HomeMy WebLinkAbout2019 - Parking Lot - Award Applied Technology ManagmentMa
SEBAST
HOME OF PELICAN ISLAND CITY COUNCIL AGENDA TRANSMITTAL FORM
Council Meeting Date: January 9, 2019
Agenda Item Title: Working Waterfront Park Improvements — Change Order 001 for
Construction Phase Services
Recommendation: Staff recommends approval of Change Order 001 for additional
construction phase services.
Background:
The City submitted a grant application to the Florida Inland Navigation District Waterways
Assistance Program 2018-2019 in March 2018. The requested assistance applied to the
Working Waterfront Park: Phase 3 projects consisting of Shoreline Protection and Parking
Improvement. On September 2018 the City received word that the FIND Board approved the
recommended funding and in October 2018 a contract was executed with the FIND Board to
receive this funding. The City has until September of 2020 to complete the construction of
these improvements and request the reimbursable funds.
Applied Technology & Management (ATM) was awarded a contract to provide preliminary
design, permitting, construction drawings, bidding services, and construction management in
March 2018 in the amount of $19,500. These services were for the shoreline protection
improvements only. The City now wishes to expand these services to include construction
management for the Parking Lot improvements which will be constructed in conjunction with
the shoreline protection improvements. The City will save time and costs by utilizing one
engineering firm for both projects which will be under construction consecutively.
If Agenda Item Requires Expenditure of Funds:
Total Cost: $3,000.00
Amount Budgeted in Current FY: $500,000.00
If Cost Requires Appropriation:
Amount of Appropriation Required: 11
Fund to Be Utilized for Appropriation: �� 7
Administrative Services Department Review:
Attachments: 1. Change Order, Construction Phase Services, ATM
City M�Aut rizatio}r
Date: / 131f 9
Change Order
Applied Technology & Management, Inc.
ATM
Change Order Number: 001
Project. Waterfront Park Shoreline
Improvements
Effective Date: January 2, 2019
Services: Construction Phase Services
Fee Estimate Change NTE: $3,000
This Change Order is appended to the Professional Services Agreement (Agreement) dated 14th day of March,
2018, by and between The City of Sebastian (hereinafter called "The City"), and Applied Technology &
Management, Inc. (hereinafter called "Engineering Consultant").
This Change Order involves modification of the original Agreement and compensation from that described in the
original scope of work of the Agreement to include the Pervious Paved Parking, as follows:
TASK 4 ADD ON — BID DOCUMENTS AND SUPPORT SERVICES — PERVIOUS PAVED PARKING
Upon completion of the Pervious Paved Parking Technical Package by others, ATM will assist the City with
development of a single Bid Package for the Shoreline Improvements and Pervious Paved Parking to be
distributed electronically to pre -qualified contractors. In an effort to facilitate solicitation and evaluation of
competitive, qualified bids for the construction, ATM will provide the City with the following bid support services:
• Attend one (1) on-site pre-bid conference with the City.
Issue addenda as appropriate to clarify, correct, or change the Bid Documents. 1 Addendum is assumed
for costing.
• Assist the City with their contractor selection. Support City's contract review. It is assumed that the City
will employ their own attorney to review the draft and final contract.
It is assumed that the City will provide the following:
• Material quantity and cost estimates for pervious paved parking design by others.
• Overall bid package documentation.
o Instructions to Bidders
o Form of Bonds
o Form of Contract
o Supplementary Conditions
o Form of Application and Certificate for Payment
o Compile related appendices—geotechnical reports, permits, etc.
• Advertisement for and solicitation of competitive bids for the work.
• Schedule on-site pre-bid conference.
• Review and tabulation of bids, bonds, and certificates of insurance.
This task is shown as an initial allowance due to uncertainty in number of bidders, number of bid packages, bid
phasing (if any), etc. The allowance is based on 1 bid package for both projects (Shoreline Improvements and
Pervious Paved Parking). It is assumed that the City will be responsible for distribution of the bid package and
payment for copying/printing and postage fees.
TASK 5 ADD ON — CONSTRUCTION PHASE SERVICES — PERVIOUS PAVED PARKING
Following award of the project to a qualified Contractor, ATM will provide limited Construction Phase services
to provide the City with technical support and observations of work in progress for both the Shoreline
Improvements and Pervious Paved Parking. Under this Task, ATM will provide technical support on a limited
basis for both of the construction elements. To this end ATM will:
• Provide technical review of Contractor's submittals (design submittals for applicable elements, shop
drawings, materials, and installation submittals for all related construction items).
• Provide technical RFI responses, as required.
• Maintain ongoing coordination with the City's project manager and the Contractor to resolve
design/construction issues and facilitate completion of the works.
• Conduct technical construction phase site visits to support the City's on-site project manager as
requested. ATM visits would occur twice per month depending on stage of construction. Site visits are
based on 1/2 day of total time each, including travel. Summary memos will be provided to the project
manager following each visit.
• Review and certify Contractors once monthly applications for payment via coordination with the City (2
hrs/month plus support staff)
• Conduct one site visit at substantial completion to provide a punch list to the City.
• Assist the City with review of as -built drawings and close-out submittals as provided by the Contractor
to the City at the completion of construction.
Note that the above scope and associated fees for construction phase services are subject to variation based on
how many contractors are retained for the work, duration of the construction, phasing of construction, extent
of changes/deviations, etc. and may have to be adjusted at a future date.
With the exception of the additional scope and fee described above, all terms and conditions of the original
Agreement remain in effect. IN WITNESS WHEREOF, the parties hereto have caused this Change Order to the
Agreement to be executed on their behalf by their respective representatives, each such representative having
been first duly authorized so to act, as of the date and year first herein above written.
of Sebastian
Client
0
Paul E. Carlisle, City Manager
(Type Name and Title)
Date:
2
APPLIED TECHNOLOGY & MANAGEMENT, INC.
-39
Title:
Date: