ALL CONSTRUCTION SHALL BE CONDUCTED IN ACCORDANCE WITH THE CITY OF
SEBASTIAN ENGINEERING AND PUBLIC WORKS AND THE FDOT STANDARD
SPECIFICATIONS FOR ROADS AND BRIDGES, LATEST EDITION.
LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND
OTHER FEATURES ARE SHOWN ACCORDING TO THE INFORMATION AVAILABLE AT THE
TIME OF PREPARATION OF THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY
CORRECT. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND AGREE TO
BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY
HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES,
STRUCTURES, AND OTHER FEATURES AFFECTING HIS WORK.
THE CONTRACTOR SHALL COORDINATE WITH UTILITY OWNERS FOR VERIFICATION OF ALL
UTILITIES AND NOTIFY UTILITY OWNERS 48 HOURS PRIOR TO DIGGING IN ANY PORTION
OF THE SITE.
THE CONTRACTOR SHALL CONTACT THE ENGINEER UPON FINDING ANY CONFLICTS IN
THE PLANS DURING CONSTRUCTION OF ANY IMPROVEMENTS SHOWN ON THE DRAWINGS.
THE LIMITS OF CONSTRUCTION SHOWN ON THE PLANS SHALL BE STRICTLY OBSERVED BY
THE CONTRACTOR, ALL INGRESS, EGRESS AND TRAFFIC PATTERNS ON THE SITE SHALL
BE EXISTING ROADWAYS SHOWN ON THE DRAWINGS.
FINISHED GRADE FOR GROUND ELEVATIONS ON DRAWINGS REFER TO GRADE AFTER
SODDING OR OTHER SURFACE TREATMENT. FINISHED ELEVATIONS SHOWN ON
DRAWINGS REFER TO ELEVATIONS AFTER CONCRETE OR ASPHALT PAVEMENT.
INSTALLATION OF ALL CONDUITS, PULL BOXES AND FOUNDATIONS SHALL BE IN
ACCORDANCE WITH ALL REQUIREMENTS OF THE APPLICABLE SECTIONS OF THE FLORIDA
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, FDOT ROADWAY AND
TRAFFIC DESIGN STANDARDS AND AS INDICATED ON THE DRAWINGS AND/OR BY THE
MANUFACTURER.
THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS OF ALL TESTINGS BY AN
INDEPENDENT GEOTECHNICAL SOILS AND MATERIALS TESTING LABORATORY, THE COST
OF ALL TESTINGS REQUIRED BY THESE PLANS & SPECIFICATIONS SHALL BE INCLUDED
WITH THE LUMP SUM BID AND NO ADDITIONAL COMPENSATION SHALL BE MADE BY THE
OWNER.
UNLESS OTHERWISE SHOWN, THE CONTRACTOR SHALL REPLACE ALL PAVING, SODDING,
STABILIZED EARTH, LANDSCAPING, DRIVEWAYS, SIDEWALKS, IRRIGATION SYSTEMS;
UNDERGROUND PIPING, ETC. LOCATED WITHIN AND OUTSIDE THE CONSTRUCTION LIMIT
LINE DISTURBED OR DAMAGED BY THE CONSTRUCTION. THE CONTRACTOR SHALL
REPLACE WITH EQUAL MATERIAL OR AS DIRECTED BY THE ENGINEER.
WHERE A CONNECTION IS TO BE MADE IN THE FIELD TO AN EXISTING CONDUIT, THE
CONTRACTOR SHALL EXCAVATE THE AREA TO VERIFY THE TYPE OF CONDUIT, CONDUIT
SIZE, AND REQUIRED CONNECTION AND FITTINGS AND OBTAIN THE OWNERS APPROVAL
OF THE PROPOSED METHOD OF CONNECTION PRIOR TO INSTALLING MATERIALS.
THE CONTRACTOR SHALL COORDINATE AND VERIFY ALL DIMENSIONS OF ALL EXISTING
AND PROPOSED FACILITIES PRIOR TO FABRICATION OF PIPING AND EQUIPMENT TO
ENSURE PROPER ASSEMBLY OF ALL ITEMS. SOME DIMENSIONS MAY NEED TO BE
VERIFIED BY THE CONTRACTOR, FROM THE MANUFACTURER.
THE CONTRACTOR IS TO FOLLOW THE CONSTRUCTION PERMITS THAT HAVE BEEN ISSUED
FOR THIS PROJECT. ALL SPECIFIC OR GENERAL CONDITIONS APPLY.
