROPOSED CENTERLINE PROFILE GRADE File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\009_C5.1-C-5.4 ( PROFILE).dwg Date: 4/20/2018 12:52 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C5.3 TAXIWAY "C", "C1" & "C2" PROFILES HORIZ. SCALE VERT. SCALEMATCH LINE SEE STA. 132+00.0010 12 14 16 18 20 22 24 26 10 12 14 16 18 20 22 24 26 132+00 14 16 18 20 22 24 26 200+00 28 14 16 18 20 22 24 26 300+00 28 14 16 18 20 22 24 26 28 14 16 18 20 22 24 26 28 TAXIWAY "C" PROFILE CONNECTOR "C1" PROFILE CONNECTOR "C2" PROFILE 14 16 18 20.47401+0020.4720.47402+0020.4720.47403+0020.4720.470.000%CL RUNUPSTA. 400+00.00=CL TAXIWAY CSTA. 130+77.16ELEV = 20.47CL RUNUPSTA. 403+86.78=CL TAXIWAY CSTA. 133+81.01ELEV = 20.47LPROP. C ELEV. PROPOSED CENTERLINE PROFILE GRADE TW B LT AT 25 PROFILE VIEW 401+0019.5719.69402+0019.5919.50403+0019.5119.48404+0019.3219.33405+0019.5319.77406+00 PROPOSED PROFILE GRADE File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\009_C5.1-C-5.4 ( PROFILE).dwg Date: 4/20/2018 12:52 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C5.4 RUNUP PROFILE HORIZ. SCALE VERT. SCALE 12 14 16 18 20 22 24 26 12 14 16 18 20 22 24 26 132+00 RUNUP PROFILE TAXIWAY "B" 25' LT PROFILE 14 16 18 20 22 24 26 14 16 18 20 22 24 26 400+00 406+0020.08 2'-6"12"STORMWATER POLLUTION PREVENTION PLAN 1.SILT FENCING,INLET PROTECTION AND ROCK CHECK STRUCTURES WILL BE REQUIRED TO CONTROL EROSION AS SHOWN ON THE PLANS OR AT LOCATIONS DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THESE MEASURES THROUGHOUT CONSTRUCTION. ALL EROSION CONTROL DEVICES SHALL BE INSTALLED PRIOR TO ANY EXCAVATION OR CLEARING AND GRUBBING WORK. THE QUANTITY OF TEMPORARY EROSION AND SEDIMENTATION CONTROL DEVICE MAY BE INCREASED OR DECREASED FROM THAT SHOWN IN THE DRAWINGS BASED ON WEATHER, CONSTRUCTION PROCEDURES AND ACTUAL SITE CONDITIONS THAT OCCUR DURING CONSTRUCTION. SUCH VARIATIONS WILL NOT BE CONSIDERED AS ALTERATIONS IN THE DETAILS OF CONSTRUCTION OR A CHANGE IN THE CHARACTER OF WORK. 2.SILT FENCE SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 104 OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. FILTER FABRIC FOR SILT FENCE AND ROCK CHECK STRUCTURES SHALL BE IN ACCORDANCE WITH SECTION 985 OF THE FDOT STANDARD SPECIFICATIONS. 3.ALL DISTURBED AREAS ARE TO BE SODDED IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 570 WITHIN 14 DAYS OF THE COMPLETION OF GRADING OPERATIONS AND WITHIN THE PRESCRIBED PHASING SCHEDULE. 4.ANY FINES, PENALTIES, OR OTHER COSTS ASSESSED BY STATE, LOCAL OR OTHER GOVERNMENTAL AGENCIES FOR NON-PERFORMANCE OF THE EROSION CONTROL REQUIREMENTS OF THIS PROJECT AGAINST THE AIRPORT AUTHORITY SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR, AND ANY SUCH ASSESSMENTS, IF NOT PAID BY THE CONTRACTOR, WILL BE DEDUCTED FROM MONIES DUE AT THE COMPLETION OF THE PROJECT. 5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR FILING AN NPDES NOTICE OF INTENT (NOI) TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES FROM FDEP. THE CONTRACTOR WILL ALSO BE REQUIRED TO FILE A NOTICE OF TERMINATION (NOT) AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR SHALL BE NAMED AS THE OPERATOR IN THE (NOI) AND MAY ENTER A STATEMENT ON THE FORM THAT "THERE ARE NO ATTACHMENTS SUBMITTED WITH THIS DOCUMENT" TO ADDRESS THAT THE CONTRACTOR DID PREPARE THE STORMWATER POLLUTION PROTECTION PLAN. 6.PLACE CE's (CONSTRUCTION ENTRANCES) ADJACENT TO STAGING AREAS OR ACCESS GATES TO WORK ZONES. PROVIDE SILT FENCE OR EQUIVALENT TO MATERIAL STORAGE LOCATIONS. MAINTENANCE PLAN 1.ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF-PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2.SEDIMENT WILL BE REMOVED FROM THE INLET PROTECTION DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED OR AS DIRECTED BY THE ENGINEER. GRAVEL WILL BE CLEANED OR REPLACED WHEN SEDIMENT POOL NO LONGER DRAINS PROPERLY. 3.SEDIMENT WILL BE REMOVED FROM BEHIND THE TEMPORARY SILT FENCE WHEN IT BECOMES 0.5 FT. DEEP AT THE FENCE. THE TEMPORARY SILT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. TEMPORARY DIVERSION SWALES WILL BE CHECKED AFTER EVERY RAINFALL AND ANY SIGNIFICANT SEDIMENT BUILD UP WILL BE REMOVED AS DIRECTED BY THE ENGINEER. FILTER FABRIC (IN CONFORMANCE WITH SEC. 985 FDOT SPEC. 12" 24" 8" ROCK SET IN A 4-IN. OR DEEPER TRENCH File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\010_C6.0 (SWPPP).dwg Date: 4/20/2018 12:45 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C6.0 STORMWATER POLLUTION PREVENTION PLAN ¾File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\011_C6.1 -6.2 DRAINAGE DETAILS.dwg Date: 4/20/2018 12:43 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C6.1 DRAINAGE DETAILS File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\011_C6.1 -6.2 DRAINAGE DETAILS.dwg Date: 4/4/2018 10:03 AMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C6.2 DRAINAGE DETAILS ROFZ ROFZ CC5C5EXIST. RUNWAY HOLD LINE EXIST. COMPASS ROSE REPAINT EXIST. ℄ STRIPES REPAINT EXIST. ℄ STRIPES EXIST. THRESHOLD MARKING ENHANCED TAXIWAY ℄ STRIPE MARKING (TYP.)23-5MATCH EXIST. RUNWAY EDGE STRIPE 18" WIDE WHITE RUNWAY EDGE STRIPE WITH 6" BLACK BORDER ESB23-5File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:54 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C7.2C7.1 0 603015 MARKING AND SIGNAGE PLAN NO. 1 ℄ TAXIWAY "C" ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ R75. 0 0'200'100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 MATCH EXIST. TAXIWAY ℄ STRIPE 6" YELLOW TAXIWAY ℄ STRIPE (TYP.) (SEE C7.8 FOR DETAILS)A5CAACR75.00 ' MATCH EXIST. TAXIWAY ℄ STRIPE AEXIST. RUNWAY HOLD POSITION MARKINGS (TO BE REMOVED) REPAINT EXIST. TAXIWAY ℄ STRIPE ENHANCED TAXIWAY ℄ STRIPE MARKING RUNWAY HOLDING POSITION MARKING23-5MATCH EXIST. RUNWAY EDGE STRIPE18" WIDE WHITE RUNWAY EDGE STRIPE WITH 6" BLACK BORDER CB B1 23-5File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:55 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C7.3 STA. 107+50.00C7.2 0 603015 MARKING AND SIGNAGE PLAN NO. 2MATCH LINE SHEET C7.1 R65.00'R65.00 'R65.00 'R65.00'202+58200+00201+00202+00℄ TAXIWAY "C"℄ CONNECTORTAXIWAY "C1"ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ 200'108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 6" YELLOW TAXIWAY ℄ STRIPE (TYP.) (SEE C7.8 FOR DETAILS) NEW T/W ℄ LEAD-IN LINE (TYP.) (SEE C7.8 FOR DETAILS) RUNWAY HOLDING POSITION MARKING (TYP.) (SEE C7.8 FOR DETAILS)23-5C23-5CCC1CC1C1C1ENHANCED TAXIWAY ℄ STRIPE MARKING (TYP.) 18" WIDE WHITE RUNWAY EDGE STRIPE WITH 6" BLACK BORDER23-5MATCH EXIST. RUNWAY EDGE STRIPEMATCH EXIST. RUNWAY EDGE STRIPE INTERRUPT TAXIWAY ℄ STRIPE AT RUNWAY EDGE STRIPE CB B2 23-5File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:55 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C7.4 STA. 115+37.50C7.3MATCH LINE SHEET C7.2 STA. 107+50.000 603015 MARKING AND SIGNAGE PLAN NO. 3 R25 . 