Loading...
HomeMy WebLinkAboutCSA-18 SW Management Plan Update - StonecropCITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) MBV ENGINEERING, INC. 1835 201h Street Vero Beach, FL 32960 Work Authorization No: CSA -18 (MBV 190070) Project Identification: Stormwater Management Plan Update - Stonecrop IT IS AGREED to undertake the following work in accordance with the provisions of the MBV Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement for Engineering Dated July 12, 2017. Description of Assignment: As per our coordination, the City of Sebastian is looking to have the Stormwater Management Plan updated for the Stonecrop basin area in conjunction with the FEMA grant application requirements. Work Scope: Task l: Preparation of an H&H (Hydrology & Hydraulics) study of approximately 120 nodes for the Stonecrop basin, to include: • Assistance with estimating the Finished Floor Elevations within the basin • Pre and Post Developed length of flood duration determination • Estimate of repair/ replacement cost for roadways per FDOT Guidelines • Model the following storm events: 0 25 year- 24 hour and 72 hour 0 100 year - I hour, 24 hour, and 72 hour Task 2: Preparation of a response to both the FEMA Environmental & Engineering comments Task 3: Preparation of an aerial map showing all drainage improvement activities, including the beginning/end coordinates in decimal degree format Task 4: Preparation of a ground disturbance map showing the total area of ground disturbance in square feet and vertical depth in feet. Include the coordinates in decimal degree format of the exact location of all areas of ground disturbance and staging areas Task 5: Contingency for additional responses Deliverables: H & H Study, Response to FEMA comments, Aerial Map, and Ground Disturbance Map - Response to FEMA engineering comments to be no later than 30 days upon authorization - Response to FEMA environmental comments to be by 2/22/19. Basis of Compensation/Period of Services: The above referenced Professional Engineering Services for CSA 18 will be performed for a fee not to exceed the below breakdown of fees: Task I: $ 6,500 Task 2: $ 500 Task 3: $ 1,250 Task 4: $ 1,250 Task 5: $ 5 000 Total $14,500 AGREED: ENGINEERING CONSULTANT: ax"��ate: 02/19/2019 Aaron Bowles, P.E. MBV Engineering, Inc. Attest: anette Williams, MMC, City Clerk CITY OF SEBASTIAN: ,, Date � l Ce urfisle City Manager Approved as to Form and Content for Reliance by the City of Sebastian Only: J .Stoke�ttorney