HomeMy WebLinkAboutCSA-07 (Complete)CITY OF
SEBASTL
HOME OF PELICAN ISLAND
1225 MAIN STREET • SEBASTIAN, FLORIDA 3295E
TELEPHONE: (772) 589-5330 • FAX (772) 589-5570
NOTICE TO PROCEED
Date: December 14, 2017
TO: MBV Engineering, Inc.
1835 20` Street
Vero Beach, FL 32960
You are hereby authorized to commence work on December 14, 2017, in accordance with CSA
#7, dated November 7, 2017 for the Indian River Drive Milling and Resurfacing evaluation, beginning at
the Sportsman's Marina and Lodge to Captain Hiram's.
The Project Manager is Joseph Griffin, City Manager. All substantial communications pertaining
to this project should be directed to gfriffin@cityofsebastian.org or by telephone at 772-388-8200.
We look forward to working with you on this project.
-Ji�//tom
Joseph Griffin
City Manager
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
MBV ENGINEERING, INC.
1835 201 Street
Vero Beach, FL 32960
Work Authorization No: CSA-7 (MBV 17-0435)
Project Identification: Indian River Drive Milling & Resurfacing from Sportsman's Marina & Lodge (412
Indian River Drive) north approximately 1.7 miles to Captain Butchers (1730 Indian River Drive).
IT IS AGREED to undertake the following work in accordance with the provisions of the MBV
Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement
for Engineering Dated July 12, 2017.
Description of Assignment:
Per our coordination, it is our understanding that the City of Sebastian is requesting an evaluation be
performed on Indian River Drive roadway within the City limits from approximately Sportman's Marina
& Lodge north to Captain Butchers. This evaluation will be used to determine if milling and re -surfacing
the roadway is a viable alternative to full roadway replacement. Upon review and recommendations,
construction plans will be generated.
Work Scope:
Evaluation
• Perform an on -site evaluation of the existing conditions for the specified portion of Indian River Drive.
• Preparation of a findings report with photographs.
• Evaluation of existing crosswalks for determination of usability.
• Drainage evaluation for alternatives of minimal improvements.
Civil Design and Permitting
Preparation of construction plans for the below improvements via existing aerial photography (no
survey included)
o Milling and resurfacing
o Striping
o Drainage (minimal improvement)
Preparation of MOT plans.
Preparation and submittal for FDEP and SJRWMD permits, if required.
Bidding Assistance
• Coordination with City personnel for the preparation of the bid documents
• Assist City with bid evaluation and contract award
Construction Administration
• Construction Inspection / Certification (including pre -construction meeting, construction progress
inspections, final as -built walk-through, and final overall site inspections / certifications)
• Prepare and submit all final project certifications for project clearance
Basis of Compensation/Period of Services:
The above referenced Professional Engineering Services for CSA 7 will be performed for a fee not to
exceed the amount as follows, including direct costs:
Evaluation $ 6,500
Civil Design and Permitting $ 13,500
Bidding Assistance $ 3,000
Construction Administration (Hourly not to exceed) $ 9,250
TOTAL $ 32,250
AGREED:
ENGINEERING CONSULTANT:
ate: 11/7/17
Aaron Bowles, P.E.
MBV Engineering, Inc.
Attest:
.. Wa�Q��C.C.y►1/1
Je eWl
C.AMC, City Clerk
_----.-
CITY OF SEBASTIAN:
Joe Griffin
City Manager
Date: Z `WO. 11 �L-
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
Cynthia V. Hall, Interim City Attorney
1225 MAIN STREET • SEBASTIAN. FLORIDA 32958
TELEPHONE: (772) 589-5330 • FAX (772) 589-5570
NOTICE TO PROCEED
Date: November 8, 2017
TO: MBV Engineering, Inc.
1835 201h Street
Vero Beach, FL 32960
You are hereby authorized to commence work on November 8, 2017 in accordance with CAS #7,
dated November 7, 2017 for the Indian River Drive Milling and Resurfacing evaluation, beginning at the
Sportsman's Marina & Lodge to Captain Butcher's.
The Project Manager is Joseph Griffin, City Manager. All substantial communication pertaining
to this project should be directed to Mr. Griffin atjgriffin@cityofsebastian.org or by telephone at 772-
388-8200.
We look forward to working with you on this project.
Joseph Griffin
City Manager
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
MBV ENGINEERING, INC.
1835 201h Street
Vero Beach, FL 32960
Work Authorization No: CSA-7
Project Identification: Indian River Drive Milling & Resurfacing from Sportsman's Marina & Lodge (412
Indian River Drive) north approximately 1.7 miles to Captain Butchers (1730 Indian River Drive).
IT IS AGREED to undertake the following work in accordance with the provisions of the MBV
Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement
for Engineering Dated July 12, 2017.
Description of Assignment:
Per our coordination, it is our understanding that the City of Sebastian is requesting an evaluation be
performed on Indian River Drive roadway within the City limits from approximately Sportman's Marina
& Lodge north to Captain Butchers. This evaluation will be used to determine if milling and re -surfacing
the roadway is a viable alternative to full roadway replacement.
