Loading...
HomeMy WebLinkAbout2001 - North Pier & Boat DocksGENERAL NOTES: 1, CONTRACTOR SHALL OBTAIN ALL REQUIRED BUILDING `� PERMITS BEFORE COMMENCING WORK 2. CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL N❑. 1 SITE CONDITIONS BEFORE STARTNG CONSTRUCTION 3. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION OF N❑ 2 ALL EXISTING UTILITIES, THE CONTRACTOR SHALL CONTACT E-1 ALL CONCERNED UTILITIES AT LEAST 48 HRS IN ADVANCE N❑ 3 OF CONSTRUCTION OPERATIONS 4. ANY DISCREPANCIES FOUND ON THE DRAWINGS SHALL l BE BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER n BEFORE COMMENCING OR CONTINUING CONSTRUCTION 5. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN TO BE <E MADE WITHOUT PRIOR APPROVAL OF PROJECT ENGINEER 6. ALL CONSTRUCTION SHALL BE COMPLETED IN ACCORDANCE H f -- WITH THE APPLICABLE ORDINANCES OF THE CITY OF SEBASTIAN, FL 7. THE CONTRACTOR SHALL MAINTAIN A CLEAN WORKPLACE IN THE TCD V d VICINITY OF THE PIER AND SHALL PROVIDE A SUITABLE BARRIER '-' I- Q Pq TO PREVENT INGRESS TO THE PIER DURING CONSTRUCTION 8, THE CONTRACTOR SHALL REMOVE ALL CONSTRUCTION MATERIAL SCRAP Q TURBIDITY BARRIER AND OTHER CONSTRUCTION DEBRIS AT THE W COMPLETION OF CONSTRUCTION 9. AT LEAST 48 HRS ADVANCE NOTICE FOR ANY REQUIRED INSPECTI❑N - NOTE: SEE TECH. SPEC. FOR NOTES ON DEM❑LITI❑N OF EXISTING PIER W AND ENVIRONMENTAL REQUIREMENTS SHORE LINE 5'- 25. C. 12'+/- -�' BEGINNING OF SUBMERGED LAND LEASE V. 12CT YP,) 0 GENERAL CONSTRUCTION NOTES MATERIAL SPECIFICATION 1. ALL WOOD SHALL BE NO. 2 KD PRESSURE TREATED 1, 'ROUGH CUT" LUMBER SHALL BE USED ON ALL MEMBERS IN THE SUBSTRUCTURE WHILE "DRESSED" SOUTHERN PINE OR EQUAL EXCEPT ALL DECKING PLANKS LUMBER IS TO BE USED ON THE DECKING AND AND HAND RAIL SHALL BE NO. 1 KD PRESSURE TREATED SHALL BE DRESSED AND SHALL BE SURFACED ON SOUTHERN PINE OR APPROVED EQUAL, FOUR SIDES 2, MAIN PIER PILINGS SHALL HAVE A MINIMUM BUTT DIA, OF 10" 2 ALL DECKING PLANKS TO BE CONSTRUCTED 3, FINGER PIER PILINGS SHALL HAVE A MINIMUM BUTT DIA OF 8" WITH BARK SIDE UP 4, PRESSURE TREATMENT SHALL BE IN ACCORDANCE WITH AMERICAN 3. TOPS OF HAND RAILS SHALL BE RADIUSED AS SHOWN WOOD PRESERVERS ASSOCIATION STANDARD C-2, THE ON THE DRAWINGS, SANDED AND FREE OF SPLINTERS PRESERVATIVE USED SHOULD BE A WATERBORNE PRESERVATIVE 4, ALL BOLT HOLES SHALL BE DRILLED A MINIMUM OF SUCH AS TYPE B OR C OR EQUAL AS COVERED IN FEDERAL 1 1/2" FROM ANY EDGE SPECIFICATION TT -W-535 & AWPA STANDARDS P5, C2 & C14, 