Loading...
HomeMy WebLinkAbout1999 Pavilion & Picnic Site Plann � P.ETENTION PARKING RETENTI(Yti I AREA 1'DE,E' AREA 1'DaP 43,1 1 1 1 1 1 1 OWNW. i i CITY❑F SEBASTIAN SMALL SOCCER , I � 1225 MAIN ST, SEBASTIAN, FLORIDA 32978-0127 FIELD � 1 City of Sebastian Building permit. 141 1 I (Site plan Approved 10-21-98) EXISTING FOOTBALL FIELD k r• 1 The scope of work is in two parts, The first part concerns the a• a• construction of a 40'x 83' pavilion located at the Barber Street 1 Sports Complex (South) in the City of Sebastian. The second part WAa y RAMP UP T D concerns the optional construction of up to three small -size FINISHED F ❑❑R e - RAMP DOWN TO and two large size picnic shelters at the same site. ` EELEV• 1 BASKETBALL EXIST. SIDEWALK COURTS EXIST, SIDEWALK —10' 10 1 The pavilion shall be constructed on an exiting concrete slab; 1 FAMF _ a shingled roof on engineered trusses shall be supported by ......:.. 5' -diameter pressure treated pilings and a double 1 3/4" x 11.7/ SIDEWALK .•a:•. b b 4-/, LVL beam, The roof shall include a commercially available cupola, RETENTION BY OTHERS BR❑❑M FINISHA finished floor coat of 3" thick fiber mesh reinforced concrete AREA 1'DEEP 3shall be a lied after construction of the structure is com feted. EXISTING s--12��21 Pp p - y y N°PE'�4 '•o"ressure treated 36" -hi h railin shalt be added last The sco e 10, CONCESSION E_:.,.y PAVED •.:.r t.:.•.:: ;._.: -, -_:- A P g g P PARKING N: �i� i�.�/�.';=��`:�= ' .:: . '.::. �::. of work shall also include the provision of electrical services STAND CONC• PROPOSED, 2 --.:.:. I4 PAD PAVILION BY ❑THERE/ and S' concrete sidewalks with ramps as shown on the plan, J I , , 40 X83 DUMPSTER I 1 PAD BY ° + PLACE BOTTOM OF SOD 3" The contruction requirements for the picnic shelters are similar k '• • ELEVATION OF SIDEWALK + to those of the avilion, OTHERS I BELOW SURFACE P • AROUND PAVILLION SHALL 4 CHAIN B " UNREINFORCED BE EVEN WITH PAVILLION 1 CONCRETE 3000 P,S,I. n rucoc FINISHED FLOOR. , I I 1 y 1 � 12'X16'(TYP.) ..- y 5mw&�AT 6rffN APIA � EXIST. PRACTICE 1 - NTS � 1 , : .::r•• }�. FOOTBALL FIELD - RETENTI�1 I kPROPOSED AREA 1'1JEE 15' PICNIC :. SHELTERS + 1 : � 1 I r. 41 15 -.� I � 751 0 40' 14'X24'(TYP,) y %, (-- - - - - - - - - -- - Tt A PSI= - - - TEf -R -AC-E ---------------------- I i I I 51t PLAN; PAPD�P, 5f, 5POP,,,f COMP�FX (50UTH) 5cor� 0r WORK LOCA110N MAP G�N��AI� N0�5 1. Contractor is responsible for checking the actual site conditions bef ore starting construction, 2. Contractor shall obtain all required building permits before commencing, 3. Contractor shall be responsible for the location of all existing utilities. The Contractor shalt contact all concerned utilities at least 48 hours in advance for construction operations, 4. No field changes or deviations from design to be made without prior approval of Engineer, 5. All construction shall be completed in accordance with the applicable ordinances of City of Sebastian, 6. The Contractor shall verify all field dimensions. Any discrepancies between those dimensions and the proposed design shall be brought to the attention of the Engineer for an immediate resolution. 7. Engineer shall be notified at least 48 hours in advance for any inspections, CD U-) � Q >< x I v H S A to 1 1 LL. � O 0� F-1 d- %1D z Q U-) o A ~ A W (T `D .--i W > �Wp U-) 0_1� W 3 LD W ` W W C6 ate. F�- ¢ LTJ Q� W tL Q U = Ld f� >- InQ z -- I__ Z M F -IX H lU W C3 Q U�c ni, H \H > LJ F- W W M In W N CO F- W WLJ W W L l j = = W W W W l I Z I 0 Q H Z Z Z W Q.. QQ Q W F- = 0-- 0o 0� ZZ W Z z = Z a J p r > > > > U W CL CL Q- d. CL F- F- 4 4 tri 0 r- G�N��AI� N0�5 1. Contractor is responsible for checking the actual site conditions bef ore starting construction, 2. Contractor shall obtain all required building permits before commencing, 3. Contractor shall be responsible for the location of all existing utilities. The Contractor shalt contact all concerned utilities at least 48 hours in advance for construction operations, 4. No field changes or deviations from design to be made without prior approval of Engineer, 5. All construction shall be completed in accordance with the applicable ordinances of City of Sebastian, 6. The Contractor shall verify all field dimensions. Any discrepancies between those dimensions and the proposed design shall be brought to the attention of the Engineer for an immediate resolution. 7. Engineer shall be notified at least 48 hours in advance for any inspections, CD U-) 07 >< x v Z � v � O 0� d- Q') z Q U-) o ~ W ry (T CD U-) 07 (�J M o 0� d- Q') z Q U-) o ~ W ry (T `D 00 1 �Wp U-) 0_1� W Q In azo Ld >- InQ z -- I__ (),J M F -IX H lU W = Q U�c ni,