Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2001 Water Assessment Project (Box 30 #12)
V CO D A N j . -L F A I s CITY 0 S-, ST.A.-N UCTr---" NO.. #859 --r T T T't ti REVIEWED AND APPROVED BYE L GORDON E. SPARKS, P,E. #23161 4 SHEET, 2 �o u N N e d < m N I � ,SHEET 3 a y ' r �TM M« x 0 a 0 vl e SHEET 4 9 -" b Z Ci y � Z y SHEET .5 0 GORDEIN SPARKS, ELA, P,E, No, 23161 Revision Date By No, Revision _Date By �vE'P� INDIAN RIVER COUNTY DEPARTMENT OF TECHNICAL BY; RICHARD BLANKEN, C.E.T DATE: JULY 2001 SEBASTIAN WATER ASSESSMENT U.S. 1 SHEET DESIGNED BY: GORDON SPARKS 1 — - 1840 25th STREET -- - SCALE: V = 300' 859 _ VERO BEACH, FLORIDA 32960 CHECKED BY: GORDON SPARKSI u ORI�� 561 567-8000 UTILITY SERVICES APPROVED BY: GORDON SPARKS INDEX OF \___.� non ---� REMOVE 8" CAF INSTALL TEMPOF SAMPLE POINT INSTALL 90° M.J. BEND AUTO REPAI -- 705 U-S,1 � Y I AUTO LOT Q E `Y 701 U.S,1 / INSTALL (2) 45' _ M.J. BENDs 100 -- t--- -- -0E (7. i i II F• O+CJO q STA 1+00 I � y II w C.R. 512 `v/ E S T ONNECT AUTO] —INS, JUMPER HAM & EGG 717 U.S,1 709 U.S,1 d w 50 100 80 Q Q Z T 0 �1 4 S A. 13 ST A 1 07 S C� Q - - --- Of Lij CL O= W IU- W Q STA. 2+00 STA. 3+00 SR-5 (US-1) I t � I � i F 3 E v L FTI DISCOUNT AUTO 949 U,S,1 ---- 1 -- BARKER --� AUTO � 00000 ` 825 U.S.1 0070 PARTS I�-- 00002,0 00000 00000 J 0070 0060 00003.1 — 00002.1 # 8 21 C--------- ----- INS ALL F.H.A CONST. 8" DIP. 'W.M. 12' FROM EDGE OF TRAVE WAY # 9 1 — w/ MIN. 36" COVER (SEE DETAIL M-2) 100 100 & RE TOR ASPHALT ROA IN KIND. j142,7 - 30 mm PVC -- —{7E (7,6_KV} --- c, STA 4+00 STA. 5+00 STA. 6+00 / STA 7+00 - - �- - --- _ - --- -- STA. 8+00 M.J. TEE 8" M.J.G.V b NSTALL 8" M.J.G.V PIPE CROSSI G � = PIPE CROSSING Y � ( SEE DETAIL M-6 TYPICAL SEE DETAIL M-6) TYPICAL p INSTALL " x 8" M.J. TEE (2) 8" .`J.G.V.s I \ (9 - 100 mm PVC)- - -- ------ ---0E (7.6 K V->------ — — i I, STA. 151-00 STA. 16+00 PIPE CROSSING ( SEE DETAIL M-6) TYPICAL moor -qwmwp--1 ✓�� CONST. 8" L�1P. W.M.- - (— AS SHOWN w/ MIN. 36 COVER COVER & RESTOREiN KIND. 1> z REMOVE 6" CAP & CONNECT INSTALL TEMPORARY JUMPER SAMPLE POINT INSTALL 8" x 6" M.J. REDUCER it---- -, �# 10 0 5 ill A TO Z❑ E I, OBERBEC 1 21 U,S, INSTALL F.H.A .1013 U , S .1 100 -o STA A 18 00 -� PIPE CROSSING Y � / I � CONST. 8" DIP. W.M. i j --{ AS SHOWN r -+ /w/ MIN. 36" COVER & RESTORE IN KIND. <. I � „ 1 M 00000 0060 000012.1 '� a CONST. 8" DIP. W.M. 12' FROM EDGE OF TRAVEL WAY w/ MIN. 36" COVER & RESTORE ASPHALT ROAD IN KIND. 227,66 ST 1 A C CC SIA q- Dr FAX HOLLOW 00000 0060 00002,0 J � r#909 I. STA. 9+00 U-HAUL CARPET STORE 00000 �� 0060 0000 % 000010,0 0060 /uUUUy.O/ ----� • j % � # 92 S #911 / � #905I # 91 S 63,68 ---J /I STALL F.H.A - STA. 10+00 i INSTALL F.H.A I i I i -+ 85 65 50 E (7 6 K -:70 N V f STA, 1I+00 v: A > rn STA. 12+00 = CO - - _r p Z� SR-5 (US-1) m d --------__ (mil j --- j---� RV PARK 1105 U,S.1 S STA 2v iA ., � 00 220 STA. A 23+ DO 26' R.C.P, f 366.47 I STA. 24+00 STA, 25+00 lr—! Z m r cu m cc) (n m Crl I .. I I • REMOVE 6" CAP & CONNECT �_- INSTALL TEMPORARY JUMPER SAMPLE POINT INSTALL 8" x 6" M.J. REDUCER nrn { ti <c GORDON SPARKS, ELA. P.E. No, 23161 ReVISIOYI Date B NO. Revision Date B wER� DEPARTMENT �� TECHNICAL BY RICHARD SLANKEN, c.E.T SHEET y y INDIAN RIVER COUNTY DATE, JULY 2001 SEBASTIAN WATER ASSESSMENT U.S. � DESIGNED BY. GORDON SPARKS - _ -- SCALE V = 40' ' 1840 25th STREET CHECKED BY. GORDON SPARKS G. ___ — ^__ �� P• 2 - VERO BEACH, FLORIDA 32960 UTILITY s ERVIC ES UCP 811) PLAN OF c C©RZ� (561) 567-8000 APPROVED BY: GORDON SPARKS OUNL13 INSTALL F.H.A -A 1 1� J CONST. 8" DIP. W.M. i )' c-orNk A EDGE OF TRAVEL WAY w/ MIN. 36" COVER (SEE DETAIL M- 40 60 REST RE ASPHALT ROAD IN KIND. 1 123 99,35 < 1- .1 kin 1110 mm rv�� �b - Ullu P)m vul BT (400 PR)- IN Lu V) LIJ �7A TA. 51+00 STA 52+00 STA. 53-00 STA. 54+00 --- ----- LLJ INSTALL 8" M.J.C,.V 0 SR-5 (US-1) F— — ----- - - -- - ----- OE 0,6 bi Li 6 K 4 CLARKWATER 1615 U.S. I//. "Vc - T 777 L ni I SEBASTIAN CENTER 16,27 U.S, I INSTALL F.H.A CDNbLltlft Ld I - 0 Ld ---_---INSTALL 8" M.JG.V ry -sTA'-'oo- CL 0 S SR-5 (US-1) R-5 (US-1) cnLd < PT (200 PR FLDRIDA EYE 1619 U, S, I r Ln STA 56400 LTk cr, +00 I COOPER TIRE 1647 U, S. I 174,92 < T:Ld 174,92 =731 Cn STA. 67+00 CD ii ALK-IN CLJINI 1621 U.S. I 100 COST. 8" DIP. W.M. 12 FROM EDGE OF TRAV* WAY wl MIN. 36" COVER (SEE DETAIL I & ESTORE ASP Al ROAD IN KIN I rilh INSTA REALTOR 1623 U,S, I 200 BT (25 PR)- - • 1671 U IS- I I INSTALL F.H.A; A — 2), 00 STA 59-00 AUTO LOT 1677 U:S, I 200 STA60+00 WENDY'S 1625 U.S. I li� BT (600 PR) 200 BT (400 PR (480 R') K: Lo > m I m CID 0 SiA 6 8 0 STA -,0+00 4, 6 9 + ('0 2 - 0 0 M 0 17— rTl �76 KAO-- 10 / LJ F-1 D T 7 F-1 I\ I T A I T STA. 61i-00 BT (400 PR)- C > m m r STA. 62,00 r- 0 z 0 m r m m r- I m m 0 13 L9 1�1 PRI]POSED 8// DIP, WX0 S - I E C TYPT l REVIEWED AND APPROVED BY, GORDON SPARKS, FLA. P,E, No, 2316I Revision Dote By No, Revision Date By -`Vc)`3 TECHNICAL BY: RICHARD BLANKEN, C.E,T DATE, DULY 2001 SHEET INDIAN RIVER COUNTY DEPARTMENT OF DESIGNED BY: GORDON SPARKS SEBASTIAN WATER 4S SESSMENT U.S. 1 1840 25th STREET SCALE: 1' z 40' 4 VERO BEACH, FLORIDA 32960 CHECKED BY: GORDON SPARKS "4 nc u 4 (561) 567-8000 UTILITY SERVICES APPROVED BY� GORDON SPARKS cP # g59 P LAN OF 0 t ; 'r _ INSTALL 8" M.J. CAP 9 t h ; INS 1• 3: 4i INSTALL 8" M.J.k-7.v. �r i' PARK A V INSTALL 11.25' Q M.J. BEND l o P CONST. 