THE CONTRACTOR IS TO ADHERE TO THE DESIGN AND CONSTRUCTION STANDARDS OF
THE CITY OF SEBASTIAN.
MAINTENANCE OF TRAFFIC SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES PART VI, WORK ZONE TRAFFIC CONTROL. THE CONTRACTOR
WILL PROVIDE A MAINTENANCE OF TRAFFIC PLAN TO THE ENGINEER PRIOR TO
CONSTRUCTION. TRAFFIC CIRCULATION WITHIN EXISTING PARKING LOT AREA MUST BE
MAINTAINED DURING CONSTRUCTION.
COMPLETE RECORD DRAWINGS, CONFORMING TO THE CITY OF SEBASTIAN STANDARDS
SHALL BE COMPILED DURING CONSTRUCTION FOR PERIODIC REVIEW. FINAL RECORD
DRAWINGS, CERTIFIED BY A FLORIDA LICENSED REGISTERED LAND SURVEYOR SHALL BE
SUBMITTED TO THE ENGINEER IN DIGITAL FORMAT PRIOR TO FINAL INSPECTION AND
ACCEPTANCE ON ANY PART OF THE PROJECT.
LOCATIONS AND DIMENSIONS OF EXISTING RIGHT-OF-WAY AND EASEMENTS ARE BASED
ON BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL VERIFY THE LIMITS OF THE
RIGHT-OF-WAY AND EASEMENTS IN ORDER TO AVOID ENCROACHMENTS.
THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AT ALL INTERSECTIONS OF
PROPOSED WORK AND EXISTING UTILITIES. THE EXPLORATORY EXCAVATIONS SHALL BE
MADE SEVENTY-TWO (72) HOURS IN ADVANCE OF THE WORK. IF THERE IS A POTENTIAL
CONFLICT, THE CONTRACTOR IS TO NOTIFY THE CITY OF ANY OBSTRUCTION.
ELEVATION DATUM IS LOCAL DATUM.
IN AREAS WHERE CONSTRUCTION ACTIVITIES RESTRICT NORMAL ACCESS TO
PROPERTIES, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALTERNATIVE ACCESS
ROUTES, WHICH ARE SUBJECT TO APPROVAL BY THE ENGINEER.
THE CONTRACTOR SHALL NOTIFY THE CITY AND IRC UTILITIES 72 HOURS IN ADVANCE OF
ANY WATER MAIN OR SANITARY FORCE MAIN SHUT -DOWN.
ALL EXCAVATIONS SHALL BE BACKFILLED AT THE END OF EACH WORK DAY.
THE CONTRACTOR SHALL NOTIFY FIBER OPTIC COMPANIES SEVEN (7) DAYS PRIOR TO
ANY CONSTRUCTION. EXTREME CAUTION SHALL BE EXERCISED IN AREAS OF FIBER
OPTICS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING DAMAGED CURBS, ASPHALT,
LANDSCAPING, DRIVEWAYS AND ANY TEMPORARY REPAIRS OF OPEN CUTS, THESE
ITEMS SHALL BE PAID UNDER GENERAL REQUIREMENTS.
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN TRAFFIC, I.E. TEMPORARY SIDEWALKS
AROUND WORK AREAS. THE CONTRACTOR MAY HAVE TO RESTRICT WORK HOURS ON
SIDEWALKS, WITH TEMPORARY FENCING BETWEEN CONSTRUCTION AND TEMPORARY
SIDEWALKS, ETC.
NOTICE TO DRAWING HOLDER
DO NOT SCALE THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE
DOCUMENTS, THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR
CLARIFICATIONS PRIOR TO CONSTRUCTION NEEL-SCHAFFER, INC., HEREINAFTER
REFERRED TO AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO
THE OWNER FOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED
ON EXTENSIONS OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS
DRAWING, WITHOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL
BE AT THE REUSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD
HARMLESS THE ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES,
INCLUDING ATTORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM,
48 HOURS BEFORE DIGGING
CALL TOLL FREE
1-8004324770
SUNSHINE STATE ONE CALL
OF FLORIDA, INC.
NO. DATE BY
1 10/18/12 LG/MS
1. THE CONTRACTOR SHALL ADHERE TO THE REQUIREMENTS SET FORTH IN THE MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) LATEST PUBLISHED EDITION.
CHAPTER VI AND THE FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS LATEST
PUBLISHED EDITION AT ALL TIMES.
