HomeMy WebLinkAbout2004 - Planned Development Plan - Phase IIIPANAMA CITY
LAND USE: PUBLIC SERVICE
ZONED: PUBLIC SERVICE
City of Sebastian
U Course
co C0►vp�;�e
0
3 LAND USE: LD
ZONED: RS -10
COWER CLUB PH. I
p PB. 15, OG. 56
d
TALLAHASSEE
CLEARWATER
,iff
SECTION 28 & 29, FLEMING GRANT, CITY OF SEBASTIAN
INDIAN RIVER COUNTY, FLORIDA
North
City of Sebastian
1 Goff Course
a LAND USE: PUBLIC SERVICE
Gl ZONED: PUBLIC SERVICE
Project
Location
LAND USE: LD
ZONED: RS -10
Collier Creek
KEY WEST
MYERS
J�
FELLSMERE •
I �
I
S.R. 60
ii
ERO BEACH
FORT PIERCE
PALM BEACH
MIAMI
LOCATION MAP
• �SELXND
• EBASTIAN
•VERO N;
LAKL
ESTATES • \FOR�
• 0 BEACH ((�
\ 72
ti
Q
VE
co�
Managed and Developed By:
R1
OnSite'
Real Estate Management & Development
9 P
' • _ (561) 794-4577
1999 Pointe West Drive, Vero Beach, FI 32966
FAX: (561) 794-9916
WW W.ONSITEMG VT.COM
WCG (Neet-Schaffer, Inc.
Professional Engineers
170519th Place, Suite G-3
Vero Beach, Florida 32960
772-770-4707
(fax) 772-770-4640
CA #00009582
SF -BEET INDEX
2 GENERAL_ NO i CS
3 EXISTING CONDITIONS & EROSION CONTROL PLAN
4 PRELIMINARY PLAT
5 MASTER UTILI r PLAN
6 MASTER ERAINAGE PLAN
7 MASTER F'OADWAY PLAN
8 MISCELLANEOUS DETAILS
AG, 2 6 2004
RICK J. ME g HIORI P. E,. DATE
FLORIDA RE . No. 48947
ISSUED: May 25, 2004
Project Number= WN.01201.001
General
1. THE REQUIREMENTS OF INDIAN RIVER COUNTY SHALL GOVERN ALL UTILITIES WORK WITHIN ITS
JURISDICTIONAL LIMITS. WHERE A CONFLICT EXISTS IN THE REQUIREMENTS OF A REFERENCED MATERIAL
OR INSTALLATION STANDARD, THE REQUIREMENTS OF THE INDIAN RIVER COUNTY UTILITY
DEPARTMENT SHALL PREVAIL WHERE THE REQUIREMENTS OF A STATE OR LOCAL AGENCY HAVING
JURISDICTION ARE MORE STRINGENT, THOSE REQUIREMENTS SHALL PREVAIL
2. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE, AT ALL TIMES, ONE COPY OF INDIAN RIVER
COUNTY UTILITIES SPECIFICATIONS. ONE COPY OF THE CONTRACT DOCUMENTS INCLUDING PLANS,
SPECIFICATIONS AND SPECIAL PROVISIONS, AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS.
3. EXISTING UTILITIES SHOWN UPON THESE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION.
IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY THE EXACT LOCATION OF ANY UTILITIES
WHICH MAY EFFECT THEIR WORK.
Sewer Collection System
1. GRAVITY SEWER PIPE SHALL CONFORM TO ASTM 3034 SDR -35.
2. FORCE MAIN SEWER PIPE SHALL CONFORM TO ASTM, D2241 SDR 21, PR 200.
3. JOINTS FOR PVC SEWER SHALL BE RUBBER GASKET TYPE CONFORMING TO ASTM D3212 AND ASTM F477.
4. ALL PVC SEWER PIPE SHALL BE INSTALLED IN ACCORDANCE WITH THE UNI -BELL PLASTIC PIPE
ASSOCIATION STANDARD UNI -8-5.
5. ALL SEWER AND FORCE MAINS TO HAVE A MINIMUM COVER OF 3' - 0" UNLESS OTHERWISE NOTED.
6. WHERE SEWER AND WATER MAINS CROSS, AT LEAST 18" VERTICAL CLEARANCE SHALL BE MAINTAINED.
WHERE A SEWER MAIN PARALLELS A WATER MAIN, A SEPARATION OF AT LEAST 10' SHALL BE MAINTAINED.
SPECIAL PROVISIONS SHALL APPLY WHEN THESE CONDITIONS CANNOT BE MET. THIS REQUIREMENT PERTAINS
TO STORM SEWER AS WELL AS SANITARY SEWER.
7. WHERE A SEWER MAIN IS TO BE INSTALLED BELOW A STORM DRAIN PIPE, A MINIMUM OF 2' VERTICAL SEPARATION
SHALL BE MAINTAINED. SPECIAL PROVISIONS SHALL APPLY WHEN THESE CONDITIONS CANNOT BE MET.
8. UNLESS OTHERWISE NOTED, MANHOLE TOP ELEVATIONS SHALL BE:
PAVED AREA -- FLUSH WITH PAVEMENT
UNPAVED AREA -- 1.0" ABOVE FINISH GRADE MINIMUM
9. AIR RELEASE VALVES SHALL BE INSTALLED AT ALL HIGH POINTS ALONG FORCE MAIN.
10. SERVICE CONNECTIONS SHALL BE 4" FOR SINGLE AND 6" OR LARGER FOR MULTIPLE RESIDENTIAL AND
COMMERCIAL SERVICES. LOCATE EACH SERVICE CONNECTION FROM THE CENTER OF THE DOWNSTREAM MANHOLE AND
RECORD THEIR LOCATION.
11. INSTALL MAGNETIC MARKERS AT THE END OF EACH SERVICE LINE OR OPPOSITE WYES AND RECORD THEIR LOCATION.
12. THE SEWER COLLECTION SYSTEM SHALL NOT BE PLACED IN SERVICE UNTIL THE SYSTEM HAS BEEN VISUALLY
INSPECTED AND FLUSHED OF SEDIMENT AND DEBRIS.
13. THE SEWER LINES SHALL BE TESTED BY ONE OF THE FOLLOWING METHODS -- WATER INFILTRATION, WATER
EXFILTRATION OR LOW PRESSURE AIR EXFILTRATION AS DIRECTED BY OWNER'S REPRESENTATIVE.
14. FORCE MAIN SEWER PIPE FITTING SHALL BE OF DUCTILE IRON, MECHANICAL JOINT, POLYBOARD COATED
IN ACCORDANCE WITH ANSI 21.4 RATED AT 350 PSI AND SHALL COMPLY WITH ANSI A21.10 AND A21.11.
Erosion Control Notes
1. ALL EROSION CONTROL MEASURES SHALL BE IN FULL CONFORMANCE
WITH ALL APPLICABLE SJRWMD PERMITS AND REGULATIONS.
2. ALL EROSION CONTROL DEVICES SHALL BE PER CURRENT FDOT STANDARD
INDEX #102 AND #103.
3. P CE UINMTIL WGETATIVE EROSION
REESTABLISHED INHT E UPLAND I CONTRIBUTING
DRAINAGE AREA.
4. CONTRACTOR SHALL UTILIZE BALED HAY AND OR SILT BARRIERS AS APPROPRIATE
AT ALL CONTROL STRUCTURE AND OUTFALL CULVERT INSTALLATIONS.
5. THROUGHOUT THE CONSTRUCTION OF THE SITE THE CONTRACTOR SHALL UTILIZE
BEST MANAGEMENT PRACTICES TO CONTROL EROSION AND TRANSPORT OF SEDIMENTS
INTO PRESERVED WETLANDS AND DOWNSTREAM RECEIVING WATERS.
A
7. CONTRACTOR MAY MODIFY DEWATERING SEDIMENTATION CONTROL PLAN BASED ON
SPECIFIC CONSTRUCTION METHODS. ALL MODIFICATIONS MUST BE APPROVED BY
BOTH THE PROJECT ENGINEER OR HIS ASSIGNED REPRESENTATIVE AND THE
ST. JOHNS RIVER WATER MANAGEMENT DISTRICT.
Minimum Vertical and Horizontal Separation
NEW OR RELOCATED, UNDERGROUND WATER MAINS SHALL BE LAID TO PROVIDE A HORIZONTAL DISTANCE OF
AT LEAST SIX FEET, AND PREFERABLY TEN FEET, BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE
OUTSIDE OF ANY EXISTING OR PROPOSED GRAVITY- OR PRESSURE-TYPE SANITARY SEWER, WASTEWATER
cc
FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER
62-610, F.A.C. THE MINIMUM HORIZONTAL SEPARATION DISTANCE BETWEEN WATER MAINS AND GRAVITY -TYPE
Z SANITARY SEWERS SHALL BE REDUCED TO THREE FEET WHERE THE BOTTOM OF THE WATER MAIN IS LAID AT
LEAST SIX INCHES ABOVE THE TOP OF THE SEWER. NEW OR RELOCATED, UNDERGROUND WATER MAINS
3 CROSSING ANY EXISTING OR PROPOSED GRAVITY- OR VACUUM -TYPE SANITARY SEWER SHALL BE LAID SO
a THE OUTSIDE OF THE WATER MAIN IS AT LEAST SIX INCHES, AND PREFERABLY 12 INCHES, ABOVE OR AT
N LEAST 12 INCHES BELOW THE OUTSIDE OF THE OTHER PIPELINE. HOWEVER, IT IS PREFERABLE TO LAY THE
WATER MAIN ABOVE THE OTHER PIPELINE
Water Distribution System
1. PVC PIPE 4 TO 12 INCHES IN DIAMETER SHALL BE PER AWWA C900-89 CLASS 150 psi (DR -18).
PIPING LESS THAN FOUR INCHES IN DIAMETER SHALL BE PER ASTM D1784 AND D2241,
PRESSURE CLASS 200 psi (SDR -21) AND APPROVED BY NSF FOR POTABLE WATER USE.
2. DUCTILE IRON PIPE SHALL BE CEMENT - MORTAR LINED, CLASS 50 MECHANICAL OR PUSH -ON JOINT AND
SHALL MEET ALL THE REQUIREMENTS OF THE FOLLOWING ANSI/AWWA C 104/A.21.4; ANSI/AWWA
C 111/A 21.11 (FOR RUBBER GASKET JOINTS); ANSI/AWWA C 150/21.50 (FOR THICKNESS DESIGN)
AND ANSI/AWWA C 151/A 21.51 (FOR D.I.P. MOLDS).
3. FITTINGS FOR P.V.C. PRESSURE PIPE AND D.I.P. SHALL BE OF DUCTILE IRON, MECHANICAL JOINT,
CEMENT MORTAR LINED IN ACCORDANCE WITH ANSI 21.4 RATED AT 350 PSI AND SHALL COMPLY WITH
ANSI/AWWA C110/A21.10 AND C111/A21.11.
4. INSTALLATIONS OF WATER LINES SHALL BE IN ACCORDANCE WITH ANSI/AWWA C900 (MANUAL M23) FOR
P.V.C. PRESSURE PIPE, AND C 600 FOR DUCTILE IRON PIPE.
5. ALL WATER MAINS TO HAVE MINIMUM COVER OF 36".
6. WHERE WATER AND SEWER MAINS CROSS WITH LESS THAN 18" VERTICAL CLEARANCE, THE SEWER WILL BE
20' OF EITHER CAST IRON PIPE OR CONCRETE ENCASED PIPE, CENTERED ON THE POINT OF CROSSING.
WHEN A WATER MAIN PARALLELS A SEWER MAIN, A SEPARATION OF AT LEAST 10' SHOULD BE MAINTAINED
WHERE PRACTICAL THIS REQUIREMENT APPLIES TO SANITARY AND STORM SEWERS, FORCE MAINS AND
REUSE MAINS.
