HomeMy WebLinkAbout2008 Restrooms IR Drive & Main Street3" SANITARY LINE, SEE
CIVIL FOR CONTINUATION.
CO
HWC` �� Com--- a .. HWC
MEN SVC. FM. WOMEN
FDS ( �.�,• FD
__..� C _
III WH
�+-U.—r �+-- I HLAV
1-1 2" DOMESTIC WATER LINE, SEE
CIVILF'OR CONTINUATION.
pLUWEB �NG 'F`LA N
1/4'-1'-O'
Mq
PLUMBING LEGEND
CO CLEAN OUT SANITARY SEWER PIPING
3" SANITARY LINE, SEE S.O.V. SHUT-OFF VALVE S- — — - VENT PIPING
CIVIL FOR CONTINUATION.
COTC CLEAN OUT TO GRADE DOMESTIC COLD WATER PIPING
FS FLOOR SINK HOT WATER PIPING (110')
CW DOMESTIC COLD WATER HOT WATER PIPING (140`)
HW DOMESTIC HOT WATER - - - - —5 HOT WATER RECIRCULATING PIPING
(2" Z, F1� �" HWR DOMESTIC HOT WATER RECIRCULATING 5--- CD --3 CONDENSATE PIPING
� I �
3" I HB HOSE BIBB ¢--- CA ------5 COMPRESSED AIR PIPING
2 2 3 3"j VTR VENT THRU ROOF S---T&P--S TEMPERATURE AND PRESSURE RELIEF
GATE VALVE SD - -- STORM DRAIN PIPING
t" 2" GLOBE VALVE G GAS PIPING
CHECK VALVE PIPE RISE UP
[� GAS SOLENOID VALVE PIPE DOWN OR DROP
i GAS COCK E-- CAPPED END OF PIPE
WATER HAMMER ARRESTER (PDI No.) Z�__ POINT OF CONNECTION
SANITARY ISOMETRIC 0 FD FLOOR DRAIN —,J P -TRAP
N.T.S.
PLUMBING FIXTURE SCHEDULE
HLAV
HANDICAP LAVATORY, ACORN ENGINEERING, WALL HUNG LAVATORY, PENAL -WARE MO
D DEL# -
ADA-I-BP-4-LW1
MUST MEET ADA REQUIREMENTS.
IWH TANKLESS WATER HEATER SHALL BE BOSCH "POWERSTAR" MODEL # AE9.5, 208V, 1
PHASE, 3.5 KW.
HANDICAP WATER CLOSET, ACORN ENGINEERING, FLOOR MOUNTED, 1.6-GPF, PENAL -WARE MODEL#
HWC 1695-W-3-ADA-FVT
-/ MUST MEET ADA REQUIREMENTS.
1
HANDICAP DRINKING FOUNTAIN, ACORN ENGINEERING, WALL HUNG, PENAL -WARE MODEL#
HDF
1� 1672 -1 -BP -3 MUST MEET ADA REQUIREMENTS.
�'0>�1)
>.,,` �� i - GENERAL NOTES:
- FIXTURES SHALL BE AS SHOWN OR EQUAL.
0 �� 2 - ALL FIXTURES SHALL COMPLY WITH TABLE 604.4 OF FBC 2004
3 - ALL FIXTURE TRIM PACKAGES INCLUDING BUT NOT LIMITED TO TRAP, ANGLE STOP, FLUSH VALVE,
't SUPPLY TUBES, AND CLEANOUT COVER PLATES SHALL BE OF THE SAME FINISH AS THE ABOVE
I SPECIFIED FAUCET AND PER ARCHITECTURAL FINISH SCHEDULE.
(4) - ALL FIXTURES SHALL BE ROUGHED IN PER MANUFACTURER CUT SHEET TO MAINTAIN UNIFORMITY.
L1-1(2" DOMESTIC WATER LINE, SEE
CIVIL FOR CONTINUATION.
DOM. WATER ISOMETRIC PROVIDE TEST TEEr �-
WITH SCREWED COUNTER—COLUMN OR PARTITION
SUNK ABS PLASTIC PLUG: AS SHOWN ON FLOOR PLAN
N.T.S. TAPERED—THREAD WITH CLEANOUT FACE SHALL
TFE JOINT COMPOUND. e 1 BE WITHIN 4 OF WALL
SURFACE PROVIDE
WHERE CLEANOUT TEE
IS CONCEALED IN A
CHASE OR PARTITION,
PROVIDE A ROUND 18
GAUGE STAINLESS STEEL
COVER WITH BEVELED
EDGES AND FLATHEAD
MACHINE SCREW.
la
CONCRETE
FLOOR
SLAB
PIPE EXTENSION IF REQUIRED. -
i-1
e �
a �
NOTE:
PROVIDE WCO WHERE SHOWN ON PLAN, AND ON SANITARY WASTE BRANCHES
NOT SERVED WITH A FLOOR CLEANOUT: LOCATE ABOVE FIXTURE FLOOD RIM
WITHIN 4' OF FLOOR. CONSULT LOCAL CODES FOR OTHER WCO REQUIREMENTS.
