HomeMy WebLinkAbout1996 -Shoreline Stabilization ProjectApril 17, 1996
Meeting on Phase II of the Indian River
Shoreline Stabilization Project along
Riverview Park East
Attendees:
1) The project will initially start from the south seawall of /
Fey' s Marina 4nd progress southward. ZS,c
o� of -ruauomj cu.4r44 (r -4r,, ,)
n/e #4734e.6s 644.060, tky 1oo Do iK 1100 Faesa'S — Cur Pve sr.,ccs, voftem,,a
2) Concrete rubble shall be removed as far back as the top of
bank only.
3 ) Fischer and Sons has agreed to accept the disposal of the
concrete rubble
4) The City DPW must remove a sign, monument, and bench to
facilitate the County crane to operate at the north end.
5) Indian River County Road and Bridge Department to furnish
crane with clam shell bucket and operator. $:oo Am 14od
6) The DPW can use a video camera to photograph the area before,
during, and after construction for documentary purposes.
7) The DPW should place the floating turbidity barriers in the
water and anchor them with PVC by Friday, April 19th.
8) Rob Skok and Terry Hill to set stakes to mark the Mean High
Water Line as established by Tammy Debu of the FDEP.
9) Richard Hunter of the Florida Aggregates Intergroup in Pt. St.
Lucie to deliver the coquina rock on Monday, April 22nd.
10) L. I. Tree Service to be notified to supply yellow sand to the
site. Can stockpile sand along parking spaces.
11) Write a letter to FDEP & Fax Them the date of Commencement of
the Shoreline restoration work
12) Write a letter to the FDEP of Notification of Completion
13) Any upland area disturbed by the project shall be sodded
within 72 hours of completion of the shoreline stabilization
project.
14)
The filter cloth is to be trenched in at the tap•-aud bottom of
the slope at least 18" minimum. SOBS i, AV- ro?
Page 2 of 2 April 17, 1996 Phase II meeting IR Shoreline Project
15) After the concrete rubble is removed, sand shall be placed and
graded.
16) The filter cloth can be installed and anchored in trenches
17) The Sign Shop shall provide barricades and marking tape to
block all parking spaces affected by construction and storage
of materials.
18) The existing sod previous laid to prevent possible future
erosion can be reused again as required on top of the upland
slope.
19) Smaller coquina rip rap will be placed by volunteers in
between the large boulders at a later date. The DPW shall
supply a front end loader to place piles of the coquina rip
rap over the boardwalk on the riverside of the boardwalk.
TEur. 56-r Foe M*y 17 Mits CoR cJ .s
April 17, 1996
Meeting on Phase II of the Indian River
Shoreline Stabilization Project along
Riverview Park East
Attendees: Carolyn Corum, Jerry Thomas, Terry Hill, Terry Cook,
Tim Smith, Rob Skok, Rich Votapka, Paul St. Pierre
1) The project will initially start from the south seawall of
Fey's Marina and progress southward. Jerry suggested working
in sections allowed by the maximum length of the turbidity
barrier. Rob suggested to bring in the turbidity curtain
behind the marsh grass.
2) Concrete rubble shall be removed as far back as the top of
bank only.
3) Fischer and Sons has agreed to accept the disposal of the
concrete rubble. Jerry to reaffirm with Fischer and Sons.
4) The City DPW must remove a sign, monument, and bench to
facilitate the County crane to operate at the north end. Leave
the bench in for now.
5) Indian River County Road and Bridge Department to furnish
crane with clam shell bucket and operator. Crane to be there
by 8 am.
6) The DPW can use a video camera to photograph the area before,
during, and after construction for documentary purposes. Terry
Hill to film the site.
7) The DPW should place the floating turbidity barriers in the
water and anchor them with PVC by Friday, April 19th. The DPW
will need more 4' - 4 1/2' long stakes to anchor the barrier.
8) Rob Skok and Terry Hill to set stakes to mark the Mean High
Water Line as established by Tammy Debu of the FDEP on Friday,
April 19th.
9) Richard Hunter of the Florida Aggregates Intergroup in Pt. St.
Lucie to deliver the coquina rock on Monday, April 22nd.
10) L. I. Tree Service to be notified to supply yellow sand to the
site. It was agreed to have the sand brought to the jobsite on
an as needed basis Monday - Friday. We will need sand between
10-11 AM on Monday. (Rich Votapka called Richard Fey and he
agreed to deliver on Monday.)
