HomeMy WebLinkAbout10201983 PZ City of Sebastian
Planning & Zoning Committee
Minutes
A meeting of the Planning & Zoning Committee was scheduled
at the City Hall for October 20, 1983.
The meeting was called to order by the Chairman, Mr. Bill
Messersmith at 7:43 PM.
The following members of the Committee were present:
Mr. Bill Messersmith
Mr. Gene Harris
Mr. Robert J. Ori
Mr. Bill Mahoney
Mr. Harold Eisenbarth
Mr. Joseph Stephenson
Mr. Jesse Brock
Others present for the meeting included:
Mayor Pat Flood
Mr. Keith Hock presented changes to upgrade the St. William
Catholic Church Site Plan. Subject changes included the following:
1. Add 100 ft. island in the center of the entry.
2. Relocate parking spaces.
Discussion followed whereby the median, crossings and the
entry, as it relates to Route U.S. #l may present problems.
Mr. Hock then requested approval of the changes subject to
review by the City Engineer.
Mr. Hock was advised that the Planning & Zoning Committee
was not inclined to approve changes from shell rock to limerock
without the City Engineer's prior review and approval.
A motion was made by Mr. Gene Harris to conceptually approve
the installation of the island, changes to the parking areas'and
the substitution of limerock for shell rock. It was seconded by
Mr. Joseph Stephenson, voted upon and unanimously approved.
Mayor Pat Flood then announced that the approved Sebastian
Budget included the services of a Secretary and City Attorney for
Planning and Zoning meetings. Further'the secretary would be
present, at the next regularly scheduled meeting of the Planning &
Zoning Committee.
The Chairman then announced a need to write a letter to Mayor
Flood reference the appointment of Mr. Jesse Brock to the Planning
& Zoning Committee.
The next order of'business concerned a presentation by Mr.
John Dickerson, Architect, on behalf of Sembler & Sembler. A site
plan for a restuarant on Indian River Drive was explained in detail.
Mr. Dickerson was aware of the COR Zoning classification and
the need to change the classification to commercial, particularly
since the adjacent areas were zoned commercial.
A motion was then made by Mr. Gene Harris to pursue a course
that will change the zoning to General Marine Commercial on the
Land Use Plan. Further, a Public Heabing to change the zoning
was also advised. The motion was seconded by Mr. Jesse Brock, voted
upon and unanimously approved.
It was also recommended that Mr. Dickerson review the contents
of Paragraph 3-18 thru 3-20 of the New Code for further guidance.
Mr. Eric Fischer then presented a site plan to improve the
building currently known as the Fischer Commercial Building,
located on Route #1, by adding additional space to the existing
structure.
Committee comments questioned the available parking area,
set back from existing poles and square footage.
It was recommended that Mr. Fischer contact the City Engineer
for his comments prior to resubmittal for Planning & Zoning Comm-
ittee approval.
There being no further business, a motion to adjourn was made
by Mr. Jesse Brock, seconded by Mr. Gene Harris, Voted upon and
unanimously approved.
The meeting adjourned at 9:50 PM.
APPROV~
~h a l'Ka~ Messersmlth
irma n
Robert J. /O~i
Dated:
City of Sebastian
Planning & Zoning Committee
Minutes
A meeting of the Planning & ZonJng Committee was scheduled
at the City Hall for October 20, 1983.
The meeting was called to order by the Chairman, Mr. Bill
Messersmith at 7:43 PM.
The following members of the Committee were present:
Mr. Bill Messersmith
Mr. Gene Harris
Mr. Robert J. Ori
Mr. Bill Mahoney
Mr. Harold Eisenbarth
Mr. Joseph Stephenson
Mr. Jesse Brock
Others present for the meeting included:
Mayor Pat Flood
Mr. Keith Hock presented changes to upgrade the St. William
Catholic Church Site Plan. Subject changes included the following:
1. Add 100 ft. island in the center of the entry.
2. Relocate parking spaces.
3. Eliminate shell rock and pave with limerock.
Discussion followed'whereby the median, crossings and the
entry, as it relates to Route U.S. #1 may present problems.
Mr, Hock then requested approval of the changes subject to
review by the City Engineer.
Mr. Hock was advised that the Planning & Zoning Committee
was not inclined to approve changes from shell rock to limerock
without the City Engineer's prior review and approval.
A motion waS made by Mr. Gene Harris to conceptually approve
the installation of the island, changes to the parking areas and
the substitution of limerock for shell rock. It was seconded by
Mr. Joseph Stephenson, voted upon and unanimously approved.
