Loading...
HomeMy WebLinkAbout1995 - IRC Water Transmission Project Speegle ConstuctionCity of Sebastian 1225 MAIN STREET o SEBASTIAN, FLORIDA 32958 TELEPHONE (407) 589-5330 o FAX (407) 589-5570 AGENDA SEBASTIAN CITY COUNCIL SPECIAL MEETING FEBRUARY 8, 1995 - 6:30 P.M. CITY COUNCIL CHAMBERS 1225 MAIN STREET, SEBASTIAN, FLORIDA ALL PROPOSED ORDINANCES AND INFORMATION ON ITEMS BELOW MAY BE INSPECTED IN THE OFFICE OF THE CITY CLERK, CITY HALL, 1225 MAIN STREET, SEBASTIAN, FLORIDA. No public input shall be allowed at a special meeting, other than during a scheduled public hearing, if any, unless otherwise provided in the meeting call. (R-93-19) PURPOSE: Change Order #3 - Indian River County Contract for Riverfront Water Project 1. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL 4. SPECIAL MEETING ITEM 95.011 A. Approve Change Order No. 3 - Indian River County Contract with Speegle Construction - Riverfront Water Project (City Manager Transmittal dated 2/7/95, Delaney Letter dated 2/6/95, Change Order No. 3) 5. ADJOURN ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE BY THE CITY COUNCIL WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING (OR HEARING) WILL NEED A RECORD OF THE PROCEEDINGS AND MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE HEARD. (286.0105 F.S.) IN COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), ANYONE WHO NEEDS A SPECIAL ACCOMMODATION FOR THIS MEETING SHOULD CONTACT THE CITY'S ADA COORDINATOR AT 589-5330 AT LEAST 48 HOURS IN ADVANCE OF THIS MEETING. City of Sebastian 1225 MAIN STREET o SEBASTIAN, FLORIDA 32958 TELEPHONE (407) 589-5330 o FAX (407) 589-5570 AGENDA TRANSMITTAL SUBJECT: City of Sebastian Water Main Change Order #3 Approval For Submittal By: City Manager %� EXPENDITURE REQUIRED: N/A AGENDA NO. �5` C) / I Dept. Origin: City Manager Date Submitted: 02/07/95 For Agenda Of: 02/08/95 Exhibits: 02/06/95 Letter from Michael Delaney Project Manager To Joel L. Koford With Change Order #3 AMOUNT BUDGETED: N/A SUMMARY APPROPRIATION REQUIRED: N/A The attached change order #3 for the contract between Indian River County Utilities and the general contractor (Speegle Construction) reflects a decrease of $7612.50 for the Sebastian Riverfront area project. The original construction estimate was $584,732.50 and the change order reduced the amount to $577,1201, or a savings of 7612.50. Under the terms of our agreement with Indian River County, we must approve each change order. RECOMMENDATION Recommend approval. M MASTELLER & MOLER, INC. - CONSULTING ENGINEERS - February 6, 1995 Mr. Joel Kof ord City of Sebastian P.O. Box 127 Sebastian, FL 32958 RE: City of Sebastian water Main Sebastian Riverfront Area, Change Order 13 Dear Mr. Kof ord : Please find enclosed four (4 ) copies of Change Order 03 for the referenced project to serve the City of Sebastian Riverfront area. There is an additional 210 calendar days added to Speegle Construction, Inc.'s contract. Therefore, should you find the Change Order to be in order, please submit all four (4) copies to the Indian River County' Utilities Department to the attention of Terrance G. Pinto for their approval. Should you have any questions regarding the Change Order, please do not hesitate to contact our office. Respectfully, MASTELLER & MULE , INC. 1. 