HOME OF PELICAN ISIAND CITY COUNCIL AGENDA TRANSMITTAL
Council Meetina Date: wa_"� r1v12$-W_:?r
Agenda Item Title: Approval to Enter into a Pre -Construction Services Agreement with Wright
Construction Group, Inc., Awarded Vendor of RFO #18-09 Design Build of
City Garage and Public Facilities Storage Building Compound.
Recommendation: Staff recommends that the Council APPROVE to enter into a Pre.
Construction Services Agreement for $446,335.00 with Wright Construction
Group, Inc., awarded vendor of RFO #1"ll Design Build of City Garage and
Public Facilities Storage Building Compound.
Backaround: The Procurement Division, on behalf of the Public Facilities Department,
recommends to Council, the approval to enter Into a Pre -Construction Services Agreement with Wright
Construction Group, Inc., the awarded vendor of RFD #18-09 for the Design Build of City Garage and Public
Facilities Storage Building Compound. The attached proposals are for the pre -construction services for the
onslte building and surrounding facilities as well as the offsite sewer service connection between the City and
County.
The Design Build method is used to allow a single vendor to provide planning, design and all construction
services under one contract. This ensures a unified flow of work from Initial concept through completion. The
Pre -Construction phase (Phase 1) of this process promotes cost and time -saving strategies to proactively
solve complex problems up -front to reduce possible budget and schedule challenges. This phase Includes
value engineering, analyzing design ideas and developing creative alternatives and solutions. This allows for
more refined estimates to reach a more concrete Guaranteed Maximum Price (GMP) to complete the project.
Wright Construction Group, Inc. (Design Builder) was awarded on April 10, 2019 by City Council authorizing
the City Manager to negotiate. The solicitation process Included Evaluation Committee review of the
submitted proposals and presentations to Council from the top -ranked firms. The award was made based on
the qualifications of the firm and their ability to fulfill the City s requirements for this project. Following award,
meetings were held to determine the specific needs of the City and the best way to achieve those needs. Due
to the size of this project, multi -year funding Is required and will be phased to achieve the end goal.
If Agenda Item Reauires Fxoendilurs of Funds:
Pre -Construction Services Cost: $446.335.00
Fund to Be Utilized for Appropriation: Discretionary
,fSales TaX f and
Administrative Services Department Budget Review:"
Attachments:
1. Pre -Construction Services Agreement
2. Pre -Construction Proposal (Onsite and Offske Utilities)
3. RFO #1"0 Council Approval
City Menagg r Authorization:
Date: 1//!I/. e"o
167 of 189
DESIGN BUILD PRE -CONSTRUCTION SERVICES AGREEMENT
RFG 18-09: Design Build of City Garage and Public Facilities Storage Building Compound
This Agreement is entered into by the parties this 25th day of June 2020.
1. Parties:
City of Sebastian, a municipal corporation of the State of Florida, (City).
and
Wright Construction Group, Inc. (Design Builder).
2. Designated Contact Person as to Cam: 3. Designated Contact Person as to Deslon Builder
Soott Baker (PROJECT MANAGER)
Scott Loiacano (PROJECT MANAGER)
Public Facilities Director
Senior Project Manager
1225 Main Street
5811 Youngquist Road
Sebastian, Florida 32958
Fort Myers, FL 33912
Phone: 772-388-6113
Phone: 239ABI-5000
772-633-0897
Call.
Email: sbaker@cityofsebastian.org
Email: scott.lolaceno@wcgti.com
4. Scope of Work. Pre -Construction services Include, but are not limited to, design, permitting, cost estimating,
value engineering, scheduling, construction phasing, construclability review, weekly design review meetings,
Input from key subcontractors as to build systems, and means & methods of construction. Pre -Construction is
expected to last six (6) months.
S. Term and Completion Time. Pre -Construction services are expected to last six (6) months. After which
time, a Construction Services Agreement will be issued for the completion of the Design Build project. Time
is of the essence in the performance of this Agreement.
NOTE: The City reserves the right to allow for any approved extensions.
6. Compensation. Pre -Construction services for the project and additional offshe utility work is $446.335.00.
The Design Builder shall be entitled to no Increase in this phase of the project.