WALL CLEANOUT DETAIL
NOT TO SCALE
SHOCK ARRESTOR SCHEDULE
P.D.I. DESIGNATION MANUF. & MODEL FIXTURE UNITS CONNECTION
A SIOUX CHIEF 652-A 1-11 1/2"
B SIOUX CHIEF 653-B 12-32 3/4-
C SIOUX CHIEF 654-C 33-60 1"
SIOUX CHIEF SHOCK ARRESTORS APPROVED FOR INSTALLATION WITH NO
ACCESS DOOR REQUIRED. CONFORMS TO ANSI/ASSE 1010 STANDARDS.
SLOPE OF HORIZ. DRAINAGE PIPE
SIZE (Inches) MINIMUM SLOPE (Inch per foot)
2-1/2 or less 1/4
3to6 1/8
8 or larger 1/16
TABLE 704.1 OF THE FLORIDA PLUMBING CODE 2004
PLUMBING SHEET INDEX
SHEER DESCRFTM
PO.1 PLUMBING PLAN - NOTES, LEGENDS, ISOMETRICS AND DETAILS
r rr
1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH FBG 2004,
APPLICABLE LOCAL CODES, RULES AND ORDINANCES.
2. PLUMBING CONTRACTOR SHALL VISIT THE JOB SITE AND THOROUGHLY FAMILIARIZE
HIMSELF WITH ALL EXISTING CONDITIONS.
3. ALL MATERIALS SHALL BE NEW.
4. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST
CLASS WORKMANLIKE MANNER. THE COMPLETED SYSTEM SHALL BE FULLY OPERATIVE. ALL
EXCAVATION AND BACKFILL AS REQUIRED FOR THIS PHASE OF CONSTRUCTION SHALL BE
A PART OF THIS CONTRACT.
5. REQUIRED INSURANCE SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR FOR PROTECTION !
AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK.
6. PLUMBING CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, INSPECTION AND
TESTS, PLUMBING CONTRACTOR TO OBTAIN PERMIT AND APPROVED SUBMITTALS PRIOR TO
BEGINNING WORK OR ORDERING EQUIPMENT. PLUMBING CONTRACTOR MUST BE PRESENT FOR
ALL INSPECTIONS OF HIS WORK BY REGULATORY AUTHORITIES.
7. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FOR THE EXACT LOCATION OF FIXTURES,
PIPING, EQUIPMENT, ETC.
8. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH
THE PROGRESS OF CONSTRUCTION, REPORT ANY DISCREPANCY TO ENGINEER/ARCHITECT
PRIOR TO BEGINNING CONSTRUCTION.
9. VERIFY LOCATION, SIZE, DIRECTION OF FLOW AND INVERTS OF ALL EXISTING UTILITIES
PRIOR TO BEGINNING OF CONSTRUCTION. ADVISE ENGINEER OF ANY DISCREPANCIES.
10. WATER DISTRIBUTION PIPING ABOVE AND BELOW GROUND SHALL BE TYPE "L" COPPER.
COORDINATE WITH LOCAL JURISDICTION FOR ADDITIONAL REQUIREMENTS.
PROVIDE ALTERNATE FOR CPUC PIPING EQUAL TO BFGOODRICH "FLOWGUARD GOLD" FOR WATER
KNOWN OR DETERMINED TO HAVE ACIDIC CHARACTERISTICS, CONTRACTOR SHALL PERFORM A
WATER TEST TO DETERMINE WATER CHEMISTRY PRIOR TO ANY WORK OR PIPING INSTALLATION
AND SHALL SUBMIT TEST RESULTS TO ENGINEER FOR REVIEW AND APPROVAL.
11. SOIL, WASTE, VENT AND RAINWATER PIPING SHALL BE CAST IRON OR PVC, WHERE CODE ALLOWS.
PVC MAY NOT BE USED THRU RATED ASSEMBLIES OR IN PLENUMS.
ALL FIXTURES MUST BE PROVIDED WITH READILY ACCESSIBLE STOPS AND APPROPRIATELY
MARKED ACCESS PANELS. COORDINATE LOCATIONS WITH GENERAL CONTRACTOR PRIOR
TO INSTALLATION.
FURNISH AND INSTALL APPROVED WATER HAMMER ARRESTORS FOR ALL (GROUP) PLUMBING
FIXTURES, SIZED AND LOCATED PER MANUF.'S INSTALLATION INSTRUCTIONS AND WH—PDI 201.
DIELECTRIC COUPLINGS ARE REQUIRED BETWEEN ALL DISSIMILAR METAL IN PIPING AND
EQUIPMENT CONNECTIONS.
ISOLATE COPPER PIPE FROM HANGER OR SUPPORTS WITH ISOLATOR PADS OR MATERIAL.
