Loading...
HomeMy WebLinkAboutLEEWARD ROOFINGLeeward Roofing 9577 Gator Drive, Unit #4 Sebastian, FI 32958 Phone 772-589-2400 Fax 772-589-2429 TO: City of Sebastian 1225 Main St Sebastian, FL DESCRIPTION Roof repair: Airport Building Quote # 18824 AcCount #: P.O. #:.. $toy Pro;ect Amount: $ 10, 8l5 i Date 3/29/19 Invoice # 19182 TOTAL DUE I Additional Charges Previous payments Remaining balance as of 3/29/19 Make all checks payable to Leeward Roofing INVOICE Terms Due upon Receipt Amount $10,875.00 If you have any questions concerning this invoice, contact: Diana Diedrich, 772-589-2400 %Maxie you 6" PLn 4dweoa $10,876.00 $0.660 $0.00 $10,875.00 , CITY OF SEBASTIAN ATTN: ADMINISTRATIVE SERVICES 1225 MAIN STREET SEBASTIAN, FL 32958 Mail Invoices In Duplicate To Above Address vendor Leeward Roofing, LLC 608 Carnival Terrace Sebastian, FL 32958 Date IVendor ordered (Number 001 Purchase order 00008704-00 FY 2019 Acct No: 450110-534610 The Above Purchase order Number Must Appear On All Correspondence - Packing sheets And Bills Of Lading Requisition 00005680 red Ivia Page 1 ship To City of Sebastian Attn: Municipal Airport 202 Airport Drive East Sebastian, FL 32958 I Terms IDepartment AIRPORT ADMINISTRATION Description / Account Unit Qty Unit Price Net Price EACH 1.00 10875.00000 10875.00 1. At domers: Remove panels for valley installlation, install new panels at each dormer. Add valleyflash side wall 2. At hip and ridge: install "z" strip & modified tape at panel ridges. Re -install ridge caps 3. Caulk siding at dormers 4. Add fasteners where needed in all assess trim 5. Dispose of all waste ***** General Ledger Summary Section *** Account 450110-534610 Chief Procurement officer PO Total 10875.00 Amount 10875.00 Rock Solid Roofing, Inc. 1072 Persian Lane Sebastian, FL 32958 Phone: (321) 7497069 Email: davin1216(a,vahoo.com State Cert: CCC1328817 To: City of Sebastian Attn: James Testa Phone: 772-453-9722 Sebastian Airport Admin Metal Re: Roof Repair From: Davin Riedinger Email: JTesta(@.Citvofsebastian.ore Date: February 26, 2019 Pages: 1 ❑ Urgent O For Review O Please Comment ❑ Please Reply ❑ Original to Follow via Mail CKOL31X12@YIbA At the above -referenced project, re -flash all undershot/dormers on the Standing Seam metal roof. Remove the panels and flashing around the dormer and install peel and stick underlayment to the roof repair area. Any rotten wood will be removed and replaced in kind. NOTE. Ifexisting Standing Seam panels can't he unclipped and removed without destroying the overlapping clip, we will stop the roofrepairprocess and discuss the complete removal and replacement of the existing roofsystem. Install a new 1" Standing Seam panel on the undershot and properly flash valley under and new panel over. This process shall be done to all 15 (fifteen) dormers on the Admin building. Clean up and haul away all roof related debris. Bid Amount $15.897.00 Payment Schedule: 50% percent of contract price due upon signing this agreement. Balance due upon Completion of above project. Approval: X Owner/Agent Date Please call with any questions or comments. Thank you. Leeward Roofing 9577 Gator Drive, Unit #4 Sebastian, Florida 32958 Phone 772- 589-2400 CCC#1326409 Work to be performed at: City of Sebastian Airport Terminal Building Sebastian, FL Quotation DATE February 7, 2019 Quotation # 18824 Customer ID Customer Name City of Sebastian Quotation valid until: March 30, 2019 Prepared by: Robert Diedrich C/O: Jim Testa We will perform the labor necessary for the completion of the followin4: Description Scope of work for roof repair of V Standing Seam Metal Roof: 1. At dormers: Remove panels for valley installation, install new panels at each dormer. Add valley/flash side wall 2. At Hip and Ridge: Install '7'strip and modified tape at panel ridges. Re -install ridge caps 3. Caulk siding at dormers 4. Add fasteners where needed in all Asses trim 5. Dispose of all waste All material is guaranteed to be as specified, and the above work to be performed in accordance and completed in a substantial workmanlike manner for the sum of Ten thousand eight hundred seventy five With payments to be made as follows: Dollars $10,875.00 $10,875.00 100% Due Upon Completion $10,875.00 Total Any alteration or deviation from above specifications involving extra costs will be executed only upon written order and will become an extra charge over and above this estimate. All agreements contingent upon weather, accidents or delays beyond our control. Florida Homeowner's 09nstnlction Rerovery Fund: Payment up to a limited amount, may be available from the Florida Homeowners' Construction Recovery Fund if you lose money on a project performed under contract, where the loss results from specified violations of Florida Law by a licensed contractor. For information about the recovery fund and filing a claim, contact the Florida Construction Industry Licensing Board at the following: 1940 N Monroe St, Tallahassee, FL 32399 850-487-1395 www.floridalicense.com Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. Work is authorized to be completed as specified in agreement with the payment schedule above. Signature Date Scott I spoke with Brian Coffey of Brian Coffey Roofing on February 12`". Brian declined to estimate the roof repairs on the Airport Administration building. it 17,