8" DIP. W.M. L4 12' FROM EDGE OF TRAVEL WAY m w/ MIN. 36" COVER (SEE DETAIL M-2) 1 & RESTORE ASPHALT ROAD IN KIND. 100 r�M PVC)— 0_ - - a- r LL. r INSTALL 8" x 8" QW 1 -___ 7i) M.J. TEE �- - - - STA, 73+GO - STA %4+00 lE �" WQ i" _ll Revision Date By Nal Revision Date By ,uveR •�tGNPI • i0th INSTALL 8" x 8" M.J. TEE 8" M.J.G.V. 8" M.J. CAP INSTALL 1 1.25• M.J. 1f C7.6 C7.6 KV}----- — F— STA. 76+00 STA. .+00 S_A 8+00 REMOVE 1 6" CAP & CONNECT INSTALL 16" x 8" M.J. REDUCER SR-5 (US-1) 90• M.J. BEND INSTALL TEMPORARY JUMPER \� SAMPLE POINT 1I-th TACO BELL PIZZA HUT K. F. C. wv wv EX-1- "- 6'- W.M_- GE c7.6 -K4 - ------- --- ----- - — --- - --- - -- --- - T (8 100 mm PVC) -BT'f�3QQ_ PR)-- - ---- --------- - -- - - --- - -------- ---- --- - -- 330 rA. +oo INSTALL 8" x 8" S rA 80+00 M.J. TEE SR-5 (US-1) wd EX_16' W.M, __-- -- --------- ---- ------- =aj-- r � �f GORDON SPARKS, FLA. P,E, No, 23161 N D I A N RIVER COUNTY DEPARTMENT OF TECHNICAL BY; RICHARD BLANKEN, C E.T DATE, JULY 2001 SEBASTIAN WATER ASSESSMENT HEET DESIGNED BY: GORDON SPARKS U. S. 1 PARK AVEAV E 1840 25th STREET scALE: 1• = 40� / VERO BEACH, FLORIDA 32960 ti �j R �%j (� CHECKED BY: GORDON SPARKS (561) 567-8000 UTILITY SERVICES V IC ES APPROVED BY GORDON SPARKS ucp 859 PLAN OF I DETECTION TAPE SEE NOTE ill MAINTAIN TRENCH WIDTH 2'-0' ABOVE TOP OF PIPE -, MAXIMUM WATER LEVEL ALLOWABLE DURING CONSTRUCTION 3/4' DIA. BEDDING ROCK OR PEA ROCK WHERE CONDITIONS REQ'D, NOTES PROVIDE TRENCH SLOPE AS REQ'D. GRADE (tJ > 6' MAX. LAYERS OR OTHER APPROVED U METHOD TO ACHIEVE 95Y COMPACTION SEE NOTE 4 M iu r r 4' MAX. LAYERS AT 957 12' PIPE 12' ITHTRENCH UNDISTURBED ,S❑IL W, 1. WHERE SOIL CONDITIONS CANNOT BE MAINTAINED AS SHOWN ABOVE, PR❑VIDE APPROVED METHOD OF C❑NSTRUCTI❑N. SHEETING WILL BE REQUIRED AS DETERMINED IN THE FIELD. 3, COMPACTION PERCENTAGES SHOWN REFER TO A.A.S.H.T.O. T-180 4, MECHANICAL C❑MPACTION NOT ALLOWED BELOW THIS LEVEL. 5. TRENCH WIDTH 'W' = PIPE O.D, PLUS 2'-0'. 6, 2' WIDE IDENTIFICATION TAPE (NON-METALLIC) TO BE ATTACHED TO PIPE. TAPE TO BE MARKED - WATER LINE, FORCE MAIN OR REUSE, TRACE WIRE SHALL BE ADDED CONTINUOUSLY ON ALL PIPE. (SEE DETAIL M-16) 7. ALL RESTORATION IN EASEMENTS OR RIGHTS OF WAY OR WHEN REQUIRED BY OTHER JURISDICTIONAL AGENCIES IT SHALL CONFORM TO COUNTY UTILITIES SPECIFICATI❑NS OR THE OTHER JURISDICTIONAL AGENCY SPECIFICATIONS, WHICHEVER IS MORE STRINGENT DRAWING UNPAVED AREAS) NO, TRENCH DETAIL M-1 EXISTING BASE TRENCH WIDTH 'W' + 4' MIN. SURFACE RESTORATION 6, MECHANICALLY MIN, SAW EXISTING PAVEMENT •. .• .•T• - .• tttttttt/,//tttt/ • -. • •• • • • t t t t t t t t/ t///// t/ •' . X/�REPLACEMENT wa cy SEE NOTE 6 IMEROCK BASE w IN 3 LIFTS AT w 6' MAX. LAYERS OR 98% v OTHER APPROVED METHOD TO ACHIEVE �j (n 95% COMPACTION 4' MAX. � MAX. WATER LEVEL ALLOWABLE DURING LAYERS 0��t CONSTRUCTION AT 95% 3/4' DIA, BEDDING ROCK IPE 12' OR PEA ROCK WHERE 12' PUNDISTURBED SOIL CONDITIONS REQUIRE O.D. TRENCH WIDTH 'W, NOTES 1. WHERE S❑IL CONDITIONS CANNOT BE MAINTAINED AS SHOWN ABOVE, PROVIDE APPROVED METHOD OF CONSTRUCTI❑N. 2. SHEETING WILL BE REQUIRED AS DETERMINED IN THE FIELD. 3. NEW SURFACING MATERIALS SHALL BE CONSISTENT WITH EXISTING AND SHALL HAVE LAPPED AND FEATHERED JOINTS. (1-1/2' MIN. THK.) 4, COMPACTION PERCENTAGES SHOWN REFER TO A.A.S.H.T,D, T-180. 5. ALL ROADWAY REST❑RATION SHALL COMPLY WITH INDIAN RIVER COUNTY PUBLIC WORKS / F,D.O,T. STANDARDS. 6, MECHANICAL COMPACTION NOT ALLOWED BELOW THIS LEVEL. 7. TRENCH WIDTH 'W' = PIPE ❑.D. PLUS 2'-0'. 8. 2' WIDE IDENTIFICATION TAPE (NON-METALLIC) TO BE ATTACHED TO PIPE. TAPE TO BE MARKED - WATER LINE, FORCE MAIN OR REUSE. TRACE WIRE SHALL BE ADDED CONTINUOUSLY ON ALL PIPE, (SEE DETAIL M-16) DRAWING (PAVED AREAS) N& TRENCH DETAIL M-2 24' X 24' X 6' THICK CONCRETE PAD AT EACH VALVE BOX WITH (1) - NO. 3 0 CONTINU❑US. (SHALL BE 36' X 36' IF LOCATED INS TRAFFIC WAY.) WATER 0/1 NOTES 1. VALVE BOX LID SHALL BE PAINTED BLUE FOR WATER AND YELLOW FOR FORCE MAINS, DRAWING NO. VALVE BOX PAD M_g AIR RELEASE VALVE 2' DIAMETER STAINLESS ST OR BRASS NIPPLE 2' STAINLESS DOUBLE STRAF SERVICE SADI WATER MAIN NOTES 0 n 0 0 0 0 0 0 0 0 0 0 ^ w va .a N o 0 0 0 0 0 0 0 0 ^ N N n v 3 = N N o 0 0 0 0 0 0 0 � o N OOD N d � Io 0 0 0 0 0 0 0 ^ o w N N i Iy N o 0 0 0 0 0 ^ o 6 0 o N o M L d i1J N L 0 O o 0 0 0 0 o M o N f � N N N � s � 4 a a v � o 0 o a Q L J s � o o a, T N NN vN 'N +' UI ^ N v � L v o 06 In in I` in Q, o b N o .D n 0+ u, N it N in N 6 O L 41 W N } LA o, �W=0 d c0 00 N IO It O0 (D Q aQ� � N N 7 D, o O o 0 0 N N N N o 0 0 cu o foil N [U (n 0h v 7 In o 0 o J N d O S E v n U N N m V ILO 0 ^ co a, o W � •' pQi v LO co T � N o N o cv N N o 0 0 �v v }Q) d ,� LA o vv �� ds N to N M d j `z L L d d S_s -� N o s o s i o 0 0 o N b N. in N o m 6 ( b v un v 6 U) 6 .D LA ^ d N N N v 1 S Cn -- v v s In uT o in o o o o In o++ L+ -I N tM m c U1 ID h OD a, E Ql 0) U1 v o 0 v �� N 0\ M UU-) ID OD a, ID Q E N N N o vas wN t tnm E L asL a>CD U N ID DO f M d t0 DO +' L 4- +' a a, "v ul �40 CLto 0° DRAWING RESTRAINING NO SCHEDULE AND NOTES M - 5 B I/2, P.V.C. AND FITTINGS 2' DIAMETER STAINLESS STEEL OR BRASS NIPPLE 2' BRASS CURB STOP 1. AUTOMATIC AIR RELEASE VALVE TO BE LOCATED ONLY WHERE CONDITIONS MAKE IT INACCESSABLE OR AS REQUIRED BY THE I. R. C. D. U. S. 2, AIR RELEASE RISERS TO BE IN A VERTICAL P❑SITI❑N AND PLACED AT SUMMITS IN THE SYSTEM. 