HomeMy WebLinkAboutCSA-05 (Complete)CERTIFICATE OF PROJECT COMPLETION
Date Accepted: 06/21 /18
Project Name & #: Public Works Compound # A1833
Total Project Expenditures: $ 19,325.00
Project Location
Contractor(s):
Contract Amount(s):
City Hall
MBV Engineering
$ 19,325.00
Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify
that this project is complete.
Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract
as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All
contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the
contractually stipulated period of time. In no way does the issuing of this certificate release the Contractor from
all legal obligations as stipulated in Chapter 713 of the Florida Statutes.
Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the
segment as being complete.
Project Manager Date
WIC
Building Official (if applicable) Date
Ci Clerk Date
PROJECT ID A1833 Public Works Compound
Revenue $ 86,104.00 330010-381130 A1833 (Interfund Transfer from 130 DST)
Expenses $ 86,104.00 330151-533400 A1833 (Contractual Services)
1011512016
DATE
CHECK #
PO #
DESCRIPTION
11/13/17
95954
8196
Conceptual Design & Coordination - thru 10/27/17
12/18/17
96096
8196
Conceptual Design & Coordination - thru 12/01/17
12/18/17
96096
8196
Survey -thru 12/01/17
01/17/18
96251
8196
Conceptual Design & Coordination -thru 12/29/17
01/17/18
96251
8196
Survey -thru 12/29/17
02/14/18
96422
8196
Conceptual Design & Coordination - thru 01/26/18
03/22/18
96945
8196
Conceptual Design & Coordination - thru 02/23/18
05/14/18
97043
8196
Relocation -Final Design & Permitting
06/21/18
97437
8196
Relocation -Final Design & Permitting - thru 5/25/18
FY18
VENDOR
AMOUNT
TOTALS
MBV Engineering
750.00
750.00
MBV Engineering
750.00
750.00
MBV Engineering
7,500.00
7,500.00
MBV Engineering
1.125.00
1.125.00
MBV Engineering
3,750.00
3,750.00
MBV Engineering
1,125.00
1,125.00
MBV Engineering
3,750.00
3,750.00
MBV Engineering
325.00
325.00
MBV Engineering
250.00
250.00
0.00
0.00
19,325.00
19,325.00
Balance
66,779.00
t71'r l�
bEtIASYLAN
_ hJ
HOME OF PELICAN ISLAND
1225 MAIN STREET • SEBASTIAN. FLORIDA 32958
TELEPHONE: (772) 589-5330 • FAX (772) 680-5570
NOTICE TO PROCEED
DATE: October 3, 2017
TO: Mr. Aaron Bowles, P.E.
MBV Engineering, Inc.
1835 20'" Street
Vero Beach, FL 32960
You are hereby notified to commence work on 10/212017 in accordance with the
provisions of your non-exclusive Continuing Professional Services Agreement, dated July
12, 2017 and in accordance with Work Authorization No.CSA-5 for the Relocation of the
Public Works Building.
City Manager, Joseph Griffin, will be the project manager. All substantial
communication pertaining to this project should be directed to Mr. Griffin at
jgriffin@cityofsebastian.org or by telephone at 772-388-8200.
We look forward to working with you on this project
Date:yd
Joseph Griffin Aaron Bowles, P.E.
City Manager MBV Engineering, Inc.
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
MBV ENGINEERING, INC.
1835 2011 Street
Vero Beach, FL 32960
Work Authorization No: CSA-5
Project Identification: Public Works Building Relocation
IT IS AGREED to undertake the following work in accordance with the provisions of the MBV
Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement
for Engineering Dated July 12, 2017.
Description of Assignment:
It is understood the City of Sebastian is looking to relocate its Public Works facility currently located at
100 Veterans Memorial Way to a property on the Sebastian Airport, more specifically located at southwest
comer of Roseland Road and Corporate Park Drive. Proposed improvements will consist of new building
facilities, parking lots, storage yards, and other required miscellaneous site improvements. As such, please
find below our scope for conceptual layout and coordination between the City, Architect and Engineer
followed by final design and permitting services.
Work Scope:
Survey
- Establish a minimum of (2) horizontal and vertical control points at or near site.
- Depict right of way lines on survey.
- Locate pavement abutting site with elevations at both edges and center.