2• ALL TRAFFIC CONTROL DEVICES (TEMPORARY SIGNS, PAVEMENT MARKINGS, BARRIER
WALLS, ETC.) REQUIRED DURING A CONSTRUCTION PHASE SHALL BE INSTALLED AND
APPROVED BY THE CITY OF SEBASTIAN TRAFFIC OPERATIONS ENGINEER PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION AND WILL BE MAINTAINED IN ACCORDANCE WITH
MUTCD, REFER TO INDEX 600. IF CASE IS NOT COVERED IN MUTCD, INDEX 600 SHALL BE
USED IN CONJUNCTION WITH ALL OTHER INDEXES SPECIFICALLY MENTIONED IN EACH
TRAFFIC CONTROL PHASE.
3. ALL DEVICES WILL BE IN GOOD CONDITION. MINIMUM REFLECTIVE INTENSITY SHALL
MEET THE FDOT STANDARD SPECIFICATIONS FOR ROADS AND BRIDGE
CONSTRUCTIONPER THE LATEST PUBLISHED EDITION.
4. INGRESS/EGRESS TO COMPLEX, MUST BE MAINTAINED THROUGHOUT CONSTRUCTION
SCHEDULE.
5. THE CONTRACTOR SHALL SUBMIT A MOT PLAN SIGNED AND SEALED BY PE FOR
CONSTRUCTION WORK ON CITY STREETS.
EROSION CONTROL/WATER QUALITY NOTES
1. EROSION CONTROL AND SEDIMENTATION CONTROL DEVICES SHALL BE IN PLACE PRIOR
TO BEGINNING ANY CONSTRUCTION. THEY SHALL BE INSTALLED, AT A MINIMUM, TO THE
LIMITS SHOWN IN THE DRAWING, AS REQUIRED IN THE SPECIFICATIONS AND IN
ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS. THE COST TO THE
CONTRACTOR FOR ALL EROSION AND SEDIMENTATION CONTROL IS INCLUDED IN THE
LUMP SUM BID AND NO ADDITIONAL COMPENSATION SHALL BE MADE BY THE OWNER.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL TEMPORARY
EROSION CONTROL FEATURES.
3. THE CONTRACTOR IS TO PROVIDE EROSION/SEDIMENTATION CONTROL TO PREVENT
SILTATION OF ADJACENT PROPERTY, STREETS, STORM SEWERS AND WATER WAYS. IN
ADDITION, THE CONTRACTOR SHALL PLACE STRAW, MULCH OR OTHER SUITABLE
MATERIAL ON GROUND ON AREAS WHERE CONSTRUCTION -RELATED TRAFFIC IS TO
ENTER AND EXIT SITE. IF, IN THE OPINION OF THE ENGINEER AND/OR LOCAL
AUTHORITIES, EXCESSIVE QUANTITIES OF EARTH ARE TRANSPORTED OFF-SITE EITHER
BY NATURAL DRAINAGE OR BY VEHICULAR TRAFFIC, THE CONTRACTOR IS TO REMOVE
AND CLEAN SAID EARTH TO THE SATISFACTION OF THE ENGINEER AND/OR AUTHORITIES.
AN EROSION CONTROL BARRIER SHALL BE ESTABLISHED AS SITE CLEARING PROCEEDS
AND MAINTAINED UNTIL SUCH TIME AS VEGETATION OR OTHER CONTROLS BECOME
EFFECTIVE.
4. EXISTING DRAINAGE PATTERNS AND CAPACITIES ARE TO BE PROTECTED AND
MAINTAINED DURING CONSTRUCTION TO ELIMINATE FLOODING AND PONDING WATER ON
PRIVATE PROPERTY. THE CONTRACTOR TO PROVIDE TEMPORARY DRAINAGE MEASURES
AS REQUIRED TO MEET THIS REQUIREMENT.
5. THE CONTRACTOR OBTAIN ALL REQUIRED NPDES PERMITS FOR CONSTRUCTION WORK
AND SHALL COMPLY WITH THE CITY'S NPDES ORDINANCE ON ILLICIT DISCHARGE.
SPECIAL CONDITIONS
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH AT&T, AT&T
DISTRIBUTION, BELLSOUTH, COMCAST CABLE TV, F.P.L., LEVEL 3 COMMUNICATIONS LLC, MCI,
QWEST COMMUNICATIONS, SPRINT/NEXTEL, & I.R.C. UTILITY DEPARTMENT FOR SCHEDULING
INSTALLATION AND OR INSPECTIONS WITH REGARD TO THEIR RESPECTIVE SERVICES.