3, AIR RELEASE VALVE TO BE INSTALLED ABOVE SURROUNDING GRADE PER. D. E. P. 4, SEE TRACER WIRE DETAIL. DRAWING (AUTOMATIC - WATER / SEWER) NO, ABOVE GROUND AIR RELEASE VALVE DETAIL M-101? 0 GRADE OBSTRUCTION__�_o Ngmqlll� 36' MIN. COVER " PRESSURE MAIN RESTRAINED JOINTS 45° OR 22 1/2' ENCASE AS REQ'D. BENDS (M.J.) SPECIAL UTILITY CROSSING - FITTING TYPE 18' MINIMUM CLEARANCE REQUIRED FOR WATER, STORM WATER, AND SANITARY SEWER MAIN CROSSINGS. D.I.P. WITH MECHANICAL JOINTS OR CONCRETE ENCASEMENT IS REQUIRED IF MINIMUM CLEARANCE CANNOT BE ❑BTAINED, GRADE SLOPE TO ❑BSTRUCTI❑N 36' MIN. C❑VER----_� SEE NOTE NO. 2 PRESSURE MAIN FOR ACCEPTABLE DEFLECTION CENTER A FULL LENGTH OF PIPE AT THE ENCASE AS REQ'D. POINT OF CROSSING STANDARD UTILITY CRUSSING - DEFLECTION TYPE N❑TES L THE DEFLECTION TYPE CROSSING SHALL BE USED WHEREVER POSSIBLE, ONLY UNDER SPECIFIC ORDERS BY THE ENGINEER SHALL THE FITTING TYPE CROSSIING BE ALLOWED. '2. CONSTRUCT STANDARD CROSSING NOT TO EXCEED 75% OF THE MANUFACTURE'S MAXIMUM JOINT DEFLECTION. 3. IF USED, TIE RODS ARE TO BE COATED WITH A COAL TAR ENAMEL AFTER ASSEMBLY, (2 COATS MINIMUM.) 4. OTHER METHODS OF RESTRAINT MAY BE USED AS APPROVED BY I.R.C,D.U.S. 5. USE ENCASEMENT WHERE VERTICAL CLEARANCE BETWEEN WATER MAIN & SEWER IS LESS THAN 18 INCHES. D.I.P. WITH MECHANICAL JOINTS MAY BE USED IN LIEU OF CONCRETE ENCASEMENT AT WATER LINE CROSSING WITH A LENGTH OF PIPE CENTERED AT THE POINT OF CR❑SSING, SO AS TO LOCATE JOINTS AT A MAXIMUM DISTANCE FROM THE WATER LINE. 6. SEE TRACER WIRE DETAIL. DRAWING NO. UTILITY CR❑SSINGS M-6 NOTE: 1 TRACE WIRE IS REQUIRED ON ALL PIPE. 2. INCLUDE ALL COST OF MATERIAL & LABOR IN PRICE OF PIPE. 3. CONTRACTOR RESPONSIBLE FOR CONTINUITY OF ALL TRACE WIRE, 4. ALL SPLICE CONNECTIONS ARE TO BE HOT SOLDERED (50/50 RESIN CORE), WRAP W/3 ALTERNATING LAYERS OF SCOTCH '33" TAPE & COVER WITH SCOTCH WATERPROOFING COMPOUND, 5. SHRINK WRAP MAY BE USED INSTEAD OF SCOTCH WRAP 6- VERIFICATION OF SIGNAL IS REQUIRED UPON COMPLETION OF CONSTRUCTION. TO PUT CONTINUOUS TRACE WIRE UNDER BOLT, FIRST LOOSEN NUT, THEN STRIP 3" MIN., WRAP ONCE STRIP 3/4" OF MAIN AROUND BOLT, I TWIST, 2 WRAPS 3/4- WIRE & 4' OF BRANCH "DO NOT CUT WIRE" &MAX. TIGHTEN NUT AFTER WRAPPING TRACE WIRE AROUND THE BOLT. FFTI WRAPS SOLDER WRAPS UHANUH SNLIUL ULIAIL FINISH GRADE PUT WIRE UNDER BOLT SEE DETAIL ABOVE. CONTINUOUS THHN SINGLE CONDUCTOR STRIP 4" MIN, >STEP OOPPER TRACE WIRE HALF HITCH HALF HITCH ON BEHIND EACH EACH SIDE OF BELL. ALL VALVES FINISH GRADE - EP--, MIN. 3 TWISTS ! / / / M , BRANCH SPLICE AT ALL TEES. FIRE HYDRANTS &SERVICE TAPS STEP 2 p14 THHN SINGLE CONDUCT COPPER TRACE WIRE. MIN, 5 WRAPS I HALF HITCH AT ALL SERVICE TAPS, SOLDER STEP 3 & EACH ENO OF ALL FITTINGS. STEP 4 MAIN LINE SPLICE DETAIL ! i TRACE WIPE DETAILS N.T.S. TRACE WIRE DRNO. DETAIL_ M-1C ASPHALT SURFACE FINISHED GRADE (--- 36' SQUARE �`-- 24° SQUARE xX %X,Xx.X X..xX XX 'XX XX.X 2• o X o X. .Xx. x•X X•x•;�X .x X. Xx`(•X x,x.xX 'X xx, °.° 'xo (1) NO. o X6x. °. X° x° X °° C❑NTIN. ° x x . ° x° c ° . R ° X° Xo CONCRETE ONE (ll PAD NO, 30 SLIDE TYPE / C❑NTIN. LIMEROCKJ VALVE BOX BASE SLIDE TYPE VALVE Box TYPE I TYPE,, II POLYETHYLENE (VISQUEEN CAST IRON STAY -PUT COVER OR EQUIVALENT) RAISED LETTERS MARKED: 'WATER' AS APPLICABLE OR 24' MAX. 'SAN. SEWER' AS APPLICABLE Ixllx Xx>XX XX XX X,x x,x x O.ODa W TYPE I TYPE II z PROVIDE EXTENSION AS SHOWN , M NOTES 1. SEE TRACER WIRE DETAIL. DRAWING NO. VALVE AND BOX M_7 ASBUILT 8' PLUG CD gs �+ T.O.P. EL. 4.63 NOTE: A MINIMUM TEXT SIZE OF 1/8' ea Z c) i SHALL BE REQUIRED ON ALL R ASBUILT 8' P.V.,R-6 TURNS ASBUILT SURVEY'S. PRM `1( i STA. 0+37 T.O.P. EL. 4.40 -R/W r ASBUILT 8' 90° BEND TIE BEGUMJiNG A END OF C@IST. INTO EXISTNG T 7 STA. 0+62 WITH KNOWN STATE PLANE ORDINATES AND SHOW ON T.O.P. EL. 4.42 ASBUILTS. ASBUILT 8' FORCE MAIN PAVEMENT o ASBUILT 8' 22 1/2' BEND F.M. UNDER W.M. lf z o STA. 1 + 15 W/ENCASEMENT 3 I- T.O.P. EL. 4.89 W.M. T.O.P. EL. 6.44(04 STAR. >23+ 18 (18' L) �x ASBUILT 8' 22 1/2°BEND F.M. UNDER SAN. S. AIR RELEASE w STA. 1+22 F.M. T.O.P. EL. 5.50 VALVE OVER W.M. T.O.P. EL. 6.52 SAN. S. T.O.P. EL. 6.40 STA. 1+38 ASBUILT A.R.V. TAP W.M. 70.P: ELA �.43 STA. 1+28 ASBUILT 8' SLEEVE 1 STA. 122.25 (18' LEFT) 3' P.V. T.O.P. EL.' 5.32 11 R-114 TURN q CORNER OF BLDG, STAR. 2+75 � F. M. UNDER TEL. R / W H CO � F.M. T.O.P. EL. 5.35 !n TO TEL. EL. 6.25 0 + N R/W co LINE 25' .T 3+0 T T zo 121+00 122+00 123+00 PRN 8' SAN. S, ASBUILT 8' P.V., NOTES (EXISTING) R-4 TURNS 1. ITALICIZED PRINTING SHOWN ABOVE REPRESENTS THE MINIMUM INFORMATION STA. 122+ 74 TO BE PROVIDED BY THE ENGINEER'S/CONTRACTOR'S SURVEYOR TO IRCDUS T.O.P. EL. 4.40 ON REPRODUCIBLE ASBUILT SURVEY DRAWINGSI ALL ASBUILT SURVEY'S TO BE SIGNED, SEALED AND DATED. SURVEY DRAWINGS SHALL ALSO BE PROVIDED ON A 3 1/2' COMPUTER DISK IN AUTOCAD R12 OR R13 FORMAT OR LATEST. IF A CADD SYSTEM IS NOT AVAILABLE, ORIGINAL ASBUILTS SHALL BE FURNISHED AND'WILL BE SCANNED INTO AN•AUTOCADD R13 FORMAT BY IRCDUS FOR DIGITAL STORAGE. A FEE STRUCTURE IS AVAILABLE AT THE OFFICE OF INDIAN RIVER COUNTY, DEPT. OF UTIL. SERVICES. ( SEE M18A, M18B & M18C FOR ASBUILT/CONSTRUCTION REQUIREMENTS.) 2. BASELINE OF CONSTRUCTION & STATIONING OF ITEMS TO BE ON THE CENTERLINE OF THE PIPE, 3. TOP OF PIPE ELEVATIONS & STATIONING TO BE TYPED, LISTED, SEALED & SUBMITTED FOR THE ENGINEER TO LOCATE THE AIR RELEASE VALVES AS CONSTRUCT113N PROCEEDS, 4. CONTRACTOR TOINDICATE THE SIZE, TYPE, DIRECTION AND NUMBER OF TURNS TO CLOSE EACH VALVE. 