7. Termination of Agreement. Either party may terminate this Agreement by giving the other party thirty (30)
days written notice. If either party defaults in the performance of this Agreement or materially breaches any of
Its provisions, the non -defaulting party may, at Its option, terminate this Agreement by giving written
notification thereof to the defaulting party. In the event of termination, City will be responsible for
compensating Design Builder only for the Work safisfaclolly completed or partially completed up to the date
of termination. Design Builder shall not be entitled to compensation for loss of anticipated profit.
8. Agreement Document. The entire agreement between the City and Design Builder, consists of: this
Agreement and all exhibits hereto; the Design Build General Terms and Conditions; special conditions, I any;
proposal(s) submitted by Design Builder and accepted by the City, if any; the Construction Documents; any
amendments or addenda executed by the City and the Design Builder hereafter, and City -approved change
order(s) or field orders. Documents not included or expressly Contemplated In this Section 8 do not, and shall
not, form any part of the Agreement for DesignlBuild Construction. Without limiting the generality of the
foregoing, shop drawings and other submittals from the Design Builder or Its subcontractors and suppliers do
not constitute a part of the Agreement for DesignlBuild Construction.
• Exhibit "A" — Pre -Construction Proposal (Onsite) submitted by Design Builder
• Exhibit "B"— Pre -Construction Proposal (Offsite Utilities) submitted by Design Builder
City of Sebastian, Florida / Wright Construction Group, Inc.
RFD #18-09 Design Build of City Games end Public Facilities Storage Compound Page 1 of 4
9. City's Project Manager. City shall designate a Project Manager. All Work done by the Design
Builder shall be subject to the review, Inspection and acceptance of the Project Manager and the City.
Any and all technical questions which may arise as to the qualify, completeness and acceptability of
Work performed, or Work to be performed, Interpretation of plans/specificalions and all technical
questions as to the acceptable fulfillment of the Agreement on the part of the Design Builder shall be
referred to the City Manager who will resolve such questions. All Work shall be subject at all times to
Inspection and review by the Project Manager and the City.
10. Project Team. Design Builder will provide names and roles of the Project Team assigned for
approval by the City. If any member of the Project Team discontinues service on the Project for any
reason whatsoever, Design Builder shall promptly replace such team member with a qualified
individual approved by the City, in writing, which approval will not be unreasonably withheld.
11. Schedules, Reports and Records. Design Builder shall submit to City cost schedules, progress
schedules, estimates, records, reports, and any other data, as related to the provision of the Work
covered under the Agreement. Furthermore, City reserves the right to Inspect and audit Design
Builder's books and records relating to the Agreement, when deemed appropriate by City. All
schedules, reports and records of Design Builder, as they relate to the Agreement, shall be retained by
Design Builder for a period of three (3) years from the date of final payment under the Agreement.
12. City Funds. If sufficient funding Is not available for Design Builder to complete the Work, City
reserves the right to modify the tens and conditions of the Agreement to change the Scope of Work
to reduce the cost to match any available funding. If such modifications to the Scope of Work are not
feasible, or if funding has been totally exhausted prior to Design Builder's completion of Its Work, the
Agreement shall be terminated on terms reasonably acceptable to both parties.
13. Insurance. During the term of the Agreement, Design Builder, at Its sole expense, shall obtain and
maintain Insurance of such a type and with such terms and limits as noted below. Providing and
maintaining adequate Insurance coverage is a material obligation of Design Builder, Design Builder
shall provide City a certificate(s) of Insurance, evidencing such coverage. It Is the Design Builder's
responsibility to ensure that the City has current Certlficate(s) of Insurance at all times during the
duration of the agreement, including renewal terms.
13.1 Minimum Insurance Requirements. The coverage's, limits or endorsements required herein protect
the primary interests of City, and these coverage's, limits or endorsements shall In noway be required
to be relied upon when assessing the extent a deteonining appropriate types and limits of coverage to
protect Design Builder against any loss exposures, whether as a result of the Project or otherwise. All
Insurance policies shall name and endorse the following as additional insumd(s): the City of
Sebastian and its City Council members, officers, employees and agents.
General Liability Insurance: Not less than $1,000,000 Combined Single Limit per each
occurrence
Professional Liability Not less than $1,000,000 per each occurrence,
(Errors & Omissions): covering any damages caused by an error, omission or any
negligent acts.
