HomeMy WebLinkAbout1995 - Change Order 3 Speegle Construction1.9.3. Chancre Order (Cont Id)
CHANGE ORDER NO. 3
DATE:
CONTRACT CHANGE ORDER
ORIGINAL CONTRACT PRICE:
REVISED CONTRACT PRICE:
Page 2 of 3
$1,232,932.43
$1,8109052.43
JOB NAME: INDIAN RIVER COUNTY PROJECT #UW -93 -30 -DS, COUNTY ROUTE 510/
U.S. HIGHWAY #1 WATER TRANSMISSION PROJECT
OWNER: INDIAN RIVER COUNTY
The amount of the Contract will be (EA11M) ( INCREASED) (MUMARM) by
the sum of: Five Hundred Seventy-seven Thousand One Hundred Twenty and
(written amount)
00/100 Dollars ($ 577,120-00 }
The Contract total including this Change Order will be:
One Million Eight Hundred Ten Thousand Fifty-two Dollars and 43/100
(written amount)
Dollars ($ 1 , 1 n. 097.43 } .
The Contract Time provided for Project Completion will b_ e ' EV)
(INCREASED) (T. ffMR) : Two Hundred Te Days.
{ ?in ) .
This document will become a supplement to the Contract and all
provisions will apply hereto.
CONTRACTOR: DATE: 2/6/95
BryPIKaXwe 11
Speegle Construction, Inc..
ENGINEER: DATE: 1cir
Ma - II-er & Mgller. Inc.
OWNER: DATE:
Indian River County Commission, Kenneth R. Macht_, Chairman
co9341#3.ws
1.9.3. CHANGE ORDER Page 1 of 3
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 3
ORIGINAL CONTRACT PRICE
$1,232,932.43
DATE 01/06/95
REVISED CONTRACT PRICE
$1,810,052.43
JOB NAME INDIAN RIVER COUNTY
PROJECT #UW -93 -30 -DS
OWNER INDIAN RIVER COUNTY
UNIT
PRICE
REV. TOTAL
ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
CHANGE
CHANGE
PRICE
* *
-l-A*****lfr"*
***f.- -- Jr*
1.
MOBILIZATION
1
LS
59,749.00
59,749.00
0
0.00
59,749.00
2.
1611 DIA. DIP WN
0
LF
25.00
0.00
0
0.00
0.00
3.
1211 DIA. DIP/PVC WN
140
LF
17.00
2,380.00
0
0.00
2,380.00
4.
1011 DIA. DIP/PVC WMAIN
25
LF
12.00
300.00
0
0.00
300.00
5.
811 DIA. DIP/PVC WM,
150
LF
10.00
1,500.00
0
0.00
1,500.00
6.
611 DIA. DIP/PVC WN
100
LF
8.00
800.00
0
0.00
800.00
7.
FIRE HYDRANT ASSEMBLY
47
EA
2,000.00
94,000.00
0
0.00
94,000.00
8.
1611 DIA. BUTTERFLY VALVE
30
EA
1,350.00
40,500.00
0
0.00
40,500.00
9.
1211 DIA. GATE VALVE
4
EA
800.00
3,200.00
0
0.00
3,200.00
10
811 DIA. GATE VALVE
9
EA
450.00
4,050.00
0
0.00
4,050.00
11.
AIR RELEASE VLVE W/CONCR. BOX
5
EA
1,400.00
7,000.00
0
0.00
7,000.00
12.
10"XIO" WET TAP WTAP VALVE
1
EA
2,000.00
2,000.00
0
0.00
2,000.00
13.
811 X 811 WET TAP W/tAP VALVE
1
EA
1,500.00
1,500.00
0
0.00
1,500.00
14.
811 X 611 WET TAP W/TAP VALVE
1
EA
1,200.00
1,200.00
0
0.00
1,200.00
15.
611 X 611 WET TAP WTAP VALVE
2
EA
1,200.00
2,400.00
0
0.00
2,400.00
16.
FITTINGS
30
TON
2,750.00
82,500.00
0
0.00
82,500.00
17.
1611 DIA. AERIAL CROSSING
5
EA
5,100.00
25,500.00
0
0.00
25,500.00
18.
JACK & BORE CR #510
1
LS
13,000.00
13,000.00
0
0.00
13,000.00
19.