7. WHERE A WATER MAIN IS TO BE INSTALLED BELOW A STORM DRAIN PIPE, A MINIMUM OF 18" VERTICAL
CLEARANCE BETWEEN PIPES SHALL BE MAINTAINED UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
8. WHERE WATER LINES CROSS UNDER DRAINAGE PIPES WITH LESS THAN 18 INCHES VERTICAL CLEARANCE,
THE WATER PIPES SHALL BE OF 20' OF CLASS 52 D.I.P. CENTERED ON THE POINT OF CROSSING,
OR CONCRETE ENCASEMENTS.
9. WATER SUPPLY FACILITIES INCLUDING MAINS SHALL BE INSTALLED, CLEANED, DISINFECTED AND
BACTERIOLOGICALLY CLEARED FOR SERVICE, IN ACCORDANCE WITH THE LATEST APPLICABLE AWWA
STANDARDS AND THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION RULES.
10. HYDROSTATIC TESTING (PRESSURE AND LEAKAGE TESTS) SHALL MEET THE REQUIREMENTS OF THE
ANSI/AWWA C 600, OR M23.
11. DISINFECTIONS OF WATER MAINS SHALL COMPLY WITH ANSI/AWWA C 651.
12. DUCTILE IRON PIPE TO BE WRAPPED WITH POLYETHYLENE.
13. MINIMUM HORIZONTAL SEPARATION BETWEEN WATER LINES AND UNRESTRICTED ACCESS REUSE WATER
SHALL BE 5 FEET.
14. ALL SERVICE LINES OF 60' IN LENGTH OR LONGER SHALL BE 1 ".
Minimum Standards
1. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS
AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE
CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND
SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE
TAKES PLACE.
2. ALL SEDIMENT CONTROL MEASURES ARE TO BE ADJUSTED TO MEET
FIELD CONDITIONS AT THE TIME OF CONSTRUCTION AND BE
CONSTRUCTED PRIOR TO ANY GRADING OR DISTURBANCE OF EXISTING
SURFACE MATERIAL ON BALANCE OF SITE. PERIMETER SEDIMENT
BARRIERS SHALL BE CONSTRUCTED TO PREVENT SEDIMENT OR TRASH
FROM FLOWING OR FLOATING ONTO ADJACENT PROPERTIES.
3. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED
ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL
BE APPLIED WITHIN SEVEN TO DENUDED AREAS THAT MAY NOT
BE AT FINAL GRADE BUT WILL REMAIN UNDISTURBED FOR LONGER THAN
30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS
THAT ARE TO BE LEFT UNDISTURBED FOR MORE THAN ONE YEAR.
4. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE
STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES.
THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND
PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS
SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
5. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON
DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED.
PERMANENT VEGETATION SHALL BE CONSIDERED ESTABLISHED
UNTIL A GROUND COVER IS ACHIEVED THAT, IN THE OPINION OF THE
REVIEWER, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL
INHIBIT EROSION.
03-01-04
04-05-04
00-00-00
00-00-00
Construction In Streets, Road Rights -Of -Way & Parking Areas
1. OPEN ROAD CUTS REQUIRES PRIOR APPROVAL OF THE CITY, COUNTY, STATE OR ANY OTHER AGENCY WHICH
MAY HAVE JURISDICTION.
2. ALL CONSTRUCTION, MATERIALS AND WORKMANSHIP ARE TO BE IN ACCORDANCE WITH FLORIDA DEPARTMENT
OF TRANSPORTATION SPECIFICATIONS AND STANDARDS.
3. ALL AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL RECEIVE GRASS, MULCH OR
SOLID SOD, AS STATED ON THE PLANS.
4. STREET OR HIGHWAY RESTORATION TO BE DONE AS PER LOCAL OR STATE AGENCY HAVING JURISDICTION.
5. THE CONTRACTOR SHALL COMPLY WITH ALL RULES AND REGULATIONS OF THE STATE, COUNTY AND CITY
AUTHORITIES REGARDING CLOSING OR RESTRICTING THE USE OF PUBLIC Z)[Kttis OR HIGHWAYS.
6. TRAFFIC CONTROL ON ALL COUNTY AND STATE HIGHWAY RIGHTS-OF-WAY SHALL MEET THE REQUIREMENTS
OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF
THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND DOCUMENT THE ACTUAL LOCATION
AND EXTENT OF ALL EXISTING UTILITIES WHICH MAY AFFECT CONSTRUCTION. EXISTING UTILITIES
SHOWN ARE BASED UPON THE BEST AVAILABLE INFORMATION SUPPLIED TO THE OWNER/ENGINEER AND
IS SHOWN FOR INFORMATIONAL PURPOSE ONLY.
8. CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL SITE CONDITIONS BEFORE STARTING CONSTRUCTION.
9. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE
COMMENCING WORK.
10. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS BEFORE COMMENCING WORK.
11. THE CONTRACTOR SHALL CONTACT ALL CONCERNED UTILITIES AT LEAST 48 HOURS IN ADVANCE OF
CONSTRUCTION OPERATIONS.
12. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN TO BE MADE WITHOUT PRIOR APPROVAL OF THE
ENGINEER AND THE APPROPRIATE GOVERNMENTAL ENTITY.
13. ALL SLOPES 5:1 OR STEEPER SHALL BE SODDED, ALL OTHER DISTURBED AREAS SHALL BE SEEDED AND MULCHED.
14. ALL MUCK OR OTHER SUCH UNSUITABLE MATERIAL ENCOUNTERED WITHIN ROAD RIGHTS-OF-WAY AND
LOT AREAS SHALL BE FULLY EXCAVATED AND REPLACED WITH CLEAN, ON-SITE FILL MATERIAL
COMPACTED TO 95% MAXIMUM DENSITY. ACTUAL EXTENT AND QUANTITY OF EXCAVATION SHALL
BE DETERMINED AT THE TIME OF CONSTRUCTION BY APPROPRIATE FIELD MEASUREMENT.
DISPOSAL OF UNSUITABLE MATERIAL SHALL BE AS DIRECTED BY OWNER OR OWNER'S ENGINEER.
6. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES
SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER
INSTALLATION.
7. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW
FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL
BE CONTROLLED BY A SEDIMENT BASIN. THE SEDIMENT BASIN SHALL
BE DESIGNED AND CONSTRUCTED TO ACCOMMODATE THE ANTICIPATED
SEDIMENT LOADING FROM THE LAND -DISTURBING ACTIVITY. THE
OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT THE
TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBED AREA TO BE
SERVED BY THE BASIN.
8. AFTER ANY SIGNIFICANT RAINFALL, SEDIMENT CONTROL STRUCTURES WILL
BE INSPECTED FOR INTEGRITY. ANY DAMAGED DEVICES SHALL BE
CORRECTED IMMEDIATELY.
9. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN, CUT OR FILL SLOPES
UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT
CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
10. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE
OR OTHER PROTECTION SHALL BE PROVIDED.
11. SEDIMENT WILL BE PREVENTED FROM ENTERING ANY STORM DRAIN
SYSTEM, DITCH OR CHANNEL ALL STORM WATER INLETS THAT ARE
MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM
WITHOUT FIRST BEING FILTERED OR OTHER WISE TREATED TO REMOVE
SEDIMENT.
12. BEFORE TEMPORARY OR NEWLY CONSTRUCTED STORM WATER
CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ADEQUATE OUTLET
PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL
LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND
RECEIVING CHANNEL
13. PERIODIC INSPECTION AND MAINTENANCE OF ALL SEDIMENT CONTROL
STRUCTURES MUST BE PROVIDED TO ENSURE INTENDED PURPOSE IS
ACCOMPLISHED. THE DEVELOPER, OWNER, AND/OR CONTRACTOR SHALL
BE CONTINUALLY RESPONSIBLE FOR ALL SEDIMENT LEAVING THE
PROPERTY. SEDIMENT CONTROL MEASURES SHALL BE IN WORKING
CONDITION AT THE END OF EACH WORKING DAY.
14. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE
WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE
CRITERIA:-
NO
RITERIA:NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE
OPENED AT ONE TIME.
(b) EXCAVATED MATERIAL SHALL BE PLACED ON THE
UPHILL SIDE OF TRENCHES.
(c) EFFLUENT FROM DEWATERING OPERATIONS SHALL BE
FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGED IN A MANNER THAT DOES NOTE
ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE
PROPERTY.
(d) RESTABUIZATION SHALL BE ACCOMPLISHED IN
ACCORDANCE WITH THESE REGULATIONS.
15. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED
PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE
TRANSPORT OF SEDIMENT BY TRACKING ONTO THE PAVED SURFACE.
WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE
WITH CURBS AND GUTTERS, THE ROAD SHALL BE CLEANED THOROUGHLY
AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE
ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT
CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY
AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION
SHALL APPLY TO INDIVIDUAL SUBDIVISION LOTS AS WELL AS TO LARGER
LAND -DISTURBING ACTIVITIES.
16. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR
AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, IN THE
OPINION OF THE REVIEWER. DISTURBED SOIL AREAS RESULTING FROM
THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY
STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
17. PROPERTIES AND WATERWAYS DOWNSTREAM FROM CONSTRUCTION SITES
SHALL BE PROTECTED FROM SEDIMENT DEPOSITION AND EROSION.
18. PHASED PROJECTS SHOULD BE CLEARED 1N CONJUNCTION WITH
CONSTRUCTION OF EACH PHASE.
19. EROSION CONTROL DESIGN AND CONSTRUCTION SHALL FOLLOW THE
REQUIREMENTS IN INDEX Nos. 101, 102 AND 103 OF FDOT
ROADWAY AND TRAFFIC DESIGN STANDARDS.
WCG#Neel-Schaffer, Inc. General Notes
Professional Engineers
170519th Place, Suffe C;-3 PreliminaryPlanned Development Plans
Vero Beach, Florida 32960 1"
772-7 -4707 Collier Club Subdivision Phase III
(fax) 772-770-4640
CA 00009582 Indian River County
RICK
Florida FL. F
OF AUG 2 6 2004
ELCHI ^nl, P.E.-- DATE:
NO: 48947
SCALE SHEET NO.
N.T.S.
JOB N0. 2
WN.01201.001 of 8
DESIGNED
SRM
DATE
48 HOURS BEFORE DIGGING
GILL TOLL FREE
DRAWN
DPK
DATE
..// p
/-80043241-70
CHECKED
ESM/RJM
DATE
SUNSHINE STATE ONE CALL
APPROVED
RJM
DATE
OF FLORIDA, INC.
10 / NO. BY
REVISIONS DATE FILE NAME
CLPH3-02.dwg
03-01-04
04-05-04
00-00-00
00-00-00
Construction In Streets, Road Rights -Of -Way & Parking Areas
1. OPEN ROAD CUTS REQUIRES PRIOR APPROVAL OF THE CITY, COUNTY, STATE OR ANY OTHER AGENCY WHICH
MAY HAVE JURISDICTION.
2. ALL CONSTRUCTION, MATERIALS AND WORKMANSHIP ARE TO BE IN ACCORDANCE WITH FLORIDA DEPARTMENT
OF TRANSPORTATION SPECIFICATIONS AND STANDARDS.
3. ALL AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL RECEIVE GRASS, MULCH OR
SOLID SOD, AS STATED ON THE PLANS.
4. STREET OR HIGHWAY RESTORATION TO BE DONE AS PER LOCAL OR STATE AGENCY HAVING JURISDICTION.
5. THE CONTRACTOR SHALL COMPLY WITH ALL RULES AND REGULATIONS OF THE STATE, COUNTY AND CITY
AUTHORITIES REGARDING CLOSING OR RESTRICTING THE USE OF PUBLIC Z)[Kttis OR HIGHWAYS.
