HomeMy WebLinkAboutCSA-1 Friendship Park (Complete)arc a SEBASTL HOME OF PELICAN ISL D CERTIFICATE OF PROJECT COMPLETION Date Accepted: 09/05/18 Project Name & #: Pickleball Courts # Al820 Total Project Expenditures: $ 16,062.20 Project Location: Friendship Park (Project has been moved to Airport) Contractor(s): Schulke, Bittle & Stoddard (CSA # 1) / Treasure Coast Newspapers Contract Amount(s): $ 15,893.90 / $ 168.30 Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify that this project is complete. Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the contractually stipulated period of time. In no way does the issuing of this certificate release the Contractor from all legal obligations as stipulated in Chapter 713 of the Florida Statutes. Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the segment as being complete, e ger ' "t� N/A Building Official (if applicable) Date a �_ iy i4 Ci erlf �"_-_� Date mcf SEBASTIAN HOME OF PELICAN ISLAND 1225 MAIN STREET - SEBASTIAN. FLORIDA 32958 TELEPHONE: (772) 589-5330 • FAX (772) 589-5570 NOTICE TO PROCEED DATE: October 3, 2017 TO: Mr. Joseph Schulke, P.E. Schulke, Bittle & Stoddard, LLC 1717 Indian River Drive, Suite 201 Vero Beach, FL 32960 You are hereby notified to commence work on 10/2/2017 in accordance with the provisions of your non-exclusive Continuing Professional Services Agreement, dated July 12, 2017 and in accordance with Work Authorization No.CSA-1 for Friendship Park Recreation Improvements. City Manager, Joseph Griffin, will be the project manager. All substantial communication pertaining to this project should be directed to Mr. Griffin at jgriffin@cityofsebasUan.org or by telephone at 772-388-8200. We look forward to working with you on this project r!/ Date: J& Date: Joseph Griffin Joseph S e,� City Manager Schulke ' le & Stoddard, LLC CITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) SCHULKE, BITTLE & STODDARD, LLC 1717 Indian River Blvd., Suite 201 Vero Beach, FL 32960 Work Authorization No: CSA-1 Project Identification: City of Sebastian - Friendship Park Recreation Improvements IT IS AGREED to undertake the following work in accordance with the provisions of the Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement for Engineering Dated July 20, 2017. Description of Assignment: Schulke, Bittle & Stoddard, LLC will provide engineering for final site plan design and permitting for the site development of new improvements to Friendship Park including 8 pickle ball courts (4 proposed, 4 future), lighting, and necessary modification to existing drainage facilities. Work Scope: • See detailed Scope of Work attached (Exhibit A) Deliverable: • Site development construction plans, approved by the City of Sebastian and SJRWMD • Contract/bid documents for construction contract procurement purposes • Construction administration services and construction inspections Basis of Compensation/Period of Services: The above referenced Professional Engineering Services for CSA-1 will be performed for a fixed fee not to exceed the amount of $24,137.50. See Exhibit B for detailed fee schedule. AGREED: TANT: - t1/ Date: 0 '7 Schulke, Bi & Stoddard, LLC Attest: Jean e Williams, MMC, City Clerk CITY OF EBASTIAN: Dater//� Joe (Mffin City Manager Approved as to Form and Content for Reliance by the City of Sebastian Only: I A.m��/��'� Cynthia V. Hall, Interim City Attorney SCOPE OF WORK — EXHIBIT A General Descriotion Schulke, Bittle & Stoddard shall provide civil engineering for the site development of new improvements to Friendship Park including 8 pickle ball courts (4 proposed, 4 future), lighting, and necessary modifications to existing drainage facilities. Final Design. Construction Documents. and Permittinq 2.0 Final Engineering 2.1 Final Site Plan: Based on the approved Conceptual plan, formal engineering plans and site plan application will be prepared in accordance with the City of Sebastian's Land Development Regulations. This submittal will include the following required elements: a. An engineering site development plan depicting in more detail, features as developed on the conceptual plan, incorporating all existing information readily available, including surveys, record drawings, aerials, maps and documents, etc., and on -site observations. The plan will include proposed and existing site data and conditions required under City of Sebastian's Land Development Regulations, including dimensional lay -out, signage/ striping, parking/ pavement / grading, access, appropriate details and cross sections of the site, site data / area calculations, etc. b. A landscape plan in accordance with City of Sebastian's Land Development Regulations. C. Stormwater Management Plan and Engineering report in compliance with City of Sebastian Land Development Regulations and SJRWMD regulations. d. Utility Plan: N/A. 2.2 Lighting Plan: Provide electrical engineers plan for new and/or modified site lighting (pickle ball court lighting). Electrical construction documents to include: a. Locate all electrical (i.e. receptacles, switches, transformers, motors, and panels) and lighting (i.e. specify fixtures and lighting controls) components. b. Circuit and homerun all components, creating appropriate panel schedules. c. Create a one -line riser diagram showing all major equipment with feeder schedule. d. Design a lighting control system that meets Florida Energy Code with detail drawings. 