16. ALL FIRE RATED FLOOR AND WALL PENETRATIONS SHALL BE PROPERLY PROTECTED FROM
FIRE, SMOKE AND WATER PENETRATION BY FILLING VOIDS BETWEEN PIPE AND WALL/FLOOR
SLEEVES WITH FIRE RATED FOAM, TO ACHIEVE THE SAME RATING AS WALLS OR FLOORS
AS PART OF THE: PLUMBER'S WORK.
PLUMBING CONTFACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM
DEFECTS FOR A PERIOD OF NOT LESS THAN ONE (1) YEAR FROM DATE OF ACCEPTANCE BY
OWNER. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE
AND SHALL INCLUDE REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION
WHICH MAY HAVE BEEN DAMAGED.
PROVIDE ACCESS PANELS FOR ALL CONCEALED VALVES AND ALL WATER HAMMER
ARRESTORS. ACCESS PANELS IN RATED WALLS MUST MAINTAIN THE SAME RATING AND
MUST MATCH THE FINISH OF THE WALL IN WHICH IT IS INSTALLED.
PROVIDE COMBINATION COVER PLATE AND CLEANOUT PLUG OR ACCESS
PANEL FOR ALL WALL CLEANOUTS FINISH TO MATCH FIXTURE TRIM.
NO COMBUSTIBLE MATERIAL TO BE USED IN MECHANICAL ROOMS OR IN CEILING SPACES
WHERE USED AS RETURN AIR PLENUMS.
NO WATER, SANITARY OR DRAINAGE PIPING PERMITTED IN ELECTRICAL OR ELEVATOR
EQUIPMENT ROOMS.
ALL CONTROL VALVES SHALL BE TAGGED AND MARKED. A REPRODUCIBLE DIAGRAM
LOCATING ALL VALVES SHALL BE PROVIDED FOR OWNER/OPERATOR.
ALL CONDENSATE DRAIN PIPING SHALL BE TYPE "L" COPPER WITH ARMAFLEX INSULATION
PER TABLE 4-11 F.B.C. 2004 WHERE USED IN A RETURN AIR PLENUM. PVC PIPING WITH
ARMAFLEX INSULATION MAY BE USED IN LOCATIONS WHERE ALLOWED BY LOCAL CODES.
SEE PLUMBING DRAWINGS FOR SIZE AND LOCATION OF PIPING.
CONDENSATE LINES SHALL NOT DRAIN ON THE ROOFING SYSTEM OR ANY OF ITS COMPONENTS
AND CONDENSATE LINES NEED NOT COMPLY WITH MIN. CLEARANCE REQUIREMENTS
PER FBC 2004, PAR. 1522.3.5
PROVIDE ANGLE STOPS ON ALL WATER SERVICE LINES TO FIXTURES FOR INDIVIDUAL
SHUT—OFF.
WATER PIPING INSULATION SHALL BE ARMAFLEX OR EQUAL INSTALLED IN ACCORDANCE
WITH MANUFACTURERS INSTRUCTIONS FOR ALL HOT WATER PIPING, WHERE DOMESTIC
WATER TEMPERATURES CAN CAUSE SWEATING ALL COLD WATER PIPING SHALL BE INSULATED
WITH ARMAFLEX INSULATION, THICKNESS AS PER TABLE 4-11 OF FLORIDA ENERGY CODE.
STUDOR MINI/MAXI AIR ADMITTANCE VALVES MAY BE USED AS AN ALTERNATE TO
VENT PIPING THRU ROOF WHERE ACCEPTABLE BY THE PLUMBING OFFICIAL AND LOCAL
CODES. INSTALLA11ON SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS.
ALL HORIZONTAL RAINWATER PIPING THE RECEIVES CONDENSATE DISCHARGE FROM AIR
CONDITIONING EQUIPMENT SHALL BE INSULATED WITH 1" THK. ARMAFLEX.
PLUMBING PLANS IN GENERAL, ARE DIAGRAMMATIC IN NATURE, AND ARE TO BE READ IN CONJUNCTION
WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE SPRINKLER, STRUCTURAL AND CIVIL PLANS AND
SHALL BE CONSIDERED AS ONE SET OF DOCUMENTS, PIPING MODIFICATIONS SUCH AS OFFSETS, BENDS,
TRANSITIONS, AND SIZES SHALL BE REQUIRED TO PROVIDE AND INSTALL A COMPLETE FUNCTIONAL
SYSTEM AND SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER,
CHANGES IN PIPE SIZES AND ROUTING SHALL BE REQUIRED BY THE CONTRACTOR TO AVOID CONFLICTS
AND TO ADAPT TO EXISTING FIELD CONDITIONS PROVIDED THAT INSTALLATION MEETS ALL
APPLICABLE CODES.
ISSUED FOR REVIEW
0
5
08-I2-08 1
Jproject
u
Q
ui--f
F -1
w
�
H
L�/1l
C
�
U
oa�
Lu
/
\
')
z
projt. no.:
2008-0427
0
project manager: P.F.
checked by:
B.B.
scale:
AS NOTED
C0
date:
08-05-08
sheet
1
PO,
08-I2-08 1
Jproject