4 0� Michael De aney Project Manager MD/vk Enclosures cc: Mayor* -Aarthur--Fi tion,, -w/ enclosure Earl Mastel.ler, MR File 19459LA (jk02O695) 1823 N. U.S. Highway 1, Suite B2 0 7380 Murrell Road, Suite 108 Sebastian, Fl. 32958 Melbourne, Florida 32940 (407) 589.4800 (407) 255-1175 (407) 589-2742 Fax (407) 253-4439 Fax co9341#3. yrs 1.9.3. CHANGE ORDER Page 1 of 3 CONTRACT CHANGE ORDER ♦�fffwffff'f+'f#f' ff' ff##AI###*###f##*llfi' ft#*M'f"rrlR CHANGE ORDER NO. 3 ORIGINAL CONTRACT PRICE 51,232,932.43 DATE 01/06/95 REVISED CONTRACT PRICE 51,810,052.43 JOB NAME INDIAN RIVER COUNTY PROJECT SM -93 -30 -DS OWNER INDIAN RIVER COUNTY UNIT PRICE REV. TOTAL ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE CHANGE CHANGE PRICE fffff •'### 1f#f#f#ti►A4r# ff#f# 1. 14091LIZAT109 1 LS $9,749.00 59,749.00 0 0.00 59,749.00 2. 16" DIA. DIP WM 0 LF 25.00 0.00 0 0.00 0.00 3. 12" DIA. DIP/PVC WM 140 LF 17.00 2,380.00 0 0.00 2,380.00 4. 10" DIA. DIP/PVC WMAIN 25 LF 12.00 300.00 0 0.00 300.00 5. 8" VIA. DIP/PVC WM ISO LF 10.00 1,500.00 0 0.00 1,500.00 .6. b•' DIA. DIP/PVC WM 100 LF 8.00 800.00 0 0.00 800.00 7. FIRE HYDRANT ASSEMBLY 47 EA 2,000.00 94,000.00 0 0.00 94,000.00 B. 16" DIA. BUTTERFLY VALVE 30 EA 1,350.00 40,500.00 0 0.00 40,500.00 9. 12" DIA. GATE VALVE 4 EA 800.00 3,200.00 0 0.00 3,200.00 10 8" DIA. GATE VALVE 9 EA 450.00 4,050.00 0 0.00 4,050.00 11. AIR RELEASE VLVE W/CONCR. BOX 5 EA 1,400.00 7,000.00 0 0.00 7,000.00 12. 10"X10" US TAP W/TAP VALVE 1 EA 2,000.00 2,000.00 0 0.00 2,000.00 13. 8" X 8" WET TAP W/TAP VALVE 1 EA 1,500.00 1,500.00 0 0.00 1,500.00 14. 8" X 6" WET TAP W/TAP VALVE 1 EA 1,200.00 1,200.00 0 0.00 1,200.00 15. 6" X 6" WET TAP W/TAP VALVE 2 EA 1,200.00 2,400.00 0 0.00 2,400.00 16. FITTINGS 30 TON 2,750.00 82,500.00 0 0.00 82,500.00 17. 16" DIA. AERIAL CROSSING 5 EA 5,100.00 25,500.00 0 0.00 25,500.00 18. JACK 8 BORE CR 0510 1 LS 13,000.00 13,000.00 0 0.00,' 13,000.00 19. JACK E BORE FEC 1 LS 28,000.00 28,000.00 0 0.00 28,000.00 20. JACK BORE U.S. HWY 01 1 LS 21,000.00 21,000.00 0 0.00 21,000.00 21. JACK 8 BORE US HWY 01 SOUTHERN 1 LS 14,000.00 14,000.00 0 0.00 14,000.00 END WHISPERING PALMS MHP 22. JACK & BORE US HWY 01 NORTHERN 1 LS 14,000.00 14,000.00 0 0.00 14,000.00 END WHISPERING PALMS MHP 23. SIDEWALK RESTORATION 2,250 LF 7.00 15,750.00 0 0.00 15,750.00 24. CURB RESTORATION 100.00 LF 12.00 1,200.00 0 0.00 1,200.00 25. PVD ROAD RESTORATION 1,900 LF 20.00 38,000.00 0 0.00 38,000.00 26. NON -PVD ROAD RESTORATION 210 LF 4.00 840.00 0 0.00 840.00 27. PVD DRIVE RESTORATION 2,000 LF 15.00 30,000.00 0 0.00 30,000.00 28. NOR -PVD DRIVE RESTORATION 1,540 LF 2.00 3,080.00 0 0.00 3,080.00 29. SOD 15,320 LF 1.80 27,576.00 0 0.00 27,576.00 30. SEED 8 MULCH 5,150 LF 0.30 1,545.00 0 0.00 1,545.00 31. POLYETHYLENE WRAP 12,000 LF 1.00 12,000.00 0 0.00 12,000.00 32. 2" DIA. LONG SERVICE W/ 2 EA 1,000.00 2,000.00 0 0.00 2,000.00 METER BOX 33. 2" DIA. SHORT SERVICE W/ 2 EA 400.00 800.00 0 0.00 800.00 METER BOX 34. 