Loading...
HomeMy WebLinkAboutITB 19-06 Addendum #3Page 1 of 2 ADDENDUM #3 *This Addendum MUST be signed and returned with submission* Date: August 9, 2019 Bid #: ITB 19-06 Bid Title: Fisherman’s Landing Shoreline Protection & Parking Improvements Bid Due Date: Friday, August 30, 2019 @ 2:00 PM EST TO ALL PROSPECTIVE BIDDERS: For the above referenced project, take note of the following revisions, additions, deletions, clarifications, and questions/answers etc. relative to the ITB, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. Clarifications 1. The City will be responsible for Park shut down notifications to the public. 2. The City will be responsible for placement of Boundary Survey stakes ONLY. Contractor will be res ponsible for confirmation of MHWL or TOPO stakes. 3. Commencement of the project, identified by a Notice to Proceed, is intended to be on or about October 1, 2019. The date provided is a “ball park” date; therefore the NTP may be issued before or after the provided date. Questions/Answers Q1: I am requesting clarification on the bid quantities shown on sheet M5/bid sheet. The following quantities are specified. Which quantities are correct? Sheet M5 Bid Sheet in Specs Armour Stone 880 tons 562 tons Bedding Material 240 tons 84 tons Geotextile 1000 sy 670 sy A1: Bid quantities on sheet M5 should be used. See attached for Revised Schedule of Values. City of Sebastian 1225 Main Street Sebastian, FL 32958 (772) 388-8228 Fax: (772) 388-8248 Page 2 of 2 Q2: Is the bedding material #57 Stone? A2: It is preferred that #57 Stone be used for the bedding material. All other documents, specifications, drawings, terms and conditions remain the same. Attachments: 1. Revised Schedule of Values END OF DOCUMENT ________________________________________________ Signature Date ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1.Site Clearing/Demo/Debris Removal 250 LF 2.Erosion and Sediment Control 1LS 3.Excavation and Disposal 1LS 4.Armor Stone 880 Tons 5.Filter Stone 240 Tons 6.Geotextile Fabric 1000 SY 7.Compacted Fill 73 CY 8.Site Restoration and Cleanup 1LS -$ Name of Authorized Representative (Print) Street Address Title City, State, Zip E-mail Address Telephone Authorized Signature REVSED 8-9-2019 Company Name CHECK TOTALS! The City is not responsible for mathematical errors. REVISED 8-9-2019 FISHERMAN'S LANDING SHORELINE IMPROVEMENTS SHORELINE SUMMARY BID INSTRUCTIONS Bids must be received no later than the date and time stated in the Advertisement. Bids received after that time & date will not be considered. This form must be returned with bid. Bids on any other form will not be accepted. Bid Form Page 1 of 1