Cyber Liability: Not less than $1,000,000 per each occurrence,
covering any damages arising from alteration of, loss of, or
destruction of electronic data and/or information "property of the
City.
Automobile Liability: Not less than $500,000 Combined Single Limit.
Worker's Compensation: In accordance with Florida Statutes 440, maintain
worker's compensation Insurance to the extent required by law
for all their employees to be engaged in work under this contract.
City of Sebastian, Florida / Wright Construction Group, Inc.
RFO #19-09 Design Build of City Garage and Public Facilities Storage Compound Page 2 of 4
14. Payment of Payment Requests
14.1 Payment Requestslinvoices. Requests for payment for the provision of the Work provided
under the Agreement shall be submitted no more frequently than once per month, unless
stipulated differently In the Agreement or solicitation documents. All requests for
paymentlinvoices shall be submitted In sufficient detail to demonstrate compliance with the terms
of the Agreement and to allow for the proper pre -audit and post -audit thereof. Upon receipt of
Design Buildefs payment request/Invoice, the City will review to ensure completeness and that
the Work covered under the payment request has been completed in accordance with this
Agreement. If It Is found that the payment request/involce is not complete, or the Work covered
under the payment request does not satisfy this Agreement, the payment request may be
rejected.
14.2 Prompt Payment. City shall make payment of a payment request in accordance with Chapter
218, Part VII of the Florida Statutes 'Local Government Prompt Payment Act' from the date
which a property received payment fequestlinvolce is recorded as received by City, for Work
completed to the satisfaction of City.
15. Indemnification. The Design Builder shall Indemnify and hold the City harmless from any and all
personal injury or property damage claims, liabilities, losses or causes of action which may arise out
of the use and occupancy of the property by the Design Builder, its family, associates, Design
Builders, agents, employees, customers and attendees. This paragraph shall survive the expiration
or termination of this agreement. Nothing in this agreement shall be constmed as the City waiving its
immunity pursuant to §768.28, at seq., Florida Statutes, or any other sovereign or governmental
immunity.
16. Public Records: Design Builder will keep and maintain public records required by the City to perform
the service. Upon request from the Clty's custodian of public records, Design Builder will provide the
City with a copy of the requested records or allow the records to be inspected or copied within a
reasonable time and at a cost that does not exceed the cost provided in Chapter 119, Florida Statues,
or as otherwise provided by law. Design Builder will ensure that the public records that are exempt or
confidential and exempt from public records disclosure requirements are not disclosed except as
authorized by law for the duration of the term of the Agreement and following completion of the
Agreement if Design Builder does not transfer the records to the City. Upon completion of the
Agreement, Design Builder will transfer, at no cost, to the City all public records In possession of the
Design Builder or keep and maintain public records required by City to perform the service. If Design
Builder transfers all public records to City upon completion of the Agreement, Design Builder shall
destroy any duplicate public records that are exempt or confidential and exempt from public records
disclosure requirements. if Design Builder keeps and maintains public records upon completion of the
Agreement, Design Builder shall meet all applicable requirements for retaining public records. All
records stored electronically must be provided to the City, upon request from the Citys custodian of
public records, in a format that is compatible with the Information technology system of the City. If
Design Builder does not comply with the City's request for public records, the City shall enforce the
provisions of the Agreement in accordance with the terms of the Agreement and may cancel the
Agreement.
IF DESIGN BUILDER HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER
119, FLORIDA STATUTES, TO DESIGN BUILDER'S DUTY TO PROVIDE PUBLIC
RECORDS RELATING TO THIS AGREEMENT, CONTACT JEANETTE WILLIAMS,
CUSTODIAN OF PUBLIC RECORDS, AT 1225 MAIN STREET, SEBASTIAN, FL 32958;
EMAIL: jwilllams@cityofsebastian.org; PHONE: 772-388.8215.
City of Sebastian, Florida / Wright Construction Group, Inc.
RFD #18.09 Design Build of City Garage and Public Facilities Storage Compound Page 3 of 4
17. Disadvantage Business Enterprise (DBE). The DBE requirements of applicable federal and slate
laws and regulations apply under this agreement, as defined in 49 C.F.R. Part 26. DBEs should have
a fair and equal opportunity to compete for dollars spent by the City of Sebastian to procure
construction -related services. Design Builder shall use good faith efforts to ensure opportunities to
compete for and perform contracts are available on the Project.
