Loading...
HomeMy WebLinkAboutPre-Const. MeetingCynthia Watson From: Frank Watanabe Sent: Thursday, November 06, 2014 6:25 PM To: 'Mark Jansen, PE' Cc: Cynthia Watson; Tim Walker; Gary Nicholas Subject: RE: Airport Drive Pre -const Meeting Mark, Where are we with the revised schedule and cost estimate? I need this tomorrow Friday 11/7 to submit to FDOT. Thanks Frank Watanabe Public Works Director/City Engineer City of Sebastian (772)388-8228 From: Frank Watanabe Sent: Monday, October 27, 2014 5:16 PM To: 'Mark Jansen, PE' Cc: Cynthia Watson; Tim Walker; Gary Nicholas Subject: Airport Drive Pre -const Meeting Mark, Thanks for scheduling this preconstruction meeting with Mancils. Per our meeting, we have the following: • Submitted revised final plans (handed plans to Cindy Watson, who will be City PM for the project) • Reviewed the construction with the revised added 48" RCP on the eastside, added swale along the road (eastside) and added sidewalk • Question and concern regarding the demuck which appears to be needed • Demucking is not a pay item on the submitted cost proposal • Mancil could excavate the material and spread along the flat area • There should be sufficient back -fill material for the pipe fill, any extra can be hauled (city trucks) • The 48" RCP will require 4 box structures per the revised plans • Same construction staging area with the project limits • Contractor to walk the area prior to any construction activity to ensure no impacts to environmental issues (gopher tortoises) • Minimal MOT, but concerns with traffic from Collier Club and Golf Course • City is ok for Mancil to close the intersection at the golf course for two day to complete the intersection • Mancil will need to coordinate the intersection closure with city staff • Roadway will be reconstructed with new base and asphalt concrete • The existing 42" drainage pipe within the canal with the slip line will need a box structure and 24 ft of pipe (no mitered end) • Change the sod on the golf course from Bahia to 419 Sod. • Mark to review and provide new schedule and cost breakdown for the construction • City will review schedule and cost estimate and issue anew NTP. • Tentative start date is two week (Nov 10th). Thanks Frank Watanabe Community Development/Public Works Director City of Sebastian (772)388-8228