- Provide sufficient existing ground elevations to establish current drainage patterns.
- Locate all drainage structures and culverts with size, material and invert, lying within or serving
site.
- Locate all aboveground utilities within or serving site which may be an obstruction or cause a
conflict.
- Locate significant desirable trees within right of way limits and 10 feet beyond.
- Provide 6 certified copies of the topographic survey.
- Provide PDF file or CAD file if requested.
Phase I: Concentual Desien and Coordination
- Site meeting with City, Architect and MBV Engineering to evaluate existing uses and proposed
future uses and needs
- Proposed Building Needs Evaluation study and coordination by architect (scope and fees for this
task not included and are to be provided by others)
- Conceptual Site Layout
- Preliminary Cost Estimate
Phase II: Final Desiffi and Permittine
1. Project coordination with the following regulatory agencies:
a. City of Sebastian (COS)
b. Indian River County (IRC)
C. Sebastian River Improvement District (SRID)
d. St. John's River Water Management District (SJRWMD)
e. Florida Department of Environmental Protection (FDEP)
2. Project coordination and review of the required boundary, topographic and tree survey. The cost
of survey work has been included in this proposal.
3. Project coordination and evaluation of the required subsurface soils investigation. The cost of
geotech work has not been included in this proposal.
4. Finalization of the site plan layout.
5. Preliminary meeting with the City of Sebastian Planning Department.
6. Design of the paving and drainage systems.
7. Design of the on -site utilities. We assume that water and sewer service is available. No cost of off -
site utility improvements are included in this proposal.
8. Preparation of the site construction drawings.
9. Coordination with traffic consultant, if needed. No cost of traffic studies or off -site roadway
improvements are included in this proposal.
10. Preparation of a code compliant landscape plan. .
11. Coordination with environmental consultant, if necessary. No costs of mitigation design or
permitting are included in this proposal.
12. Preparation of the following permit applications:
a. City of Sebastian Major Site Plan
b. IRC Utilities
C. IRC Concurrency
d. IRC Fire Review
e. Sebastian River Improvement District (SRID)
f SJRWMD Environmental Resources Permit
g. FDEP Wastewater Collection
h. FDEP NPDES Notice of Intent
13. Attendance at Planning and Zoning Meeting.
14. Attendance at City Council Meeting.
Basis of Compensation/Period of Services:
The above referenced Professional Engineering Services for CSA #5 will be performed for a lump sum
fee, including direct costs but excluding permit fees, as described below:
Survey $ 15,000
Phase I: Conceptual Design and Coordination $ 7,500
Phase II: Final Design and Permitting $ 34,500
AGREED:
ENGINEERING CONSULTANT:
ate: 9-20-17
Aaron Bowles, P.E.
MBV Engineering, Inc.
Attest:
16'ette Williams, MMC, City Clerk
CITY OF SEBASTIAN:
Joe Griffin
City Manager
Date!' t171-
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
Cynthia V. Hall, Interim City Attorney
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
M 3V ENGINEERING, INC.
1835 20'e Street
Vero Beach, FL 32960
Work Authorization No: CSA-5
Project Identification: Public Works Building Relocation
IT IS AGREED to undertake the following work in accordance with the provisions of the MBV
Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement
for Engineering Dated July 12, 2017.
Description of Assignment:
It is understood the City of Sebastian is looking to relocate its Public Works facility currently located at
100 Veterans Memorial Way to a property on the Sebastian Airport, more specifically located at southwest
corner of Roseland Road and Corporate Park Drive. Proposed improvements will consist of new building
facilities, parking lots, storage yards, and other required miscellaneous site improvements. As such, please
find below our scope for conceptual layout and coordination between the City, Architect and Engineer
followed by final design and permitting services.
Work Scope:
Survev
- Establish a minimum of (2) horizontal and vertical control points at or near site.
- Depict right of way lines on survey.
- Locate pavement abutting site with elevations at both edges and center.
- Provide sufficient existing ground elevations to establish current drainage patterns.
- Locate all drainage structures and culverts with size, material and invert, lying within or serving
site.
- Locate all aboveground utilities within or serving site which may be an obstruction or cause a
conflict.
- Locate significant desirable trees within right of way limits and 10 feet beyond.
- Provide 6 certified copies of the topographic survey.
- Provide PDF file or CAD file if requested.