18. Waiver. The delay or failure by City to exercise or enforce any of Its rights under this Agreement shall
not constitute or be deemed a waiver of City's right thereafter to enforce those rights, nor shall any
single or partial exercise of any such tight preclude the City of any other or further exercise thereof or
the exercise of any other right.
19. Severability. If a court deems any provision of the Agreement void or unenforceable, that provision
shall be enforced only to the extent that It is not in violation of law or Is not otherwise unenforceable
and all other provisions shall remain in full force and effect.
20. Survival. All express representations, waivers, indemnifications, and limitations of liability Included in
this Agreement will survive completion or lamination of the Agreement for any reason.
21. Authority. Each person signing the Agreement warrants that he or she is duly authorized to do so
and to bind the respective party to the Agreement.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and
year noted above.
ATTEST
T((S�®EAALL)):` THE MC
CITTY//OFF SEBASTIAN-
Bale Williams, Ml/�I.X.L'-t.f;l.R'IR. BY: u//, E�j/
ITY CLERK CITY MANAGER
Approved as to form and legality for
reliance
,byy�ythe City of Sebastian on
hnfAlfb
ITY ATTORNEY
WRIGHT CONSTRUCTION GROUP, INC.
BY:��� �0
Fr M. Etlmen
PRESIDENT
City of sebastlen, Florida / Wright Construction Group, Inc.
RFD #18-09 Design Build of City Garage and Public Facilities Storage Compound Page 4 of 4
February 13, 2020
Scott Baker
Public Facilities Director, Airport Director
City of Sebastian — Public Works Maintenance and Garage Compound — Design Build
1225 Main Street
Sebastian FL 32955
RE: Preconstruction Proposal for Design Build of the City of Sebastian Public Works Maintenance and
Garage Compound — Revision 3
Dear Scott,
Wright Construction Group would like to thank you for this opportunity to present you with our
proposal for pre -construction services for the above referenced project.
We here -in propose to work on the proposed services to become the base of the contract. Construction
costs will be added in to the base contract by amendment once this GMP has been established and
approved by the City.
Our proposal is based on the following assumptions:
1. The design and construction progress schedules will be established during the preconswction
phase and coordinated with the City.
2. The construction budgets are currently yet to be established
Preconstruction services include the following:
1. Work with the City and BSS W to develop the project to the construction phase based on
meetings with the City.
2. Manage the design services being performed by BSSW and their sub consultants.
3. Survey and geotechnical soil borings are included by the Civil Engineer in the preconstruction
proposal.
4. Perform redi-check and Clash Detection on the construction documents to identify any conflicts,
questions, omissions, and submit requests for information (RFI's) to the design team for
clarification.
5. Prepare milestone documents for the Review and Approval of the City including a Schematic
and Design Development set in addition to the final for construction set of documents
6. Develop a schematic estimate for the project based on design concepts prepared by the Architect.
7. Develop a progress estimate to within 10 % of the cost of the project, when the design
development documents are developed to 50-60 %.
8. Provide and recommend value engineering and cost savings alternatives throughout the process.
9. Attend project related meetings and provide written records of the meetings (as required).
10. Solicit and pre -qualify subcontractors and vendors for the project.
11. Develop bid packages for all major components of the project to issue with bid invitations..
12. Provide the appropriate bid documents needed for subcontractor and vendor pricing.
13. Advertise and solicit bids via our on-line plan room, and other public sources
14. Conduct pre -bid meetings to inform prospective bidders and minimize unknowns.
15. Provide additional Value Engineering received from Subcontractors and Vendors after the
bidding process has been completed and before the GMP is submitted.
16. Identify critical scheduling issues and develop milestones as required.
17. Prepare a construction detailed schedule to attach to subcontracts when issued.
18. Develop a Phasing Plan (if required)
19. Develop a Site Utilization Plan
20. Establish the Guaranteed Maximum Price (GMP).
21. Include an owner's contingency in the GMP.
We propose to present this project in a series of GMP's (Guaranteed Maximum Price) and not to restrict
it by line item.