JACK & BORE FEC
1
LS
28,000.00
28,000.00
0
0.00*
28,000.00
20.
JACK & BORE U.S. HWY #1
1
LS
21,000.00
21,000.00
0
0.00
21,000.00
21.
JACK & BORE US HWY #1 SOUTHERN
I
LS
14,000.00
14,000.00
0
0.00
14,000.00
END WHISPERING PALMS NHP
22.
JACK & BORE US HWY #1 NORTHERN
I
LS
14,000.00
14,000.00
0
0.00
14,000.00
END WHISPERING PALMS MHP
23.
SIDEWALK RESTORATION
2,250
LF
7.00
15,750.00
0
0.00
15,750.00
24.
CURB RESTORATION
100.00
LF
12.00
1,200.00
0
0.00
1,200.00
25.
PVD ROAD RESTORATION
1,900
LF
20.00
38,000.00
0
0.00
38,000.00
26.
NON -PVD ROAD RESTORATION
210
LF
4.00
840.00
0
0.00
840.00
27.
PVD DRIVE RESTORATION
2,000
LF
15.00
30,000.00
0
0.00
30,000.00
28.
NON -PVD DRIVE RESTORATION
1,540
LF
2.00
3,080.00
0
0.00
3,080.00
29.
SOD
15,320
LF
1.80
27,576.00
0
0.00
27,576.00
30.
SEED & MULCH
5,150
LF
0.30
1,545.00
0
0.00
1,545.00
31.
POLYETHYLENE WRAP
12,000
LF
1.00
12,000.00
0
0.00
12,000.00
32.
211 DIA. LONG SERVICE W
2
EA
1,000.00
2,000.00
0
0.00
2,000.00
METER BOX
33.
211 DIA..SHORT SERVICE W
2
EA
400.00
800.00
0
0.00
800.00
METER BOX
34.
111 DIA. LONG SERVICE W/
2
EA
500.00
1,000.00
0
0.00
1,000.00
METER BOX
35.
111 DIA. SHORT SERVICE W/
2
EA
400.00
800.00
0
0.00
800.00
METER BOX
36.
1611 DIA. DIP WM
27,475
LF
23.95
658,026.25
0
0.00
658,026.25
37.
JACK & BORE (CR #510)
1
LS
16,550.00
16,550.00
0
0.00
16,550.00
W/1611 WM
38.
ADDIL SURVEY,STAKEOUT,ASBUILTS
I
LS
3,187.80
3,187.80
0
0.00
3,187.80
39.
BOND/INSURANCE
1
LS
1,998.38
1,998.38
0
0.00
1,998.38
40.
SEBASTIAN RIVERFRONT AREA CHANGE ORDER #3
(SEE ATTACHED PAGE 3 OF 3 FOR QUANTITIES)
577,120.00
TOTAL
51,232,932-43
$1,810,052.43
i
1 9 3 CHANGE ORDER
CHANGE ORDER NO. 3
(9459#3a.ws)
Page 3 of 3
CONTRACT CHANGE ORDER
CONTRACT AMOUNT ADDITION $577,120.00
DATE 02/06/95
JOB NAME INDIAN RIVER COUNTY PROJECT #UW-93-30-DS/SEBASTIAN RIVERFRONT AREA
OWNER INDIAN RIVER COUNTY
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
1.
MOBILIZATION
1
LS
30,000.00
30,000.00
2.
12" DIA. DIP/PVC WM
10,720
LF
22.00
235,840.00
3.
6" DIA. DIP/PVC WM
4,760
LF
8.60
40,936.00
4.
4" DIA. DIP/PVC WATER MAIN
11200
LF
6.50
71800.00
5.
12" DIA. GATE VALVE
22
EA
11200.00
26,400.00
6.
6" DIA. GATE VALVE
17
EA
400.00
61800.00
7.
4" DIA. GATE VALVE
6
EA
350.00
21100.00
8.
FIRE HYDRANT ASSEMBLY
26
EA
2,000.00
52,000.00
9.
FITTINGS
3.5
TON
5,000._00
17,500.00
10.
12" DIA. AERIAL CROSSING
1
LS
51100.00
51100.00
11.
SIDEWALK RESTORATION
20
LF
7.00
140.00
12.
PVD ROAD RESTORATION
400
LF
20.00
81000.00
13.
PVD DRIVE RESTORATION
11935
LF
15.00
29,025.00
14.
