HomeMy WebLinkAboutWork Ordermu
SEBA_STKN
HOME Or PEI tSt D
CERTIFICATE OF PROJECT COMPLETION
Date Accepted:
07/05/18
Project Name & #:
Working Waterfront Phase 2A (Restrooms) # A1621
Total Project Expenditures:
$ 326,546.88
Project Location:
Working Waterfront
Contractor(s):
L.H. Tanner / Hoyle Tanner / CWT Engineering / Misc
Contract Amount(s):
$ 270,071.07 / $ 32,950.00 / $ 17,199.00 / $ 6,326.81
Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify
that this project is complete.
Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract
as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All
contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the
contractually stipulated period of time. In no way does the issuing of this certificate release the Contractor from
all legal obligations as stipulated in Chapter 713 of the Florida Statutes.
Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the
segment as being complete.
-n `L, $lze/zot
Project Manager Date
Building icia (if app icab e D e
Ciry� GI YL[e GCina 8 ��
Qerk= .��_ =_ Date
PROJECT ID A1621 Working Waterfront Park Phase 2A
amrzare
FY 16 FY 17
FY 18
DATE
CHECK#
PO#
DESCRIPTION
VENDOR
AMOUNT AMOUNT
AMOUNT
TOTALS
09/22115
90897
Permit Modification EL 31-024699.002
Florida Dept of Environmental Protection
250.00
250.00
10/14115
91044
Permit Modification EL 31-024699-002
Florida Dept of Environmental Protection
170.00
170.00
02/03116
91967
(7) Renderings of Working Waterfront Scheme
Patrick Ness
700.00
700.00
06/03116
92048
Design Survey (6101116-5128116)
Hayle, Tanner, & Assoc
6.850.00
6,850.00
06/30/16
92791
Design Survey (5/29116-6126116)
Hoyle, Tanner, & Assoc
11,078.00
11,078.00
08105116
92954
Design Survey (62916-713D116)
Hoyle, Tanner, & Assoc
2,450.00
2,450.00
08110116
93050
Design Survey (7M1/168H0/16)
Hoyle, Tanner, & Assoc
9.250.00
9,250.00
08110116
93050
Overpayment
Hoyle, Tanner, &Assoc
2,450.00
2,450.00
09/12116
72228
Refund of overpayment
Hoyle, Tanner, & Assoc
-2,450.00
-2,450.00
11/04116
93581
Design Survey(92916-1029/16)
Hayle, Tanner, & Assoc
460.00
460.00
02106117
94129
Design Survey(1/01/17-123/17)
Hayle, Tanner,& Assoc
1,862.00
1,862.00
03/21117
AmEx
Request for Bids
Treasure Coast Newspapers
181.50
181.50
0426117
94726
Design Survey (1129117.42V17)
Hoyle, Tanner,& Assoc
1,000.00
1,000.00
08107117
95218
8116
Engineering Services (711V17-8/04117)
CWT Engineering
2,400.00
2,400.00
08/18/17
95259
Restroom Permit Application
Florida Dept of Environmental Protection
250.00
250.00
09/04/17
95413
Lift station calculations for DEP Permit
CWT Engineering
749.00
749.00
09115417
95469
8085
Working Waterfront Restroom Construction
LH. Tanner
31,566.81
31,566.81
10/30/17
95741
8116
Engineering Services (8107/17-9/30/17)
CWT Engineering
700.00
700.00
09/30/17
RETAINAGE ($ 3507.42)
L.H. Tanner
0.00
0.00
1901/17
RETAINAGE( - S 3507.42)
L.H. Tanner
O00
0.00
10/30/17
95741
8116
Engineering Services (10401/17-1028117)
MIT Engineering
2,300.00
2.300.00
10131/17
95747
8085
Working Waterfront Restroom Construction (9/75117-10131/17)
L.H. Tanner
37,788.50
37,780.50
1127117
95905
8085
Working Waterfront Restroom Construction(11/(11/17-1127417)
L.H. Tanner
53,150.37
53,150.37
1128117
95950
8116
Engineering Services (1028/17- 1127/17)
CWT Engineering
2.200.00
2.200.00
1227117
Stuffs
8116
Engineering Services (I WW17.1227/17)
CWT Engineering
2,000.00
2,000.00
0141918
96206
8085
Working Waterfront Restroom Construction (11/28/17-01/15/18)
L.H. Tanner
42.624.70
42.624.70
01/18118
96203
Fire Prevention Site Plan Review Fees
Indian River County Fire Prevention
250.00
250.00
0128/78
96409
8116
Engineering Services (12/27/17-0128/18)
CWT Fngineenng
1,400.00
1.400.00
02/0918
96335
8085
Working Waterfront Restroom Construction (01/15418-02106/18)
L.H. Tanner
13,530.64
13,530.64
022918
96489
8116
Engineering Services (0128/18-0228/18)
CWT Fnipneenng
1,200.00
1,200.00
0902/13
98498
Water & Sewer Connection Fees
