HomeMy WebLinkAbout2007 CDM Proposal for Construction Servicesen«
SEDASa.-�
HOME OF PEl1GN ISIAlN
AGENDA TRANSMITTAL
Subject: Agenda No. 07 0 (LI
Camp Dresser McKee (COM) Proposal for Department Origin: Engineering
Construction Services for Twin Ditches Stormwater Finance Det _
Retrofit Project City Attorney:r((
City Clerk:
Date Submitted'
YAi
ov f r Submittal by: For Agenda of: 24 January 2007
er, City Manager
Exhibits: Cover Letter and Document from CDM
EXPENDITURE AMOUNT BUDGETED: APPROPRIATION
REQUIRED: REQUIRED:
Not to exceed $35,560.00I Remaining unallocated $112,518 $35,560 from Series 2003 Bond
Proceeds
SUMMARY
City solicited proposal from Camp Dresser McKee (CDM) In mid -2006 to provide professional engineering
services during contracting and construction for the Twin Ditches Capital Improvements Project This.
project essentially calls for the removal of the middle berm in approximately 4000 LF of the existing major
double (or'twin) ditches parallel to Main Street and adjacent to the road to the Municipal Golf Course
from Airport Drive East nearly to Wimbrow Drive. These improvements will effectively convert the existing
conveyance into a Best Management Practice (BMP) wet detention treatment system in order to increase
sedimentation control, reduce turbidity, and improve water quality of the stormwater runoff discharged to
the St Sebastian River. The project will be constructed on approximately 7 acres of City owned property
and right of way to treat stormwater runoff from neatly 615 acres of primarily residential development
watershed. The project also Includes construction of a new control structure at the west end to control the
discharge of run-off to the St. Sebastian River. This project has been Identified as a major component of
the City's adopted Master Stormwater Management Plan, The SJRWMD permit for the project was
obtained in 2006.
The low bidder for the construction contract is Master Excavators, Inc., (MEI), with a bid of $897,133.50
and Council approved going forward with award of the construction contract to MEI on 10 January 2007.
The amount of funding currently remaining in the project budget is $1,009,652,25 ($112,518.75 more than
the low construction contract bid). It Is proposed to mMmk no more than $35,560 of that underun
amount to the subject contract amendment to CDM for providing ongoing engineering services during
contracting and construction for the project Any budgeted amounts not spent on this project will go
toward funding of other projects within the Stormwater Capital Improvement Program.
It should be noted the City has been advised by DEP that its grant application for $500,000 for this project,
prepared in large part by CDM, is currently in process and, funding resources permitting, Is likely to be -
awarded to the City perhaps as early as August 2007. Discussions with DEP, however, Indicate the CitUD
could not take advantage of such grant on this project If the project Is substantially complete by me Urn
the grant is ready for award (which may well be the case). City therefore has requested DEP
consideration for applying the $500,000 grant to another stormwater capital improvement project that
could take advantage of th "ant at a later date (i.e., the Collier Creek Dn., ng project). DEP has
agreed to favorably consider such request and City, with CDM assistance, is therefore currently revising
the grant application package to effect such transfer of the $500,000 grant opportunity to the Collier Creek
Dredging project.
RECOMMENDED ACTION
Move to accept CDM proposal to provide professional engineering services during contracting and
construction of the Twin Ditches Slormwater Retrofit Project for an upper limit amount of $35,550 with
tasks to be performed and billed as Identified in the accompanying documentation.
636
WORK ASSIGNMENT UNDER
PROFESSIONAL SERVICES ENGINEERING AND
ENVIRONMENTAL SERVICES AGREEMENT
CITY OF SEBASTIAN, FLORIDA
TWIN DITCHES STORMWATER RETROFlT PROJECT.
PHASE II - CONSTRUCTION SERVICES
SCOPE OF SERVICES
CDM shall.perform the following described engineering services related to bidding and
construction services for the City of Sebastian (CITY) Twin Ditches and Middle Stonecrop . .
Stormwater Retrofit Projects.
TASK1.0 GENERAL ENGINEERING SERVICES
These services shall include the following subtasks:
Subtask 1.1 CDM will obtain the Front -End Documents from the City, review and prepare
the contract documents, incorporate the technical specifications, and submit the
complete package to the City for review.
Subtask 1.2 CDM will consult with and advise the CITY and act as its representative as
provided in the General Conditions of the construction contract. Consult with
and advise the CITY as to the acceptability of substitute materials and equipment
proposed by the Contractor when substitution is permitted by the Contract
Documents.
Subtask 1.3 CDM will make visits to the site at intervals appropriate to the various stages of
construction to observe the progress and quality of the executed work of the
Contractor and to determine in general if such work is proceeding in accordance
with the Contract Documents. During such visits and on the basis of on-site
observations; CDM shall keep the CITY informed of the progress of the work,
shall endeavor to guard the CITY against defects and deficiencies in such work
and may disapprove or reject work as failing to conform to the Contract
Documents.
Subtask 1.4 CDM will review and approve Shop Drawings and samples, the results of tests
and inspections and other data which the Contractor is required to submit.