0 0 'R75.00'R75.00 ' R75.0 0' ℄ TAXIWAY "C" ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ OFZOF ZOFZOFZ OF Z OF Z OFZ200'116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 R75.00'6" YELLOW TAXIWAY ℄ STRIPE (TYP.) (SEE C7.8 FOR DETAILS) NEW T/W ℄ LEAD-IN LINE (TYP.) (SEE C7.8 FOR DETAILS)R75.00 ' RUNWAY HOLDING POSITION MARKINGS (TYP.) (SEE C7.8 FOR DETAILS)125.00'℄ CONNECTOR TAXIWAY "C2" NEW T/W ℄ LEAD-IN LINE (TYP.) (SEE C7.7 FOR DETAILS)CC2C2CC1 0 - 2 8 C 23-5C223-5C2CC2300+003 0 1 + 0 0 302+003 0 3 + 0 0 303+68CC2C2ENHANCED TAXIWAY ℄ STRIPE MARKING (TYP.) MATCH EXIST. RUNWAY EDGE STRIPE MATCH EXIST. RUNWAY EDGE STRIPE18" WHITE RUNWAY EDGE STRIPE WITH 6" BLACK BORDER 18" WHITE RUNWAY EDGE STRIPE WITH 6" BLACK BORDER MATCH EXIST. RUNWAY EDGE STRIPE MATCH EXIST. RUNWAY EDGE STRIPE 23-51 0 - 2 8 23-5INTERRUPT TAXIWAY ℄ STRIPE AT RUNWAY EDGE STRIPE CB B3 CB B4 23-51 0 - 2 8 23-5MATCH EXIST. TAXIWAY F ℄ STRIPEINTERRUPT TAXIWAY ℄ STRIPES AT RUNWAY EDGE STRIPE INTERRUPT TAXIWAY ℄ STRIPE AT RUNWAY ℄ STRIPE File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:55 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C7.5 STA. 123+00.00C7.4MATCH LINE SHEET C7.3 STA. 115+37.5000 603015 MARKING AND SIGNAGE PLAN NO. 4 OFZOF Z OF Z ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ 200'123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00125'℄ TAXIWAY "C" 6" YELLOW TAXIWAY ℄ STRIPE (TYP.) (SEE C7.8 FOR DETAILS)R75.00'C CB23-5CBCBBCMATCH EXIST. TAXIWAY C/L STRIPE. INTERRUPT AT RUNWAY EDGE STRIPE EXIST. RUNWAY HOLDING POSITION MARKING (TO BE REMOVED) EXIST. TAXIWAY C/L STRIPES TO BE REMOVED MATCH EXISTING TAXIWAY C/L STRIPE R75.00'R75.00'BC23-5C28-10CREPAINT EXISTING TAXIWAY C/L STRIPE REPAINT EXISTING TAXIWAY C/L STRIPE REPAINT RUNWAY HOLDING POSITION MARKING (SEE C7.8 FOR DETAILS) RUNWAY HOLDING POSITION MARKINGS (TYP.) (SEE C7.7 FOR DETAILS)CBENHANCED TAXIWAY ℄ MARKING (TYP.) EXIST. 6" T/W LEAD-IN LINES TO BE REMOVED 23-523-528-10CB B5 23-523-528-10INTERRUPT TAXIWAY C/L STRIPE AT RUNWAY EDGE STRIPE File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:55 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C MATCH LINE SHEET C7.6 STA. 130+62.00C7.5MATCH LINE SHEET C7.4 STA. 123+00.000 603015 MARKING AND SIGNAGE PLAN NO. 5 403+87400+00 401+00402+00 4 0 3 + 0 0 500+00 501+00 502+00502+83℄ TAXIWAY "C" ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ 200'139+95131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+006" YELLOW TAXIWAY ℄ STRIPE (TYP.) (SEE C7.8 FOR DETAILS)65.5'R50.00'R50.00'R50.00'R50.00'R50.00 'R50.00 ' R65.00' STOP T/W ℄ AT EDGE OF R/W STRIPES TAXIWAY HOLD BAR (SEE C7.8 FOR DETAILS) RUNWAY HOLDING POSITION MARKING (TYP.) (SEE C7.8 FOR DETAILS)23CCENHANCED TAXIWAY ℄ STRIPE MARKING (TYP.) REMOVE EXIST. 