6. TRAFFIC CONTROL ON ALL COUNTY AND STATE HIGHWAY RIGHTS-OF-WAY SHALL MEET THE REQUIREMENTS
OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF
THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND DOCUMENT THE ACTUAL LOCATION
AND EXTENT OF ALL EXISTING UTILITIES WHICH MAY AFFECT CONSTRUCTION. EXISTING UTILITIES
SHOWN ARE BASED UPON THE BEST AVAILABLE INFORMATION SUPPLIED TO THE OWNER/ENGINEER AND
IS SHOWN FOR INFORMATIONAL PURPOSE ONLY.
8. CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL SITE CONDITIONS BEFORE STARTING CONSTRUCTION.
9. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE
COMMENCING WORK.
10. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS BEFORE COMMENCING WORK.
11. THE CONTRACTOR SHALL CONTACT ALL CONCERNED UTILITIES AT LEAST 48 HOURS IN ADVANCE OF
CONSTRUCTION OPERATIONS.
12. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN TO BE MADE WITHOUT PRIOR APPROVAL OF THE
ENGINEER AND THE APPROPRIATE GOVERNMENTAL ENTITY.
13. ALL SLOPES 5:1 OR STEEPER SHALL BE SODDED, ALL OTHER DISTURBED AREAS SHALL BE SEEDED AND MULCHED.
14. ALL MUCK OR OTHER SUCH UNSUITABLE MATERIAL ENCOUNTERED WITHIN ROAD RIGHTS-OF-WAY AND
LOT AREAS SHALL BE FULLY EXCAVATED AND REPLACED WITH CLEAN, ON-SITE FILL MATERIAL
COMPACTED TO 95% MAXIMUM DENSITY. ACTUAL EXTENT AND QUANTITY OF EXCAVATION SHALL
BE DETERMINED AT THE TIME OF CONSTRUCTION BY APPROPRIATE FIELD MEASUREMENT.
DISPOSAL OF UNSUITABLE MATERIAL SHALL BE AS DIRECTED BY OWNER OR OWNER'S ENGINEER.
6. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES
SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER
INSTALLATION.
7. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW
FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL
BE CONTROLLED BY A SEDIMENT BASIN. THE SEDIMENT BASIN SHALL
BE DESIGNED AND CONSTRUCTED TO ACCOMMODATE THE ANTICIPATED
SEDIMENT LOADING FROM THE LAND -DISTURBING ACTIVITY. THE
OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT THE
TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBED AREA TO BE
SERVED BY THE BASIN.
8. AFTER ANY SIGNIFICANT RAINFALL, SEDIMENT CONTROL STRUCTURES WILL
BE INSPECTED FOR INTEGRITY. ANY DAMAGED DEVICES SHALL BE
CORRECTED IMMEDIATELY.
9. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN, CUT OR FILL SLOPES
UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT
CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
10. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE
OR OTHER PROTECTION SHALL BE PROVIDED.
11. SEDIMENT WILL BE PREVENTED FROM ENTERING ANY STORM DRAIN
SYSTEM, DITCH OR CHANNEL ALL STORM WATER INLETS THAT ARE
MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM
WITHOUT FIRST BEING FILTERED OR OTHER WISE TREATED TO REMOVE
SEDIMENT.
12. BEFORE TEMPORARY OR NEWLY CONSTRUCTED STORM WATER
CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ADEQUATE OUTLET
PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL
LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND
RECEIVING CHANNEL
13. PERIODIC INSPECTION AND MAINTENANCE OF ALL SEDIMENT CONTROL
STRUCTURES MUST BE PROVIDED TO ENSURE INTENDED PURPOSE IS
ACCOMPLISHED. THE DEVELOPER, OWNER, AND/OR CONTRACTOR SHALL
BE CONTINUALLY RESPONSIBLE FOR ALL SEDIMENT LEAVING THE
PROPERTY. SEDIMENT CONTROL MEASURES SHALL BE IN WORKING
CONDITION AT THE END OF EACH WORKING DAY.
14. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE
WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE
CRITERIA:-
NO
RITERIA:NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE
OPENED AT ONE TIME.
(b) EXCAVATED MATERIAL SHALL BE PLACED ON THE
UPHILL SIDE OF TRENCHES.
(c) EFFLUENT FROM DEWATERING OPERATIONS SHALL BE
FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGED IN A MANNER THAT DOES NOTE
ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE
PROPERTY.
(d) RESTABUIZATION SHALL BE ACCOMPLISHED IN
ACCORDANCE WITH THESE REGULATIONS.
15. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED
PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE
TRANSPORT OF SEDIMENT BY TRACKING ONTO THE PAVED SURFACE.
WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE
WITH CURBS AND GUTTERS, THE ROAD SHALL BE CLEANED THOROUGHLY
AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE
ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT
CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY
AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION
SHALL APPLY TO INDIVIDUAL SUBDIVISION LOTS AS WELL AS TO LARGER
LAND -DISTURBING ACTIVITIES.
16. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR
AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, IN THE
OPINION OF THE REVIEWER. DISTURBED SOIL AREAS RESULTING FROM
THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY
STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
17. PROPERTIES AND WATERWAYS DOWNSTREAM FROM CONSTRUCTION SITES
SHALL BE PROTECTED FROM SEDIMENT DEPOSITION AND EROSION.
18. PHASED PROJECTS SHOULD BE CLEARED 1N CONJUNCTION WITH
CONSTRUCTION OF EACH PHASE.
19. EROSION CONTROL DESIGN AND CONSTRUCTION SHALL FOLLOW THE
REQUIREMENTS IN INDEX Nos. 101, 102 AND 103 OF FDOT
ROADWAY AND TRAFFIC DESIGN STANDARDS.
WCG#Neel-Schaffer, Inc. General Notes
Professional Engineers
170519th Place, Suffe C;-3 PreliminaryPlanned Development Plans
Vero Beach, Florida 32960 1"
772-7 -4707 Collier Club Subdivision Phase III
(fax) 772-770-4640
CA 00009582 Indian River County
RICK
Florida FL. F
OF AUG 2 6 2004
ELCHI ^nl, P.E.-- DATE:
NO: 48947
SCALE SHEET NO.
N.T.S.
JOB N0. 2
WN.01201.001 of 8
ror°1 r�2 (O's,roD�
4�EBASTIAW GOLF COURS �°�• 1�;� 2 2 3 2��
�q,' �• N ^5 08 32 E 3089. qo� 03 1 roc, 2ro til
Ile
202 I INSTALL SILT FENCE
PLANS ALONG SCRUB JAY PRESERVE
X11 AND PRESERVED WETLAND AREA
31 ..�,�,� North
° PHASE
orO �S ti�G�S, � ti1� ~� • 11 GRAPHIC SCALE
1`� ti122
ry4�• ti4'. 2�
1 20 3
h 20�
� � 3
♦; 4 01q
Cb1 O�
2 tK
♦ 2� 20°`
3i9` , 1�
_ .n
L
eb
-70
,�- ff A
SCRUB
♦ Pv� JAY PRESERVE
♦ �Go�SJ 10.65 ACRES
♦ 11
of
♦ 2011 2°0
PHASE
0
q�1 21 2
IIA
o .
2°� ♦ q�
3 �
I
i
r,
200'x200' ' • —
SETTLEMENT
POND ' ` EXISTING WETLAND TO BE PRESERVED
P 2Ofo A O�bA' I 2°'
� o
tit a •2ti2
OrO � poi
� •2°'
,,,, ..� % ®• 212` 21�
A
2 of
HAY
Y B r •, •' 2°o�ti ' ` �` �� �, 2,x!3
2� BARRIER
,21• •
q2 �' P 11
O• ti
2
O ep'
24i
•
g� •212 �
2°'�1 o'
• �° �� 0 50 100
• �' 'Ar
k,
( IN FEET )
1 inch = 100 ft.
1
Z 20oi
C;p
1
• 2°�1
212
tK
S . M . TRACT ' B' '
•21 I
♦ rod
PHASE
212`
IIBg
orb ,21� 32
431 411
of �� b�1 a� ,'2ro 1��• '�. i2,y�
r
1
1 � I
(NJ, � � 1�2� .22� .2�0 212 �� , 20
I 1 1 1 h 1 2,
OD i 1. 2 2 e
(P -Nq
�o I
S E BAST, I H I G H LAIC" (° roe PHAS
1• •1 1 2 PLAT B06K 5, PAGE 14 2 21' 2 ItB 1
• •2
5I
w
48 HOURS BEFORE DIGGING
1N�
DESIGNED
JCALL
TOLL FREE
I DRAWN
v
1-800-432-41-70
1-800-432—`/ 1-70
w
i
rn
( CHECKED
d
' �
SUNSHINE STATE ONE CALL
I APPROVED
a
OF FLORIDAINC.
N
410
7 N0. BY
REVISIONS DATE FILE NAME
J
i
i
•20�
•2~
PHASE
1
�b 2
�,1 '`L12tb h 212
;Lo• _20• 203 .21h
N 45008' E 3889. �'
.2ti' 22 .2� �1.
•23 -
1
1N�
24: -
-� lw�0
w
i
rn
O 1�
Cn
w
21�h
N
410
N
•2
•It;
21'
232
20�
e
1
22� W
ry
O
U
LL
O
0
z
Q
V)
Q
M
W
Key Map
2123�
1 �20_
0,
EXISTING GRADE
• % ����\ 3.0' BELOW EXISTING
GRADE
200.0'
SECTION A -A
22�h 223 NO SCALE
ro
2
2~
q�
WCGOYeel Schaffer, Inc.
Professlonal Engineers Existing Conditions and Erosion control
170519th Place, Suite G-3 PreliminaryPlanned Development Plans
Vero Beach, Florida 32960 p
772-770-4707 Collier Club Subdivision Phase M
(fax) /72-7-70-4W
CA 00009582 Indian River County
AUG w/ SCALE SHEET NO.
`2 6 FOOTL u r
h' K J. M LCHIOR P.E. DATE: JOB N0. 3
Florida FL. REG. N0: 4$947 WN.01201.001 of 8
SEBASTIAN GOLF COURSE
7&00 75.00 70= moo 70.00 70= 70.00 70.00 70.00 70.00' e3.e4
Lot �{ 348 Lot 349 Lot 350 Lot 351 Lot 352 Lot 353 Lot 354 Lot 355 Lot 356 Lot 357
Lot Lot 1 Lot s # 9.150 91. _ 8,870 s.f. 9,100 s.f. 9,100 al. 9,100 s.f. 9,100 s.f. 9,100 al. 8,673 s.f, _ 9,457 81.
Lot Lot Lot Lot Lot Lot Lot Lot 148 Lot 146 , CONCEPTUAL PLAN OPEN s $ g s 8 $ $ s Lot 358
156 155 154 153 152 151 150 149
-- TOTAL SITE AREA 158.80 ACRES 14,390 al.
/ APPROVED UNITS 452 S/F LOTS
--------------- ----------- APPROVED DENSITY 285 UNITS/AC. °'� /� 2'a�- - -- --- - -- - -- \
3.0.5
1 RESIDENTIAL AREA 126.46 ACRES 30% 37.94 ACRES ► rr a,;,r 70ny 7&W 70-na 7000 73.,9
PRESERVE AREA 12.00 ACRES 100% 12.00 ACRES
_ Lot 145 RECREATION AREA 5.00 ACRES 80% 4.00 ACRES gTract
-Tr,
- - - - - LAKE AREA 15.34 ACRES 100% 15.34 ACRES 936 a.