ALL design services for Schematic. Design Development, and GMP Phases from BSSW and sub.
consultants required to establish the GMP are included in this uronosal.
The Project contingency will be managed by the project team with the entire unused portion returned to
the Owner upon completion and close out of the final pay application. The Project contingency will not
be spent without approval from the Owner.
Our proposed lump sum fee for the above services is $ 386,857.00 (Three Hundred Eight Six
Thousand Eight Hundred Fifty Seven Dollars) which will be invoiced on a periodic basis as
preconstmction milestones are achieved.
We propose to prepare the general conditions necessary to manage the construction phase of the project
and submit them with the Guaranteed Maximum Price.
Please review our proposed scope of services for this phase of your project and contact me with any
questions or comments regarding same.
Respectf 11 Submitted,
Scott Loiacano
Senior Project Manager
Page 2 of 2
City of Sebastian
Public Works Building
Preconstruction Phase Services
2/13/2020
Schematic Design Phase
Develop the preliminary conceptual design and subsequent schematic design documents. This
preliminary phase will also include the necessary site survey and geotechnical testing. Aschematic
estimate will be created from all available documents provided by BSSW and Carter Associates. The
schematic estimate will include the new Public Works Building with all associated sitework and
related Infrastructure improvements, Schematic design phase will include some V.E. as we consider
major building components. $86,830
Design Development Phase
Once the preliminary design Is approved, we will proceed with the design development drawings. At
this stage, the design will begin to fill in the details of the major strucutral and MEP elements as well
as architectural details and specifications. In addition to developing the building details and the major
structural and MEP design elements, these documents will also Include the major site plan
development Including drainage and utilities, all zoning and other items required for the city's
checklist of requirements. We will provide more detailed estimates at this stage and verify that the
design team is working within the budget parameters established in the Schematic Stage. We will
also begin looking at Constructability and Life Cycle Costs of the building elements and make
recommendations to the City and the Design Team where appropriate. Value Engineering as a
process Is integral with this effort and will continue through Design Development. $101,700
GMP Phase
At this stage in preconstruction, all construction documents shall set forth in detail the requirements
for the construction of the project. This will Include all final structural, mechanical, and electrical
calculations, drawings, and specifications. Any required offsite sanitary designs are included. In
addition, all permitting services will be finalized in this phase as well. (permit fees are not included)
Detailed scopes of work will be finalized for each division of work. The subcontractor bid process will
be expanded at this point to Include broadcast advertising through multiple outlets, prequalifying,
and holding pre -bid meetings to ensure an understanding of scopes, schedule, and site constraints.
Redi-Check will be performed again to flush out any potential issues in the documents. Final CPM
schedules will be created for each phase of the project. RFPs will be coordinated with the appropriate
design professionals. Material purchases will be negotiated with major suppliers where
advantageoud to the City. Receive, review, and qualify bids from subcontractors. Finalize GMP for
presentation to the City of Sebastian. $171,220
Misc. Administrative Costs $0
G/Llnsurance $1,799
Subtotal $361,549
7%Fee (OH & P) $25,308
Total Preconstruction Phase Services $386,857
* NOTE: Included in WCG Preconstruction Services above are ALL Civil Architectural. Structural & MEP Designs for
ALL Phases. Preconstruction obese services amount above is ALL inclusive.,
:� cep:
February 13, 2020
Scott Baker
Public Facilities Director; Airport Director
City of Sebastian —Public Works Maintenance and Garage Compound — Design Build
1225 Main Street
Sebastian FL 32958
RE: Preconstruction Proposal for Design Build of the City of Sebastian Airport Drive West Off -Site
Utility Project
Dear Scott,
Wright Construction Group would like to thank you for this opportunity to present you with our
proposal for pre -construction services for the above referenced project.
As requested, we here -in propose to work on the proposed services to become the base of the contract
Construction costs will be added in to the base contact by amendment once this GMP has been
established and approved by the City.
Our proposal is based on the following assumptions:
1. The design and construction progress schedules will be established during the preconstruction
phase and coordinated with the City.
2. The construction budgets are currently yet to be established.
Preconstruction services include the following:
I . Work with the City and Carter and Associates, Inc. (Civil Engineer) to develop the project to the
construction phase based on meetings with the City.
2. Manage the design services being performed by Carter and Associates, Inc. and their sub
consultants.