6" TAXIWAY LEAD-IN LINE 18" WHITE RUNWAY EDGE STRIPE WITH 6" BLACK BORDERRNW-NE232238 17.41 RCP/24" INV CB B5 CB B6 23MATCH EXIST. RUNWAY EDGE STRIPE File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:56 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C7.6MATCH LINE SHEET C7.5 STA. 130+62.000 603015 MARKING AND SIGNAGE PLAN NO. 6 OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ10B 10A EXIST. RUNWAY HOLD LINE AAEXIST. RUNWAY HOLD LINE TO BE REMOVED ABBAEXIST. 6" YELLOW TAXIWAY ℄ STRIPE RE-PAINT EXIST. RUNWAY HOLDING POSITION MARKING ENHANCED TAXIWAY ℄ STRIPE MARKING (TYP.) RE-PAINT EXIST. 6" TAXIWAY ℄ STRIPES RE-PAINT EXIST. 6" TAXIWAY ℄ STRIPES EXIST. THRESHOLD MARKING RE-PAINT EXIST. 6" TAXIWAY ℄ STRIPES RUNWAY HOLDING POSITION MARKING MATCH EXIST. TAXIWAY ℄ STRIPE MATCH EXIST. TAXIWAY ℄ STRIPE AB 101010101010 File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:56 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C7.7 0 603015 MARKING AND SIGNAGE PLAN NO. 7 250'TO RUNWAY CENTERLINEYELLOW MARKINGS 4 LINES & 3 SPACES AT 1' EACH DASHES AND SPACES 3' IN LENGTH 12" TAXIWAY CENTERLINE STRIPE RUNWAY HOLDING POSITION MARKING DETAIL PAINT 8' WIDE BLACK STRIPE CENTERED ON HOLD BAR TO PROVIDE MIN 6" BLACK BORDER3'1'6" REFELECTIVE YELLOW STRIPING (TYP.) STRIPING DETAIL (TYP.) 6" 6" (TYP.) 6" NON REFELECTIVE BLACK STRIPING (TYP.) BOX IN THE END OF YELLOW STRIPING (TYP.)6"(TYP.)TAXIWAY CENTERLINE TAXIWAY TURN RADIUS AT RUNWAY DETAIL C S T R I P E ( Y E L L O W )RAD IU S A S SHOWN 6" W I D E T / W PTC R/W TERMINATE T/W C STRIPE 200' FROM PT. L L L 3'C R/W C STRIPE18" WIDE R/WL LNOTE: ALL RUNWAY HOLDING POSITION MARKINGS SHALL BE PERFORMED THERMOPLASTIC. T/W EDGE STRIPE (TYP.) T/W EDGE STRIPE TO ABUT THE BLACK OUTLINE OF THE HOLDING POSITION MARKING File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:58 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C7.8 MARKING PLAN DETAILS RUNWAY HOLDING POSITION MARKING AND ENHANCED LEAD-IN CENTERLINE DETAIL SURFACE PAINTED HOLDING POSITION SIGN File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:58 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C7.9 MARKING PLAN DETAILS C/5 5/C A C2/5-23 C/ B A/5 C A/C C/A C/C1 23-5/C C C/23-5 C/C2 C/10-28 C C 23-5/C2 C2 B/ C B /C C/28-10 C 23-5/C B C/23-5 C/32 B C2 C1/C A/10 A A B/10 B/A A/B C1 C1 C2/ C B/ C /AB C RNW-NE File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\012_C7.1-C7.10-MARKING PLANS AND DETAILS.dwg Date: 4/20/2018 12:58 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C7.10 MARKING PLAN DETAILS File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\013_C7.11 AIRFIELD GUIDANCE SIGN DETAILS.dwg Date: 4/20/2018 12:59 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C C7.11 AIRFIELD GUIDANCE SIGN DETAILS File Path: Y:\Sebastian (X26)\15-40.01 (Taxiways C, D &E Design & Bid)\2. DESIGN\CADD\Phase II\014_C8.1-JUNCTION BOX, DUCT BANK AND RUNWAY EDGE LIGHT DETAILS.dwg Date:4/20/2018 1:00 PMDrawing Name: DateNo.Description By REVISIONS Notes: 15-40.01 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 MA HJ JNG APRIL 2018 Project Name: TAXIWAY C RUNWAY EDGE LIGHT, JUNCTION CAN AND DUCT BANK DETAILS C8.1