. TOTAL 44% 69.28 ACRES
- - - -- - - - - �- \ + 33.05• 7ss9' 70.00' 70.00• 70.00• 54.79•
-- -I i\\ a, - -- -- - 1 ! MUMMY a/ Lot 359 8
Lot 144 F�►N OPEN Lot 347 I II
\ TOTAL SITE AREA 158.80 ACRES �/ t o. t 91 ,
I I 10,787 s.f. « Lot 317 Lot 316 Lot 315 I � Lot 314 N Lot 313 I +�•�'
y / o 9,432 al. 8 750 s.f.
l Lot Lot Lot Lot Lot Lot Lot PROPOSED UNITS 391 S/F LOTS �r / ;j Lot 318 � � 8,750 s.f. � 8,750 s.f. $ 9,864 s.f. 1
1 165 166 167 168 I { 169 170 17 t ` ` PROPOSED DENSITY 2.46 UNITS/AC. Lot 34fi / / 10,265 al. I � I � o
I I 1 Lot 143 RESIDENTIAL AREA 112.19 ACRES 3OX 33.66 ACRESI
I 1 PRESERVE AREA 25.47 ACRES 100X 25.47 ACRES a 10s62 s.f. -71, l 1 Lot 360
RECREATION AREA 5.69 ACRES 80X 4.55 ACRES ',� / 1E:SEMErOj' + F I j I I 9,100 a.f.
` ` LAKE AREA 15.45 ACRES 10OX 15.45 ACRES / / 4n7x 740, 7000 7000• I I 70.00 eo0o I i 130.00
TOTAL 5OX 79.13 ACRES $ y ,p / Lot 319 I I I
\ Tract 'Q' Lot 172 ` , 1 Lot 45 9,622 al. Lot 309 Lot 310 1 1 Lot 311 Lot 312 1 � �1 8
\ / \ \ Lot 142 / / / / ,,� 10,632 s.f. 8,355 s.f.1 8,892 s.f. v 1x,080 s.f. ( Lot 361
I 9,100 s.f.
I 1 1 1 130 ao
Lot 3,201
Lot 308 1
8,804 al. i
Lot 344 12.032 s.f. R ' e, I I � � � 1 Lot 362 �
\ �i / Lot Lot 173 9,597 s.f. /4't3 \
Lot a' sw J L-_-.-_ $ 9.100 al. 8
Lot 141 j.� ti / Zt d+ s. y
164 \ 19$ \ ` '�� a` �/
Lot 321 pti. 2600' 70.00• -1.no �Y/ 1 130.00
Lot 343 / \ 8,794 al. 125W
/ \ \ Lot Lot 174 ` ` 9.334 al.
197 ` Lot 140 / \ / \ $ $p Lot 363
\ ' ►i j ` 9,100 al.
Lot 322 4 �Or�ulzsos 70.00 asA6 8Lot 307 r
J 11,984 al. \ �� e I 130.00
Lot 342 / / 8.818 s.f. � I 1 Lot 304 Lot 303 � I
8,899 al. � Lot 305 I 8,688 s.f. �} 9,ot 3 3 1
\ Lot Lot 175 � .- • '' / , P.U.. ,,
9.463 s.f.
Lot t 96 \ Lot 139 - \ , ` EMEN Lot 30fi N JI V
113 \ \ ` � r ..___ . - ..- . _ . ,,,� � �,�, � $/ � `S' $ Is
Lot 364
Lot 323 11,365 S.f. & 1 $ 9,100 s.f. 8
Lot 341 8,756 s.f. 1 130.00•
\ Lot \ 8.456 s.f. I I
195 Lot 176 Lot 138 / / I N °�� // / oHy/ 10 P.U.Q. I 1
•ro o $ A EAS WENT 92 44.92• t2sm'
Lot \ / 1 Lot 340 / / `'?' 7s. Lot 302 I I Lot 365 0
114 \ �\ ` 10,097 al. / Lot 4 Lot 2 I� $1 9,100 al.E U S L �
Lot Lot 177 `� ` \, 1 ' 'dao• /� o I , s . I _ 1 130.00•
\ P E DLot 137 1 /0 0- 1
t25.e1•
Lot \L _ Lot 339 � � 1
115 \ ` , 10,979 s.f. :4 Lot 325
STORMWATER MANAGEMENT Lo{ 301 1 8I Lot 366
880 Tract b" g 8,750 al. I� � I 9,100 SJ.
\ Lot 17$ \ 112,428 al. 8 1 I
\ Lot \ Lot 136 j 2.58 ACRES 1 13os0•
Lot \ 193 , 1 ' j Lot 326 _ _ _ ,20 t- - J
116 Lot 338 8,752 91. - _ \ Lot 300 I 211 Lot 367
,� .�\ \ \ I 11,403 al. / 8
•a7• • s,007 af. 81 9,100 al.
Lot ` Lot e Lot 179 \ Lot 135 , 1 ,ae.es _ N
1 17 \ 192 \ e i Lot 327 ti3z10 'o.7a a1 I I 130.0(r
I I 8,109 91. A a7 t2sar I I 1 �I
e o Lot 337 & +1.47' 2a 531 i 70.00 lam ?boo eom
o Lot a
Lot \ Lot 191 / ` e Lot 134 ` 1 10,477 s.f. I 1 I 125.94 Lot 294 1 I 1 I $ I 9,100 s.f.
68
Lot 180 I 1.6Lot 293 Lot 295 Lot 296 Lot 297 Lot 298 Lot 299
/ / ` 1x I 11.689 s.#. ti 9.515 s.f. I I
w` 8,809 al. 8,750 al. 8.750 al. 8,750 e.f. 9,866 al. b I 130.ar
1 1$ \ �\ / ` \ Lot 328 I I
`� 8,940 s.f.Lot 336 8 8 8
Lot Lot 181 \� 1 ` �. -'' g 9,418 al. � \ 1r.0° � 13,708Lot al. /�4: � I � gI Lot 369 `g I
Lot \ 190 1 __L . I 9,100 al. W'^
�. 119 \ \ , Lot 133 / // '�_--_J L- TEAS MET ------- 1 VJ M
\ ` / 1 ` Lot 329 p /' 3-9 7a.On 7000'-. 70.00 70.00 Sty ' I 13o.ar ( W
"O /-' Lot 335 1�' a� 9,369 s.f. »'
Lot \ \1 \ 189 Lot Lot,` ,� ~ a 10,356 al. I I I I 125A0' � g1 Lot 370 � � �
120 \ \ \ 182 , Lot 132 �'S7 / I I a e \ \ 1 9,100 s.f.- - -
\ Tract ' N • 130 sa' I $1 Lot 330 g N Lot 291 \ Sz 1 03 37 ss 70.00 7oar 70.00 7aao Ssm -`3� I 1
Lot Lot , , (� 1�------I----
wl
�" '" 8,704 s.f. 13,367 s.f. / 1 1 I 1 y
188 183 Lot 334 1 1
Lot \ , �/ 0 9,120 s.f. IN i2s.ar Lot 289 Lot 288 I Lot 287 Lot 286 „ Lot 285 Lot 284 I I g Lot 371
121 \ \ Lot184 / ` �/' Lot 290 9.515 al. � 8,809 s.f. 8,754 s.f. !r 8,750 s.f. " 8,750 s.f. $ 9,866 s.f. I 9,100 s.f. VJ Q
^,., Lot 131 /� I � � 8 $ $ I$$- Q
\ \ Lot \� �' ` \ Q % 'u'°U• I H I 10,826 91. 1g- 1 130.00 T
Lot \ / ` ,/ \ Tract "S" `� Lot 331 1
Lot 187 185 \ i 1 \ , ''�� 3,996 s.f 9,850 al. 1 1 tEOASEME T
122 \ \ / j 41.47• 28.531 I 70.W 7000 70.00 SOW Lot 372
Lot 241 •` /' ♦♦ Lot 246 a 0�,SEMS 21.3. ark St 4? 125.W 9,100 al. �
10,943 s.f. / ow j y �� Lot 283 I I '130.00•
Lot ` Lot 186 / // , �\ / v - / ,4 / / Lot 332 $ 8,750 al. ISE;
123 , .' // / Lot 130 ` \ Lot 242 / / ♦ / 9,765 al. b � 1 � I Lot 373 �
Lot 245 ♦ / / 4/ ,?. 12s.ar 1 $1 9,100 81.
\ \ j/ ga• STORMWATER MANAGEMENT
Lot ` % / �` 129Lot \ \ \ // Lot 243 Lot 244 / Tract 'C" 9 Lot 282 I I 1100°
124 \ '' / Lot 232 �` % / / Lot 333 2.615ACRES 8 8,750 s.f.
Lot \ \ / 10,654 al. - _ - tzsm•J � Lot 374
128 \ \ ` - - '
Lot �� _ _ // /------� $ i 9.100 81. $
Lot 127 Lot 233 \ \ \_ Lot 247 1zac1 Lot 281 I� 1 130.0&\ 125
_ 8,853 al.1�_ 1
Lot \\\! �`"- - - \ J�
126 �'� Lot \ \ 7Lot 375
11,721 al. e, y1 szz9 27.99 70.00 70.00• iLm' e0ar 1 1 81 9,100 al.
Lot 234 / - - _. -- Lot 273
Lot 248 S I
Lot 199 ` / / 12,731 S.f. I
130.00,\ / \ Lot 275 Lot 276 Lot 277 Lot 278 Lot 279 Lot 280
01�/ / }� 11,169 al. 8,812 al. 8,750 s.f.1 1 8,750 al. 8,750 al. 9,869 el.
'Lot 231 // Lot 235 \ 1 I �I
Lot 376
Lot 236 Lot 23$ �� '� s $
Lot 237 � qa I 10' P.U.D. ' I 1 9,099 S.f.
.. ` \ \ e Lot 249 Lot 272 *'' o\ EASEMENT
\ Lot 200 \ ` C 14,446 s.f.---- - - - - -- ------ I I 130.00
- - %
1
Lot 230 lam• 70 na• 70.00' 70.00' - 70.00' 55.22=
"- t �F� ,= -
41 Lot 377
- - $1 9,099 al. 8
1
L1it 201 ` ` Lot 250
\ ` \ 229 \ \a \ Boar
\��_ - 70.00• 70.00- - - 70.00- - 70.00 70m' 70.00' 54.79' y� 1 I
R E V lu Lot 239 � ` - - - - `+'�
V E L u , , , ! - - I S I 9,099 aLot l.
8 _
/ , ! Lot 271 Lot 270 Lot 269 Lot 268 Lot 267 Lot 266 Lot 265 Lot 264 Lot 263 1
ria Lot 202 \ \ // t ` Lot 251 11,527 al. 8,550 s.f. � 8,750 S.f. � 8,750 al. � 8,750 al. � 8,750 al � 8,750 al. x 8,750 s.f. Ir 9,864 s.f. 1 i 130ar
et \ l \ / // Lot ` ' I R $ $ $ $
228 Lot 240 I I 1 1EASEMENT 11 s 1
\\\ \ I 10 P.U.D. 1 41 Lot S.
\ \ \ Lot // I -EASEMENT I 9,100 s.f.
Lot 203 \ \ \ 227 / i I esss Tom �- 700- - - -70.00•- - -7oar Taus- - �aao• - - -ever -1 I
% I I Lot 252 71.09• 70.00•-ae:a�- ia9o�-',= 70:69 - - --70.04•- - -70&66'- -a0A4- - 04i7•- , 130.19•
1 I Lot 257 Lot 258 Lot 259 Lot 260 Lot 261 La 62 �m1
Lot I 1 Lot 254 Lot 255 Lot 256 t 2
\ \ / Lot Lot 1 1 ( I 8,776 al. 8,750 al. 1 8,750 S.f. 8,750 al. 8,750 al. , 8,750 al. 8.750 S.f. 8,761 al. 10,683 al. / ' Lot 380
e. �
Lot 204 �` v/ 225 224 222 222 1 1 221 220 Lot 1 I 1 g 1 8 8 8 8 8 8 �$ I 6.431 s.f.