3. Survey services are included by the Civil Engineer in the preconstruction proposal.
4. Provide civil construction documents and specifications for review with the City of Sebastian
any other municipalities.
5. Electrical design for grinder pump station connections located at existing and future private
residences is not included at this time.
6. Electrical design and estimates for connection to the regional lift station is included in the base
project preconstmetion and conceptual design estimates.
7. Perform a constructability review of the project construction documents and specifications.
8. An opinion of probable cost to be developed during the design development stage.
9. Attend project related meetings and provide written records of the meetings (as required).
10. Provide the appropriate bid documents needed for subcontractor and vendor pricing.
11. Advertise and solicit bids via our on-line plan room, and other public sources
12, Conduct pre -bid meetings to inform prospective bidders and minimize unknowns.
13. Prepare a construction detailed schedule to attach to subcontracts when issued.
14. Develop a Phasing Plan (if required)
15. Develop a Site Utilization Plan
16. Establish the Guaranteed Maximum Price (GMP).
17. Include an owner's contingency in the GMP.
We propose to present this project in a series of GMP's (Guaranteed Maximum Price) and not to restrict
it by line item.
ALL design services for Design Develooment. and GMP Phases from the Civil Engineer, Carter
and Associates. Inc.. and sub consultants required to establish the GMP are included in this
proposal.
The Project contingency will be managed by the project team with the entire unused portion returned to
the Owner upon completion and close out of the final pay application. The Project contingency will not
be spent without approval from the Owner.
Our proposed lump sum fee for the above services is $ 59,478.00 (Fifty -Nine Thousand Four
Hundred Seventy -Eight Dollars) which will be invoiced on a periodic basis as preconstmction
milestones are achieved.
We propose to prepare the general conditions necessary to manage the construction phase of the project
and submit them with the Guaranteed Maximum Price.
Please review our proposed scope of services for this phase of your project and contact me with any
questions or comments regarding same.
Respectfully Submitted,
Scott L acano
Senior Project Manager
Page 2 of 2
City of Sebastian
Public Works Off Site Utilities
Preconstruction Phase Services
2/13/2020
Schematic Design Phase
Preliminary design sketches to identify scope. $0
Design Development Phase
Once the preliminary design is approved, we will proceed with the design development drawings.
Includes coordination of lift station location, multiple progress meetings, design analysis, grant
application coordination, including updated sketches and opinions of probably costs. Electrical design
to the lift station and actual power will be included in the garage compound project. Electrical design
to grinder pump stations from existing and future private residences is not included at this time.
Includes topographic surveys required, locates of existing driveways, elevations, and proposed
property lateral connections. Includes regional lift station design to existing properties on Airport
Drive West and 4 Each proposed service lateral connections to properties. Includes formal
construction plans and specifications for the gravity sewer, force main, and lateral connections as
required. Includes complete permitting services for Indian River County (Utility), City of Sebastian
(Right Of Way), and FDEP (General Permit for Construction of Wastewater Collection System). Wright
Construction group to facilitated and coordinate as necessary. $30,950
GMP Phase
At this stage in preconstruction for the off site utilities, all construction documents and specifications
have been completed prior. Necessary permitting will also be well underway. The subcontractor bid
process will begin at this point to include broadcast advertising through multiple outlets, and holding
pre -bid meetings to ensure an understanding of scopes, schedule, and site constraints. Redi-Check
will be performed again to flush out any potential issues In the documents. Final CPM schedules will
be created. RFI's will be coordinated with the appropriate design professionals. Material purchases
will be negotiated with major suppliers where advantageous to the City. Receive, review, and qualify
bids from subcontractors. Finalize GMP for presentation to the City of Sebastian. Construction
services for Carter and Associates, Inc. are Included in this proposal, Includes Civil Engineering "on -
site" representation as necessary and system certification and "as-builts" for permitting agencies. $24,360
Misc. Administrative Costs $0
G/Llnsurance $277
Subtotal $55,587
7% Fee (OH & P) $3,891
Total Preconstruction Phase Services $59,478
* NOTE: Included in WCG Preconstruction Services above are ALL CIVIL DESIGN AND CONSTRUCTION SERVCIES,
Preconstruction chase services amount above is ALL Inclusive.