Indian River County Utilities
4,401.00
4,401.00
03/06/18
96549
8085
Working Waterfront Restroom Construction (02406118-03106/18)
L.H. Tanner
18.549.46
18,54946
03/20/18
W633
8005
Workkg Waterfront Restroom Construction(03/(I6/18-032918)
L.H. Tanner
26,537.61
26.537.61
032918
96757
8365
Professional Services (3113/18-328118) Conceptual Plan urCost Estimate
CWT Engineering
3,500.00
3,500.00
04403/18
W763
8085
Working Waterfront Restroom Construction(0320118-04103/18)
LH. Tanner
8,767.73
8,76T73
042918
96863
Solid Waste Fees
Indian River County Solid Waste
124.31
124.31
0901/18
96899
8085
Working Waterfront Resmoom Construction (04ro3118-042918)
LH. Tanner
10,548.14
10,548.14
04/1918
97034
8116
Professional Services (22941884/13118) Professional Personnel
CWT Engineering
200Af
200.00
05/21/18
97034
Professional Serviws(05ARVIB)
CWT Engineering
200.00
20DW
0904/18
97161
8085
Working Waterfront Restoom Construction (Retainage)
L.H. Tanner
27,007.11
27,00711
07/0918
97293
Quarterly Reports for FIND Grant
CWT Engineering
350.00
350.00
MIND
30,748.00 39,16931
256,629.57
326,546.88
CITY OF SEBASTIAN, FLORHIA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
Work Authorization No: #CSA -4
Project Identification: Construction Administration Working Waterfront Restrooms
IT IS AGREED to undertake the following work in accordance with the provisions of the CWT
Engineering, LLC. Master Agreement entitled Non -Exclusive Continuing Professional Services
Agreement for Engineering Dated July 12, 2017.
Description of Assignment:
CWT Engineering will be the Engineer of Record (EOR) for the Working Waterfront Restroom
Construction and assist in the coordination with the contractor. The work scope will include:
Description Est. hours
1. Be the Engineer of Record (EOR) and review shop drawings and materials 4
2. Review any design or utilities issues by the contractor 6
3. Provide routine site visits, take photos and prepare summary reports 72
4. Review and approve as EOR the utility connections for water and sewer 12
(Hydrostatic pressure test, installation per County spec, video test sanitary, etc.)
5. Be present at the installation/testing of lift station per IRC Utilities permit 4
6. Review and inspect all testing materials (concrete foundation and sidewalks) 4
7. Review contractor pay applications as EOR 6
8. Attend final walk through, summarize and review punch list for close-out 8
9. Review as -built plans for final Building Dept. approval 4
10. Close-out the DEP permit 4
Total 124 hours
Basis of Compensation/Period of Services:
The above hours are estimated for this Professional Engineering Services for CSA 4 to be performed for
a lump sum fee in the amount of $12,400. The fee includes direct expenses for the project such as in-
house duplicating, facsimile, printing, mileage, telephone, postage, in-house copies and administrative
services. Any additional services such as attending any public meetings will be billed on a time and
material basis in accordance with our hourly rate of $100.00 per hour.
AGREED:
ENGINEERING CON T:
Date: Z �c
CWT Engineering LLC.
Attest:
Jea(r6tte Williams, -MAIC, City Clerk
CITY OF EBA�:
Joe G I in
City Manager
Date:1 -may /7
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
P/� A ---p
Robert A. Ginsburg, City Attorney
CWT Engineering, LLC.
July 15, 2017
City of Sebastian Continuing Engineering Contract
General Rate Schedule for CWT Engineering staff for this contract:
Staff Position Hourlv Rate
• Principal
$100.00/Hr.
• Senior Engineer
$100.00/Hr.
• Project Manager
$100.00 Hr.
• Senior Inspector
$50.00/Hr.
• Technician
$30.00/Hr.
• CAD/GIS $30.00/Hr.
• Clerical $20.00/14r.
Any services which require the attendance of staff at workshops, public meetings and
Commission/Council meetings will be billed on a time and material basis in accordance with our
hourly rate of $100.00 per hour for senior staff which will include travel time.