Subtask 1.5 CDM will issue CTTY instructions to the Contractor and issue necessary
interpretations and clarifications of the Contract Documents. Have authority as
the =a representative, to require special inspection or testing of the work. Act
as initial interpreter of the requirements of the Contract Documents regarding
the execution and progress of the work.
A-1 , M.
Subfusk 1,6 .. CDM Ta assist,the City in rgvigwing the -applications for payment, the . ....
accompanying data and schedule. The application for payment will be reviewed
during the monthly meetings. CDM and the City will determine the amounts
owing to the Contractor, based on on-site observation and documentation. City
will process the applications for payment and will administrate the construction
project CDM will provide technical guidance.
Subfask 1.7 CDM will conduct a final check to determine if the work has been completed in
accordance with the Contract Documents.
TASKZ0 SPECIAL ENGINEERING SERVICES
Activities performed under this task consist of supplementary and special engineering services
required during the construction and implementation of the project
Subfask 2.1 Prepare for the CITY a set of reproducible record drawings and two (2) blueline
prints showing those significant changes made during the construction process
based on digital files (AutoCAD) information furnished to CDM by the
Contractor.
Subtask 2.2 Provide services in connection with preparing final certifications of completion
of construction.
PAYMENT AND COMPENSATION
PHASE lI CONSTRUCITON SERVICES
Compensation for Phase 11 shall be for anupper limit amount of $ 35560.
ESTIMATED PROJECT SCHEDULE .
An estimated project schedule outlining the project phases is m follows.
Construction Services 6 Months
ATTEST:
SallyA. Mao, MMC
(SEAL)
Approved as to Form and Contract for:
Rolil ce%by thhee]C,tty of Sebastian Only
Rich Stringer, CiVAttomey
Signed, sealed and delivered
In the presence of: `�
Name uUP-TA .1,
—1('' �VM-?.
Name: JKei/�' JIT c*n
_,
THE CI OF S BASTIAN
By:
Name: Al Minner
Title: City Manager
By:
Name: sft� S G rdf+c. P.E., gcEC
Title: Pr1Ad?d
REQ1-V&T1M1!i-
CrYY OF •
ME M 1 •ROW• G•
Sl
Of0cer
Principal/
Senior
Professional
Staff
Project
Total
Total
Task
(g155/Hr.)
Associate
Professional
II,
Support
Admin
Hous
ODC
Cost !
($140/Hr.)
($120IHr.)
($100/Hc)
($70I1ir.)
($60/Hr.)
Task 1- General Engineering Services
$900
1.1 - Preparation of Fort Ends Docs
0
2
8
12
0
8
30
_$2,920
1.2 -Material Submittal Review
0
2
4.
6
0
4
16
.$11600
1.3 -Site Visits
4
12
12
24
0
8
80
$6,620
1.4- Shop Dmwings Review
0
4
24
12
0
16
56
$5,600
1.5-RFI/Clarification Response
2
6
24
24
0
8
64
$6,910
1.6 - Mon0ily Meetings/Payment Review
2
12
12
0
0
0
26
$3,430
1.7-Walkthrou hs
0
_4
4
6
0
8
22
$2,120
Task 2- Special Engineering Services
$400
2.1 - Record Drawings
0
2
2
8
8
4
24
$2,120
2.2- Final Certifications
4
8
8
0
0
4
24-
$2,940
SUBTOTAL
10
`52
X88
80 s
8
60
308
$1,300
$34,266
TOTAL
I
$35,560
Sl
CDm
1M1 xyM1wq N-1-&Sutle 301
W.0e1,h, M9de 32963
teL 772231.1301
fu 7722311332
January 16,2W7
Mr. David W. Fisher, P.E.
City Engineer
City of Sebastian
1225 Main Street
Sebastian, Florida 32958
Subject Twin Ditches Stormwater Retrofit Project
Proposal for Construction Services
Dear Mr. Fisher:
CDM is pleased to submit this proposal to provide professional engineering services during
construction for the Twin Ditches Stormwater Retrofit Project.
This proposal is for an upper limit amount of $35,560.00 for performing the tasks as identified
in the attached Exhibit A. Payment shall be made on a billing schedule basis, based on our
standard billing rates plus direct costs. CDM will submit monthly invoices for the work
performed
CDM appreciates the opportunity of provide you with this proposal and looks forward to
being of service to the City of Sebastian on this project.
Very
, �ttrrruu3{ly yours,
it
Ana c DeMel
Project Manager
Camp Dresser & McKee Inc.
File: 0000-EJGNB-MD.EJGSEB
cc: Eric Grotke, CDM/VRB
0
P��
<.... N1n9-en9lneering-<outmnbn...... 11...
EXHIBIT A
WORK ASSIGNMENT UNDER
PROFESSIONAL SERVICES E4GII4MMG AND
M VIRONMENIAL SERVICES AGREEMMgT
CITY OF SEBASTIAN, FLORIDA
TWIN DrrCHES STORMWATER RETROFIT PROJECT.