5, C❑UNTERBORE OUTSIDE STRINGERS ON BOAT DOCKS - PILING TREATMENT SHAL BE 2.5 TO HIDE 1/2" THREADED RODS AND NUTS - BENT AND STRINGER TREATMENT SHALL BE 0,60 6, PIER AND BOAT DOCK PILINGS SHALL HAVE A MINIMUM - DECKING, RAILINGS AND MID -POSTS SHALL BE 0,25 IMBEDMENT OF 6 FEET IN THE LAGOON BOTTOM 4, ALL CONNECTORS SHALL BE MARINE GRADE STAINLESS STEEL WITH THE EXCEPTION OF LAG SCREWS OR TAP CONS WHICH SHALL BE HOT DIPPED GALVANIZED WHERE SPECIFIED ON THE DRAWINGS, 5. NAILS SHALL BE 16ol STAINLESS STEEL RING SHANK REVISI❑N 4 REVISION 3 REVISION 2 REVISION 1 INCREASED FINGER CHANGED PILING C -C CHANGED PIER AND MODIFIES DIMENSIONS OF PIER LENGTH DISTANCE TO 5'-2" PLATFORM PILINGS FINGER PIERS (FROM 4'X12' TO 20' TO COMPLY WITH TO 10" DIA. TO 4'-4'X16'); ALSO MODIFIES SUBMERGED LAND HANDICAP DOCK CONFIGURATION LEASE SUBMERGED LAND LE BOUNDARY a IV CAW HANDRAIL �--� -N A'-4: 0 0 MATCH STEP LINE --�\ �5'-2'0,C, CTYPJ 11' .` 11'-5' CTYPJ 6'- 2" 0, C. O.C. O,C, O,C. - s • s i i HANDICAP BEAT DOCKS i� T �-43' 4' D.C. O O 2D, 253/-2" lb ACCESS PIER 238'-2' FINGER PIER O O O O O O • • s � s � s s • s s • t s a • s • s s • � a • s s a s s • s 0 0 0 0 0 0 0 0 0 0 SUBMERGED LAND BOAT PIER AND BOAT DOCKS LEASE BOUNDARY MATCH - LINE (SEE SHEET 3 FOR TRANSITI❑N DETAIL 0 0 TOP RAIL 11'-5' 0,C' HANDRAIL 3)1 BENCH 0 0 .�' 14' D.C. FISHING/ ❑BSERVATI❑N PLATFORM _ J�1 CO `� REVISIONS DATE N❑. 1 7-17-01' � V N❑ 2 9-10-011 E-1 * N❑ 3 * * * l 12-15-01' 238'-2' FINGER PIER O O O O O O • • s � s � s s • s s • t s a • s • s s • � a • s s a s s • s 0 0 0 0 0 0 0 0 0 0 SUBMERGED LAND BOAT PIER AND BOAT DOCKS LEASE BOUNDARY MATCH - LINE (SEE SHEET 3 FOR TRANSITI❑N DETAIL 0 0 TOP RAIL 11'-5' 0,C' HANDRAIL 3)1 BENCH 0 0 .�' 14' D.C. FISHING/ ❑BSERVATI❑N PLATFORM _ J�1 DRAWN BY BAJ APPROVED DATE 5-21-01 SCALE AS SHOWN JOB NO, SHEET 2A OF A CO `� REVISIONS DATE N❑. 1 7-17-01' � V N❑ 2 9-10-011 E-1 N❑ 3 11-5-01' Q NF14 12-15-01' n {— X <E DRAWN BY BAJ APPROVED DATE 5-21-01 SCALE AS SHOWN JOB NO, SHEET 2A OF A CO `� F__1 In � V (4 E-1 7, r::::) Q n {— X <E LI 0 H f -- z M � TCD V d o\, '-' I- Q Pq W W <Y -I L� I CT 00 In Q 77 W n Q Ln L W `0 Ln `J a In cu cu <-- m o > n D_ L_ CLQ = U > n/ DRAWN BY BAJ APPROVED DATE 5-21-01 SCALE AS SHOWN JOB NO, SHEET 2A OF A CO `� In 0� m� l J z � TCD V d o\, '-' I- Q Pq W W <Y -I L� I CT 00 In CLI `D 1 � LLJ Azz klo� Ln W `0 Ln `J >- In cu cu <-- m o x U D_ L_ DRAWN BY BAJ APPROVED DATE 5-21-01 SCALE AS SHOWN JOB NO, SHEET 2A OF A GENERAL N❑TESD 1 CONTRACTOR SHALL OBTAIN ALL REQUIRED BUILDING PERMITS BEFORE COMMENCING WORK 2, CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL SITE CONDITIONS BEFORE STARTNG CONSTRUCTION 3. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL CONTACT ALL CONCERNED UTILITIES AT LEAST 48 HRS IN ADVANCE OF CONSTRUCTION OPERATIONS 4, ANY DISCREPANCIES FOUND ❑N THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER BEFORE COMMENCING OR CONTINUING C❑NSTRUCTI❑N 5. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN TO BE MADE WITHOUT PRIOR APPROVAL OF PROJECT ENGINEER 6, ALL CONSTRUCTION SHALL BE COMPLETED IN ACCORDANCE WITH THE APPLICABLE ORDINANCES ❑F- THE CITY OF SEBASTIAN, FL 7. THE CONTRACTOR SHALL MAINTAIN A CLEAN WORKPLACE IN THE VICINITY OF THE PIER AND SHALL PR❑VIDE A SUITABLE BARRIER TO PREVENT INGRESS TO THE PIER DURING CONSTRUCTI❑N 8. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL COMPONENTS OF EXISTING PIER IN ACCORDANCE WITH ALL APPLICABLE ORDINANCES 9. AT LEAST 48 HRS ADVANCE NOTICE FOR ANY REQUIRED INSPECTION NOTE: SEE TECH. SPEC, FOR NOTES ON DEMOLITI❑N OF EXISTING PIER AND ENVIRONMENTAL REQUIREMENTS SHORE LINE 12' (TYP ) 5' -2" — 12'+/- —k �--- BEGINNING OF SUBMERGED LAND LEASE BOUNDARY .4! 20, o 2X10 HANDRAIL • r /� �r 4'-4` f ,� • o s�4'-4" n 0 0 MATCH ry LINE STEP (TYP,) O.C. O.C, O.C. s sus • o c (• o � HANDICAP BOAT DOCKS 182'-3" GENERAL CONSTRUCTION NOTES: 1, "ROUGH CUT" LUMBER SHALL BE USED ❑N ALL MEMBERS IN THE SUBSTRUCTURE WHILE "DRESSED" LUMBER IS TO BE USED ON THE DECKING AND SHALL BE DRESSED AND SHALL BE SURFACED ON FOUR SIDES 2 ALL DECKING PLANKS TO BE CONSTRUCTED WITH BARK SIDE UP 3, TOPS OF HANDRAILS SHALL BE RADIUSED AS SHOWN ON THE DRAWINGS, SANDED AND FREE OF SPLINTERS 4. ALL BOLT HOLES SHALL BE DRILLED A MINIMUM OF 1 1/2" FROM ANY EDGE 5, COUNTERBORE OUTSIDE STRINGERS ON BOAT DOCKS TO HIDE 1/2" THREADED RODS AND NUTS 6, PIER AND BOAT DOCK PILINGS SHALL_ HAVE A MINIMU IMBEDMENT OF 6' IN THE LAGOON BOTTOM REVISION 3 REVISI❑N 2 INCREASE FINGER PIER ADDED PIER LENGTH TO 20' TRANSITI❑N DETAIL i 253' ACCESS PIER 23,_8,_ _ FINGER PIER —� 0 0 20' s • 1 `� s s � s �—+t 1� i 6' 0 0 0 0 — — s_ 3'-4" 0, C, BOAT PIER AND BOAT DOCKS SUBMERGED LAND LEASE BOUNDARY REVISION 1 CHANGED PILING C -C DISTANCE TO 5'-2" TO COMPLY WITH SUBMERGED LAND LEASE; ALSO MOD. ADA FINGER PIERS FOR SAME REASON MATERIAL SPECIFICATI❑N 1. ALL WOOD SHALL BE NO. 2 KD PRESSURE TREATED SOUTHERN PINE OR