Lot 253 = 1 1E°ASEMEM` ee•
�� I ,41.
``------ ------ --I f----.--------_ .� I �.-__-----A------ � / � Lot 381
70.01 70.00• 70.00' 70.00' - -7000• - . - 70.00• 70,1p• 36.79• 33.2'1 "
,1' � \ 14,168 s.f.
- - - ... - - - - - •49'� ! 1
Lot 205 16.42'
act "Q"
654 s.i_
70.00• 70.0070. 70.00 70.00 70.00• 70.00' 70.00' 53.03• 4 � 01.2 = \ m
Lot 391
390
• Lot 217 218- Lot 382 Lot 383 Lot 384 Lot 385 Lot 386 Lot 387 Lot 388 Lot 389 Lot \
206 / / Lot 12,250 el. 12,250 al. 12,252 al. 12,250 s.f. 12,250 al. 12,250 al. 12,250 al. 12,250 s.f. 12,250 al. 12,250 al. 12,098 s.f. 11,099 s.f.-
\ / I Lot 207 Lot Lot _
20$ Lot Lot Lot Lot Lot Lot ;, ;, ;, � �° • ---
209 210 211 212 213 214 215 216 8 8 $ $ $ $ 3 $ $ $ \ .47 -
/ j Tract "P"
I--------� /---- - - - ------- -------_--------------------------------------------------------------------17,1E5sf---
I I' 798" %Or Mal' 'gar ur^ 72W 7q 11W
SEBASTIAN HIGHLANDS PHASE_ PHASE_
PLAT BOOK 5, PAGE 14
TIB IIIA
A, DESIGNED SRM DATE 03-01-04 me Neet-SChaffer, inc.
48 HOURS BEFORE DIGGING Pr'ofe88ionalEnglneer8 Preliminary Plat
CALL TOLL FREE DRAWN DPK DATE 04-05-04 %r�$19fh Place, Suite G-3 "
..// -BOO �T�//Lq2-Y77O WO(� Preliminary Planned Development Plans
/h7CHECKED ESM/RJM DATE 00-00-00 Vero Beach, Florida 32960 " " "
APPROVED RJM DATE 00-00-00 772-T70-4707 Collier Club Subdivision Phase
SUNSHINE STATE ONE CALL III
OF FLORIDATATE INC. NEIR SC1 AR%R (fax) 772 -no 4640
/ NO. BY REVISIONS DATE FILE NAME CLPH3-04-07.DWG CA 00009582 Indian River County
arr>E DATA Key Map
TOTAL SITE SITE AREA - 1.925.773 91. - 44.20 Ac.
PHASE III A = 60
PHASE III B = 81
NUMBER OF LOTS - 141
DENSITY = 141 DU / 44.20 AC
= 3.19 DU/ACRE
REQUIRED OPEN SPACE = 962887 9.f. = 22.10 Ac.
PROPOSED OPEN SPACE
LOT AREAS O 4OX (max) = 554.415 91. = 12.73 Ac.
LAKE AREAS O 3OX (max) = 284,959 a f. 6.54 Ac.
(TO WATERS EDGE
PRIVATELY OWNED IMPERV. AREA = 178.55 s.f. - 4.1 Ac.
O 1 O (max)
TRACTS 'P' 'Q' 'R' do 'S' - 29.960 s.f. - 0.69 Ac.
TOTAL PROVIDED - 1.047.885 s.f. - 24.06 Ac.
PHASE III -A SITE AREA 880.673 SF - 20.22 Ac - 46.00X
DENSITY - 60 DU/ 20.22 AC - 2.97 DU/ACRE
PHASE III -B SITE AREA = 1.045.411 SF= 24.00 Ac - 54.00X
DENSITY 81 DU/ 24.00 AC - 3.37 DU/ACRE
SETBACKS
FRONT 10 FEET -SIDE LOAD GARAGE, 20 FEET -FRONT LOAD GARAGE*
SIDE 7.5 FEET
REAR 25 FEET
MAXIMUM BLDG. COVERAGE 3OX
MINIMUM OPEN SPACE 4OX
WANIM FRECK=o 1 czo
1. REDUCE FRONT YARD SETBACK FROM 20' TO 10' WITH SIDE LOAD GARAGE
2. REDUCE SIDE YARD SETBACK FROM 10' TO 7.5'
3. MINIMUM CORNER LOT WIDTH FROM 90' TO 67'
ZONINQ
RS -10
LAND USE
L -D
SURVEYOR
DAVID M. JONES
2345 14th AVENUE
VERO BEACH, FL 32960
(561) 567-9875
RICK J. MELCHIORI, P.E.
2345 14th AVENUE
VERO BEACH, FL 32960
(561) 567-9875
AQEIKT
ONSITE MANAGEMENT GROUP
1999 POINTE WEST DRIVE
VERO BEACH, FL 32966
(561) 794-9916
SOL Tym
THE SOIL TYPES AS DETERMINED BY THE SOIL SURVEY OF
INDIAN RIVER COUNTY. FLORIDA FOR THE YEAR 1984 ARE
RIVIERA FINE SAND
WINDER FINE SAND
BOCA FINE SAND
FLOOD ZONE
THE SUBJECT PROPERTY IS LOCATED IN FLOOD ZONE 'AE'. 'X'
PER F.I.R.M. PANEL N0.120610076E, DATED MAY 4. 1989.
FLOOD HAZARD WAFIC40
THE PROPERTY MAY BE SUBJECT TO FLOODING DURING A
100 YEAR BASE FLOOD EVENT. YOU SHOULD CONTACT
LOCAL BUILDING AND ZONING OFFICIALS AND OBTAIN THE
LATEST INFORMATION REGARDING FLOOD ELEVATIONS AND
RESTRICTIONS ON DEVELOPMENT BEFORE MAKING PLANS
FOR USE OF THE PROPERTY.
PEMAM
CITY OF SEBASTIAN PLANNED DEVELOPMENT
CITY OF SEBAASTIAN CONCURRENCY PERMIT
INDIAN RIVER COUNTY UTILITIES
S.J.R.W.M.D. ENVIRONMENTAL RESOURCES PERMIT
D.E.P. WATER MAIN
D.E.P. SANITARY SEWER
WATER SOURCE
EXISTING 10" PVC WATER MAIN PER
INDIAN RIVER COUNTY UTILITIES
SEWER SOURCE
W SANITARY SEWER PER
INDIAN RIVER COUNTY UTILITIES
TRAMWER STATE1 EW
PRIOR TO TRANSFER, THE TRANSFEREE MUST ASSUME
IN WRITING. ON A FORM ACCEPTABLE TO THE COUNTY
ATTORNEY. ALL COMMITMENTS, RESPONSIBILITIES, AND
OBLIGATIONS OF THE PRIOR DEVELOPER. FAILURE TO
GIVE TIMELY NOTICE OR TO PROVIDE THE ASSUMPTION
OF PRIOR COMMITMENT VOIDS THE PRELIMINARY APPROVAL
.;,AR`f-eONSTRUCTION: SEPTEMBER. 2004
END CONSTRUCTION: MAY, 2006
TRACTS
TRACT P.Q,R & S RECREATION ARTA
TRACT'S C & D- CONSERVATION AREA
N nB
CONSTRUCTION OF WETLAND AREAS SHALL BE ACCESSED
ONLY AT EASEMENT LOCATION INDICATED. REMAINING
EXISTING UPLAND BUFFER SHALL NOT BE DISTURBED
DURING CONSTRU.:11ON PROCES.
SCALE SHEET NO.
AUG -2 6 2004
1 „=100'
JOB NO. 4
RI J. MEL HIORl, P.E. DATE:
Florida FL. REG. NO 48947 WN.01201.001 of g
SEBASTIAN GOLF COURSE
t
Lot 1
Lot 147
156 155 54 53 152 151 Lot Lot 148 Lot 146 1.
150 149
APPAL SITE AREA 158.80 ACRES
ROVED UNITS 452 S/F LOTS
----`------------ -------`------/ , APPP OVEDRESNTIAL AREA 1.46 AC.85 RES
'I-.--=--------- ----------' Lot 145 PRESERVE AREA 12.00 ACRES
Nt-�--- _ RECREAMON AREA 5.00 ACRES
LAKE AREA 15 34 ACRES
Lot Lot Lot
348 349 350 351 352 353 354 355 Lot
356 Lot
357
PROPOSED 8"
S/
� -- -[!UC TILE IRON Lot
44--- \/---?--�T----- C7 WATER ;AIN 358
Tract "R — — .� - /- ; 8
�--------------------\��
-•1 — �— 1---�----n--- `---1�--� \\ ' Lot
PROPOSED 8" l r} I 359
Lot 144 tot I I I
lrl I ( I I \ \ 347 PVC WATER MAIN
Lot
Lot Lot Lot Lot Lot Lot Lot \ \ / / !' Lot 317 316 315 I I 314 313
i 165 166 167 168 I ( 169 170 171 \ \ / / / 318 PROPOSED 8 I -PROPOSED 8"
L
t ( ( \ 346 / / UCTILE IRON I PVC R MAIN
1 I I \\ \ \ Lot 143 / WATER MAIN 10'P.U.D.— r.. 60
I I I. I
3 9
35
Tract 'D' Lot 172 \ \\ 4 / / / I I I I i I Lot
Lot 142 Lot
Lot Lot Lot Lot I I I 361 320 309 310 I I 311 312 I D
Lot 1Lot 98 Lot 173 \ \\ Lot 141 Lot / / Lot Lot / r v\ PVC WATER MAIN I I Lot
\ ` 344 I I PROPOSED 4"
164 / \ \ / / 321 308 J L 362
\rLot
\ 197 Lot 174 \ \ Lot 140 \' / \ 343 5 Lot \ \ S �\ Lot
\ % 322 \ \ 17 /� I I 363
/ � / \ \� ` � \ \ \ \ / • \ / / � Lo{ I� � \I I PROPOSED 8"
307 � / I I I �I PVC WATER MAIN
\ Lot Lot 175 \ r \ Lot Lot Lot Lot
Lot P U
196 Lot 139 I I
_ `\ \ \� \ _ _ — — _ \ 342 / 305 I I 304 303
\ \ \ \ \ 4 / / 323 EMEN Lot
1 13 I Lot
\ \ \ � \ \ ` \ \ •` / •' _ .- � 306 I i I I I 364
Lot
\\ \ Lot Lot 176 \ \ ` / 341 / 10' P.U.D. I I I I
\Lot 195 \ Lot 138 \ / /Lot EAS -MENT
114 324 \\ \ � \ ._ / I
\ [ Lot I I I I 365
302
\ La 4 Lo0 U S L t 177 \ \ ` Lot 137 / / / ooLot
Lot \ \ L ` Lot / / 325
115
1 339 / STORMWATER MANAGEMENT I I I Lot
\\ \ \ Lot 178, \\ ` 1 I / / / Tract "D" Lot 366
Lot \ 193 ' Lotr\ \ Lot 136 ` / / / 3Lot 301
26 - — — — — —
Lot
g ! ------ I I 10 Lot
Lot \ \ 1 y2 Lot 179 Lot 135 I I '
\ \Lot / I ' Lot / Lot
0 I I I -0I 367
117 \ 327
3Lot
37 I I I �j- I
Lot Lot 180 / , I
Lot \ \\ \ 191 / j Lot 134 I I I I I I 368
Lot
\ \ / / / \ r \\ j 1 11 1 328 294 Lot Lot Lot Lot ` `I
� \ / / Lot 295 236 297 298 Lot I I I
o \ / \ 1, Lot \ \ I ` 293 299 I f
\ < Lot Lot 181 \ Lot PROPO';ED 4" Lot I
Lot \ \\ \\ 190 \\ 10' P.0 O. PVC % TER MAIN � —� L � ( 369
