HomeMy WebLinkAboutCO #31pMf OF PfGCAN ISUND CITY OF SEBASTIAN CHANGE ORDER CHANGEORDERN: 3 PROJECTNAME: Taxiway'C'Construction CONTRACTOR N.ANIE: S 29.400.00 Dickerson Florida, Inc. CONTACT NAME: John Pluswiek PO IN. 910 WA Ft. Pierce, FL 349N _ Date: May 22.2019 CONTRACT DATE: Sept. 12,2018 By the signature affixed below, both the City and the Contractor agree to the changes as stipulated herein. Upon proper execution of this document, the Contractor is hereby notified to commence work All changes stated below are hereby incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are enjoined and in full force while executing the changes) stipulated as follows: DESCRIPTION: Conenion far umuiuble mMUiW ynMniauacaumerM dunoe dR comwnian oTTesnray'C' aI &hA1rM Municipal Airyen A) CONTRACT PRICE PRIOR TO THIS CHANGE SZ.195.303A5 NET INCRFASFmFCREASE) RESULTING FROM THIS CHANGE S 29.400.00 NEW CONTRACT PRICE INCLUDING THIS CHANCE ORDER Sd3LIp03.45 0) CONTRACFTIME PRIOR TO THIS CHANCE (NUMBER OF DAYS) WA NET INCREASE(DECREASE)RESULTING I'ROMI HIS CHANCE (NUMBER OF DAYS) .30 days NEWCOMPU.TIONDATEINCLWWGTIIISCIWNGE lolc30.2019 AGREED CO' UC R: CIT' FSEB AN ) i �''� r/ R Date:l Date. �.��q A arized signatureAu1M1 riud Cily N onager AnsevAt s By Cim arsehastian Stam _City Manager Authorisatlon -cumulative amount less than 15% orcontract price or SI5.000 single change order. �Cfty Council Authodxad9n -cumulative amount exceeds t5% orcontract price or $15.000 single change order. (Nltetingdate S/7J/T9 1 CITY OF SEBASTIAN: _ Date: May 22.2019 v��� ' ty M ager - Project Mgr. C/ey ry Finance Director CityClerk vette Williams. MGIC. City Clerk City ProcurcmeRl ure...I — Address: 3122 North 250 Street Ft. Pierce, Florida 34946 ORIGINAL CONTRACT AMOUNT: AMOUNT OF PREVIOUS CHANGE ORDERS: COST OF THIS CHANGE ORDER: REVISED CONTRACT AMOUNT: DESCRIPTION OF CHANGE Replace excavated unsuitable material with clean screening sand Supply and install Tensar TX -160 Geogrid Overrun of unsuitable excavation contract quantity I Change Order# 003 $ SEBASTIAN MUNICIPAL AIRPORT 2,192,481.95 $ CITY OF SEBASTIAN, FLORIDA 2,821.50 $ 202 AIRPORT DRIVE E. 29,460.00 $ SEBASTIAN, FLORIDA 32958 MUNICIPAL AIRPORT QUANTITY CHANGE ORDER TOTAL AMOUNT Project Title: Taxiways"C° F Date Prepared: Project Construction of approximately 3,900 feet of $9,240.00 Description: asphalt paved ADG II taxiways, including FAA AIP No. 3-12-0145-014-2018 unlighted taxiway guidance signs and storm 434633-1-94-01 drains. FOOT Fin. Proj No. Contractor: Dickerson Florida, Inc. G.L. Acct. No. Address: 3122 North 250 Street Ft. Pierce, Florida 34946 ORIGINAL CONTRACT AMOUNT: AMOUNT OF PREVIOUS CHANGE ORDERS: COST OF THIS CHANGE ORDER: REVISED CONTRACT AMOUNT: DESCRIPTION OF CHANGE Replace excavated unsuitable material with clean screening sand Supply and install Tensar TX -160 Geogrid Overrun of unsuitable excavation contract quantity I Change Order# 003 $ 2,192,481.95 $ 2,821.50 $ 29,460.00 $ 2,224,703.45 QUANTITY UNIT PRICE TOTAL AMOUNT 480 cv $25.00 $12,000.00 1750 sv $5.28 $9,240.00 480 cy $17.00 $8,160.00 I TOTAL $29,400.00 j Reason for Change OL�pij; Unforseen unsuitable matedal on perched water table at intersection ofTxwy B and Txwy C and at Txwy C Connector to Rnwy 23. Subject to the conditions set forth below, an equitable adiustment is established as follows: The contract price is ... The contract time to complete work is ... not changed. not changed. x In used/decreased $ _29,400.00 x increased/decreased 30 days. The foregoing Is (n accordance with your contract dated Octo er 11.2017 land as listed below: A. The aforementioned change and work affected thereby are subject to all contract stipulations and covenants. B. The rights of the Owner are not prejudiced; and C. All claims against the Owner which are incidental to or as a consequence of the aforementioned change are satisfied. SIGNATURE Omer Representative: I Contractor RPR Design Consultant FAA: (ifapplicable) FDOT (if applicable) TITLE DISTRIBUTION: Each 1Jignalory Parry ATTACHEMENTS: Price Proposal from Dickerson ano Fiber Optic Cable Product Data (2 sheets) DATE May 16, 2019 TO: Mr. Henri Burton Senior Construction Manager Infrastructure Consulting & Engineering 5550 W. Idlewild Ave. Suite 102 Tampa, FL 33634 RE: Sebastian Municipal Airport Taxiway C FAA AIP Project No.: 3-12-0145-0142018 FOOT FM No.: 434633.1-94-01 Sebastian, Florida A DICKERSON FLORIDA, INC. A COMPANY OF THE DICKERSON GROUP, INC. PO Box 910 Fart Pierce, FL 349540910 phone 772429-0444 fax 772-429-0445 Change Order Proposal #3 Subject: Correction for unswtable matenals condition at Taxiways B & C. I I ITEM NO. DESCRIPTION CITY UNIT UNIT PRICE TOTAL +� 143 Replace unsuitable excavated areas with clean screening sand 480 CY $25.00 I $12,000.00 ISuonly and install Tensar Tdax TX160 _ _� 1750 BY $5.28 $9,240.001 I44 45 Overrun of unsuitable excavadon contract quantity 480 CY $17.00 $8,160.00 TOTAL: 529,400.00 Sincerely, Dickerson FL, Inc. John L. P