EQUAL EXCEPT ALL DECKING PLANKS AND HAND RAILS SHALL BE NO, 1 KD PRESSURE TREATED SOUTHERN PINE OR APPROVED EQUAL, 2. MAIN PIER AND PLATFORM PILINGS SHALL HAVE A BUTT DIA, OF 10" 3, FINGER PIER PILINGS SHALL HAVE A BUTT DIA. OF 8" 4, PRESSURE TREATMENT SHALL BE IN ACCORDANCE WITH AMERICAN WOOD PRESERVERS ASSOCIATION STANDARD C-2. THE PRESERVATIVE USED SHOULD BE A WATERBORNE PRESERVATIVE SUCH AS TYPE B OR C OR EQUAL AS COVERED IN FEDERAL SPECIFICATION TT -W-535 & AWPA STANDARDS P5, C2 & C14, ALL PILINGS SHALL HAVE A MINIMUM RETENTION OF 2,5 M ~ BENTS AND STRINGERS SHALL HAVE A MINIMUM RETENTION OF 0.60 DECKING, RAILINGS AND MID -POSTS SHALL HAVE A MINIMUM RETENTION OF 0.25 5, ALL CONNECTORS SHALL BE MARINE GRADE STAINLESS STEEL WITH THE EXCEPTION OF LAG SCREWS OR TAP CONS WHICH SHALL BE HOT DIPPED GALVANIZED WHERE SPECIFIED ON THE DRAWINGS, 6. NAILS SHALL BE 16d STAINLESS STEEL RING SHANK 1010. 14 s - t- —I— 1 ,_11'-5" ❑.C.4 3 3' • s - BENCH I_ X 14' O.C. FISHING/ OBSERVATION PLATFORM SUBMERGED LAND LEASE BOUNDARY STRINGER 0 TOP RAIL ¶MATCH LINE II HAND RAIL INTERFACE DECK I 1 X11 TRANSITION FROM ACCESS PIER TO BOAT PIER CREVISIONS DATE N❑, 1 11-5-01 N❑, 2 12-6-01 N❑, 3 12-15-01 R DRAWN BY APPROVED DATE SCALE JOB NO, SHEET 3A OF (S A / 00 O � '-' U m O m Q n �-- X Q Q W ED � z o,) CD Q �zz ry C� _j L LL_ I mI'D co Ln �Ln Lf) Q W n Q ry LL - LTJ L_L_I F-1 In ojP CULLJ z ox Z \ n -4 " n LL Z U � O V J DRAWN BY APPROVED DATE SCALE JOB NO, SHEET 3A OF (S A / 00 m m 0 z o,) CD Q �zz W WE] H C� _j L LL_ I mI'D co Ln �Ln Lf) CI.J I 0) CO >- i-- In ojP CULLJ z ox Z -- < U -4 " n LL DRAWN BY APPROVED DATE SCALE JOB NO, SHEET 3A OF (S A / 1' 51-2# .� O.C. R1/2' 45' 3'-6' (TOP OF C HANDRAIL) MHW T\ Y/ V/ LAGOON BOTTOM PILINGS SHALL BE IMBEDDED 6' MIN. IN LAGOON BOTTOM SECTION VIEW OF 252' ACCESS PIER SEGMENT OF MAIN PIER r G'-2' 3'-4' G' 1 MAIN PIER BENT 10' �s I 8' 8" STEP DETAIL STEPS TO FINGER PIER g) DIMENSIONS; o ALL BENTS 2X10 ALL STRINGERS 2X10 PILINGS, MAIN PIER 10' DIA. PILINGS, FINGER PIERS 8' DIA. MID -POSTS 4X4 MAIN PIER DECKING 2X8X6' FINGER PIER DECKING 2X8X4°-4" HANDRAILS 2X10 MID -RAILS 2X4 FASTENERS �- - BENTS TO PILINGS 3/4' S.S. THREADED RODS, NUTS AND WASHERS STRINGERS TO PILINGS 1/2' S.S, THREADED RODS, NUTS AND WASHERS MIDDLE STRINGER TO BENTS TOE NAIL 16d S.S. RING SHANK NAILS MIDDLE STRINGER OVERLAP 16d S.S. RING SHANK NAILS MID -POSTS TO STRINGER 1/2' S,S, BOLT, NUT AND WASHERS HANDRAILS TO PILINGS 1/2' HOT DIPPED GALV, LAG BOLTS PLUS 16d S,S, NAILS HANDRAILS TO MID -POSTS 16d S.S. NAILS MID -RAILS TO PILINGS AND MID -POSTS 16d S.S. NAILS DECKING TO STRINGERS 3' S.S. DECK SCREWS 1' 51-2# .