Phase I: Conceptual Desian and Coordination
- Site meeting with City, Architect and MBV Engineering to evaluate existing uses and proposed
future uses and needs
- Proposed Building Needs Evaluation study and coordination by architect (scope and fees for this
task not included and are to be provided by others)
- Conceptual Site Layout
- Preliminary Cost Estimate
Phase II: Final Design and Pemuttine
I. Project coordination with the following regulatory agencies:
a. City of Sebastian (COS)
b. Indian River County (IRC)
C. Sebastian River Improvement District (SAID)
d. St. John's River Water Management District (SJRWMD)
e. Florida Department of Environmental Protection (FDEP)
2. Project coordination and review of the required boundary, topographic and tree survey. The cost
of survey work has been included in this proposal.
3. Project coordination and evaluation of the required subsurface soils investigation. The cost of
geotech work has not been included in this proposal.
4. Finalization of the site plan layout.
5. Preliminary meeting with the City of Sebastian Planning Department.
6. Design of the paving and drainage systems.
7. Design of the on -site utilities. We assume that water and sewer service is available. No cost of off -
site utility improvements are included in this proposal.
8. Preparation of the site construction drawings.
9. Coordination with traffic consultant, if needed. No cost of traffic studies or off -site roadway
improvements are included in this proposal.
10. Preparation of a code compliant landscape plan.
11. Coordination with environmental consultant, if necessary. No costs of mitigation design or
permitting are included in this proposal.
12. Preparation of the following permit applications:
a. City of Sebastian Major Site Plan
b. IRC Utilities
C. IRC Concurrency
d. IRC Fire Review
e. Sebastian River Improvement District (SRID)
f. SJRWMD Environmental Resources Permit
g. FDEP Wastewater Collection
h. FDEP NPDES Notice of Intent
13. Attendance at Planning and Zoning Meeting.
14. Attendance at City Council Meeting.
Basis of Compensation/Period of Services:
The above referenced Professional Engineering Services for CSA #5 will be performed for a lump sum
fee, including direct costs but excluding permit fees, as described below:
Survey $ 15,000
Phase I: Conceptual Design and Coordination $ 7,500
Phase II: Final Design and Permitting $ 34,500
kFil:121:1�7a
ENGINEERING CONSULTANT:
Aaron Bowles, P.E.
MBV Engineering, Inc.
Attest: _
��.cUY►'I/J/
4Jette Irli?ams? MMC, City Clerk
CITY OF SEBASTIAN:
o ,nffxii
City Manager
Date: � 14", / ;'-2—
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
Robert A. Ginsburg, City Attorney
IIIII.•
��/ �������,
����,' �, „�,
�� ,,,
w
Iw""�,pRyJµp
I'Wwr�qWW0I'
nI
CIT/IIII 'WI &""J®I5Nx�,4�i 9G'WI�✓°I
"
,
�lmWqdl4TA
.W��
µ
0
o�I rwyIMMMlduIIeSR
"Wfl
C N04,
yN+ivM+p'','"yr"ypA�I Msp+.yn
,w,
�
I
uxWI v1 Wni
I
,1m
'
III
�
N
�,r ",wflll�fll^np
I
/
I � ',���„ �
i Address
„�,,,,,
II
FWV'
Ids''',11�,,�,Itl�Y"w".�`w"u'4MM'Eiw*'I��,'C'IC,""'kmm Cl,�"�'/w",�","„`"""�YY/w�'w�+"�%"Y,r�"rvf�k�i M"'RG#N"�TCd�"vwW�rc"�G"n✓+�Y"�17g7i 'Y��"7'"'��X""tl',VY`n'"'u�l�l'�C"»%ww"rtG%Ii'�z'm"✓�'%�%"rn �yF
Shl'TO
'WM iM'1 �I
yyryry��! Wp!±WIW ^rye'. '1�^'Iyy
�W /WIN' WI'dl WiMw���
�����
m
�Mw +W+Y N'YA'S'��Mf<" wn
/M wryN 'rye M "MyI"y,
lull
yµ � �,,,
�I �)
'��'y''yy WIrW�JI ywly�l +'�I µy",y1 i �1 �
I WP w4'W wM ��' 'IWN q� �'y�
I S�"
IIJ +
W�'NIrIiF' MIFF M""M M�
l
�N'�'�+ w'4�r �,
yy!..