NON -PVD DRIVE RESTORATION
1,660
LF
2.00
31320.00
15.
SOD
12,665
LF
1.80
22,797.00
16.
2" DIA. LONG SERVICE W/
2
EA
11000.00
21000.00
METER BOX
17.
2" DIA. SHORT SERVICE W/
3
EA
400.00
11200.00
METER BOX
18.
1" DIA. LONG SERVICE W/
46
EA
500.00
23,000.00
METER BOX
19.
1" DIA. SHORT SERVICE W/
41
EA
400.00
16,400.00
METER BOX
20.
SURVEY,STAKEOUT,ASBUILTS
1
LS
10,362.00
10,362.00
21.
BOND/INSURANCE
1
LS
51500.00
51500.00
22.
JACK & BORE US #1
1
EA
20,500.00
20,500.00
23.
2" BLOWOFF
16
EA
350.00
51600.00
24.
JUMPER ASSEMBLY
1
LS
41800.00
41800.00
TOTAL $577,120.00
D
INDIAN RIVER COUNTY
UTILITIES DEPARTMENT
1840 25TH STREET
VERO BEACH FL, 32960
TO—JOEL KOFORD
SEBASTIAN CITY HALL
P.O. BOX 780127
_SEBASTIAN, FL 32978
WE ARE SENDING YOU
UTIL (CITY.AA)
LETTER OF TRANSMITTAL
DATE: FEBRUARY 15, 1995
JOB NUMBER:
ATTENTION: JOEL KOFORD. CITY MANAGER
RE: SEBASTIAN RIVERFRONT PROJECT
_X Attached _ Under separate cover via the following items: _ Shop drawings _ Prints
_ Plans _ Samples _ Specifications _ Copy of letter _ Change order
COPIES
1
THESE ARE TRANSMITTED AS CHECKED BELOW:
For approval
X For your use
As requested
For review and comment
FOR BIDS DUE
DESCRIPTION
EXECUTED CHANGE ORDER FOR SEBASTIAN
RIVERFRONT PROJECT
Approved
as submitted _
Resubmit
_copies for approval
Approved
as noted _
Submit
_copies for distribution
_ Returned
for corrections _
Return
_corrected prints
19<
< PRINTS
RETURNED
AFTER LOAN TO US
COPY TO:
IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE
FES 1ss5
Reye -
city y ' ed
Office
SIGNED:
ANA ANDERSON
FRANCHISE COORDINATOR
DEPARTMENT OF UTILITY SERVICES
City of Sebastian
1225 MAIN STREET c SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 13 FAX (407) 589-5570
February 14, 1995
Mr. Harry Asher
Assistant Director
Utilities Department
Indian River County
1840 25th Street
Vero Beach, FL 32960
RE: Change Order No. 3 - Indian River County/Speegle
Construction Contract
Dear Mr. Asher:
Mr. Earl Masteller of Masteller, Moler, Inc. has requested that I
revise the letter I sent to you dated February 9, 1995 regarding
change order no. 3 for the contract between Indian River County
and Speegle Construction.
Please be advised that the City Council, at its February 8, 1995
Special Meeting, approved change order no. 3 for the contract
between Indian River County and Speegle Construction.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Kathryn✓ M. O'Halloran, CMC/AAE
City Clerk
KOH/sam
cc: Joel L. Koford, City Manager
Earl Mastller, Masteller & Moler, Inc.
�w hi � �CQ P�.� ^� n� M �,
-�e.a /mss-��-t� �a-�- `�
�.- �c-t,��v
�,
t
City of Sebastian
1225 MAIN STREET o SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 o FAX (407) 589-5570
February 9, 1995
Mr. Harry Asher
Assistant Director
Utilities Department
Indian River County
1840 25th Street
Vero Beach, FL 32960
RE: Change Order No. 3 - Indian River County/speegle
Construction Contract
Dear Mr. Asher:
The City Council, at its February 8, 1995 Special Meeting,
approved change order no. 3 for the contract between Indian River
County and Speegle Construction, reflecting a decrease of
$7,612.50 for the Sebastian Riverfront Water Project.
I£ you have any questions, please contact City Manager, Joel
Koford.
Sincerely,
E A/
Kathryn M. O'Halloran, CMC/AAE
City Clerk
KOH/sam
cc: Joel L. Koford, City Manager
Michael Delaney, Masteller & Moler, Inc.