�-
119 Lot 133 / Lot Lot — — — _ EASEME )T '^ m
`\ 329 292 / �A I I WILY
_ \ \ Lot t � \ ' �— � Lot�IM
S 'Qr' I
Lot \ \
189 Lot ` , / 335 1 1 I % Lot S -- —I— _.. I I 11 370 •`�•
120 \ \ 182 \ Lot 132 t 291 \ 18 e,Cl—
\ Tract 'N' �j HYDI Lot — —1 F— —L
— — �� — — 8
\ �V 330 �- \I
\\ Lot Lot ` — — I I 19 I
188 183 Lot I I Lot Lot Lo� Lot Lot
1Lot21 \` \ \\\ Lot „�./ 334�I I 290 LO 289 288 I I 287 286 285 284 I ( 3Lot71 I
Lot 131 .0Q� PROPOSED 8L`2�� ' Lot I I PROPOSED M Vi I Q
\ \ \ \ Lot Lot PVC R MAIN I 331 IK
I I I I PVC WATER MAIN Q I y
\ \ 187 185• • Tract "S" 1 p
1Lot
22 \ \ \ \ / / ® , \ ♦ / I I F1tSEME� I
\ \ \ Lot 241 ` _ ` / % I I /� 1 I I I 372
\\\ \ Lot 186 / / / \ \ \ POINT -'OF ONNECTTON 2 S Lot 1 Lot I Ir
Lot / v ST 10+85.41 / 332 283 1
Lot 130 \ Lot 242 % OFF Ei 17' L
f� I`M EXISTINGPLUG. Tl= 24 / / / / — 373
I I Lot
Lot \ / POINT OFC ECTION STORMWATER MANAGEMENT
Lot \ ` / \\ 129 \ \ �� Lot 243 Lot 244 / ST133V+48.27 Tract "C" Lot I I I
124 \ / \\ Lot 232 \ %� / / OFPStT 1.12' R 282
Lot128 \\ \\ `1�\ ✓/ / REMOVE NLW MALot
\ Lot 0 1 ------J I i
374
\ � \ \ ` `' -.._ - - — "-" '' � � /
gLot127 Lot 233 �\ Lot 27 /
r Lot I I
Lotl 281 I
.0 Lot
\ 126 / `\` `"`—�\\ \ Lot
\ j _ _ , _ _ 1 \ ♦ T— I
\ ` � �- Lot 1 1 I I I
\ � � Lot 234 �! '' � � \ Lot 248
01�
0 Lot 199 \ \
r \ \ , / /Lot 235 \\ \\ \ / / 273 274 Lot Lot Lot I I Lot Lot Lot I I
Lot 231 % ` \ \ / j / 275 276 277 I I 278 279 280 I I ( Lot
Lot 236 Lot 237 Lot 238 \\ \r \ / ♦ / \ I 10' P.U.D. i I 376
- \ \
Lot 2QQ C Lot 249 ♦ \ EASEMENT
r \ \ \ \
\ ,•1 \ \ \ Lot 20 ----- �T— 21---�J------�
\ ` Lot 23Q ♦ 272 ' _ — , —=— — — — �RJi�r — =� —3.'� ( S 3Lot
77 —
r Lot 201 ` \ \\ \\ r \ Lot 250 ♦ _ - - — __ �\ II 113
\\
0 R E V lu -- 66 229 / Lot 239 \ � � 1
, 1 1 1 Lot PV CWATER MAIN — — I I Lot
\ \ /V E L 0 P E D I I PR031��SED 8"
Troo Lot 202 \ / // 1 I 1 Lot 251 , 270 Lot Lot Lot Lot I I Lot 364 Lot
f \ / Lot ` 269 268 267 266 265 263 I PVC WATER MAIN
228 ' I 10' P.U.D.
\ \ Lot 24Q ` I ' EASEMENT I I
' 10' P.U.Lot
Lot ASEMENDT. I 379
zz7
Lot 203 \ �/ ------ —E — — — ------ ---�
\ \ f _
I I I Lot 252 ' r --- -- -- ---------------
Lot
� �
Lot
Lot 204 `� / 225 Lot Lot Lot Lot Lot Lot I I I Lot Lot I I Lot Lot Lot Lot Lot Lot Lot
r `✓ 22`1 223 222 I f 221 220 219 I I I I 254 255 I 256 257 258 259 260 261 262 I I
Lot 25311EASEMENT
r \ ®----- _ _-1 L_--__------ -- Lot
,I -- �--�-- ---�--Q---44--�T---�-- j 381
Lot 205kact
% "
/'-"--—---- .— -------.— --- ----- --
.._..\
a
48 HOURS BEFORE DIGGING
CALL TOLL FREE
1-800-432-4770
SUNSHINE STATE ONE CALL
OF FLORIDA, INC.
POINT OF CONNECT a S `
STA 8 +32.64 15 16
OFFSE• 17 R PROPOSED 8' PROPOSE',) 8" S
Lot \
�/ / / REM01r. PLUG. TIE INTO PVC WATER MAIN PVC WATER MAIN 14 \
206 Lot EXISTIIIG 8" GV/WM Lot
Lot 207 Lot Lot 385 Lot Lot Lot \
208 209 Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot
210 211 212 213 214 215 216 217 218 382 383 384 386 387 388 389 390 391 \
Tract P. \
/---- --- — ------— — — — — — — — — — — — — — — — — — — ------------- -------- ------------------------------------- X
W-EX8'W.M-t---� SEBASTIAN HIGHLANDS PHASE PHASE_
PLAT BOOK 5, PAGE 14 Iff B 1H A
DESIGNED SRM DATE 03-01-04
DRAWN DPK DATE 04-05-04
CHECKED ESM/RJM DATE 00-00-00
APPROVED RJM DATE 00-00-00
/ NO. BY REVISIONS DATE FILE NAME CLPH3-04-07.DWG
WCGjNeel-Schaffer, I= Master Utility Plan
Professional Engineers Y
170519M Place, Suite G-3 PreliminaryPlanned Development Plans
Vero Bead% Rorida 32960
772-no7o7 Collier Club Subdivision Phase III
(fad n2-- 7o 4s4o
CA oWWW2 Indian River County Florida FL;
Key Map
SCALE SHEET N0.
AUG 2 c 2001
�y
f P.E. 5
LG�,�IC�F�I, [" DATE JOB N0.
NO: 48947 WN.01201.001 of 8
SEBASTIAN GOLF COURSE
1- A
Lot
Lot 147 Lot Lot Lot Lot
Lot Lot
155 154 14'8 ` 348 349 350 351 352 353 354 Lot Lot
Lot Lot Lot 153 152 ot Lot 151 Lot Lot150. 49 Lot 146
TOTAL SITE AREA 158.80 ACRES 356 Lot357 North UNITS 452 S/F LOTS
—..------------.---. •--
— ---� \ , APPROVED DENSITY 2.85 UNITS/AC.
'
RESIDENTIAL AREA 126.46 ACRES
— — — — — — — —
... _ Lot 145 PRESERVE AREA 12.00 ACRES — \ 35sA�..E
- - - - RECREAl10N AREA 5.00 ACRES / - 1
/221
LAKE AREA 15.34 ACRES Tract "R
— —
��---------------I I -- `�\� '-------------- '-----��
I I \ � Lot , 44 , r
Lot (/� F1�T �
Lot Lot Lot Lot I I Lat Lot Lot \ \ 347 / L°# Lot I I 1Lot 359 1 inch 1 00 ft.
165 166 167 168 I I 169 170 171 \ \ \ Lot 317 316 315 314 313 I
' I 1 \\ \ \ Lot 143 346 / � I 1Lot
\\ \ / 'E`SEENT 360
I I I I 1
`-, / � 319
,\ \ Tract 'D' Lot 172 \ \ Lot
/ Lot 142 3451 Lot Key Map
Lot , ej
320 309 310 I I 311 312 I 1 361
\ i Lot Lot 173 Lot
164 198 \ Lot 141 Lot344
321Lot —21308 /r. \�J L--- -----� I 1 362
\ \ \ ^ / I
197 Lot 174 \ `. ! Lot \4' 1/ 1
Lot 140 / \ \ 343 Lot\ \ Lot
Lot /�- , (– — — — — — -� 363
\ \ Lot307
Lot 175
Lot \Lot
1 13 \ \ 196 \ Lot 139 342 / P.U. . Lot . I Lot Lot ! 1
\ \ \ _ - — . — . Lot EMEN 305 304 303
_ \ \ / /323 306 ! I 3Lot
64
Lot l \ Lot 195 Lot 176 \ \ \ Lot 13EI / ` / ! \ 341 / Lot 10' P.U.D. 1 I 2 I 1
114 , \ \ \ \ ` \ / I / / 324 EAS =MENT 1
E I U S L\ \ \\ I I 340 / / Lot I ( I Lot
\ \ \ Lot Lot 177 \ 3ot365
Lot \ \ 4 Lot 137 � � / /Lot
E P E DLot1 I
115 339 / / 325 STORMWATER MANAGEMENT
\ \ Lot 178 \ ` Tract "D" I Lot
Lot366
Lot \ 193 , Lot 136 ! / Lot 301 1
116 \ 338 � / 326 ------ r ' 1
–1
\
Lot ''
1Lot 17 \ \ 192 Lot 179 � \ Lot 135 / ` � i � pp � I Lot •
' 3Lot27 i� 300 ! ` I 1 367
\\ \
Lot , Lot 1$0 \\ \ / 1' ,- I 337 I I I I 1 Lot
Lot \ 191 / Lot 134 I I I I 368
�
118 \ \ � � , ` 3Lot
28
294 Lot 0l I I I
, Lot 296 297 2°98 Lot !
j Lot \ Lot ` 293 299
Lot \ 190 Lot 1$1 / 336 Lot Lot
�-
119 \ \ Lot 133 ` / ' ! I 10' P.U.� I
Lot Lot / EASME(JT I. 1 369 W�/� I M
329 292 /-----� 1------- 1 V� W
-------�11 I
y/ Q
Lot \ \\ \ 189 \ , / Lot t — _ I •r
120 \ \ \ LotLot
182 `` , Lot 132 \ `� 335 I i 291 ,\ t 1 " 4 �� ( 370 IL 1
Lot I
\ Lot Lot Tract N I 1 330 \ /�------1---------------1�I1i
Lot \ \ 1$$ \ 183 1 / Lot I — — Lot Lot 11 Lot
Lot / 290 oI I 2s7 286 285 2�4 Lot wI
121 334 I Lot 289 288 • t
\ \ \ \ \ 184 , Lot 131 �� i I I 1 I 37t col
Q
i �`Lot
\ \ 1Lot
$7 Lot \\\ / \\� �. i , r 33111"11\-10'
1 i I QI
Lot \ 185 \ • Tract "S"
22 \ \ \ � � / \ • � � • / ! I 'EAS MEl�ir I 1
\ � V •---• Lot 241 • ` �� Z4� I 1 I Lot 1
'' �--- � \ \ ' � -' ♦, � � EME _ f I I I 372
Lot \ Lot 186 r . / \ \\ / /' 246 �/ // Lot ` Lot I
123 \ / �✓ ` 332 I
\ \ \ ' /� Lot 130 ` \ Lot 242 / ♦ 283 1
Lot Lot 245 / 1 1
l \ � I 1
\ Lot \ \ \ STORMWATER MANAGEMENT 373
Lot\\ 124 \ \ \\\ 129 Lot 232 \ \ \ / Lot 243 Lot 244 / / / Lot Tract "C"
Lot IN, 1
\ / 128 \\ \ J / / 282 I 1^ I
\ \ Lot\\ \ \ _ __—— .24J 1 Lot
Lot %374
\ 125 ` 127 Lot 233 '"" Lot 247 ll, j I I
T7
Lot 2 ��''– 'I� \ 1 281 I
/ \ \ Lot 234 / — _ \ \ ♦ T ��— I I I 375
\10
Lot 199 \ Lot
� \ / � ! \ \ Lot 24$ I !