PHASE 11- CON57RUCITON SERVICES
SCOPE OF SERVICES
CDM shall perform the following described engineering services related to bidding and
construction ser u:es for the City of Sebastian (CITY) Twin Ditches and Middle Smnecrop
Stormwater Retrofit Projects.
TASK1.0 GENERAL ENGMUUNG SERVICES
These services shall include the following subtasks: .
Subtask 1.1 CDM will obtain the Front -End Documents from the City, review and prepare
the contract documents, incorporate the technical specifications, and submit the
complete package to the City for review.
Subtask 12 CDM will consult with and advise the CITY and act as its representative as
provided in the General Conditions of the construction contract Consult with
and advise the CITY as to the acceptability of substitute materials and equipment
proposed by the Contractor when substitution is permitted by the Contract
Documents.
Subtask 13 CDM will make visits to the site at intervals appropriate to the various stages of
construction to observe the progress and quality of the executed work of the
Contractor and to determine in general if such work is proceeding in accordance
with the Contract Documents. During such visits and on the basis of on-site
observations; CDM shall keep the CITY informed of the progress of the work,
shall endeavor to guard the CLTY agaimt defects and deficiencies in such work
and may disapprove or reject work as failing to conform to the Contract
Documents.
Subtask 1.4 CDM will review and approve Shop Drawings and samples, the results of bests
and inspections and other data which the Contractor is required to submit
Subtask 1.5 CDM will issue CITY instructions to the Contractor and issue necessary
interpretations and clarifications of the Contract Documents. Have authority as
the Cn Y's representative, to require special inspection or testing of the work. Act
as initial interpreter of the requirements of the Contract Documents regarding
the execution and progress of the work
r38 A-1 a�
Subtask 1.6 CDM will assist the City in.reviewing the applfcations for payment, the
accompanying data and schedule. The application for payment will be reviewed
during the monthly meetings. CDM and the City will determine the amounts
owing to the Contractor, based on on-site observation and documentation City
will process the applications for payment and will administrate the construction
project CDM will provide technical guidance.
Subtask 1.7 CDM will conduct a final check to determine if the work has been completed in
accordance with the Contract Documents.
TASK20 SPECIAL ENGINEERING SERVICES
Activities performed under this task consist of supplementary and special engineering services
required during the conshvction and implementation of the project.
Subtask 2.1 Prepare for the CITY a set of reproducible record drawings and two (2) blueline
prints showing those significant changes made during the construction process
based on digital files (AutoCAD) information furnished to CDM by the
Contractor.
Subtask 2.2 Provide services in connection with preparing final certifications of completion
of construction
PAYMENT AND COMPENSATION
PHASEII cON51RuclIONSERVICES
Compensation for Phase II shallbe for an upper limit amount of $ 35,560.
ESTIMATED PROJECT SCHEDULE
An estimated project schedule outlining the project phases is as follows:
Construction Services 6 Months
A-2 wuauam
Regular City Council Meeting
January 24, 2007
Page Eleven
07.027 D. Chamber of Commerce Insurance (Transmittal. Insurance Estimates from PRIM
131-133
The City Manager advised this was settled under the Chamber presentation.
07,014 E. Aoorove CDM Twin Ditches Stormwater Retrofit Proiect Contract (City Enaineer
135-140 Transmittal. CDM Letter. Pr000sed Aareement)
The City Manager gave a brief update and said the project will be funded by the 2003
stormwater bond.
Mr. Neglia asked if this would prevent discharge to the SL Sebastian River and the City
Manager explained this project identified by the 2000 Master Plan, will affect a different
watershed area.
On MOTION by Mr. Neglia and SECOND by Ms. Coy, item E was approved on a roll call
vote of 4-0.
07.028 F. Aoorove CDM Middle Stonecroo Stornwater Retrofit Pro, act Contract (City
141.147 Enaineer Transmittal. CDM Letter. Proposed Aareement�
The City Manager gave a brief report on the cost reduction and said the project will be
funded by the 2003 bond.
On MOTION by Ms. Coy and SECOND by Mr. Neglia, Item F was approved on a roll call
vote of 4-0.
07.029 G. Ap�ove CDM Collier Canal Se wall Assessment and Desian Prolect Contract
149-159 ICIN Engineer Transmittal. CDM Letter, Pr000sed Aoreement)
The City Manager gave a brief update on the project and advised the permitting process
is almost done. Mr. Neglia noted the City is receiving a $500,000 Dept. of
Environmental Protection grant for this project.
Bob Audette, 755 Wimbrow Drive, Sebastian, clarified he works in the construction
industry though not in the City and not in this realm, and said it is very important that
people know the initial plan was submitted well before the Council decided not to go with
curb and gutter, expressed Concerns about wildlife and widening, and swale work. He
said it is important to Consider what might have happened if Council had not decided to
go with curb and gutter. He said CDM had a lot of work to do of their own making and
asked why should the City pay to fax this sorry plan. He said the new plan is to work
within walls, which has a wading bird habitat which will take away a good part of the
walking trail of Hardee Park. He noted that Hardee Park is lit up and did not understand
how authorities determined it to be suitable habitat.
Ms. Coy asked if there was room for negotiation in the contract.