City of Sebastian
1225 MAIN STREET o SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 0 FAX (407) 589-5570
AGENDA TRANSMITTAL
SUBJECT: City of Sebastian
Water Main Change Order #3
Approval For Submittal By:
City Manager 9"1(—
EXPENDITURE
REQUIRED: N/A
AGENDA
NO. �54'()11
Dept. Origin: City Manager
Date Submitted: 02/07/95
For Agenda Of: 02/08/95
Exhibits:
02/06/95 Letter from Michael Delaney
Project Manager To Joel L. Koford
With Change Order #3
AMOUNT
BUDGETED: NIA
SUMMARY
APPROPRIATION
REQUIRED: N/A
The attached change order #3 for the contract between Indian River County Utilities and the
general contractor (Speegle Construction) reflects a decrease of $7612.50 for the Sebastian
Riverfront area project. The original construction estimate was $584,732.50 and the change
order reduced the amount to $577,120, or a savings of 7612.50. Under the terms of our
agreement with Indian River County, we must approve each change order.
RECOMMENDATION
Recommend approval.
City of Sebastian
1225 MAIN STREET o SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 o FAX (407) 589-5570
FAX TRANSMIIIAL SHEET
DELIVER TO:
J
FROM:
DATE: C>'7/%/%S TIME SENT: /'Jd
t /
TOTAL NUMBER OF PAGES (INCLUDING COVER SHEET) 2,
6L'tre_
IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CALL (407) 589-5330
HMil� MASTELLER & MOLER, INC.
-- CONSULTING ENGINEERS -
February 6, 1995
Mr. Joel Koford
City of Sebastian
P.O. Box 127
Sebastian, FL 32958
RE: City of Sebastian Water Main
Sebastian Riverfront Area, Change Order #3
Dear Mr. Kof ord :
Please find enclosed four (4) copies of Change Order #3
for the referenced project to serve the City of Sebastian
Riverfront area. There is an additional 210 calendar days
added to Speegle Construction, Inc.'s contract. Therefore,
should you find the Change Order to be in order, please submit
all four (4) copies to the Indian River County' Utilities
Department to the attention of Terrance G. Pinto for their
approval.
Should you have any questions regarding the Change Order,
please do not hesitate to contact our office.
Respectfully,
MASTELLER 4 M LE , INC.
Michael De aney
Project Manager
MD/vk
Enclosures
cc: Mayor ,'Arthur— F irtion,<,.w/ enclosure -i
Earl Masteller,
File 19459LA
(jk02O695)
1623 N. U.S. Highway 1, Suite 132 O 7380 Murrell Road, Suite 106
Sebastian, FL 32958 Melbourne, Florida 32940
(407) 589-4800 (407) 255-1175
(407) 589-2742 Fax (407) 253-4439 Fax
C09341#3.ws
1.9.3. CHANGE ORDER Page 1 of 3
CONTRACT CHANGE ORDER
•.rrr#wrrrt#rwt##wrw#r*wtr*#rr*rrr**rt*wr#rrwwrr**#+rrwwwrr#rrtirrwsrwrwr**rrrr*t+►r*wtrrrwrrrrrwwrrrrwrrrrrrrrrrrrrrrw
CHANGE ORDER N0. 3
ORIGINAL CONTRACT PRICE
$1,232,932.43
DATE
01/06/95
REVISED CONTRACT PRICE
S10810,052.43
JOB
NAME INDIAN RIVER COUNTY
PROJECT OW -93 -30 -DS
OWNER INDIAN RIVER COUNTY
UNIT
PRICE
REV. TOTAL
17EM
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
CHANGE
CHANGE
PRICE
wvr�rrr*rrrr#r*t###r*rt##4rr**a►*rr*#***rrllrr#*wrr**rr*r*t*#r#*#t*r**#*##******"*r
t**#7tr******r*#+t*#
r***t***fir***
1.
MOBILIZATION
1
LS
59,749.00
59,749.00
0
0.00
59,749.00
2.
1611 DIA. DIP WH
0
LF
25.00
0.00
0
0.00
0.00
3.
1211 DIA. DIP/PVC WH
140
LF
17.00
2,380.00
0
0.00
2,380.00
4.
10" DIA. DIP/PVC WMAIN
25
LF
12.00
300.00
0
0.00
300.00
S.
