Loading...
HomeMy WebLinkAbout2011 Landscape IrrigationLinda Kinchen From: Debbie Krueger Sent: Thursday, July 14, 2011 1:41 PM To: 'Leclaire, Jeffrey';'Chris Kafer Cc: Linda Kinchen; 'Geoffrey Barkett'; 'Dacks' Subject: Sebastian CR512 Landscaping Improvements - FDOT#418031-1-58-01, IRC Permit #2009020517 Attachments: SCCI Change Order #1.pdf Effililk obv SCC1 Change Order #1.pdf (3 MB... Jeffrey - Chris, Per the process established at the preconstruction meeting on June 1, 2011, attached for the approval from FDOT and Indian River County is Change Order #1, reflecting additional underground feeds, addition of 100 amp service and additional directional bores. Please respond to all addressees via email with your approvals or questions you may have in regards to approval of this change order #1. Thank you as always for your assistance in this matter. Debra Krueger, CGFO City of Sebastian Administrative Services Director Telephone #772-388-8202 Fax #772-388-8247 email address: dkrueoer(a)cityofsebastian.oro Z INSTRUCTION NC. 4205 N. Courtenay Parkway Merritt Island, FL 32953 (321)452-3190 FAX(321)459-3358 scci@santacruzconstruction.com City of Sebastian 07/11/2011 1225 Main Street Sebastian, FL 32958 Attn: Debra A. Krueger (dkrueger@cityofSebastian.org) Administrative Service Director Reference: CR512 Landscape Improvements at Fleming, Barber, Roseland Intersection Cost Proposal for Additional Electric Project # CO834 SCCI# 56016 Additional underground feeds (quote enclosed) $ 1,559.70 Cost of 100 amp Service Nema 382,790.00 x 3 = (quote enclosed) 8,370.00 $ 9,929.70 15% Overhead1$ ,489.46 $11,419.16 10% Profit 1,141.92 $12,561.08 2.5% Bond 314.03 Total $12.875.11 Please add for Stainless Steel 100 amp Services $ 6,636.13 Please note this does not include additional directional bore. If ween be of further assistance please do not hesitate to contact me. ect Manager Enclosed: Craftsman Proposal for Service Craftsman Proposal for additional wire CC. Geoffrey Barkett (gbarett@sbsengineers.com) PB/mg File: Job 56016-1d ESTABLISHED 1975 State Certified and Bonded General Contractor State License Number CGC004606 379 Williams Point Boulevard • Cocoa, Florida 32927-4801 321-632-0525 • FAX# 321-632-4090 E-mail: cesolar@bellsouth.net Florida State Certified # EC -13001497 - Unlimited Electrical Contractors International Association of Electrical Inspectors # 114575 UL 96A - Master Label Lightning Protection Installer: #UL -E136206 UCF - Florida Solar Energy Listed Solar Electric (P.V.) Installers July 11, 2011 To: Paul Bonvllle, Senior Projects Manager Santa Cruz Construction, Inc. Change Order #2 Sebastian - Landscaping Project (Electrical) Based upon latest revisions (6/29/11) the distances have changed on the lengths of electrical underground feeds. The changes are listed below. A. Flemming Street and CR512 Distance has Increased 38.0'x $5.86 = $222.68 B. Barber Street and CR512 Distance has increased 30.0' x $5.86 = $175.80 C. Roseland Rd. and CR 512 Distance has increased 127.0' x $5.56 = $1330.22 Hand ElectJic 25.0' less x $6.76 = 5169.00 Credit Total cost change to distances (7-11-11) - $1,559.70 Respectfully, Donald R. Cnresident T002 YU TB;TT TTOZ/TT/l0 379 Williams Point Boulevard s Cocoa, Florida 32927-4801 321-632-0525 s FAX# 321-632-4090 E-mail: cesolarC beilsouth.net Florida State Certified # EC -13001497 - Unlimited Electrical Contractors International Association of Electrical Inspectors # 114575 UL 96A - Master Label Lightning Protection Installer: #UL -E136206 UCF - Florida Solar Energy Listed Solar Electric (P.V,) Installers July 6, 2011 E. Breaker panel to be Nema 3R, 100 amp 2 pole main breaker, 10K AIC, one 2P40 amp breaker for 3 IIP 230 volt lo pump motor, one 2P 30 amp breaker for TVSS surge arrestor, one 1P 20 amp breaker for sprinkler controller, spaces for minimum of two future 1 P breakers. F. TVSS surge arrestor mounted on exterior of breaker panel — UL listed. G. Install two 5/8" x 10' copper clad ground rods 6'6" apart at base of panel. Connect ground rods with #4 hand drawn bare copper conductors continuous to neutral bar of breaker panel. Install bonding screw through neutral bar into frame of metal breaker can to become a bonded neutral. Label panel with voltage, phase, main, and sub breakers. Cost of one new electrical service at each of three locations using painted steel Nema 3R rain tight breaker panel with 25' maximum. underground run to FPL in - ground J -box, Per Location • $2, 790, 00 Cost of one new electrical service at each of three locations using Nema 4X stainless steel breaker panel with 25' maximum underground run to FPL in - ground J -box. Per Location�4,496.604,496.60 Our proposal does not include any permit or utility fees. Res tfully, r Donald R. Coriway, PresMent ]r3 Ov:gT TIOZi90%Lo ZOOQJ Dacks From: Dacks [scci@bellsouth.net] Sent: Friday, July 08, 20116:65 PM To: 'Geoffrey Barkett' Subject: CR 512 Beautification - New Jack and Bore Quantities Attachments: Jack and bore Breakdown.xisx Mr. Barkett: Attached are the breakdown numbers for the directional bore differentials summarized as follows: Additional Bore for Electrical 195 If Additional Wire for Pumps 170 If Additional Bore for Irrigation 13 If Please advise where you would like to reduce the boring on the irrigation to eliminate or reduce the net 208 If of additional boring. If you have any questions, please do not hesitate to contact me. Sincerely, Paul Bonville Chief Project Manager Santa Cruz Construction, Inc. 321-452-3190 Office 321-459-3358 Fax sari casantacruzconstruction.com Road Description New (If) Old (if) Difference (if) Fleming jElectrical 113 75 38 Barber jElectrical 1 105 75 30 Roseland jElectrical 1 2051 781 127 Total 195 Road Description New (If) Old (If) Difference (If) Fleming Irrigation 196 195 1 Barber I Irrigation 1 2031 191112 11 Roseland Irrigation 0 0 0 Total 13 Road Description New (if) Old (if) Difference (if) Roseland lHand Electric 1 1101 135 -25 Total -25 Summary of Additional Quantities Jack and Bore for Electric +195 If Additional Wire for Pumps +170 If (195 If -25 If) Additional Bore for Irrigation +13 If Total Increase in Jack and Bore 208 If (195 If + 13 If)