� O.C. R1/2' 45' 3'-6' (TOP OF C HANDRAIL) MHW T\ Y/ V/ LAGOON BOTTOM PILINGS SHALL BE IMBEDDED 6' MIN. IN LAGOON BOTTOM SECTION VIEW OF 252' ACCESS PIER SEGMENT OF MAIN PIER r G'-2' 3'-4' G' 1 MAIN PIER BENT 10' �s I 8' 8" STEP DETAIL STEPS TO FINGER PIER SECTION VIEW OF FINGER PIER SEGMENT OF MAIN PIER FINGER PIER BENT (TYP, 4'-4' I MAIN PIER 1. ADA RAMP AND FINGER PIER SAME AS OPPOSITE SIDE ,/L_, DECKING C[1NFIG. AT ��1= ADA RAMP,' CAIN PIER INTERSECT]ION NOTCH MAIN PIER BENT AT POST AS SHWN TO ACCOMMODATE FINGER PIER STRINGER e o' 3' '-w M, FINGER PIER BENT (TYP,) FINGER PIER STRINGER (TYP.) TOP OF PILING UNDER DECK (TYP.) SCAB 2X10 ONTO TYPICAL ADA FINGER BENT TO HELP SUPPORT PIER FRAMING (SEE STRINGERS ----\ SHEET 2 FOR ADA FINGER PIER LOCATION) r-TYP, DECK BOARD i 4'-4' RA11P 5' 0, C. STRINGER RAMP �. BENT FINGER f PIER STRINGER ADA RAMP BENT (TYP.) 16' STEP e I DECKING C❑NFIG. AT FINGER PIER/MAIN Pit -K INTERSECTION MHW LAGOON BOTTOM i //i //i �/ i / 6' MIN. IMBEDMENT m TYPICAL FINGER PIER FRAMING NOTE: FINGER PIERS ARE THE SAME ON BOTH SIDES OF MAIN PIER MHW i RAMP TO ADA FINGER PIER REVISION I CHANGE MAIN PIER PILINGS TO 10" DIA, REVISI❑N 2 MODIFY ADA FINGER PIER TO STAY INSIDE SUB. LAND LEASE BOUNDARY REVISION 3 INCREASE LENGTH ❑F FINGER PIERS TO 20' REVISIONS DATE ND. 1 9-11-01 N❑, 2 12-6-01 ND. 3 12-15-01 Ja g) Ln o I Cv MHW `D co V J LOCF) 3'-4' ❑.C. 7� �/ �/ �/ �/ �/ �/ �/ ,/ •/ �/ LAGOON BOTTOM Ln , X <E �- - LTJ PILINGS SHALL BE IMBEDDED LL 6' MIN. IN LAGOON BOTTOM Q SECTION VIEW OF FINGER PIER SEGMENT OF MAIN PIER FINGER PIER BENT (TYP, 4'-4' I MAIN PIER 1. ADA RAMP AND FINGER PIER SAME AS OPPOSITE SIDE ,/L_, DECKING C[1NFIG. AT ��1= ADA RAMP,' CAIN PIER INTERSECT]ION NOTCH MAIN PIER BENT AT POST AS SHWN TO ACCOMMODATE FINGER PIER STRINGER e o' 3' '-w M, FINGER PIER BENT (TYP,) FINGER PIER STRINGER (TYP.) TOP OF PILING UNDER DECK (TYP.) SCAB 2X10 ONTO TYPICAL ADA FINGER BENT TO HELP SUPPORT PIER FRAMING (SEE STRINGERS ----\ SHEET 2 FOR ADA FINGER PIER LOCATION) r-TYP, DECK BOARD i 4'-4' RA11P 5' 0, C. STRINGER RAMP �. BENT FINGER f PIER STRINGER ADA RAMP BENT (TYP.) 16' STEP e I DECKING C❑NFIG. AT FINGER PIER/MAIN Pit -K INTERSECTION MHW LAGOON BOTTOM i //i //i �/ i / 6' MIN. IMBEDMENT m TYPICAL FINGER PIER FRAMING NOTE: