Loading...
HomeMy WebLinkAbout2018 Schumann and Kildare Double BarrelDATE: November 06, 2018 PROPOSAL #P12466 SUBMITTED TO: Sebastian Public Works, City of STREET: 1225 Main Street CITY, STATE & ZIP: Sebastian, Fl 32958 PHONE: (772) 228-7056 FAX: (772) 228-7077 EMAIL: twalker@cityofsebastian.org JOB NAME: Schumann and Kildare Double Barrel ATTENTION: Tim Walker We propose to furnish a crew and all necessary equipment to clean, televise, and install CIPP in 32X50" CMP and 15X22" CMP at the above mentioned job location. This work will be performed at our following hourly and/or unit prices:This proposal is based off of a piggyback of Shenandoah Construction's Collier County Storm Drain Maintenance Agreement 15-6363. Mobilization (at $300.00 Each) l Each $300.00 Medium Clean 42" (at $5.50 Per L.F.) 380 L.F. $2,090.00 Medium Clean 18" (at $1.00 Per L.F.) I60 L.F. $160.00 Storm Drain Video inspection 0 - 48" (at S6.00 Per L.F.) 540 L.F. $3,240.00 Install 42" CIPP (at $225.00 Per L.F.) 380 L.F. $85,500.00 Install 18" CIPP (at $75.00 Per L.F.) 160 L.E. $12,000.00 Estimated Total: $103,290.00 NOTE: Due to the fragile condition of the existing pipe(s), the possibility of the pipe collapsing exists during the construction phase. If this unlikely event occurs, we will provide you with an additional estimate for a necessary point repair to complete the lining process. Due to the poor condition of the original host pipe, residual settling may appear at the surface grade, post lining. This condition is not covered under warrantee. This proposal may be withdrawn if not accepted within 30 days. Payment terms net 30 days. (If we encounter an Insurance compliance fee requirement, this fee will be invoiced in addition to the above rates.) All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Price above is only an estimate of foreseen conditions. Unforeseen conditions can affect the amount of time to complete the work, therefore increasing or decreasing estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. Unless noted above engineering, permits, testing and bonds are not included in the pricing. Owner is to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. Parties to this proposal/contract expressly waive all tort claims against each other and limit their remedies to breach of contract. SIGNATURE: SHENANDOAH GENERAL CONSTRUCTION CO. Louis Woska TITLE DATE Estimator l 1 /06/2018 ACCEPTANCE OF PROPOSAL / SIGN & RETURN The above prices, speci ion and con ' ons are sat' factory and are hereby accepted. You are authorized to do the work as specified. SIGNATURE: COMPANY NAME: City of Sebastian DATE: 12 / 13 / 18 REPRESENTATIVE: Paul E . Carlisle TITLE: City Manager