5. CONTRACTOR TO PROVIDE NAME OF BUSINESS OR RESIDENCE, STREET ADDRESS AND TAX I. D. NUMBER FOR ALL PROPERTIES ADJACENT TO LINE EXTENSIONS. 6. ASBUILT UTILITY LINES SHALL BE SHOWN WITH A WIDER SOLID LINE. EXISTING UTILITY LINES SHALL BE SHOWN WITH A THIN DASHED LINE. (EXAMPLE) DRNO, Na., ASBUILj DRAWING M-17 REVIEWED ANDAPPROVED BY CORDON Er SPARKS, FL, P,Er# 23161 PC-VISIOYI SHEET � Date By NO. R2VISIOYI Dote By `2NE,p TECHNICAL BYE RB DATES JULY tool -- - INDIAN RIVER COUNTY DEPARTMENT of DESIGNED BY: GS SEBASTIAN WATER ASSESSMENT STANDARD 1840 25th STREET SCALE N/A _ ,•�<II VERO BEACH, FLORIDA 32960 UTILITY SERVICES CHECKED BY. Gs uCP # U C P D ETAI L�J - o� ! 03P1 (561) 567-8000 APPROVED BY: Gs I 4LL FROM RIGHT OF WAY (TYP.) NOTES 1. VALVES SHALL BE LOCATED SO THAT ONLY 3 VALVES ARE REQUIRED TO ISOLATE ANY 2 RESIDENTIAL OR 1 COMMERCIAL BLOCK, 2. VALVE SPACING ON WATER MAINS SHALL NOT EXCEED 1000' MAXIMUM, 3. A MIN, COVER OF 36' IS REQUIRED ABOVE BELL OF D.I.P. AND P,V.C, PIPE, 4. CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF BLUE REFLECTIVE MARKERS INDICATING FIRE HYDRANTS. 5. PIPE INSTALLED UNDER PAVEMENT SHALL BE D.I.P., AND SHALL EXTEND 5 FEET BEYOND EITHER SIDE OF PAVEMENT. P.V.C. MAY BE USED BELOW ENTRANCE ROADS AND PARKING LOTS, IF INSTALLED WITH A MINIMUM OF 42' COVER. 6. DEAD END LINES, VALVES, AND HYDRANTS SHALL BE RESTRAINED. 7. ALL LINES MINIMUM 10' OFFSET FROM BUILDINGS. DRAWING (VALVE AND FIRE HYDRANT) NO• LOCATION DETAIL W-1 A CORPORATION STOP SHALL BE INSTALLED WITH A LENGTH OF I' COPPER TUBING EXTENDING ABOVE THE GROUND. THE TUBING SHALL BE INSTALLED WITH A 180° BEND, 1' GATE VALVE - 1' COPPER TUBING GRADE N f /\.. o CORPORATION STOP WITH P.V.C. PLUG Z WHEN ABANDONED w� •1AIN NOTES 1. TEMPORARY SAMPLING POINT MAY BE CONSTRUCTED OF ALTERNATE MATERIALS AS APPROVED BY IRCDUS. DRAWING (BACTERIOLOGICAL) NO TEMPORARY SAMPLING POINT W - 6 Nil��Jj • 31111111111111 �w�� ' GATE VALVEO MECHANICAL JOINT 6' ANCHOR TEE FOR 6' GATE VALVE. VARIES WATER MAIN PLAN VIEW CONCRETE THRUST BLOCK PUMPER NOZZLE FACING ROADWAY VALVE BOX ACCESS GRADE N z DIRECT W CONNECTION iD z o (ANCHOR TYPE) cu U 6' G.V. 6' PIPE \\ / 1.5 CU, FT, CONCRETE 6' (MIN.) CONCRETE THRUST \ WATER MAIN BLOCK UNDISTURBED NOTES CROSS SECTION SOIL 1. HYDRANT GUARDS TO BE 4' DIAMETER GALVANIZED STEEL OR DUCTILE IRON PIPE FILLED w/ CONCRETE. GUARDS TO BE PAINTED SAME AS HYDRANT. 2. C OF THE PUMPER CONNECTION SHALL BE 18' MIN, ABOVE THE OF THE NEAREST ROADWAY OR FINISH GRADE. 3. COAT TIE RODS WITH COAL TAR ENAMEL AFTER ASSEMBLY (2 COATS MIN.) 4. ALL HYDRANTS SHALL BE TRAFFIC BREAKAWAY TYPE, AMERICAN- DARLING B-84-B,MUELLER A423 OR CLOW MEDALLION F2545. 5, ALTERNATE METHOD OF RESTRAINING HYDRANT MAY BE USED IF APPROVED BY IRCDUS (E.G. TIE RODS OR MEGA LUGS.) 6. COMPLETE ANCHORED FIRE HYDRANT ASSEMBLY MAY BE UTILIZED IN LIEU OF ABOVE. 7. FIRE HYDRANT SHOULD BE LOCATED WITHIN 12' FROM EDGE OF PAVEMENT WHERE POSSIBLE, DRAWING NO, FIRE HYDRANT ASSEMBLY DETAILS (FHA) W_2 GRADE ROADWAY GRADE (SWALE) CONCRETE PAD 30' SO. X 4' MIN, THICK W/ (1) No. 30 CONT, 1, MIN. 2' LOCKING CURB STOP W/ P.V,C. PLUG APPROVED COMPRESSION ° METER BOX FITTINGS ° 12' MIN. I.D. 2' CORPORATION STOP 1 C.F. 3/4' GRAVEL OR RESTRAINED PLUG (M.JJ ° CRUSHED ROCK. 2' POLYETHYLENE HORIZONTAL DISTANCE EQUAL TO DEPTH OF COVER ,. / 'D / '; ° 3 O °MIN , CONCRETE POURED TO UNDISTURBED \ _ \ `'.,D \' PRESSURE -TREATED NOTES SOIL PLYWOOD L COAT ALL EXPOSED THREADS WITH COAL TAR ENAMEL BEFORE BACKFILL, 2. THRUST BLOCK HEIGHT EQUAL TO PIPE DIAMETER. 3, BLOW -OFF TO BE LOCATED AT ALL DEAD END LINES, AS REQUIRED BY I,R.C.D.U.S. 4, ECLIPSE NO, 85 BLOW -OFF AS MANUFACTURED BY JOHN C, KUPFERLE FOUNDARY CO., ST, LOUIS, MO. MAY ALSO BE USED, 5. THRUST BLOCK DIMENSIONS SHALL BE AS APPROVED BY THE IRCDUS. ALTERNATE METHODS OF RESTRAINT MAY BE USED AS APPROVED BY IRCDUS, DRAWING NO. 2" BLOW -OFF W-3 2' -0' VARIES 2' -0' DOUBLE DETECTOR CHECK VALVE VICTAULIC (WITHOUT BUILDING SPRINKLER) i� 6 ii COUPLING t- 6 1' GLOBE VALVE I' CHECK N VALVE BY-PASS METER DETECTOR BYPASS 3' -0` CUSTOMER PLAN PIPING UTILITY PIPING TO DETECTOR CHECK VALVE PROPERTY LINE (WITHOUT BUILDING SPRINKLER) GATE VALVE ❑. S. & Y. GATE W/ INDICATOR VALVE 90° BEND TIE RODS (TYPJ (TYPJ 18' MINIMUM DISTANCE Q CONCRETE SUPPORTS (OR APPROVED BY IRCDUS) - SECTION NOTES WATER MAIN 1. ALL COMMERCIAL BUILDINGS AND INSTITUTIONS WITH BUILDING SPRINKLERS MUST HAVE HERSEY MODEL D,D,C, II L/A PATTERN DETECTOR CHECK VALVE AND METER TO BE INSTALLED ON THEIR OWN PROPERTY, DETECTOR CHECKS SHALL BE INSTALLED IN ACCORDANCE WITH THE STATE FIRE MARSHALL CODE, THE IRCDUS AND SHALL BE MOUNTED ABOVE GROUND. 2, DETAIL SHOWN CAN BE MODIFIED AND APPROVED BY THE DEPT, OF UTILITY SERVICES FOR EACH INDIVIDUAL PROJECT, DOUBLE -DETECTOR DRAWING NO. CHECK VALVE W-9 ASSEMBLY PROPERTY LINE P.E. GOOSENECK 3' METERS SHALL BE LONG (MIN,) OR SWING LOCATED IMMEDIATELY JOINT OR APPROVED INSIDE THE RIGHT-OF-WAY EQUAL BY IRCDUS UNLESS OTHERWISE LOCKING CURB LOCKING DIRECTED BY IRCDUS STO(T❑ ACCOMMODATE APPROVED METER BOXES 5/8' x 3/4' METER) SHALL BE 'CDR SYSTEMS CORP,' POLYMER CONCRETE & OR 2' 2'-0' ROADWAY 2'-0FIBERGLASS • CORP. STOP FINISH GRADE ---- ox iQ >0 12' Zz IN LINE DUAL LONG SERVICE CHECK BY IRCDUS M SHORT METERS STAINLESS STEEL SERVICE (SEE NOTE 6) DOUBLE STRAP SERVICE SADDLE FITTINGS WATER MAIN AS REQ'D. NOTES 1. SUCCESSIVE TAPS INTO THE WATER MAIN SHALL BE A MINIUM OF 18' ON CENTER, 2, SHORT SERVICES REQUIRE 18' MIN. COVER; LONG SERVICES REQUIRE 24' MINIMUM COVER. 