R/V11 LINE
I
I
I
I
I
I
I
NEW SW -
TYPE 'D' CURB OR
MOD 'D1' CURB
TYPICAL SECTION
80' ROW
(� NEW
DRIVEWAY EX. DRIVEWAY
ill
VARIES TRAVEL LANE l TRAVEL LANE VARIES
TYPE 'D' CURB OR
MOD'D1' CURB
NEW SW
/ TIE TO EX. DRIVEWAY/
J 19.65' ANGLED PARKING
TIE TO EX. GRASS AREA/
SHALLOW DRAINAGE AREA
REVISIONS
DESCRIPTION
OFFICE QA/QC
2' MIAMI CURB/ 2' MIAMI CURB/. f
F CURB F CURB /
€ I
22' PAVEMENT y E. GROUND
I
0.5% TO
2.1 %\ 2% 2% J.TO 2% % VARIE`.a` .,�
TYPE 'D' CURB OR
MOD'DV CURB
SEE NEW CONST. _ TIE TO NEW SW/
TYPICAL SECTION SHALLOW DRAINAGE AREA
1. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER
MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN
LAND -DISTRIBUTING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND
DISTURBANCE TAKES PLACE.
2• SEDIMENT CONTROL MEASURES ARE TO BE ADJUSTED TO MEET FIELD CONDITIONS AT
THE TIME OF CONSTRUCTION AND BE CONSTRUCTED PRIOR TO GRADING OR
DISTURBANCE OF EXISTING SURFACE MATERIAL ON BALANCE OF SITE. PERIMETER
SEIDMENT BARRIES SHALL BE CONSTRUCTED TO PREVENT SEDIMENT OR TRASH FROM
FLOWING OR FLOATING ONTO ADJACENT PROPERTIES.
3. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED
AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE
SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO
DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN UNDISTURBED
FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS
THAT ARE TO BE LEFT UNDISTURBED FOR MORE THAN ONE YEAR.
4. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM
DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED
BY A SEDIMENT BASIN. THE SEDIMENT BASIN SHALL BE DESIGNED AND CONSTRUCTED
TO ACCOMODATE THE ANTICIPATED SEDIMENT LOADING FROM THE LAND -DISTURBING
ACTIVITY. THE OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT THE
TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBED AREA TO BE SERVED BY THE
BASIN.
5. AFTER SIGNIFICANT RAINFALL, SEDIMENT CONTROL STRUCTURES WILL BE INSPECTED
FOR INTEGRITY. DAMAGED DEVICES SHALL BE CORRECTED BY THE CONTRACTOR
IMMEDIATELY.
6. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS
CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR
SLOPE DRAIN STRUCTURE.
7. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHALL BE PROVIDED.
8. SEDIMENT WILL BE PREVENTED FROM ENTERING ANY STORM DRAIN SYSTEM, DITCH OR
CHANNEL. ALL STORMWATER INLETS THAT ARE MADE OPERABLE DURING
CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT
ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHER WISE
TREATED TO REMOVE SEDIMENT
NOTE:
NEW STRUCTURAL TYPICAL SECTION
- 11" SUBGRADE TO 98%
- 8" LIMEROCK BASE COMPACTED TO 98%
- 2" TYPE SP 0.5 ASPHALT
Am
CONSTRUCTION IN STREETS, ROAD RIGHTS-OF-WAY
& PARKING AREAS
1. OPEN ROAD CUTS REQUIRE PRIOR APPROVAL OF THE CITY, COUNTY, STATE OR ANY OTHER
AGENCY WHICH MAY HAVE JURISDICTION.
2. CONSTRUCTION, MATERIALS AND WORKMANSHIP ARE TO BE IN ACCORDANCE WITH FLORIDA
DEPARTMENT OF TRANSPORTATION SPECIFICATIONS AND STANDARDS.
3. AREAS IN EXISTING RIGHT-OF-WAYS DISTURBED BY CONSTRUCTION SHALL RECEIVE GRASS,
MULCH OR SOLID SOD, AS STATED ON THE PLANS.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND DOCUMENT THE ACTUAL
LOCATION AND EXTENT OF EXISTING UTILITIES WHICH MAY AFFECT CONSTRUCTION. EXISTING
UTILITIES SHOWN ARE BASED UPON THE BEST AVAILABLE INFORMATION SUPPLIED TO THE
OWNER/ENGINEER AND IS SHOWN FOR INFORMATIONAL PURPOSE ONLY.
5. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL SITE CONDITIONS BEFORE
STARTING CONSTRUCTION.
