HomeMy WebLinkAbout2011 Landscape IrrigationLinda Kinchen
From: Debbie Krueger
Sent: Thursday, July 14, 2011 1:41 PM
To: 'Leclaire, Jeffrey';'Chris Kafer
Cc: Linda Kinchen; 'Geoffrey Barkett'; 'Dacks'
Subject: Sebastian CR512 Landscaping Improvements - FDOT#418031-1-58-01, IRC Permit
#2009020517
Attachments: SCCI Change Order #1.pdf
Effililk
obv
SCC1 Change Order
#1.pdf (3 MB...
Jeffrey - Chris,
Per the process established at the preconstruction meeting on June 1, 2011, attached for the
approval from FDOT and Indian River County is Change Order #1, reflecting additional
underground feeds, addition of 100 amp service and additional directional bores.
Please respond to all addressees via email with your approvals or questions you may have in
regards to approval of this change order #1.
Thank you as always for your assistance in this matter.
Debra Krueger, CGFO
City of Sebastian
Administrative Services Director
Telephone #772-388-8202
Fax #772-388-8247
email address: dkrueoer(a)cityofsebastian.oro
Z
INSTRUCTION
NC.
4205 N. Courtenay Parkway
Merritt Island, FL 32953
(321)452-3190
FAX(321)459-3358
scci@santacruzconstruction.com
City of Sebastian 07/11/2011
1225 Main Street
Sebastian, FL 32958
Attn: Debra A. Krueger (dkrueger@cityofSebastian.org)
Administrative Service Director
Reference: CR512 Landscape Improvements at Fleming, Barber, Roseland Intersection
Cost Proposal for Additional Electric
Project # CO834
SCCI# 56016
Additional underground feeds (quote enclosed) $ 1,559.70
Cost of 100 amp Service Nema 382,790.00 x 3 = (quote enclosed) 8,370.00
$ 9,929.70
15% Overhead1$ ,489.46
$11,419.16
10% Profit 1,141.92
$12,561.08
2.5% Bond 314.03
Total $12.875.11
Please add for Stainless Steel 100 amp Services $ 6,636.13
Please note this does not include additional directional bore.
If ween be of further assistance please do not hesitate to contact me.
ect Manager
Enclosed: Craftsman Proposal for Service
Craftsman Proposal for additional wire
CC. Geoffrey Barkett (gbarett@sbsengineers.com)
PB/mg
File: Job 56016-1d ESTABLISHED 1975
State Certified and Bonded General Contractor
State License Number CGC004606
379 Williams Point Boulevard • Cocoa, Florida 32927-4801
321-632-0525 • FAX# 321-632-4090
E-mail: cesolar@bellsouth.net
Florida State Certified # EC -13001497 - Unlimited Electrical Contractors
International Association of Electrical Inspectors # 114575
UL 96A - Master Label Lightning Protection Installer: #UL -E136206
UCF - Florida Solar Energy Listed Solar Electric (P.V.) Installers
July 11, 2011
To: Paul Bonvllle, Senior Projects Manager
Santa Cruz Construction, Inc.
Change Order #2
Sebastian - Landscaping Project (Electrical)
Based upon latest revisions (6/29/11) the distances have changed on the lengths of electrical
underground feeds. The changes are listed below.
A. Flemming Street and CR512
Distance has Increased 38.0'x $5.86 = $222.68
B. Barber Street and CR512
Distance has increased 30.0' x $5.86 = $175.80
C. Roseland Rd. and CR 512
Distance has increased 127.0' x $5.56 = $1330.22
Hand ElectJic 25.0' less x $6.76 = 5169.00 Credit
Total cost change to distances (7-11-11) - $1,559.70
Respectfully,
Donald R. Cnresident
T002 YU TB;TT TTOZ/TT/l0
379 Williams Point Boulevard s Cocoa, Florida 32927-4801
321-632-0525 s FAX# 321-632-4090
E-mail: cesolarC beilsouth.net
Florida State Certified # EC -13001497 - Unlimited Electrical Contractors
International Association of Electrical Inspectors # 114575
UL 96A - Master Label Lightning Protection Installer: #UL -E136206
UCF - Florida Solar Energy Listed Solar Electric (P.V,) Installers
July 6, 2011
E. Breaker panel to be Nema 3R, 100 amp 2 pole main breaker, 10K AIC, one
2P40 amp breaker for 3 IIP 230 volt lo pump motor, one 2P 30 amp
breaker for TVSS surge arrestor, one 1P 20 amp breaker for sprinkler
controller, spaces for minimum of two future 1 P breakers.
F. TVSS surge arrestor mounted on exterior of breaker panel — UL listed.
G. Install two 5/8" x 10' copper clad ground rods 6'6" apart at base of panel.
Connect ground rods with #4 hand drawn bare copper conductors
continuous to neutral bar of breaker panel. Install bonding screw through
neutral bar into frame of metal breaker can to become a bonded neutral.
Label panel with voltage, phase, main, and sub breakers.
Cost of one new electrical service at each of three locations using painted steel
Nema 3R rain tight breaker panel with 25' maximum. underground run to FPL in -
ground J -box,
Per Location • $2, 790, 00
Cost of one new electrical service at each of three locations using Nema 4X
stainless steel breaker panel with 25' maximum underground run to FPL in -
ground J -box.
Per Location�4,496.604,496.60
Our proposal does not include any permit or utility fees.
Res tfully, r
Donald R. Coriway, PresMent
]r3 Ov:gT TIOZi90%Lo
ZOOQJ
Dacks
From:
Dacks [scci@bellsouth.net]
Sent:
Friday, July 08, 20116:65 PM
To:
'Geoffrey Barkett'
Subject:
CR 512 Beautification - New Jack and Bore Quantities
Attachments:
Jack and bore Breakdown.xisx
Mr. Barkett:
Attached are the breakdown numbers for the directional bore differentials summarized as follows:
Additional Bore for Electrical
195 If
Additional Wire for Pumps
170 If
Additional Bore for Irrigation
13 If
Please advise where you would like to reduce the boring on the irrigation to eliminate or reduce the net 208 If of
additional boring. If you have any questions, please do not hesitate to contact me.
Sincerely,
Paul Bonville
Chief Project Manager
Santa Cruz Construction, Inc.
321-452-3190 Office
321-459-3358 Fax
sari casantacruzconstruction.com
Road
Description
New (If)
Old (if)
Difference (if)
Fleming
jElectrical
113
75
38
Barber
jElectrical 1
105
75
30
Roseland
jElectrical 1
2051
781
127
Total
195
Road Description New (If) Old (If) Difference (If)
Fleming Irrigation
196 195
1
Barber I Irrigation 1
2031 191112
11
Roseland Irrigation
0 0
0
Total
13
Road Description New (if) Old (if) Difference (if)
Roseland lHand Electric 1 1101 135 -25
Total -25
Summary of Additional Quantities
Jack and Bore for Electric +195 If
Additional Wire for Pumps +170 If (195 If -25 If)
Additional Bore for Irrigation +13 If
Total Increase in Jack and Bore 208 If (195 If + 13 If)