811 DIA. DIP/PVC WM
150
LF
10.00
1,500.00
0
0.00
1,500.00
6.
611 DIA. DIP/PVC WH
100
LF
8.00
800.00
0
0.00
800.00
7.
FIRE HYDRANT ASSEMBLY
47
EA
2,000.00
94,000.00
0
0.00
94,000.00
8.
16t1 DIA. BUTTERFLY VALVE
30
EA
1,350.00
40,500.00
0
0.00
40,500.00
9.
12" DIA. GATE VALVE
4
EA
800.00
3,200.00
0
0.00
3,200.00
10
8" DIA. GATE VALVE
9
EA
450.00
4,050.00
0
0.00
41050.00
11.
AIR RELEASE VLVE W/CONCR. BOX
5
EA
1,400.00
7,000.00
0
0.00
7,000.00
12.
10"X1011 WET TAP W/TAP VALVE
1
EA
2,000.00
2,000.00
0
0.00
2,000.00
13.
811 X 811 WET TAP W/TAP VALVE
1
EA
1,500.00
1,500.00
0
0.00
1,500.00
14.
8t1 X 611 WET TAP W/TAP VALVE
i
EA
1,200.00
1,200.00
0
0.00
1,200.00
15.
6t1 X 611 WET TAP W/TAP VALVE
2
EA
1,200.00
2,400.00
0
0.00
2,400.00
16.
FITTINGS
30
TON
2,750.00
82,500.00
0
0.00
82,500.00
17.
16" DIA. AERIAL CROSSING
5
EA
5,100.00
25,500.00
0
0.00
25,500.00
18.
JACK & BORE CR #510
1
LS
13,000.00
13,000.00
0
0.00_'
13,000.00
19.
JACK & BORE FEC
1
LS
28,000.00
28,000.00
0
0.00
28,000.00
20.
JACK 8 BORE U.S. HWY #1
1
LS
21,000.00
21,000.00
0
0.00
21,000.00
21.
JACK & BORE US HWY #1 SOUTHERN
1
LS
14,000.00
14,000.00
0
0.00
14,000.00
END WHISPERING PALMS MHP
22.
JACK & BORE US HWY 01 NORTHERN
1
LS
14,000.00
14,000.00
0
0.00
14,000.00
END WHISPERING PALMS NHP
23.
SIDEWALK RESTORATION
2,250
LF
7.00
15,750.00
0
0.00
15,750.00
24.
CURB RESTORATION
100.00
LF
12.00
1,200.00
0
0.00
1,200.00
25.
PVD ROAD RESTORATION
1,900
LF
20.00
38,000.00
0
0.00
38,000.00
26.
NON -PVD ROAD RESTORATION
210
LF
4.00
840.00
0
0.00
840.00
27.
PVD DRIVE RESTORATION
2,000
LF
15.00
30,000.00
0
0.00
30,000.00
28.
NON -PVD DRIVE RESTORATION
1,540
LF
2.00
3,080.00
0
0.00
3,080.00
29.
SOD
15,320
LF
1.80
27,576.00
0
0.00
27,576.00
30.
SEED & MULCH
5,150
LF
0.30-
1,545.00
0
0.00
1,545.00
31.
POLYETHYLENE WRAP
12,000
LF
1.00
12,000.00
0
0.00
12,000.00
32.
2/1 DIA. LONG SERVICE W/
2
EA
18000.00
2,000.00
0
0.00
2,000.00
METER BOX
33.
2" DIA. SHORT SERVICE W/
2
EA
400.00
800.00
0
0.00
800.00
METER BOX
34.
1" DIA. LONG SERVICE W/
2
EA
500.00
1,000.00
0
0.00
11000.00
METER BOX
35.
1" DIA. SHORT SERVICE W/
2
EA
400.00
800.00
0
0.00
800.00
METER BOX
36.
1611 DIA: DIP WM
27,475
LF
23.95
658,026.25
0
0.00
658,026.25
37.
JACK & BORE (CR #510)
1
LS
16,550.00
16,550.00
0
0.00
16,550.00
W/1611 WM
38.
ADD1L SURVEY,STAKEOUT,ASBUILTS
i
LS
3,187.80
3,187.80
0
0.00
3,187.80
39.