FINGER PIERS ARE THE SAME ON BOTH SIDES OF MAIN PIER MHW i RAMP TO ADA FINGER PIER REVISION I CHANGE MAIN PIER PILINGS TO 10" DIA, REVISI❑N 2 MODIFY ADA FINGER PIER TO STAY INSIDE SUB. LAND LEASE BOUNDARY REVISION 3 INCREASE LENGTH ❑F FINGER PIERS TO 20' REVISIONS DATE ND. 1 9-11-01 N❑, 2 12-6-01 ND. 3 12-15-01 Ja Ln Q) Ri m z � �- °—' W Ld � Q � � ��-LL_ W C4 z z Q L- Q >- Ln Q �as W U--ic-/) d- g) Ln o I Cv 0� `D co V J LOCF) LD Ln , X <E Ln LTJ LL V Q a_ n/ �I U L_1 _ CLI El L1__I � � U U Ln Q) Ri m z � �- °—' W Ld � Q � � ��-LL_ W C4 z z Q L- Q >- Ln Q �as W U--ic-/) d- g) Ln o I Cv 0� `D co I LOCF) CO Ln , �,D Ln LTJ ox Z Q a_ LL_ / DRAWN BY BAJ APPROVED DATE 7-20-01 SCALE 3/8"=1'-0" JOB NO, SHEET4 A OF 6A CENTER MID -RAIL BETWEEN BOTTOM OF HANDRAIL AND DECK / U i I� DIMENSIONS: TOP 2'X10'X6 1/2' SIDES 2'X10'X6 1/2' BACK 2'Xl0'X14' FRONT (SEE DETAIL) MHW LAGOON BOTTOM e \ \ \ \ \ ��/��/\�/� ���/��//��/��/fie ,\�/ \moi\fie///\�e\xr\�e\e\xr\�e\\r\ /�e\xe\fir\fie\fie\Xe\fie\��/�i\xe\ / / e LIGHT BOX DETAIL SCALE, 3/4'=1'0' ACCESS PIER ELEVATION 214' SCALE; 3/8'=1'-0' ULOU I 24/ / 5'-2" / 11'-5' 11'-5' 51-2"ol D.C. D.C. O,C' ' �r 3'-4" 3'74' O O O 0 0 — Tl_ + t MHW LAGOON BOTTOM �e/�,e/fie/fie/Rr/ / 6' MIN, PILING r / IMBEDMENT IN LAGOON BOTTOM OPENING TO ADA OPENING TO BOAT DOCK/ RAMP FINGER PIER BOAT DOCK PIER ELEVATION SCALE, 3/8'=1'-0' 1" FRONT DETAIL REVISION 3 FINGER PIER LENGTH TO 20' LIGHT FIXTURE ENERTRON TECHNOLOGIES, INC, MODEL 7900 W -L REVISION 2 SHOW ACCESS PIER W/6' O,A, WIDTH REVISION 1 CHANGE MAIN PIER PILINGS TO 10" DIA 12'-0' COUNTERBORE BOAT DOCK _. HIDE HEX NUT AND THREA D.C. (TYPJ 0 Tf LIGHT BOX (24' ❑.C,) SEE THIS SHEET FOR LOCATIONS X 0 Q O � Q r � 3'-4' 3/_6" CD '—' �W� a I CU 0 0 Gr') -� CENTER LIGHT BOX -� CC) I BETWEEN PILINGS M L� Ltd CENTER MID -RAIL BETWEEN BOTTOM OF HANDRAIL AND DECK / U i I� DIMENSIONS: TOP 2'X10'X6 1/2' SIDES 2'X10'X6 1/2' BACK 2'Xl0'X14' FRONT (SEE DETAIL) MHW LAGOON BOTTOM e \ \ \ \ \ ��/��/\�/� ���/��//��/��/fie ,\�/ \moi\fie///\�e\xr\�e\e\xr\�e\\r\ /�e\xe\fir\fie\fie\Xe\fie\��/�i\xe\ / / e LIGHT BOX DETAIL SCALE, 3/4'=1'0' ACCESS PIER ELEVATION 214' SCALE; 3/8'=1'-0' ULOU I 24/ / 5'-2" / 11'-5' 11'-5' 51-2"ol D.C. D.C. O,C' ' �r 3'-4" 3'74' O O O 0 0 — Tl_ + t MHW LAGOON BOTTOM �e/�,e/fie/fie/Rr/ / 6' MIN, PILING r / IMBEDMENT IN LAGOON BOTTOM OPENING TO ADA OPENING TO BOAT DOCK/ RAMP FINGER PIER BOAT DOCK PIER ELEVATION SCALE, 3/8'=1'-0' 1" FRONT DETAIL REVISION 