, / /Lat 235 \ \ i 274
273
\ Lot Lot Lot
Lot Lot Lot
Lot 231 / / \ 275 276 277 11 278 279 280 1 1 7
Lot 200
\ Lot 236 Lot 237 Lot 23$ \ � ,,r i' ♦
` VJ \ \ \ \ \ Lot 249 ♦ / \ 1 10' KUM,
6
ENT 1 3
Lot 23d .� , \ Lot �---------— --
�
-------� I I
\ ` -- _ oat ` 272 `
1
Lot 201 (t / \ ,/ I 377
\ \ \\
LotR E V I ION/ \ \ , Lot 25d \ _ �. 16 ... — — T\
_ _ _ _
\ \
Lot 202 229 / Lot 239 \ ` \�-------- --------------
V E L Lot
/ ` � � ` 1
` 1 , Lot 271 1
T, \ \ / I 7
\1 \ j I I 3 8
ao�
/228 ` ' Lot 251 1 270 269 268 267 266 I 265 264 263 I 1 1
\ \ < \
Lot 240 ` I ` � / 10, EAS MENT I I
Lot 203 \ \ Lot // 1 �, I EASEMENT I 1 3Lot
79
\ \ // ---- 24———————— ----- 24" —1 ,
------- — �" I
` \ \ %Lot 1 I I I Lot 252 33 --- — --- ----
226
I I
� /Lot
\Lot Lot Lot Lot Lot Lot / 3�0
\ Lot_ 204 �'' / 225 224 223 222 Lot Lot Lot1 ! 221 220 219 ( 1 I 254 Lot , I I tot Lot Lot
Lot 253 1 255 10'SP.U.D. 257 258 259 260 261 262 ,
- I ( I EASEMENT
1 --
\` —__-------I f--.----------- '� I ��-------j-------- ---------_------------j I f• 381 '
Lot 205 ' \ _ % I
�. 20 °r —�
— .---------- -------------— — — — — — — — — — — — — — — — — — — — — — — — — — — — — ---------- _ \�,
Lat
\ 206 Lot \
Lot 207 208 Lot Lot Lot Lot Lot \ \ \
209 Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot —
/ / 210 211 212 213 214 215 216 217 218 382 383 384 385 386 387 388 389 390 391 \
---- /-- --- -----• — — — — ----..--....—_•_._..__...--.-------------------- -------------------------------------- Tract "P"---
SEBASTIAN HIGHLANDS PHASE PHASE__
d
PLAT BOOK 5, PAGE 14 a B M A
48 HOURS BEFORE DIGGING I DESIGNED SRM DATE 03-01-04 ., WALE SHEET NO.
s,: .� CG�NeehSchaffer, Inc.Ir�c _ .
CALL TOLL FREE I Profe88lo11alEngineer8 Master Drainage Plan aus. s 200
DRAWN DPK DATE 04-05-04
170519th Place, Suite G 3
1-800-432-4770 CHECKED ESM/RJM DATE 00-00-00(li Vero Bead Aorida 32960 Preliminary Planned Development Plans _ r :. 1"=100'
Collier Club Subdivision Phase 6
SUNSHINE STATE ONE CALL APPROVED RJM DATE 00-00-00 772—no 4707 RSC .MEL �� � .. �A-�• JOB N0.
Of FLORIDA INC. r NO. BY REVISIONS I DATE FILE NAME CLPH3-04-07.DWG NEEL SCHAFFER (fax) 772-1-70-4640 Indian River County Florida Y, WN.01201.001
FL. EG. NO: OF 8
SEBASTIAN GOLF COURSE
�. O
Lot
L Lot Lot Lot 147 Lot Lot Lot
Lot Lot
156 Lot Lot Lot Lot Lot 148 348 349 350 351 352 353 Lo 35s Lot
155 154 153 152 150 149 Lot 146 Lot Lot
TOTAL SITE AREA 158.80 ACRES 357
APPROVED UNITS 452 S/F LOTS LOW P01
ELEV. 19.0E
`^---------------_.:......_-.-----------�� \ � APPROVED DENSITY 2.85 UNITS/AC. /----�---- - -- - �-� Lot ,
1 RESIDENTIAL AREA 126.46 ACRES HIGH P01 _ - - - - - - - - - - Lot
Lot 145 PRESERVE AREA 12.00 ACRES EIXV. 19.97 \
358
- - RECREATION AREA 5.00 ACRES - .. - _
---- - -- r LAKE AREA 15.34 ACRES Tract R p - Lit l 0'
I-----------------I I------- � _ -- ------ -- --
I 1 Lot
\� �
\ � Lot 144 , r �\ 359
=� I I � Lot / I I
jLot Lot 347 I
I 165 166 167 168 I I 169 170171 ` I�i8 31 Lot
6 Lot I I Lot Lot ( 1
Lot 143 313
346 / / !� I Lot
I ` / 1I ' \ P.U.D. ELEV. 20.00
319 -' I I I HIGH POW
/ Lot E6NT EMEI ( f
Tract 'D' Lot 172 Lot
Lot 142 :�
/ 345 I I Lot
/ / / Lot Lot Lot I I Lot Lot I I 361
/ l 1 320 309 310 1 1 311 312 1 '
\i / / Lot Lot 173 , ` Lot / / HIGHPOINT
9211 1 1 1
Lot / Lot 141 344 _ LOW P19 3
164 �� 198 ` ` ` / \ 1 ELEV. 19 05 Lot
LOW POINT / / 321 Lot J - _ �,I 1 362
� \ \ 19.03 � / 308 / � -��
r r,
Lot
Lot 174 \ h
/L \ - I INT. LOW POINT
187 � Lot � 1 --Ga - -..._
Lot 140 / \ 343 ` Lot \ \ HIGH POINT - - _ » ELEV. 19.57
322 \ ELEV. 19.39 - _ 1 Lot
-\ ) \- / / 307
Lot 1 `
Lot Lot 175 196 _ Lot
113 �` `` \ Lot 139 ' _ _ ^ • - - - \ 342 / 3ot ' EMEN Lot 305 1 I Lot 304 Lot I
306 303 I I Lot
/ \
364
Lot I \
Lot Lot 176 ` / ` 1a' 1 I 1 ,�, 1
\
114 Lot 195 Lot 138 I % 341 / / / / Lot EAS = P.U.D.Uuff.D HIGH POINT , \ • / / 324 L I I I ELEV. 20.00
01
Lot E 10 U S L` ` ( ' 340 / Lot 1 1 365
1Lot 15 ` ` E4 LotL (" D" P E D Lot 177 , `\ Lot 137 / / / / 32t5 302 f
Lot I 1
339 STORMINATER MANAGEMENT 1
Lot Lot 178 \ / / Tract "D" 1
116 t 193 - Lot 136 , ! / / / Lot Lot 366
1 I Lot
r
Lot HIGH P01 / 326 - - - - - - J •LOW POINT
338 ELEV. 20.15 - - - - - - --ELEV. 19.55
\ Lot
1Lot17 ` � 192 Lot 179 � \ Lot 135 / �• I i �
I Lot
367
327 � J l 3 0 � I
I
Lot `� 191 , j Lot Lot 180 \ C' Lot 134 ` 1 337 i I 1 1 1 I I I 6
118 \ / , , Lot I I I 1
Po ` f / ` ` ` / �1 1 328 Lot 294 295 286 297 298 Lot I 1
' Lot `. Lot 293 299 I
Lot � � � 190 Lot 181 � • "- 336 � - •� 1 Lot
�-
119 Lot 133 ` JIT
A/ Lot Lot / 1FASEME.' _ L ., I 369 (W //��
/ 329 292/ �- --- I------ --- I VJ W
t Lot , , J l- 1 ,THIGH POINT Q I
Lot \ 189 t / Lot - - - _ ELEV. 20.22
120 \ 1 of , ` Lot 132 L�% 335 1 ` LotLot 291 , L.1 - - - 1� I Lot I
_ _
` \ Lot Lot `, ` `` 7 1 / Tract 'N' I I 330 ,\�- LOW POINT�6 r - - - - - - - - - - - - -� I e
Lot \ 180 183 1 1 I HIGH POINT _ ELEV. 19.17 11 I [ I
121
Lott
122
Lot
123
Lot
124
Lot
yrft 25
00 Lot 199
48 HOURS BEFORE DIGGING
CALL TOLL FREE
1-800-432-41-70
SUNSHINE STATE ONE CALL
OF FLORIDA, INC.
/ NO.
t
Lot ELEV. 19.69
Lat i 1 290 Lot Lot 1 1 297 s°Ss Lot it I I Lot W
334 I Lot 289 288 I I
184 Lot 131 i�' LOW POINT ,1 1 ELEV. 19.08/ 371
3t 1 Q
1 •
Lot \ '� `t • ��:i ♦ ' 331 I I Q
37 � \ i Tract "S" /� II�f
/Lot 241ESEME T I II IL
'I
Lot I
/ / \ ✓ ' �, , EME I I
_at 186 24 372
6 / / ` / / Lot �\ Lot 1 Il
Lot 130 Lot 242 / 332 283 1 1
C � \
i // / Lot 245 / / / ` 1 1Lot
Lot 0 373 / STORMWATER MANAGEMENT I I 1
129 \ / Lot 243 Lot 244 / 3t Tract "C" Lot
Lot 232 \ / /
/ 128 `` LotHIGH POINT / / - - - 282 - J II IELEV.LOW P119 Sot
�. \ ELEV. 19.81 / I,
Lot `"-- -- / ----- _ 1 374
127 Lot 233Lot \ \ \ \.` ` Lot 247
26 / �_ _ - ` /% 281 1 I 1
�.