BOND/INSURANCE
1
LS
1,998.38
1,998.38
0
0.00
1,998.38
rrr**,►,r#*:*#**r**r*rrrrrrr*,►rr**,�w*#,Tara
r*#rr**rr*,err******• wr,►r**rrtrr*ww*,►r*rr*#*****r.**r***,tw*wr
40.
SEBASTIAN RIVERFRONT AREA CHANGE ORDER #3
(SEE ATTACHED PAGE 3 OF 3 FOR QUANTITIES)
577,120.00
TOTAL
S1,232,932.43
S1,810,052.43
1.9.3. Chanae Order f Cont' dl, _ Page 2 of 3
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 3 ORIGINAL; CONTRACT PRICE: $1,232,932.43
DATE: REVISED CONTRACT PRICE: $19810,052.43
JOB NAME: INDIAN RIVER COUNTY PROJECT #UW -9330 --DS, COUNTY ROUTE 510/
U.S. HIGHWAY 01 WATER TRANSMISSION PROJECT
OWNER: INDIAN RIVER COUNTY
The amount of the Contract will be ( ) (INCREASED) (MIRAIRM) by
the sum of: Five Hundred Seventy-seven Thousand One Hundred Twenty and
(written amount)
00/100 Dollars (S 577,120-00 1 .
The Contract total including this Change Order will be:
One Million Eight Hundred Ten Thousand Fifty-two Dollars and 43/100
(written amount)
Dollars (S 1 . Al nS? . 41 ) .
The Contract Time provided for Project Completion will be
( INCREASED) (ERk2Xt=R) : Tae Hnndred To Days.
( ?in ) -
This document will become a supplement to the Contract- and all
provisions will apply hereto.
CONTRACTOR: DATE: 2/6195
Bry�r�axwe l l
Speegle Construction, Inc.. -
ENGINEER: _ A w P. DATE: 2
Masteller & Moler, Inc.
OWNER: DATE:
Indian River Countv Commission. Kenneth R. Macht, Chairman
(9459#3a.ws)
1.9.3. CHANGE ORDER Page 3 of 3
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 3 CONTRACT AMOUNT ADDITION $577,120.00
DATE 02/06/95
JOB NAME INDIAN RIVER COUNTY PROJECT #UW-93-30-DS/SEBASTIAN RIVERFRONT AREA
OWNER INDIAN RIVER COUNTY
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
1. MOBILIZATION
2. 12" DIA. DIP/PVC WM
3. 6" DIA. DIP/PVC WM
4. 4" DIA. DIP/PVC WATER MAIN
5. 12" DIA. GATE VALVE
6. 6" DIA. GATE VALVE
7. 4" DIA. GATE VALVE
8. FIRE HYDRANT ASSEMBLY
9. FITTINGS
10. 12" DIA. AERIAL CROSSING
11. SIDEWALK RESTORATION
12. PVD ROAD RESTORATION
13. PVD DRIVE RESTORATION
14. NON -PVD DRIVE RESTORATION
15. SOD
16. 2" DIA. LONG SERVICE W/
METER BOX
17. 2" DIA. SHORT SERVICE W/
METER BOX
18. 1" DIA. LONG SERVICE W/
METER BOX
19. 1" DIA. SHORT SERVICE W/
METER BOX
20. SURVEY,STAKEOUT,ASBUILTS
21. BOND/INSUR.ANCE
22. JACK & BORE US #1
23. 2 " BLOWOFF
24. JUMPER ASSEMBLY
1
LS
30,000.00
30,000.00
10,720
LF
22.00
235,840.00
41760
LF
8.60
40,936.00
11200
LF
6.50
71800.00
22
EA
11200.00
26,400.00
17
EA
400.00
61800.00
6
EA
350.00
21100.00
26
EA
21000.00
52,000.00
3.5
TON
5,000..00
17,500.00
1
LS
51100.00
51100.00
20
LF
7.00
140.00
400
LF
20.00
81000.00
11935
LF
15.00
29,025.00
1,660
LF
2.00
31320.00
12,665
LF
1.80
22,797.00
2
EA
11000.00
2,000.00
3
EA
400.00
1,200.00
46
EA
500.00
23,000.00
41
EA
400.00
16,400.00
1
LS
10,362.00
10,362.00
1
LS
51500.00
51500.00
1
EA
20,500.00
20,500.00 '
16
EA
350.00
51600.00
1
LS
41800.00
41800.00
TOTAL $577,120.00