3. MINIMUM SERVICE SIZE N❑T LESS THAN 1', DUAL SERVICES SHALL BE A MINIMUM 1-1/2' AND TRIPLE SERVICES SHALL BE A MINIMUM 2', QUADRUPLE SERVICES SHALL BE AS APPROVED BY IRCDUS, 4.' 1' & 1-1/2' LONG SERVICES REQUIRE A 2' MIN. I.D. CASING PIPE, 2' LONG SERVICES REQUIRE A 3' MIN, I.D. CASING PIPE. CASING PIPE SHALL BE SCH 40 P.V.C. 5. METERS GREATER THAN 2 INCHES SHALL BE MANUFACTURED BY HERSEY, MASTER OR APPROVED EQUAL BY THE I.R.CO. DEPT. of UTILITY SERVICES AND SUPPLIED BY APPLCANT. METERS 2' AND SMALLER SHALL BE SUPPLIED BY IRCDUS. 6.' PIN LOCKS SHALL BE PURCHASED BY THE DEVELOPER AND/OR CONTRACTOR AND SHALL BE INSTALLED ON ALL LOCKING CURB STOPS, SAMPLING POINTS, AND WATER SERVICE CONNECTIONS AT THE TIME OF ACTIVATING ALL WATER MAINS OR AT SUCH TIME AS DIRECTED BY IRCDUS. 7. CURB STOPS SHALL BE THE SAME SIZE AS THE METERS THAT ARE INSTALLED. DRAWING NO. WATER SERVICE W-4 FEBC❑ 805Y DBL, CK, 2' G.V, 2' SCH 40 GALV. �<TYPJ 'T' or 'Wye' C.TYPJ PRESSURE GAUGE 2' METER SEE NOTE 10 (TYPJ 2' SERVICE EXISTING GRADE 18' MAX SADDLE 12' MIN p > M.J.G.V. FORD FB 1700 O 2' CORP. STOP f O NEW W,M. '----TIE-IN VALVE TO BE CLOSED AND LOCKED, EXISTING WATER MAIN 1. TIE-IN VALVE SHALL BE OPERATED BY COUNTY PERSONNEL ONLY AND IN THE PRESENCE OF THE ENGINEER OF RECORD, 2. LINES TO BE FLUSHED SHALL BE GREATER THAN 6' IN DIAMETER. TEMPORARY JUMPER DETAIL DRAWING NO. 1-12 (A) 2 1 1/2' 11 SERVICE LATERAL METER BOX w (METER NOT SHOWN) V P.E. z SERVICE tCURBSTOPS J LATERAL IF x 0~C UJ CL 0BRASS COMPRESSIONWYE BRANCH--2� -1 IN LINE DUAL I > BRASS LOCKING CURB CHECK BY IRCDUS PLAN VIEW w STOP (FORD ❑R'MUELLER) WITH INTEGRAL 0 METER COUPLING CENTER OPENING n. OVER METERS) 1' MIN. CUSTOMERS METER PIPING BOX ¢ z (BY OTHERS) (SEE NOTE f NO. 3) w N W O U 4' MIN, GRAVEL------____,_ OR CRUSHED ROCK CR❑SS SECTION NOTES 1. METERS OVER 2' MUST BE APPROVED BY I.R.C.D.U,S. AND INSTALLED BY CONTRACTOR. 2. ALL METERS 2' AND SMALLER WILL BE SUPPLIED AND INSTALLED BY LR.C.D.U.S. 3. MINIMUM SIZE OF METER BOXES: 1' SERVICE (12' X 20')t 1-1/2' AND 2' SERVICE (17' X 28'). 4. METERS GREATER THAN 2' SHALL BE MASTER METER OR COMPOUND AS REQUIRED AND APPROVED BY I.R.C.D.U.S. DRAWING NO. METER BOX W-S NOTES 1. A temporary jumper connection is required at all connections between existing active water mains and proposed new water main Improvements. 2, The Temporary Jumper detail (W-12A) is to be used for filling any new water main of any size from the existing active water mains and for the flushing of new mains up to 6' diameter (2.5 FPS minimum velocity) and for putting bacteriological samples from from any new water main of any size. 3. The jumper connection shall be maintained until after the filling, flushing, testing and disinfection of the new main has been successfully completed and clearance for use from the Florida Department oP Environmental Protection (FDEP) and other pertinent agencies has been received. Adequate thrust blocking and/or restraints shall be provided temporarily, as required, 4. Pipe and fittings used for connecting the new pipe to the existing pipe shalt be disinfected prior to installation in accordance with AWWA C651, 1992 EDITION. The tapping sleeve and the exterior of the main to be tapped shall be disinfected by spraying or swabbing per Section Two of AWWA C651-92, 5. The Jumper connection shalt also be used to maintain a minimum pressure of 20 PSI In the new mains contlnuou5ly after disinfection and until F.D.E.P clearance letter Is obtained. 6. The Contractor shall provide documentation demonstrating that the double check backflow prevention device is in good working order at the time of installation and provide documentation that the double check backflow prevention device has been tested and is in good working order one year from Installation by a qualified back flow technician as approved by Indian River County's Utility Engineer. 7. Except as required to flush lines greater than 6' diameter, the tie-in valve shall remain closed and shall be locked in the closed position by the utility company, The tie-in valve shalt remain Locked closed until the new system has been cleared for use by FDEP and all other pertinent agencies. 8. Upon receipt of clearance for use from FDEP and all other pertinent agencies, the Contractor shall remove the temporary jumper connection. The corporation stops are to be closed and plugged with 2' brass stops, 9. All instatlation and maintenance of the temporary jumper connection and associated backflow prevention device, fittings valves, etc., shall be the responsibility of the Contractor. 10. If the water main to be flushed is larger than 6' diameter or such Length that a full pipe flush 'at the 2.5 FPS velocity cannot be accomplished, the following procedure shalt be utilized, a) Install pressure gauges as indicated on detail (W-12A), b) Open all downstream valves in the new system prior to flush. c) Flush new water main thru tie-in valve maintaining a 10+ PSI pressure differential between gauges during flush. d) Tie -In valve shalt be operated by county personnel, In the presence of the engineer of record to insure that the required pressure differential is maintained. TEMPORARY DRAWING NO. JUMPER DETAIL W-12 NOTES C B) • REVIEWED AND APPROVED BY: GORDON E SPARKS, FL, P,E.