Work Scope:
Evaluation
• Perform an on -site evaluation of the existing conditions for the specified portion of Indian River Drive.
• Preparation of a findings report with photographs.
Civil Desian and Permitting
• Preparation of construction plans for the roadway improvements via existing aerial photography (no
survey included).
• Preparation and submittal for FDEP and SJRWMD permits, if required.
Bidding Assistance
• Coordination with City personnel for the preparation of the bid documents
• Assist City with bid evaluation and contract award
Construction Administration
• Construction Inspection / Certification (including pre -construction meeting, construction progress
inspections, final as -built walk-through, and final overall site inspections / certifications)
• Prepare and submit all final project certifications for project clearance
Basis of Compensation/Period of Services:
The above referenced Professional Engineering Services for CSA 7 will be performed for a fee not to
exceed the amount as follows, including direct costs:
Evaluation
Civil Design and Permitting
Bidding Assistance
Construction Administration
TOTAL
AGREED:
ENGINEERING CONSULTANT:
ate: 11/6/17
Aaron Bowles, P.E.
MBV Engineering, Inc.
Attest:
4JetrtW-ffltia'ms,:NlMC, QCity � City Clerk
$ 4,500
$ 10,500
$ 2,500
$ 6.000
$ 23,500
CITY OF SEBASSTIAN:
< -:-
Jo'�Giiffin
City Manager
Date: �Alo, /;7—
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
l
Cynthi�l, Interim Attorney
,,,
�����
..
I��
�„ w,;
,,,,,,... 4
en
� ........ s i t in N".NTH 0 0 .:a 18 ... 00 F""Ir""202.8
.I'T'' OF ' EIBA TIA Y
ATTIN: ADMINISTRATIVE TRA.T..IVE SERVICEACC NMNo
E IB A' ..T" I ANON „ FL I R e V i :
(' t u : Released Tugs 1
Vendor
p To
N B En i n ring, Inc' CITY OF SEBA. IT AT+N
1' 3 5 20,th,l Street ATTN: ADMINISTRATIVE SEIRVICIES,
1225 IMA iI INwd STREET
' EBA 'mTIAIN+N„ FL 32958,
enlro Beach, FT. 32'9 011
Indian IRiveer
rbate
Nndoir jDate Ishldd
rid 'Ir ed A
TMNurunb'Irm 6 Requm r ril II Viia
I" e ri,ns I Dee r ,Iran In
LN~N DescriptiOn / ACCryrnnT:
()tunit rice
0101 1 A #7 For Indian R, i v e rM Drive
1— T'. 0 32250M,000
milling Resurfacing evaluation,
EACH
civil design n ed Ip r^rhn i t i ng„
bi dbrrdi n assi' t mn 'I ' and
'onst$'UCtiani administration a
aII Irovin'' d by City o unci l on
T ece nn l lr 13, 20117.
ship, To
'CITY OF IET A 'T`IAN
1,2215 MAIN STREET
I E'T
SE ASTIAN, FN. 32958
SERVICES
Requisition Tot,al
3221510 M00
Gllen r l Ledger
u.urrnllrnn r .y e'uW nw i'I o'rnl
ACrIu'n''
Amalrnt
Remaining eIt,
'1 d"°6lrr6:5^A1 31
225M0
'dI
187I LX0
TRANSPORTATION PROJECTS FUND STREETS/ROADS
* * Vr i1 * A p p rr'" o v a l / cI n rn v rr"'.s iI r'n Iran' . 'fin
' � nl I ' 9 II e RAY'' �2114117i ��I
,?'rnl rn N M ' n' r' rrn n L. W
w.7 N,,.
A B 'r 'r'., . I r ' r�l
.'. S u rnl I ' CY
u r,u u s e d 12 114,117
ieain T a r b el l
G,L
Allocation
changed
Pending
Ken Killgore
GL
Allocation
changed
Pending
'jeninifer, Smith th
IL
Allocation
cIh Ing'I
�u �', '"II ""IlVhilxl'rr liwl��. ell 4 Y
4 Vl r,
....,��., ................ Two.,
.. Bill
ll :r; � :�m �:,�� •� �.. -..: �. �. � .. ;._ _ _ .. k ._ .,...�. _ _.... _ �.,� I, :.: �. � � .: _ _ _ .. _. _ Requisition 0 0 0 0 ; 1- 0 0 F.. r .. 0 'fl. 8
T"T`N: ADMINISTRATIVE SERVICES JACCt fin;
S ,."FIAN„ FL. lRev"i
j B u yM rj 9 r iff i rn
�StatuS: Released Page 2
vendor ship To
MBV E ngi n ering Inc CITY OF A I"IAIN
1835 20,th Street A'TTN ADMINISTRATIVE SERVICES
1225 MAIN STREET"'
ver'o E a .hi, FL. 32960
Indian River
Date
it �vendr �Datt~. pSpaip..
wUm r SReqUired 11 vi a � T r`PS I Department
L. Description / ACCOLM„� r y L nif Price Net Price
„„,,