Mayor Pat Flood then announced that the approved Sebastian
Budget included the services of a Secretary and City Attorney for
Planning and Zoning meetings. Further~the secretary would be
present at the next regularly scheduled meeting of the Planning &
Zoning Committee.
The Chairman then announced a need to write a letter to Mayor
Flood reference the appointment of Mr. Jesse Brock to the Planning
& Zoning Committee.
The next order of business concerned a presentat,ton by Mr.
John Dickerson,.Architect, on behalf of Sembler & Sembler. A site
plan for a restuarant on Indian River Drive was explained in detail.
Mr. Dickerson was aware of the COR Zoning classification and
the need to change the classification to commercial, particularly
since the adjacent areas were zoned commercial.
A motion was then made by Mr. Gene Harris to pursue a course
that will change the zoning to General Marine Commercial on the
Land Use Plan. Further, a Public Hearing to change the zoning
was also advised. The motion was seconded by Mr. Jesse Brock, voted
upon and unanimously approved.
'It was also recommended that Mr. Dickerson review the contents
of Paragraph 3-18 thru 3-20 of the New Code for further guidance.
Mr. Eric Fischer then presented a site plan to improve the
building currently known as the Fischer Commercial Building,
located on Route #l, by adding additional space to the existing
structure.
Committee comments questioned the available parking area,
set back from existing poles and square footage.
It was recommended that Mr. Fischer contact the City Engineer
for his comments prior to resubmtttal for Planning & Zoning Comm-
ittee approval.
There being no further business, a motion to adjourn was made
by Mr. Jesse Brock, seconded by Mr. Gene Harris, Voted upon and
unanimously approved.
The meeting adjourned at 9:50 PM.
R~ull~ted
APPROVED:
Wfllia~':'MesSers~ith
Chairman
Dated:
October 17, 1983
TO: Wtlltam Nessersmtth, PE, Chairman of the Planning and Zontng Commission
Earl Mastellar, PE, City Engineer
FROH: Lest. L. Solln, Jr., A[CP, Planning Consultant
SUBJECT: Comprehensive Plan Land Use Map Policy for the 66± Acre Tract
Comprising the Southwest quadrant of the State Road 512 and
Laconia Street Intersection
This memorandum is written to clarify the Comprehensive Plan Land Use Map policy
for land located southwest of the State Road 512 and Laconia Street intersec-
tion.
General Commercial Designation
Approximately 14.87 acres of land are designated for general commercial develop-
ment at the southwest corner of the intersection of State Road 512 and Laconia
Street. This designation first appeared on the Proposed Land Use Plan for the
City of Sebastian prepared by the Indian River County Planning and Zoning
Department during 1979-1980. This land is one of the few remainin~ unplatted
sites along the State Road 512 corridor. The site is highly accessible to
residential areas within the Sebastian Highlands via Barber Street which serves
the northwest and southwest Highlands. In addition, the site is located at the
southern terminus of Roseland Road which serves major residential settlements
north of the site, north to Roseland. Finally, the site is accessibly located
near Vero Lake Estates westward along the State Road $1~ corridor.
The 14.87= acres commercial site was designated to serve as a community shopping
center by the year lggO-2000. The Comprehensive Land Use Plan Map has set the
subject site aside in order to accommodate projected long term shopping needs of
residents anticipated to reside in residential areas within a 3 to 5 mile
radius.
Medium Density Residential Development
Approximately 34.32 acres are delineated on the Comprehensive Plan Land Use Map
for medium density residential development. Similar to the commercial site
identified above, this land is also accessible to major arterial and collector
streets within the City of Sebastian and adjacent areas. The Housing Element of
the Comprehensive Plan identified that the City of Sebastian lacks developed
sites for multiple family residential structure types. The subject site was
viewed by Solin and Associates, Inc., (SAi) as ideal for accommodating medium
MEMBER OF THE AMERICAN BOCIETY OF CONSULTING I::CANNERB
PAGE 2
density residential structures. Notwithstanding, SAI was concerned about the
possible impacts of the planned multiple family housing on single family platted
lands along the south side of Granduer Avenue.
Low Density Residential Development
Approximately 16.81 acres of land on the subject site are designated for low
density development. This density is incorporated into the overall Comprehen-
sive Plan for the subject 66, acres in order to assure a more stable land use
transition between the commercial and multiple family residential area to the
north and the platted single family housing along the south side of Granduer
Avenue. The lots along the south side of Granduer Avenue are larger than most
of the residential lots within Sebastian Highlands. Therefore, SAI was particu-
larly concerned with protecting the stability of these relatively high value
lots.