# 23161 Revision Date By No, Revision Date By �"Ey INDIAN RIVER COUNTY DEPARTMENT OF TECHNICAL BY: RB DATE1 JULY 2001 SEBASTIAN WATER ASSESSMENT STANDARD SHEET DESIGNED BY: GS 1840 25th STREET SCALE: N/A <oRI�P VERO BEACH, FLORIDA 32960 UTILITY SERVICES CHECKED BY: GS UCP # U C I D ETAI ES _ (561) 567-8000 1 1 APPROVED BY: GS I I I OF s e SPECIPICATMNS 1, CLEARING AND GRUBBING: Clearing and grubbing shalt be performed within the limits of the project work in accordance with Section 110, FDOT Specifications, for 'Standard Clearing and Grubbing,' defined in Paragraphs 110-2 and 110-3. This item of work shall include, but is not limited to, the complete removal and disposal of all trees, brush, stumps, roots, grass, weeds, rubbish and all other obstructions to a depth of 18 inches below natural ground or design grade, whichever its lower. However, it should be noted that prior to the removal of any trees, the Contractor shalt confirm their removal with the Owner, All material shalt be removed from the site of the project, and shall be disposed of in accordance with all local, regional, State and Federal laws, regulations or ordinances, Material may be burned upon receiving all required permits. Any unburned remains shalt be legally disposed of, 2, EARTHWORK AND GRADING: All earthwork and grading shalt be performed as required to attain the final grades, typical sections and elevations shown on the Plans for the proposed project work. In all other respects, materials and construction methods for earthwork, embarkment, excavation and grading shall conform to the requirements of Section 120, FDOT Specifications. Any plastic material (A-2-6, A-2-7, A-4, A-5, A-6, A-7 and muck) within 36 inches of the finished grade shall be removed and replaced with A-3 material, 3. PAVING IMPROVEMENTS: A, Subgrade Subgrade shall. be compacted to 98% of maximum density as determined by AASHT❑ T-180, and stabitized to a minimum FBV of 75 PSI. Subgrade shalt be thoroughly rolled in its entirety with a pneumatic -tired roller before any field inspection is made. B. Concrete Pavement Concrete pavement surface course shall be fiber reinforced concrete with a 28 day compressive strength of 4,000 psi, Subgrade shall be moistened as required to provide a uniform dampened surface at the time concrete is placed. Contraction joints shall be constructed true to line with face perpendicular to surface of pavement, Joints shall be provided in both the longitudinal and transverse directions at a maximum spacing of 18 feet, Depth of contraction joints shall be no greater than 1/4 nor less than 1/5 of the pavement thickness. Contraction joints shall be formed by sawing, premolcled inserts or hand tool, Joints must be completed between four and eighteen hours after concrete has been placed. Expansion joints shall be placed between the proposed pavement and other rigid structures such as drainage inlets and existing concrete stabs, Expansion joints shalt be 1/2' wide and filled with a preformed expansion joint filter, conforming to AASHT❑ M-213, and a joint seating compound, conforming to AASHT❑ M-173. A construction join shall be used if concrete placement is interrupted long enough to cause a cold joint, If possible, the construction joint should be placed at the location of a planned contraction joint. The construction joint shall be formed by either a semicircular keyway 2' diameter or 14' long 6' dowels placed across the 12' on center, C. Concrete Finish Finish of concrete shall be a uniform, gritty, non -slip surface, broom finished with a coarse broom to provide a non-skid surface just before the water sheen disappears, No water shall be added to the surface to assist finishing operations. No steel trowel or other tools will be used to develop a slick surface, D. Concrete Curing Concrete shot( be cured by protecting it against loss of moisture and mechanical injury for at least three days after placement. A liquid curing membrane, translucent with a fugitive dye and conforming to AASHT❑ M-148, shall be applied immediately after the finishing operation has been completed. Ready -mixed concrete shall conform to AASHT❑ M-157. The stump of the concrete shall be between three, if applicable and four inches. No water shall be added to the concrete to increase workability, E. Type 'D' Curb Concrete Type 'D' curb shall be constructed as per FDOT Section 520 and shalt be built to the typical section shown on the plans, F. Sod Sod shall be placed in conformance to FDOT Section 570, 575 and 981. Sod shall be certified as free of Soda Appte. G, Striping Materials and construction methods for applying painted traffic stripes and markings shalt conform to the requirements of Section 710 and 711, FDOT Specifications, Traffic paint shot[ be applied in all locations shown on the plans. H. Sidewalks 4' Thick Concrete Sidewalk shall be constructed as per FDOT standards, I. Signage The Contractor shalt provide all materials and labor needed to install all signs as shown on the plans. Materials and construction methods shall conform to Section 700, FDOT Specifications, The Manual of Uniform Traffic Control Devices, Florida Department of Transportation Standards, J. Testing The Contractor shall retain the services of an approved independent testing laboratory or laboratories to conduct all required test on subgrade, base and surface course materials. Test results must be submitted prior to any request for payment of items listed above. Should any test fail to meet specifications as shown herein, the Contractor shall at his own expense correct all deficient work and submit laboratory test results showing compliance with these specifications. 