3.0 Permitting 3.1 Construction plans, engineering calculations and reports, and supporting documentation will be submitted to the appropriate agencies for the following construction permits: a. St. Johns River Water Management District (40C-42) b. City of Sebastian Site Plan C. City of Sebastian Land Clearing and Tree Removal d. City of Sebastian Stormwater Management Permit e. City of Sebastian Building Department — Plan Review 3.2 Follow up with permitting agencies via telephone, e-mail or written correspondence. Review and address and review comments and revise the plans accordingly. Resubmit as required. 3.3 Upon issuance of the above permits, the site plan shall be released and construction may commence with site work. 4.0 Contract Administration and Inspections 4.1 Contract procurement a. In general, SBS will assist the City with bid procurement including assistance in the preparation of bidding and procurement documents and information for a competitive public bid. Services may include: Page 1 of 2 (i) Description of time, place and conditions of bidding and construction (ii) Assist with preparation of bidding and proposal forms (use standard City forms) (iii) Assist with preparation of Forms of Agreement — between owner and contractor (use standard City forms) (iv) Assist with preparation of Conditions of the Contract — standard, supplementary, and other special conditions (use standard City forms) b. SBS will assist the City with Construction Procurement services, including: (i) Prepare and provide bid sets for competitive bidding (ii) Coordinate and attend pre -bid meeting; respond to RFI's sent by bidders, and prepare Addendums / plan modifications, if necessary (iii) Bid validation (iv) Assist City in finalizing construction contract 4.2 Construction Administration: SBS will assist the City with the Contract Administration and inspections, including: attend progress meetings, review shop drawings and contractors' submittals, and provide routine site inspections to verify the work is proceeding in accordance with the plans and specifications for the purposes of certification upon completion of the work. Inspections shall be documented with written reports and digital photographs. SBS will coordinate the responsibility for document review, meeting attendance, and inspections with civil engineer, and other consultants. The construction period is estimated to be three (3) months, and CA and inspection fees have been estimated by SBS based on this time frame, and the tasks and frequency of services listed below. Anticipated tasks / services include: Site: a. Coordinate and attend pre -construction meetings (1) b. Attend progress meetings with contractor (1/wk) C. Review shop drawings (1) d. Review contractor's pay requests (3) e. Periodic inspections of the site work (3 hr/wk) f. Substantial completion inspection / punch list (1) g. Review as-builts for adequacy and completeness (1) h. Final inspection / final completion determination (1) i. Prepare final certification submittals for site permits Page 2 of 2 FEE SCHEDULE — EXHIBIT B Final Desian. Construction Documents, and Permittina 2.0 Final Engineering 2.1 Final Site Plan $ 5,000.00 2.2 Electrical Construction Documents $ 2,000.00 3.0 Permitting $ 5,000.00 4.0 Contract Procurement Administration and Inspections 4.1 Contract Procurement $ 3,500.00 4.2 Construction Administration $6,637.50 TOTAL: $22,137.50 "Reimbursables Direct Reimbursement $ 2,000.00 (Estimate) Contract administration, contract procurementibidding services, and inspections are not included within the above scope and fee. The following consultants will be retained by SIBS to provide all necessary services. The consultant fee is included in SBS cost above: • Electrical Engineer —Treasure Coast Engineering $2,500.00 • Surveyor— Meridian Land Surveying $ 500.00 Reimbursables will be billed direct to the client at cost or paid direct by the client, and include permit application fees, surveying, soils and/or other required field tests, prints, copies, mailings/ FedEx, archeological or environmental consultation and studies, traffic analysis/ consultation, traffic counting, etc. Prints - $2.00/sheet Xerox Copies - $0.15/page Other Reimbursables — at cost Invoices shall be submitted monthly, and the invoice amount shall be in proportion to the percentage of the Scope of Work complete. All payments must be received by the Engineer within 30 days of the date of an invoice. Any payments received after said date will be subject to a late interest fee of one and one half percent (1-1/2%) per month. The client shall be responsible for all attorney's fees, court costs, and related expenses incurred in the event that payment is not timely made and proceedings are brought by the Engineer to collect sums owed. Page 1 of 2 RATE SCHEDULE The following rates will apply to actual time devoted by Schulke, Bittle & Stoddard, L. L.C. staff to this project computed to the nearest % hour. Personnel Hourly Rate Principal $200.00 Project Manager/Engineer $150.00 Design Tech $120.00 Construction Manager $ 85.00 Draftsman $ 85.00 Inspector $ 75.00 Clerical $ 60.00