3 FINGER PIER LENGTH TO 20' LIGHT FIXTURE ENERTRON TECHNOLOGIES, INC, MODEL 7900 W -L REVISION 2 SHOW ACCESS PIER W/6' O,A, WIDTH REVISION 1 CHANGE MAIN PIER PILINGS TO 10" DIA �J BOAT DOCK/FINGER PIER ELEVATION SCALE, 3/8'=1'-0' NOTE: ADA FINGER PIER ELEVATION IS ON SHEET 4 ELEVATIFINS REVISIONS Dpi T E N0, 1 9-11-01 N0o 2 12-10-01 N0 3 12-15-01 COUNTERBORE BOAT DOCK OUTSIDE STRINGERS TO HIDE HEX NUT AND THREA ROD (TYPJ 0 Tf �J BOAT DOCK/FINGER PIER ELEVATION SCALE, 3/8'=1'-0' NOTE: ADA FINGER PIER ELEVATION IS ON SHEET 4 ELEVATIFINS REVISIONS Dpi T E N0, 1 9-11-01 N0o 2 12-10-01 N0 3 12-15-01 i % DRAWN BY BAJ APPROVED DATE 7-21-01 SCALE AS SHOW! I JOB NO, f i i SHEET 5 A OF 6A i 00Ln El Q*) CLJ n U X 0 Q O � Q r � Ln CD '—' �W� LLJ I CU Gr') W Q CC) I M L� Ltd oc) �zz r-, LF)��Q i % DRAWN BY BAJ APPROVED DATE 7-21-01 SCALE AS SHOW! I JOB NO, f i i SHEET 5 A OF 6A i 00Ln Q*) CLJ m O Ln CD '—' �W� LLJ I CU Gr') ,D Q CC) I M L� Ltd oc) �zz r-, LF)��Q '�D W � U-) z -- I— of ® x F- (-LJ W I Q i % DRAWN BY BAJ APPROVED DATE 7-21-01 SCALE AS SHOW! I JOB NO, f i i SHEET 5 A OF 6A i i J� BENCH DETAIL a 4X4 Nt)ILER---'-1 FOR 2X8 RAIL AND MID -RAIL FASTENED TO BENT AND STRINGER MID-P❑ST FASTENED TO STRINGER 2X10 STRINGER 2X10 BENT 2X8X6' PIER DECKING (1/4' SPACING BETW, BOARDS) y PIER STRINGER HANDRAIL ---, PIER BENT TOP RAIL-� 14'-2' ❑,C, MID -POST FASTENED TO BENT AND STRINGER l / FRAMING PLAN e ,j.-4NOLE BRACE I II 2X8 SUPPORT 2X8X14' PLATFORM DECKING (1/4' SPACE BETW, BOARDS) 6'-2' 28'-10'❑,C, 30'-O'D,A, 0. C. -:1 11 2X10 �T PLATFORM STRINGER I 2X10 TOP RAIL 2X10 SUPPORT RAIL a 2X4 MID -RAIL 3' 16- 5'70" 6"5'-0' 10'-7 5/8' MID P❑ST I I I f 10'-3 5/16" J� MHW i VAF.IES LAGOON BOTTOM X/ Xl r / L 2x8 SEAT BACK L f- X6 SEAT +4 SUPP❑RT III II / III ' i TlO r PILINGS SHALL BE IMBEDDED 6' MIN, IN LAGOON BOTTOM \\ \\ \\ \\ \\ \ \\ \\ \\ \ /i, e s ELEVATI❑NS REVISI❑N 1 CHANGE PILING DIA, TO 10" REVISI❑N 2 ADD BENCH DETAIL r REVISIONS DATE N❑ 1 9-12-01 N❑, 2 12-6-01 Co Lnm C') z � Q � � ~ U Q Q r iLLQLL- LL- <z >- Lo Q (Uoj U O d- (p, LO o I C1J Q� `D CO e:e I Lt) CT) CO �U-) LF) �. l\D L� Lo X = Q n 11 DRAWN BY BAJ APPROVED DATE 8-3-01 SCALE 3/8„=1'-0” JOB NO. SHEET6 A OF 6 A 7 E—� a Q n x ry Q H V J r Q Q W W n W � W V J Co Lnm C') z � Q � � ~ U Q Q r iLLQLL- LL- <z >- Lo Q (Uoj U O d- (p, LO o I C1J Q� `D CO e:e I Lt) CT) CO �U-) LF) �. l\D L� Lo X = Q n 11 DRAWN BY BAJ APPROVED DATE 8-3-01 SCALE 3/8„=1'-0” JOB NO. SHEET6 A OF 6 A