1" DIA. LONG SERVICE W/ 2 EA 500.00 1,000.00 0 0.00 i,00D.0D METER BOX 35. 1" DIA. SHORT SERVICE W/ 2 EA 400.00 800.00 0 0.00 800.00 METER BOX 36. 16" DIA. DIP WH 270475 LF 23.95 658,026.25 0 0.00 658,026.25 37. JACK 8 BORE (CR *SID) i LS 16,550.00 16,550.00 0 0.00 16,550.00 W/16" WM 38. ADD'L SURVEY,STAKEOUT,ASBUILTS 1 LS 3,187.80 3+187.80 0 0.00 3,187.80 39. BOND/INSURANCE 1 LS 1,998.38 1,998.38 0 0.00 1,998.38 ♦fk##V�t#1+InrNt�rwtMtftwRRltt#►w#X#R1# k wt+k#r� i i tRtt##+RIr#ttrtA# 40. SEBASTIAN RIVERFRONT AREA CHANGE ORDER #3 (SEE ATTACHED PAGE 3 OF 3 FOR QUANTITIES) 577,120.00 1OTAL S1,232,932.43 51,810,052.43 1.9.3. Chancre order ( Cont' d). _ Page 2 of 3 CONTRACT CHANGE ORDER CHANGE ORDER NO. 3 ORIGINAL CONTRACT PRICE: $1.232,932.43 DATE: REVISED CONTRACT PRICE: $198109052.43 JOB NAME: INDIAN RIVER COUNTY PROJECT OUW-9 3 =3 0 -DS , COUNTY ROUTE 510/ U.S. HIGHWAY Ol WATER TRANSMISSION PROJECT OWNER: INDIAN RIVER COUNTY • The amount of the Contract will be t aoaz�cAta) (INCREASED) (X AX0S0) by the sum of: Five Hundred Seventy-seven Thousand one Hundred Twenty and (written amount) 00/100 Dollars (S 577.120.00 1 . The Contract total including this Change Order will be: One Million Eight Hundred Ten Thousand Fifty-two Dollars and 43/100 (written amount) Dollars (alp n%7.41 l . The Contract Time provided for Project Completion will be * (8i5=) ( INCREASED) (1RkXt=R) : No 1311ndred Ter Days. ( ?in 1. This document will become a supplement to the Contract. and all provisions will apply hereto. CONTRACTOR: DATE: 2/6/95 Bryq&�.AaxweII SpeeRle Construction, Inc.. . ENGINEER: DATE: 2 Masteller & Moler. Inc. •• OWNER: DATE: Indian River Countv Commission, Kenneth R. Macht, Chairman •- (9459#3a.ws) 1.9.3. CHANGE ORDER Page 3 of 3 - CONTRACT CHANGE ORDER CHANGE ORDER NO. 3 CONTRACT AMOUNT ADDITION $577,120.00 DATE 02/06/95 JOB NAME INDIAN RIVER COUNTY PROJECT #UW-93-30-DS/SEBASTIAN RIVERFRONT AREA OWNER INDIAN RIVER COUNTY ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE 1. MOBILIZATION 2. 12" DIA. DIP/PVC WM 3. 6" DIA. DIP/PVC WM 4. 4" DIA. DIP/PVC WATER MAIN 5. 12" DIA. GATE VALVE 6. 6" DIA. GATE VALVE 7. 4" DIA.. GATE VALVE S. FIRE HYDRANT ASSEMBLY 9. FITTINGS 10. 12" DIA. AERIAL CROSSING 11. SIDEWALK RESTORATION 12. PVD ROAD RESTORATION 13. PVD DRIVE RESTORATION 14. -NON -PVD DRIVE RESTORATION 15. SOD 16. 2" DIA. LONG SERVICE W/ METER BOX 17. 2" DIA. SHORT SERVICE W/ METER BOX 18. 1" DIA. LONG SERVICE W/ METER BOX 19. 1" DIA. SHORT SERVICE W/ METER BOX 20. SURVEY,STAKEOUT,ASBUILTS 21. BOND/INSURANCE 22. JACK & BORE US #1 23. 2" BLOWOFF 24. JUMPER ASSEMBLY 1 LS 30,000.00 30,000.00 10,720 LF 22.00 235,840.00 41760 LF 8.60 40, 936.00 11200 LF 6.50 71800.00 22 EA 1,200.00 26,400.00 17 EA 400.00 61800.00 6 EA 350.00 21100.00 26 EA 21000.00 52,000.00 3.5 TON 5,000.-00 17,500.00 1 LS 51100.00 51100.00 20 LF 7.00 140.00 400 LF 20.00 81000.00 11935 LF 15.00 29,025.00 1,660 LF 2.00 31320.00 12,665 LF 1.80 22,797.00 2 EA 11000.00 21000.00 3 EA 400.00 11200.00 46 EA 500.00 23,000.00 41 EA 400.00 16,400.00. 1 LS 10,362.00 10,362.00 1 LS 51500.00 51500.00 1 EA 20,500.00 20,500.00 16 EA 350.00 51600.00 1 LS 41800.00 41800.00 TOTAL $577,120.00