MW 11�4 w"'PN�^'AImNn�A�'?yll�1y�ry'p�yp, BII,I XMM W.w�II�yyW�
+,�+Y�^ �IY�'Nq �p� W�` I��,� "� �,µ�nn ryµW�
ii
II
,IIIII��......
M "
ypM�
ryry�qqy��Wv
II IIIIIIII
Ale ,III
Ill [re,�mis
�,,I
I.I
rr0
I� ,�
I III
lI'�11
x,SM''II 'I,i
„�i
,.,A,.,i
"",��ii,
��, �,�,i� ��,�, i�oi� ���n�,�, o �,n, �i....................11
/ 11�/
�
II AI w,,
!
/I 1 INI W�+ ��y 'y" �,'�i,
I,y �
''ypp"''
�,Il�, lilt,i�
I� 9
'WuJ71 q1 'Ym M l4'W �y� '�""
Mwl ry W'.wp'Pod �'Sw �y
M
Ni �,
�
y' Ff9
,yell 'qulwW g9w5p ��4ryy@.��y�gIW� I'
�„ �,�,
y7�
HW, 0 Mwv YMN0 M oo
+y
wow w U
X �W;M +W +y', II
yy�� gg ///////// ��
IIII I 'A'II,� M W IC
r
g�y��,�µ�� '��^M' �yry�ry /� I�+'W�'�ryq�I pMy
M'W14 % iMY� M WMW��� ��^4
IIIII
wrN'7MQN M IWw" �X'MAkW AI . WW'IIIIP
91 " l oni:
II
�, IIII
..IIIIII �I ryy��I�qIWW
' i,N ilI "YW oIeI j�; gy�y,IWpI� WIgi
"' �I
E �i WM
,„W W !
/
III51
IIIIII
I17yW'�MFI y��AIV�� yyW ryIp� !s' WWV WW�W' RAW, IWWAI'WM MI IUW W M A Aw'liw W5R ��,
�� ��,i��
IIIIII
M�WnQIW�MW«,'R.w"" III
y I�I�p�u �yX�,�
yypp��I��. Jy
14 � ���' III
III.• 1' �« � I �
kkyy���� WIC '':egrmr.� 'q��, �y ��y� '�'y �, IY� pry+ �M+ �W�M,�y q�
WSW yW mP,N
',�,' W �;�
Ill 14'�� 'WIRI W m.F� IMiW 9Y"",�U IM MrW W ks! ,
„'
�,,,
gip{ ;ah
Ii,,,�' I.
"IMr�'�+NI „���, 14.M iIM���
I liii�, ' Mryy �yy��4y ��,yp', I �I,py4y�y�yll,��y ,,
'i'W"YW" „ +uA 91 Mn,µP'"Mr,'' NIIMN'''W'MWT"',yM°', �`KN'
�,Wq� �Mryyl p�lwµry��vr�p'
l�""R"ulWl0d :
�i ��
III
at'I
���
,IIII ��,
M''�N�W� W'd �WR I�p4 �'RI Y',MXp
�4''wq'A
�y,y4��WN,yIN���VWy11 �M+ fib, !�qu yy wMW +IVy% 'y, �W I�W�9p� wryl �'pp
% WCw Iq M4iM'�'WWW G✓,IW �4u IIII �wl,ll W'w,� �'.", N AI4m NbM 11 NM III N+M IIII
illlII
111
* ' r �,�
�w Total
III�IM M AMW'^kW 14iW�
,�y
'NWS',IM
/
��,yyl��MW ,,,I "W±ir NWl li"4d'��PI �i% roilfl'IWW.M, ��,, +ms�'SIct, „WAPlbil
VW 'MWi Wa^ General''
IgGAIgIM I 'WM Mw�'�
III ,
IIII
„
„' „
O0 �
IIIII"
m+MM�µqq�,, Q�MI�I�WI�yIp�p���II���y^�ryy�, �w�wµµ�W.. AWµ��,',{y�00-4p��,ygy�,yq �Mqy
M'�1 mrv'Iw!YM^'.wMII�I wM "'�i 'SMg1'�'15Rn WMM I4Yrn''
( l
�,
III
IIII
x .P 411II,
�I Mil ie 'N"" 'tixu 0.NWI '°wi�WII��iIIPr"n WIW ����
IIIIIIII/
Bill To Requisition 00005095-00 FY 2018
CITY OF SEBASTIAN
ATTN: ADMINISTRATIVE SERVICES JACCt NO:
1225 MAIN STREET 13301SPS33400-A1833
SEBASTIAN, FL jReVieW:
32958 Myer: j riffin
IStatus: Aylocated Page I
vendor ship To
MBV Enneenc C
iring, IITY OF SEBASTIAN
1835 28th Street ATTN: ADMINISTRATIVE SERVICES
1225 MAIN STREET
SEBASTIAN, FL 32958
Vero Beach, FL 32960
Indian River
p6d6fItejpIered
Number )Required
IVA
JDepartment
10/10717—"1000540 1
1
—ITerms
ICITY MANAGER
A bekFi0tibh-/-A&bUht
oty- ---Unit Wili- Nit Olike
001 Work AUtharization CSA #5
Survey
1.00 15000-00000 15000.00
woIrk for the relocation of
the
EACH
Public works Bldg.
