CERTIFICATE OF PROJECT COMPLETION
Date Accepted: 09/18/2019
Project Name & #: Stonecrop Drainage # At 960
Total Project Expenditures: $ 12,000.00
Project Location: Stonecrop Drainage Basin
Contractor(s): MBV Engineering
Contract Amount(s): $ 12,000.00
Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify
that this project is complete.
Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract
as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All
contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the
contractually stipulated period of time. In no way does the issuing of this certificate release the Contractor from
all legal obligations as stipulated in Chapter 713 of the Florida Statutes.
Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the
segment as being complete.
Project Manfiger / Da
Building Official (K applicable) Date
(I eAyt tie Cc�t��aww /3/zozo
Cjq Clerk Date
PROJECTID
A1960
Stonecrop Drainage
Revenue
$ 12,000.00
363010-381130 A1960 (Interfund Transfer from DST)
Expenses
$ 12,000.00
363151-606920 A1960 (Drainage)
10 27=0
FY19
DATE
CHECK#
PO#
DESCRIPTION
VENDOR
AMOUNT
TOTALS
03/19/19
98970
8699
Stormwater Mgmt Plan Update (Task 1)-thru 03/01/19
MBV Engineering
1,625.00
1,625.00
04/17/19
99088
8699
Stormwater Mgmt Plan Update (Task 1) -thru 03/29119
MBV Engineering
4,225.00
4,225.00
04/17/19
99088
8699
Stormwater Mgmt Plan Update (Task 2)- thru 03/29/19
MBV Engineering
500.00
500.00
04/17/19
99088
8699
Stormwater Mgmt Plan Update (Task 3)- thru 03/29/19
MBV Engineering
1,250.00
1,260.00
04/17/19
99088
8699
Stormwater Mgmt Plan Update (Task 4) - Ill 03/29/19
MBV Engineering
1,250.00
1,250.00
07/22/19
99792
8699
Stormwater Mgmt Plan Update (Task 5) - thru 06/28/19
MBV Engineering
500.00
500.00
08/14/19
99792
8699
Stormwater Mgmt Plan Update (Task 1)- thru 07/26/19
MBV Engineering
650.00
650.00
08/14/19
99792
8699
Stormwater Mgmt Plan Update (Task 5) - thru 07/26/19
MBV Engineering
750.00
750.00
09/18/19
99995
8699
Stormwater Mgmt Plan Update (Contingency) -thru 08/30/19
MBV Engineering
1,250.00
1,250.00
0.00
12,000.00
12,000.00
Balance 0.00
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
MBV ENGINEERING, INC.
1835 201h Street
Vero Beach, FL 32960
Work Authorization No: CSA-18 (MBV 19.0070)
Project Identification: Stormwater Management Plan Update - Stonecrop
IT IS AGREED to undertake the following work in accordance with the provisions of the MBV
Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement
for Engineering Dated July 12, 2017.
Description of Assignment:
As per our coordination, the City of Sebastian is looking to have the Stormwater Management Plan
updated for the Stonecrop basin area in conjunction with the FEMA grant application requirements.
Work Scope:
Task l: Preparation of an H&H (Hydrology & Hydraulics) study of approximately 120 nodes for
the Stonecrop basin, to include:
• Assistance with estimating the Finished Floor Elevations within the basin
• Pre and Post Developed length of flood duration determination
• Estimate of repair / replacement cost for roadways per FDOT Guidelines
• Model the following storm events:
0 25 year- 24 hour and 72 hour
0 100 year - I hour, 24 hour, and 72 hour
Task 2: Preparation of a response to both the FEMA Environmental & Engineering comments
Task 3: Preparation of an aerial map showing all drainage improvement activities, including the
beginning/end coordinates in decimal degree format
Task 4: Preparation of a ground disturbance map showing the total area of ground disturbance in
square feet and vertical depth in feet. Include the coordinates in decimal degree format of
the exact location of all areas of ground disturbance and staging areas
Task 5: Contingency for additional responses
Deliverables: H & H Study, Response to FEMA comments, Aerial Map, and Ground Disturbance Map
- Response to FEMA engineering comments to be no later than 30 days upon authorization
- Response to FEMA environmental comments to be by 2/22/19.
Basis of Compensation/Period of Services:
The above referenced Professional Engineering Services for CSA 18 will be performed for a fee not to
exceed the below breakdown of fees:
Task I:
$
6,500
Task 2:
$
500
Task 3:
$
1,250
Task 4:
$
1,250
Task 5:
$
5 000
Total $14,500
AGREED:
ENGINEERING CONSULTANT:
ax"��ate: 02/19/2019
Aaron Bowles, P.E.
MBV Engineering, Inc.
Attest:
anette Williams, MMC, City Clerk
CITY OF SEB�ASTIIAAN:: ,,
Date �
l Ce urfisle
City Manager
Approved as to Form and Content for
Reliance by the City of Sebastian Only:
Ahmpeb. Stokes,