6. DISCREPANCIES ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
BEFORE COMMENCING WORK.
7. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS BEFORE COMMENCING WORK.
8, THE CONTRACTOR SHALL CONTACT ALL IMPACTED UTILITIES AT LEAST 48 HOURS IN ADVANCE
OF CONSTRUCTION OPERATIONS.
9. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN TO BE MADE WITHOUT PRIOR APPROVAL OF
THE ENGINEER AND THE APPROPRIATE GOVERNMENTAL ENTITY.
10. ALL MUCK OR OTHER SUCH UNSUITABLE MATERIAL ENCOUNTERED WITHIN THE ROAD RIGHT-OF-
WAY AND LOT AREAS SHALL BE FULLY EXCAVATED AND REPLACED WITH CLEAN, ON-SITE FILL
MATERIAL COMPACTED TO 95% MAXIMUM DENSITY. ACTUAL EXTENT AND QUANTITY OF
EXCAVATION SHALL BE DETERMINED AT THE TIME OF CONSTRUCTION BY APPROPRIATE FIELD
MEASUREMENT. DISPOSAL OF UNSUITABLE MATERIAL SHALL BE DIRECTED BY OWNER OR
OWNER'S ENGINEER.
11. ALL STAMP CONCRETE PARKING AND CROSSWALKS SHALL MEET THE EXISTING CITY'S
CONCRETE PATTERN AND COLOR AND SHALL APPLY SEALANT 28 DAYS AFTER INSTALLATION.
12. ALL PEDESTRIAN LIGHTS SHALL INCLUDE FOUNDATION, PULL BOXES, CONDUIT AND WIRING AND
SHALL CONNECT TO THE CITY'S EXISTING ELECTRICAL SERVICE BOX.
PARKING ON ONE SIDE TYPICAL SECTION
80' ROW
R/W LINE R/W LINE
NEW
111
EX.y
19.65' ANGLED PARKING y VARIES = = VARIES = 9' PARALLEL
DRIVEWAY/GRASS: VARIES TRAVEL LANE TRAVEL LANE PARKING
EX. OAK
TREE
i'
2' MIAMI CURB OR
'F' CURB
TIE TO EX DRIVEWAY/
NEW PARKING AREA/
GRASS AREA
TYPE 'D' CURB OR
MOD 'D1' CURB
TYPICAL SECTION CLEVELAND
DRAWING INFORMATION
FILENAME: PRESIDENT STREETS
SCALE:
SURVEYED BY:
DSGN:
FTW DATE:
05/02/2011
DRWN:
MDS/LGM DATE:
11/21/2013
CHKD:
FTW DATE:
11/21/2013
QA/QC:
FTW DATE:
11/21/2013
10L NEEL-SCHAFFER
® SOLUTIONS YOU CAN BUILD UPON
2925B 20th Street, Vero Beach,
Florida 32960 PH: (772) 770-4707
FAX: (772) 770-4640 CA00008556
2' MIAMI CURB OR
TYPE 'D' OR MOD 'D1' CURB 'F' CURB \
PAVEMENT
VARIES
0.15% TO 5.71
►
TIE TO NEW SW2% 2%
TIE TO EX. SW _
SLOPE VARIES (3:1 TO 6:1)/
SHALLOW DRAINAGE AREA
TIE TO EX DRIVEWAY (SLOPE VARIES)
PARKING AREA (SLOPE VARIES)
NO TYPE 'D' CURB FOR DRIVEWAY.
TIE TO EX. GRASS AREA
SEE NEW CONST.
TYPICAL SECTION
R/W LINE
r VARIES
EX. SW
2%-5.5% ----
riy
TIE TO NEW SW
'1:K i
SLOPE VARIES (4:1 TO 6:1)
_ TIE TO EX. SW
SLOPE VARIES (4:1 TO 6:1)
_ TYPE 'D' CURB OR MOD 'D1' CURB
NO TYPE 'D' CURB FOR DRIVEWAY.
SLOPE VARIES FOR DRIVEWAY
TIE - IN AND PARALLEL PARKING
TYPICAL SECTION WASHINGTON
T
C EV
bb735 ;
rn
GENERAL NOTES/TYPICAL SECTION ANN", STATE°F 7
t.�<���
PRESIDENTIAL STREET IMPROVEMENTS
SEBASTIAN FLORIDA -�
FRANK T. WATANABE, P.E.
FL. REG. NO. 66735
WORKING NUMBER:
N S . 08024.017
SHEET NUMBER:
02