Page 2 of 2 April 17, 1996 Phase II meeting IR Shoreline Project
11) Write a letter to FDEP & Fax Them the date of Commencement of
the Shoreline restoration work. Rich wrote a letter to Tammy
Debu of the FDEP and faxed it on Wed. April 17, 1996.
12) Write a'
letter to the FDEP of Notification of Completion
13) Any upland area disturbed by the project shall be sodded
within 72 hours of completion of the shoreline stabilization
project.
14) The filter cloth is to be trenched in at the top and bottom of
the slope at least 18" minimum and placed on a shelf at the
top which will be anchored by boulders.
15) After the concrete rubble is removed, sand shall be placed and
graded.
16) The filter cloth can be installed and anchored in trenches
17) The Sign Shop shall provide barricades and marking tape to
block all parking spaces affected by construction and storage
of materials.
18) The existing sod previous laid to prevent possible future
erosion can be reused again as required on top of the upland
slope. Have new sod laid. It will be too labor intensive to
reuse the existing sod.
19) Smaller coquina rip rap will be placed by volunteers in
between the large boulders at a later date. The DPW shall
supply a front end loader to place piles of the coquina rip
rap over the boardwalk on the riverside of the boardwalk.
Placement of the rip -rap is tentatively set May 17th as the
date this is to be done.
irII
City of Sebastian
1225 MAIN STREET o SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 0 FAX (407) 589-5570
M E M O R A N D U M
DATE: December 18, 1995
TO: Terry Hill, Tim Smith, Rob Skok, and Jerry Thomas
FROM: Richard Votapka, Public Works Director 69✓
SUBJECT: Field Trip to Melbourne to see a Shoreline Stabilization
Project
-----------------------------------------------------------------
As per our meeting on December 12, 1995, on site by the shoreline
of the Indian River, Vice Mayor Corum arranged for a site visit to
Melbourne for us to see the shoreline stabilization project at
Ballard Park on Thursday, January 4, 1996 at 10AM. Please list your
names below if you are interested in atten ing:
shore
City of Sebastian
1225 MAIN STREET 13 SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 0 FAX (407) 589-5570
M E M O R A N D U M
DATE: December 12, 1995
TO: Indian River Shoreline Stabilization File,,,/
FROM: Richard Votapka, Public Works Director /c/
SUBJECT: On Site Meeting to Discover Implementation of Project
---------------------------------------------------------------
Attendees: Terry Cook, Willis, Jerry Thomas, Tim Smith, Robert
Skok, Rich Votapka, Terry Hill, and Vice Mayor Corum
A meeting was held on site to discuss various items concerning
the project as follows:
1) The project will start from the seawall south of the Yacht
Club (actually Marker 68) and end at the grass outcropping
approximately 100 feet to the south.
2) We will attempt to remove rubble as far back as the top of
the bank only.
3) The rubble can be stacked in a parking area.
4) The Sebastian Roads and Bridge Division will take the rubble
back to the Public Works Compound if necessary.
5) Rich to compose a letter to the Press Journal to print ASAP
stating that concrete rubble is available to anyone.
6) The City is to use a floating boom barrier 100, long. Rich is
to check to see how much barrier Vero Beach has.
7) The City is to remove a sign, monument, and a bench to
facilitate the County crane to operate.
8) The Sign Shop has to place barricades around the stockpile if
it is to be located in the parking area immediately to the
west.
Page 2 of 2
9) The DPW is to check on the dimensions & pricing of filter
cloth.
10) Carolyn Corum would like to visit the Ballard Park in North
Melbourne because they have a completed shoreline
stabilization project.
cc: vice Mayor Carolyn Corum
Jerry Thoma
Tim Smith
Robert Skok
Terry Hill
ird2
City of Sebastian
1225 MAIN STREET o SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 o FAX (407) 589-5570
M E M O R A N D U M
DATE: December 5, 1995
TO: Tim Smith, Terry Cook, Rob Skok, & Jerry Thomas
FROM: Richard Votapka, Public Works Director X6
SUBJECT: Meeting with Terry Cook RE: I.R. Shoreline Stabilization
Project
--------------------------------------------------------------
Terry Cook, Indian River County Road and Bridge Superintendent, has
rescheduled our meeting with him for Tuesday, December 12 at 8:30
AM on site. This time we will call him at 8:00 AM to confirm the
meeting time.
cook