Description:
Project 47 is similar to project 46 in that two of the road crossings at, insufficient to
carry the flow of the conveyance channel. The road crossing culverts under Clearbrook
Street west of Laconia and the culvert under Laconia just south of Gladiola are
bottlenecks to the conveyance channel. This project would replace both road crossings to
increase the capacity flowing under Laconia Street and Clearbrook Street. This
conveyance channel has a direct discharge to the South Prone of the Sebastian River with
no treatment for water quality improvement. The second phase of the project includes the
purchase of land and construction of a best management practice 4.5 acre wet detention
pond for increased sedimentation of settleable solids and reduction of total phosphorus
and total nitrogen.
The current conceptual budget estimate for this project is $1.218.000. including design
and construction. This number may change based on final design specifications and
market conditions.
l LOCATICN!HF• tEGFIIC
�T. .
't.ffi� SIWnMalm!binayv:,lenl P
COM FW. ] IJ
Rvlem W
Lower Stonecrop Stormwater Improvements
. -�5 -
omnwn`vnw
•.
w',� `7 Cmm,ct5vxm �.arVm I
�
w
l LOCATICN!HF• tEGFIIC
�T. .
't.ffi� SIWnMalm!binayv:,lenl P
COM FW. ] IJ
Rvlem W
Lower Stonecrop Stormwater Improvements