4, DRAINAGE IMPROVEMENTS: All labor, materials and methods of construction shall be in accordance with the minimum engineering and construction standards of FDOT Specifications, The Contractor shall provide all materials and labor needed to complete that project work for drainage improvements at the locations, size and type shown on the plans for the following items. Trench excavation and backfilling operations shall meet the requirements of FDOT Specifications, Section 125. Particular emphasis is given to Article 125,8.3, backfilting operations. The Contractor, shall provide for the necessary density test to comply with this section, Pipe trench shall be dry white pipe is being laid and bedded as per detail and FDOT Section 430, The Contractor shall comply to Chapter 90-96, Laws of Florida, which requires the Contractor performing trench excavation in excess of 5 feet deep comply with at( applicable trench safety standards and shoring B. Single Service Connections requirements as set forth in the Occupational Safety and Heatth Administration exvavation safety standards, 29 C.F.R.' 19926.650 Subpart P and incorporated as the State of Florida Standard (OSHA), as revised or updated, Sanitary Service laterals shall have a minimum slope of 1/8' per foot of run. A. Reinforced Concrete Pipe (RCP) �, Sanitary service lateral connection shalt meet or exceed Indian River County Utilities and FDEP Alt RCP shall conform to the requirements of Section 941, FDOT Specifications for standard and Specifications when possible, elliptical concrete pipe and Section 942, FDOT Specifications for gaskets Service line identification; B. Mitered End Section (MES) 1. One 4'-0' hardwood or treated wood marker stake shall be put in the earth against the Construction methods and materials shall conform to the requirements of Section 430 and 941, plug when service connection is backfilled. The stake shalt extend 18 inches minimum FDOT Specifications for reinforced concrete pipe mitered end sections as detailed in FDOT Index #273. above grade. The stake shall be painted green, C. Modified (Type 'C' Inlet) Control Structure Pre -cast concrete catch basins shalt meet the requirements of' ASTM Specifications C-478 and 64T C. 2 1/2' PVC Force Main ' and FDOT Standard Specification 425. Concrete for pre -cast control structure shall have a minimum compressive strength of 4000 PSI at 28 days. All Force Mains 2 1/2' and less' in diameter shall be high density polyethylene (HDPE), shall be in conformance with FDEP and Indian River County Utilities Specifications. D. Sewer Line Testing S. P❑TABLE WATER DISTRIBUTION SYSTEMS Force Mains shall be tested in accordance with Indian River County Utilities Specifications. All pressure main shall be pressure tested per the requirements of AWWA. Materials, construction methods, required tests, testing methods and construction tolerances for the potable water distribution system shall conform to the requirements of the Florida Department of Environmental Protection Agency, Indian River County Health Department, Indian River County Fire Department, E, Fittings and Valves ' Indian River County Utilities and American Water Works Association and Ten State Standards, Excavation shall be to required depths. Minimum cover to finished grade for water mains shall be 36' inches. All fittings and valves in this section shalt conform to the same requirements as Section 5, Prior to complete backfilling, each joint shall be left- exposed for visual observation during test operations. Potable Water Distribution System. Fittings and Valves shalt be in conformance with FDEP Alt water mains shall be disinfected in accordance with AWWA Standard C651, latest edition, and Indian River County Utilities Specifications, A. Single Service Connections At( Single ' Service Connections shalt be constructed in accordance with Indian River county Utilities, B. PVC PIPE (under 4 inches) 7, ADDITIONAL WATER AND WASTEWATER NOTES: SDR-21 PVC shalt be provided and installed in accordance with the Indian River County Utilities Specifications, All Single Service Connections shall be constructed in accordance with Indian River county Utilities. Pipes must bear. the 'NSF" approval stamp for suitability to potable water application, A. All water and wastewater system construction shall be installed, inspected, and tested in accordance with Indian River County Utility Standards, C. PVC Water Main (4 inches and larger) In cases of discrepancies between the construction plans and Indian River County Utilities Shall be Class 150, DR-18 manufactured to ductile iron pipe outside dimensions in compliance with Specifications, the most restrictive shall apply, AWWA Standard C-900, and C-905, latest edition, (C-900 PVC. pipe may be substituted with C909 PVC, pipe), The pipe shall have an integral bell end and gasket sealwith the joint in compliance with the B. 