CERTIFICATE OF PROJECT COMPLETION
Date Accepted: 09/13/19
Project Name & #: Stormwater Improvements # A1961
Total Project Expenditures: $ 133,758.75
Project Location: SW Park / Caprona & Empress / Schumann & Kildare
Contractor(s): Shenandoah Construction / Maschmeyer Concrete / Ring Power
Contract Amount(s): $ 119,590.25 / $ 5,544.00 1$ 8,624.50
Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify
that this project is complete.
Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract
as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All
contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the
contractually stipulated period of time. In no way does the Issuing of this certificate release the Contractor from
all legal obligations as stipulated in Chapter 713 of the Florida Statutes.
Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the
segment as being complete.
ego /9
emjeict.anaer Date
N/A
Building Official (if applicable) Date
� 9.zo-19
y e Date
PROJECTID A1961 9tormwater Improvement
Revenue $ 500,000.00363010J81163A1961(Intednd Tansterfmm163SW)
Expenses 363151-534640 Ai961(R8 M- Operating Equipment)
Expenses $ 500,000.00 363151-60692OA1961(Drainage)
L19/Mr9
DATE
CHECK#
PO4
DESCRIPTION
10/02A8
97959
8573
Rack( or stomrvrater retention ponal
1=3118
97958
8573
Rdok Wr or aler/¢landed Pond
10104/16
97956
8573
Rock for eWonvater mention Pond
12/31/19
98432
8627
Repair CAT 308
09/13/19
M.s .,er Concrete
8652
Install CIPP pipe
09113]19
-
8653
lnsWil CIPP qPs
awz1w
s0swo
FY19
rewa
Vw'm
�01a.rea
VENDOR
AMOUNT
TOTALS
w.�e
s+sin:
0o ,En
M.s .,er Concrete
2,079.00
2,07900
In'.
Maschmever Concrete
207900
2.07900
Ziin.
Mascllmeyer Conaete
1,386.00
1,38800
4]wm
Ring Power
8,624.SO
8,624.50
e,azass
Shenandoah Constructed
16,300.25
16,300.25
scsw.]s
Shenandoah Construction
103,290.90
103,290.00
m3 aom
0,00
0.00
0.00
060
0.60
133,758.75
133,758.75
ss«m
was
1o�xm.w
eszam
Y 1z3o]]
133,]sB.]s
Balance
368,241.25
Bx15
ISHENANDOAH I Fart
CONSTRUCTION
1888 N.W. 22°s Street • Pompano Beach. FL 33069
(772)467-8861 Fax: (772) 467-8863
DATE: March 06, 2019 PROPOSAL #PI3454
SUBMITTED TO: Sebastian Public Works. City of
STREET: 1225 Main Street
CITY, STATE & ZIP: Sebastian. FI 32958
PHONE: (772) 228-7056
FAX: (772) 228-7077
EMAIL: twalkerCacityofsebastian.org
30B NAME: 162 Capron
ATTE\'TION: Tim Walker
We propose to furnish a crew and all necessary equipment to clean, televise, and install 42" CIPP at the above mentioned job
location. This work will be performed at our following hourly and/or unit prices:
Mobilization (at 5300.00 Each) I Each $300.00
Heavy Clean 42" (at $7.50 Per L.F.) 76 L.F. 5570.00
Storm Drain Video inspection 0 - 48" (at $6.00 Par L.F.) 76 L.F. 5456.00
Install 42" CIPP (at $225.00 Per L.F.) 76 L.F. S17.100.00
Estimated Total: SI8,426.00
NOTE: Due to the fragile condition ofthe existing pipe(s), the possibility ofthe pipe collapsing exists during the construction phase.
IPlhis unlikely event occurs, we will provide you with an additional estimate for a necessary point repair to complete the lining
process. Due to the poor condition ofthe original host pipe, residual settling may appear at the surface grade, post lining. This
condition is not covered under warrantee.
This proposal may be withdrawn if not accepted within 30 days. Payment terms net 30 days.
Df we encounter an Insurance compliance fee requirement. this fee will be invoiced in addition to the above rates.)
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according w standard
practices. Prim above is only an estimate of foreseen conditions. Unforeseen conditions eon affect the amount of time to complete
the work, therefore increasing or decreasing estimate. All agreements are contingent upon strikes• accidents or delays beyond our
control. Unless noted above engincering, permits. testing and bonds are not included in the pricing. Owner is to carry fire, tornado
and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. Parties to this
proposal/contract expressly waive all tort claims against each other and limit their remedies to breach of contact.
SIGNATURE:
SHENANDOAH GENERAL CONSTRUCTION CO. TITLE DATE
Louis Woska Estimator 03,062019
ACCEPTANCE OF PROPOSAL / SIGN & RETURN
The above prices, sp ' cation and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified. / / /
SIGNATURE:: ✓� �/ l I
v COMPANY NAME: City of Sebastian DATE:
REPRESENTATIVE: Paul E. Carlisle TITLE: City Manager