I 330151-533400-AI833
1500T00
ship To
CITY OF SEBASTIAN
ATTN: ADMINISTRATIVE SERVICES
1225 MAIN STREET
SEBASTIAN, FL 32958
002 work Authorization CSA #5 130 7500.00000 7500.00
Conce tUal DeSign & coordination EACH
for twe re,location of the Public
works Bldg.
I 330151-533400-Al833 750000
Ship To
CITY OF SEBASTIAN
ATTN: ADMINISTRATIVE SERVICES
1225 MAIN STREET
SEBASTIAN, FL 32958
003 work AUthors zation CSA #5 Final Loo 3450T00000 3450T00
DeSign and Per"itting for the EACH
rilocation of the Pu lic works
CITY OF SEBASTIAN
AT"TIPN» AIDIM11NISTRAT1'VIE SERVICEA °t P" O
775 I(MATPN STRF.IFT (3 30151-5 3 34010-A 183
S BAS'TT'APN„ FII. ReVi :
3 29 'S' 81
I t to s: A located Page 2
veindoir Ship T
P B'V Engineering, Inic CITY OF S BAST'IAPN
1835 201t a Street ATTPN: ADMINISTRATIVE SERVICES
1225 MAIN STREET
Ir o Beach, FL. 329601
I ni cd ii a ni R i 'v e r
�,vend' rw l bate I Sh d' p
'
I'� Ir� 3 t i ��rul A'r lualir�d .
1 330351-5 3 '0'0-A133
CITY OF SEBASTIAN
ATTN.' ADMINISTRATIVE SERVICES
1,2215 1 STREET
T
SEBAS'TIAPN F'IL 312958
F rom J' I r ' r ment
Qty Unit Price i PN t Price
Requisition "Total
570001.010
General'! ILedger u iryap1i11 a r y Section t„ roc * * f'e
A Ir 'OaU ra't A rfl10 u,u In t. Riemaiiningi Budget
33 151-5334100-A183'3 57010011.0110 -57000.00
TRANS P' OIR TA'T T PNI PAR T IF WIi'S FUND ro'T'H R O N11-rRA 'TUAL S IR' T IP" S
AILr t R1 o r "II ' d P3 PW'ir �".
i gi n'16 t ILV r
"M
lll �w'
dihll[II1�1'l rI
1111�IIY� In
MV CYL
RI YVO'
HOME OF P AN ISLAND
12,25, NIARI STREET' * SEHA!s,rllM,i, ROR[)A 3;?958
'FLEPHC*�U"72li 589,63TI 0 F,Ax y,7M
DATE Octobier 3, 2017
M° r. Aaron BoMes, RE
NIBVEngdneednig, nnc,
18352 0" Street
'Vero Beach, FL 32960
You 'are hiereb, noUfiled 'tom comilence or on 10/2121017 ini: acclordance with the
'Y
pravisjons of youir In on-exc s Im onfinuing Pirolfessior:M Servdces Agreement, dated J'udy
12, 2017 and tin ac:co rdance wd th Work Authodzafion . CS A-5 fo,r the Relloca:: Ucin of'the
PublIc Works Building,
Clity Manager,, Joseph Gidiffin,, wilH be the iproject rnanager,, AH substan101
coimin muiNcation perlaininig to this, project sholLdd ble dEre' ictield to Mr, Gr&in t
j 'rtffiurnll@d't 'o,f tdl'a'Iru, r' Ior by tele:phiolne at 772-38,8-82,00,
'We took forward to, working with YOU on thiis project
Date:a t 0.3
Joseph Griffin rM Bowlies, R E.