Additional. Considerations, Including Drainage
The 66± acre tract is located in an area which drains poorly. A detailed site
analysis is required to determine the possible presence of small wetland areas.
This observation is noted in order to assure that persons viewing the ultimate
development capacity of the site do not over-estimate its ability to accommodate
development alternatives.
SAi recommends that the City encourage the land owner to pursue development
options under a planned unit development zoning designation. In this manner,
the developer wouldL, be able to enjoy more flexibility in accommodating innova-
tive site design. On the other hand, through a planned unit development concept
the City would have a more desirable land management program for administering
development of the site to assure that the diverse uses permitted on the proper-
ty are suitably located. Such controls would better protect adjacent residen-
tial property owners and better assure that environmentally fragile lands are
preserved.
~OI. IN AND ABBOCIATEB. INC.
PLANNING CONSULTANTB
1 ~01 1 ~ PLACE. Bi. lITE 101
VEl:tO BEACH,
October 24, 1983
TO: William Messersmith, PE, Chairman of the Planning 'and Zoning Commission
14asteller, PE, City Engineer
FROl~4~e~ter L. Solin, jr., AICP, Planning Consultant
SUBJECT: Additional comments regarding th~..~_6~±a~ract located at the
south-west quadrant of the State Roa--d-ST2and Laconia Street
intersection.
This memorandum is written to provide guidance in managing the development
application for the subject site. The nature of the proposed development
together with the Comprehensive Plan Map and Zoning Map amendments necessary to
accommodate the development proposal are described below. This memorandum is
not written in support of the amendment since such a position would require a
detailed analysis of the application and supportive data required pursuant to
the City of Sebastian Ordinances. No such application has been submitted by the
applicant and, therefore, it is premature for the City to take a position.
NevertheleSs, the policies presented below are the appropriate policies for
accommodating the development as described to the City Planning and Zoning
Commission on October 17, 1983.
Characteristics of Proposed Development
At the October 17, 1983, Planning and Zoning Commission Workshop Session,
Darrell McQueen, Project Engineer, presented a proposal for multiple family~
housing on the subject site. In addition, the development proposal included
reservation of a six (6) acre out parcel located at the extreme north-east
corner of the property at the intersection of Laconia Street and State Road 512.
During the workshop session the Planning Consultant's memorandum of October 17,
1983, was presented in order to clarify existing Comprehensive Plan Land Use Map
policY for the subject property.
Planning Consultant Comments
Based on the discussion at the October 17, 1983, Planning and Zoning Commission
Workshop, the Planning Consultant advises the following:
Response to Applicant'q Request fo~ Information. As Project Engineer,
Darrell McQueen requested the Planning and zoning Commission to inform him
of the necessary changes to the Comprehensive Plan and/or the Zoning Code
in order to accommodate the development proposed by the applicant. In
answer to the applicant's request, the following commentsare presented:
MEMBER OF THE AMERICAN 80CIETY OI= CONSUL?lNG PCANHER8
PAGE 2
Required Comprehensive Plan Amendment. The following Comprehensive
Plan Land"USe Map amendment would be'needed by the applicant in order
to achieve the stated objectives: l) reduce the scale of the commer-
cial area from 14.87± to 6-10 acres of commercial facilities; and 2)
obtain a higher residential unit yield. These objectives could be
accommodated by requesting that the general commercial, "CG", be
amended by reducing the general commercial, "CG", designation to cover
only those lands desired to be developed for commercial purposes by
the applicant and by changing the balance of the general commercial,
"CG", to high density residential, "HD".
Zoning Policy. The applicant should be advised that the appropriate zoning
designation for a mixed use development such as the one proposed, would be
the planned unit development, "PUD(R)". The developer is not required to
develop under a PUD. However, the planned unit development concept "locks-
in" a specified plan concurrently with the City Council's decision to
approve the PUD district zoning for the site. The PUD concept also pro-
vides for greater flexibility in project design.
If the applicant does not desire to develop under a planned unit develop-
ment,"PUD", zoning designation, the applicants could request C-2 zoning for
the general commercial area, R-2 zoning for those areas designated for high
density "HD" and medium density "MD" residential development, and R-1 for
the area designated for low density "LD" residential development..
Other Considerations. At this time it would be premature for the Planning
'COnsultant or the Planning and Zoning Commission to submit recommendations
concerning the above described Comprehensive Plan Land Use Map and Zoning
Map amendments. Such recommendations should be withheld until the appli-
cant has submitted the appropriate application, requisite fees, and
supporting plans and studies.