Lot
Lot 234 / / - - - 375
Lot 248 Lot 1 1 10' P.U.D.Lot I I
i�
l / /Lot 235 \ / % 273 274 EASEMENT
Lot 231 1
i , Lot Lot Lot Lot Lot Lot
/ / \ I I I I Lot
Lot 236 Lot 237 Lot 238 275 276 277 278 279 280 � / ''�
/Lot 249 ,?A / \ I I 1 I
376
Lot 230,� ` Lot-----------� L--------- .� (HIGH POINT
aOt 272 1 IELEV. 20.0
}
` \\ \Lot R E V lu` t Lot 250 HIGH POINT \ / j - - L4/ - - 1 377
2
ELEV. 0.17 - ---..--- - - -
\� Lot 239 Lot \ _ - - - - - - - - - - - /ic
[CFES 24' WHIT' STOPV E L r P E r Dk, t HIGH POINT LOW P011 "T y Lot
02 /` 1 271 ELEV. 19.95 ELEV. 19.18 EOP GN, STREET *FAME gSIGN A7D I I 378
Lot ` Lot 251 Lot Lot Lot Lot Lot Lot Lot Lot
/ I OSS PER I.R.L/C.O.. SPEG. I INDICATES PROPOSED TRD GHT
1 270 269 268 267 266 1 1 Lot 264 263
228 Lot 240 ' BY
I - f 0' P.U.D. FLORIDA POWERICA 0-M & LINT. STANDARD
Lot / I 110' PUNT t EASEMENT I 1 Lot 14 FOOT POLE AND C 'ACH LIGHT
EASof 203 ` \ 227 / _moi I j -
------------------- ---� 1
\ / Lot 252 (- ------------------
LotLot
! I ( I 1 �---- ---- 379
226
I
Lot Lot LotLot Lot LotLot 204 � \ ~ .,,�/ f 225 224. 223 222 I 1 221 22Q 219 ( I I 254 Lot I I Lot Lot Lot { Lot Lot Lot
\ 255 256 257 258 W9 260 261 262 / LME TALE
I I I Lot 253
\ I 1 �1EASEMENT
---------1 L--------------� I �.- _--- '------� L------------------ ---- / , { L3 ��5%
1.Q
391 L4 b26.7� N48niu
Lot 205 `--�.,
- - - ` LOCATION OF L5 2s.00 S44 i 1
� n � �-- � � _ GATE HOUSE � 257.07• N�sBLoi�T
1.7
�- La10. N45'28'
- \ L9 878.80 N45 OB 27'
\ \ 117.8 S31'41
----...._-----•---------------- - - - - - - - - - - - - - - - - - - - - ----------------�� L1L101 252.81 5442 1}
/
NGH POINT J LOW POINT _ HIGF POINT LOW PL12 393.93' N4Bo828
ONT \
Lot / / EL EV. 19.76 =LEY. 19.00 ELEV 1936 ELEV. 1 S 00
206 Lot "
Lot 207 Lot Lot Lot \ \
tot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot 385 Lot Lot Lot Lot Lot \ Le
209 210 211 212 213 214 215 216 217 218 382 383 384 386 387 388 389 390 Lot \ \ \
-__--- -//---- -------..--.-.- .------------------------------------- ----- Tract "P"
HIGH POINT
ELEV. 19.76
SEBASTIAN HIGHLANDS PHASE- PHASE_
PLAT BOOK 5, PAGE 14 11 B M A
DESIGNED SRM DATE 03-01-04
DRAWN DPK DATE 04-05-04
CHECKED ESM/RJM DATE 00-00-00
APPROVED RJM DATE 00-00-00
BY REVISIONS I DATE FILE NAME CLPH3-04-07.dwg
R-ofee o Schaffer, ers Master Roadway Plan
Professional Engineers
170519th Place, kite G-3 PreliminaryPlanned Development Plans
Vero Beach, Florida 32960 p
772-,70-4707 Collier Club Subdivision Phase III
(fax) 772-7-70-4W
CA 00009582 Indian River County
Florida FL'
Key Map
SCALE SHEET NO.
AUG ; 2.6 2004
1"=100' I n= 1 00'
JOB NO. 7
IFLC TORI, P.F. DATE:
Wt 4$347 WN.01201.001 of 8
CURVE TABLE
CURVE
DELTA ANGLE
TANGENT LENGTH RADIUS
C1
30.115.'`
4722 q175.00
C2
30.21M-
141.71
C3
1740}7
l
24.99 fQ.7V 225.00
04
50.43 '
CS7rig
41.48 9M. 50,00,
C8
31*!'
57.23 111.&
C7
21.48 1•
91.34
C8
2
130.62 1 257,6W
C9
8809'20'
146.55 I 259.79' I 22s -nn'
Florida FL'
Key Map
SCALE SHEET NO.
AUG ; 2.6 2004
1"=100' I n= 1 00'
JOB NO. 7
IFLC TORI, P.F. DATE:
Wt 4$347 WN.01201.001 of 8
1' OFFSET FROM R.O. W.
5' SIDEWALK
PROP. R/W 50'
CONST.
10'
_w
6" TYP. 2' 1' OFFSET FROM R.O.W.
2% 2% _ 6%
5' SIDEWALK
MOD. MIAMI CURB
1" TYPE III ASPHALTIC CONC.
6" COQUINA BASE
8" STABILIZED SUBGRADE
MIN. F.B.V. 50 PSI
SUBDIVISION STREETS
� Q / SCALE: N.T.S.
2'X2 -X1/4- GALV.
WITH 1/2" BOLTS AT 0 m
6" O.C.. USE WEDGE
ANCHOR WITH 3" MIN.
EMBEDDED ON CONCRETE
FACE •�
8„ �. 8„
o o � H-
A&
4'-10"
1/2 OF 48" GALV. ,
#4 BARS TOP & #5 BARS WITH
CORNER EACH BOTTOM HOOKS, 6"C.C.
FRAME BOTTOM
#5 BARS I I I HOOKS, 4WITH x POSITION #4 BARS
C.C. BOTTOM #4 BARS WITH
4 SIDES - --- - ���,�- HOOKS, 4" C.C.
I I I I LONGITUDINAL A V I N'' A + BOTTOM
CENTERLINE I I I I ® A I A
i
22
" A& N
_ r
22" I /I #4 BARS
#4 BARS, TOP
CLOSED
x STIRRUPS -_� &BOTTOM
8" C. C. � � #4 BARS (12" &
TOP VIEW OPENING CENTERED #4 BARS coo 24" LEGS) SAME
CONTINUOUS OR OPPOSITE
TOP VIEW 12" RETURN LAPS TOP VIEW
L 22" GRATE ELEV.
= CONCRETE GRATE ELEV.
8-7/8" - 22' BRICK -1 l
N+ 1-1/4"
.< 4,e
_ZQ
__._. OPTIONAL KEYS OPTIONAL KEY -r .To
19-1/2 " I _ 19-1/2" (IN LIEU OF DOWELS) < (IN LIEU OF DOWELS)
22-1/4' I 22-1/4" - �- 3'-6" OR 4'-0" -�- -�_
BOTTOM OR RISER BOTTOM OR RISER
29-1 /4" �n 2g-1 /4" SEE NOTE 6 BELOW
TRANSVERSE LONGITUDINAL SECTION AA SECTION BB
SECTION SECTION NOTES:
1. THE INLET GRATE IS SUITABLE FOR PEDESTRIAN AND BICYCLE TRAFFIC.
IDI �- MODIFIED MIAMI CURB 2. INLET TO BE LOCATED OUTSIDE PEDESTRIAN CROSSWALK WHERE PRACTICAL.
I
3. FOR STRUCTURE BOTTOMS SEE F.D.O.T. INDEX NO. 200. FOR SUPPLEMENTAL DETAILS SEE
f INLET GRATE F.D.O.T. INDEX NO. 201,
5' 5' 4. ALL STEEL IN SLAB TOPS SHALL HAVE 1-1/4" MINIMUM COVER UNLESS OTHERWISE SHOWN.
TRANS. TRANS. EDGE OF CURB TOPS SHALL BE EITHER CAST -IN-PLACE OR PRECAST CONCRETE.
5. FOR ALTERNATE B APPLICATIONS, TOP SLAB OPENINGS SHALL BE PLACED SUCH THAT 2 EDGES
OF INLET FRAME WILL BE LOCATED DIRECTLY ABOVE THE BOTTOM.
GUTTER FLOW LINE 6. WHEN USED ON A STRUCTURE WITH DIMENSIONS LARGER THAN THOSE DETAIL ABOVE AND
CURB PLAN TRANSITION RISERS ARE NOT APPLIED, THE TOP SLAB SHALL BE CONSTRUCTED USING F.D.O.T. INDEX
NO. 200 WITH THE SLAB OPENING ADJUSTED TO 24"-36". THE "SPECIAL TOP SLAB" ON F.D.O.T.
INDEX NO. 200 IS NOT PERMITTED.
MIAMI CURB INLET TOP 7. FRAME MAY BE ADJUSTED WITH ONE TO SIX COURSES OF BRICK.
2 8. INLET AND GRATE DETAIL SHOWN IS U.S. FOUNDRY 5105 WITH APPROXIMATELY EQUAL OPENINGS
WILL BE PERMITTED THAT SATISFY AASHTO H-20, LOADING. INLET AND GRATE SHALL BE CLASS
SCALE: NTS 30 CASTINGS IN ACCORDANCE WITH ASTM A 48.
4'-8 5/8" /— L 5"X3" -1/2"X5/16"
(22 SPACES ® 9/16"
23 BARS ® 1/4
5" STEEL DECKING,
�0�0
WEIGHT 630 LBS.
I MAW BAR 5-X1/4-
INTERMEDIATE
"X1/4"INTERMEDIATE BARS
1-1/2"X1/4" RETICULIN
BARS 1-1/4"X3/16"
5/16"
SECTION CC
roll
_f_o' L 5"X3-1/2"
E
SECTION DD
3D 1 WALL ), 6"
MIN.
CORRUGATED STEEL
PIPE (16 GA. WITH
v (7 0
3"X1" CORRUGATIONS) m 4 I 5" DIA. PVC (NOM.)
PLAN � STEEL GRATE ELEV* 16.0 S
TOOL EDGES TO4"_1 p SCH 40 PVC PIPE
3/4" RADIUS �� DECKING 4'-8 5/8" `jIs 6 5'-4" 6°
ELEV: 18.0 t I� 5
'-3" !� PIPE CONNECTION WITH
`. / NPT END
zap 12" _ 12 STANDARD RUST RESISTANT
ROOF DRAIN (NPT CONN.)
MIN. OPENING TO EQUAL
v v;'Ic iv `. 150 ON AREA OF PVC
ELEV: 17.0 � 8„ _ #4 BARS g x PIPE
s ®12" O.C. �: , <
2 - 2 24" DIA. R.C.P. �; o CONTROL ORIFICE WITH
INV. 14.0DEBRIS STRAINER
i
ELEV: 1 .0 - 2„ 2" Lr).
N - 5'-00" STRAINER DETAIL
/ NOTE: BOX DEPTH N.T.S. °
ELEV: 11.0 l° :: ( _ I CONSTRUCTION JOINTS PERMITTED
f1 : 4. ' . BETWEEN THESE LIMITS -SEE INDEX
#4 BARS —
/ C ,e. d N- • , NO. 201 FOR MINIMUM DIMENSIONS
®12" O.C. SECTION AA °° SECTION BB
NOTES:
CONTROL STRUCTURE 1. THESE INLETS MAY BE USED WITH ALT. B
STRUCTURE BOTTOMS.
� Q / SCALE: N.T.S.
48 HOURS BEFORE DIGGING
CALL TOLL FREE
1-800—,432-41-70
SUNSHINE STATE ONE CALL
OF FLORIDA, INC.
N0. ,
DESIGNED
SRM
DATE
03-01-04
DRAWN
DPK
DATE
04-05-04
CHECKED
ESM/RJM
DATE
00-00-00
APPROVED
RJM
DATE
00-00-00
BY REVISIONS DATE FILE NAME
CLPH3-08.dwg
SURFACE ON LOW SIDE OF
PAVEMENT TO BE 1/4" ABOVE
LIP OF GUTTER -SURFACE ON
HIGH SIDE TO BE FLUSH WITH
GUTTER
R_3/4„ 1'-0"
(TYP.)
I
a
Cq
<°
a_
r r
2'-0"
-
FLEXIBLE PAVEMENT -
N OTES:
1. PROVIDE 1/8"-1/4" CONTRACTION JOINTS AT 10' CENTERS (MAXIMIUM) AND AT ALL POINTS
OF TANGENT OF CURVES WHERE R<20'.
2. CONCRETE SHALL CONFORM TO F.D.O.T. CLASS 1 CONCRETE.
3. SEE F.D.O.T. INDEX 300 FOR OTHER NOTES.
(71 MODIFIED MIAMI CURB
� Q / SCALE: N.T.S.
Pro
WCGINeel-Schaffer, Inc.
Professional Engineers Miscellaneous Details
170519th Place, S°ffe G-3 PreliminaryPlanned Development Plans
Vero Beach, Ronda 32960 p
772-770-4707 Collier Club Subdivision Phase IB
(fax) 772-770-4640
CA 00009582 Indian River County
FI rida
SCALE SHEET NO.
AUG 2 6 2004 AS NOTED
JOB NO. 8
J. M'EUNIORII, P.E. DATE:
REG. NCS' 48947 WN.01201.001 of 8