City IManagler MBV Engineering, inc,
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
MBV ENGINEERING, INC.
1835 20" Street
Vero Beach, FL 32960
Work Authorization No: CSA-5
Project Identification: Public Works Building Relocation
IT IS AGREED to undertake the following work in accordance with the provisions of the MBV
Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement
for Engineering Dated July 12, 2017.
Description of Assignment:
It is understood the City of Sebastian is looking to relocate its Public Works facility currently located at
100 Veterans Memorial Way to a property on the Sebastian Airport, more specifically located at southwest
comer of Roseland Road and Corporate Park Drive. Proposed improvements will consist of new building
facilities, parking lots, storage yards, and other required miscellaneous site improvements. As such, please
find below our scope for conceptual layout and coordination between the City, Architect and Engineer
followed by final design and permitting services.
Work Scope:
Survey
- Establish a minimum of (2) horizontal and vertical control points at or near site.
- Depict right of way lines on survey.
- Locate pavement abutting site with elevations at both edges and center.
- Provide sufficient existing ground elevations to establish current drainage patterns.
- Locate all drainage structures and culverts with size, material and invert, lying within or serving
site.
- Locate all aboveground utilities within or serving site which may be an obstruction or cause a
conflict.
- Locate significant desirable trees within right of way limits and 10 feet beyond,
- Provide 6 certified copies of the topographic survey.
- Provide PDF file or CAD file if requested.
Phase 1: Conceptual Design and Coordination
- Site meeting with City, Architect and MBV Engineering to evaluate existing uses and proposed
future uses and needs
- Proposed Building Needs Evaluation study and coordination by architect (scope and fees for this
task not included and are to be provided by others)
- Conceptual Site Layout
- Preliminary Cost Estimate
Phase II: Final Design and Permitting
I Project coordination with the following regulatory agencies:
a. City of Sebastian (COS)
b, Indian River County (IRC)
C. Sebastian River Improvement District (SKID)
d. St. John's River Water Management District (SJRWMD)
e. Florida Department of Environmental Protection (FDEP)
2. Project coordination and review of the required boundary, topographic and tree survey. The cost
of survey work has been included in this proposal.
3. Project coordination and evaluation of the required subsurface soils investigation. The cost of
geotech work has not been included in this proposal.
4. Finalization of the site plan layout.
5. Preliminary meeting with the City of Sebastian Planning Department.
6. Design of the paving and drainage systems.
7. Design of the on -site utilities. We assume that water and sewer service is available. No cost of off -
site utility improvements are included in this proposal.
8. Preparation of the site construction drawings.
9. Coordination with traffic consultant, if needed. No cost of traffic studies or off -site roadway
improvements are included in this proposal.
10. Preparation of a code compliant landscape plan.
11. Coordination with environmental consultant, if necessary. No costs of mitigation design or
permitting are included in this proposal.
12. Preparation of the following permit applications:
a. City of Sebastian Major Site Plan
b. IRC Utilities
C. IRC Concurrency
d. IRC Fire Review
e. Sebastian River Improvement District (SRID)
f. SJRWMD Environmental Resources Permit
9. FDEP Wastewater Collection
h. FDEP NPDES Notice of Intent
13. Attendance at Planning and Zoning Meeting.
14. Attendance at City Council Meeting.
Basis of Compensation/Period of Services:
The above referenced Professional Engineering Services for CSA 95 will be performed for a lump sum
fee, including direct costs but excluding permit fees, as described below:
Survey $ 15,000
Phase 1: Conceptual Design and Coordination $7,500
Phase 11: Final Design and Permitting $34,500
ENGINEERING CONSULTANT:
_��'Date: 9-20-17
Aaron Bowles, P.E.
MBV Engineering, Inc.
Attest:
Jeaette Williams, MMC, City Clerk,
11
CITY OF SEBASTIAN:
Date,
Joe Griffin
City Manager
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
vj
Cynthia V. Hall, Interim City Aftorney