'Standard Separation Statement for Water/Sewer Conflicts requirements of ASTM D 3139, latest edition. • DIP Water Main 1. Sanitary sewers, force mains, and storm sewers should cross under water mains whenever Shall be C-150, or C-151, latest edition, manufactured to ductile iron pipe outside dimensions in compliance possible, Sanitary sewers, force mains and storm sewers crossing water -mains shalt be laid to with AWWA Standard C-900, and C-905, latest edition, The pipe shalt have an integral bet[ end provide a minimum vertical distance of 18 inches from outside of pipe to outside of pipe. and gasket seat with the joint in compliance with the requirements of ASTM D 3139, latest edition, Polethylene pressure piping ( 4 inches to 63 inches), shall be in accordance with AWWA C906-99 Standards, Only joining by Thermal Butt -Fusion is allowed, D, Gate Valves All valves shall be mechanical joint ductile iron conforming to the requirements of AWWA C-509, latest edition, Rated at 200 psi working pressure, They shall also be mec,�)anicatty restrained according to the I,R.Co.U. restraining schedule, �► E. Fittings All fittings shall be mechanical joint ductile iron conforming to the requirements of AWWA C-110, or C-153, latest edition and shall be cement tined in conformance with AWWA C-104 latest edition, Rated at 350 psi working pressure. They shall also be mechanically restrained according to the Indian River County Utilities restraining schedule. No thrust blocks shall be used. F, Polyethylene Tubing Polyethylene tubing (PE) shalt be provided and installed in accordance with AWWA C-901, latest edition and Indian River County Utilities Specifications, Reference ASTM, Standards G, Water Main Testing All water mains • shall be bacteriological tested as per AWWA-C651, latest edition, The Contractor shalt make all arrangements with a certified testing laboratory to take a(t water samples required for bacteriological test and shall maintain a combined chlorine residual of not less than 0.6 mg/t (PPM), Water mains being tested shall remain under tine pressure (20-psi-min.), after the sample taps are turned off, All water mains shalt be pressure and teakage tested for a minimum of two hours in accordance with all FDEP, and AWWA C-600 Standards, latest edition, The following formula shall be applied to determine the allowable leakage per hour of testing. ND -\F Where: L 7400 L = allowable leakage in gallons per hour N = number of joints in the length of pipeline tested D = nominal diameter of the pipe in inches P = average test pressure during the leekage test, in pounds per square inch (gauge) Following the leakage test, each section of completed pipeline shall be as thoroughly flushed as possible. A minimum flow shall be used that will insure velocity in the pipe of 2,0 FPS. The water shall be potable water or water from a source satisfactory to the Utility, Where gravity sanitary sewers and storm sewers must cross a water main with less than 18 inches vertical distance, both the sewer and the water main shall be constructed of ductile iron pipe (DIP) at the crossing. (DIP is not required for storm sewers,) -Sufficient lengths of DIP must be used to provide a minimum separation of 10 feet between any two joints. All joints on the water main within 20 feet of the crossing must be mechanically restrained, A .minimum vertical clearance of 6 inches must be maintained at all crossings. All crossings shall be arranged so that the sewer pipe joints and the water main pipe joints are equidistant from the point of crossing (pipes centered on the crossing),' , Where a new pipe conflicts with an existing pipe with less than 18 inches vertical clearance, the new pipe shall be constructed of DIP (except storm sewers) and the new pipe shall be arranged to meet the crossing requirements above. 2. A minimum 10 foot horizontal separation shot( be maintained between any type of sewer and water main in parallel installations whenever possible, In cases where it is not possible to maintain a 10 foot horizontal separation between gravity sewer, the water main must be laid in a separate trench or on an undistributed earth shelf located on one side of the gravity sewer at such an elevation that the bottom of the water main is at (east 18" inches above the top of the sewer. Where it is not possible to maintain a 10' horizontal separation and a vertical distance of 18 inches, the water main shall, be constructed of DIP and the gravity sewer shalt be constructed of DIP (except storm sewers) with a minimum vertical distance of 6 inches. The water main should always be above the sewer. Joints on the water main shall be located as far apart as possible from joints on the sewer (staggered joints). ' Any upgraded sanitary sewer gravity main, where either or both of the vertical and horizontal requirements are not maintained, shalt be hydrostatically pressure tested using water to ensure joint tightness. 3. At( DIP shall be class 50 or, higher. Adequate protective measures against corrosion shall be used as determined by the design engineer, ' 4. Maximum obtainable separation of reclaimed water lines and domestic water tines shall be practiced, A minimum horizontal separation of five feet (center to center) or three feet (outside to outside), shalt be maintained between reclaimed water lines and either potable water mains or sewage collection lines. A minimum vertical clearance of 18 inches must be maintained between reclaimed water tines and potable water mains or sewageocoltection lines, At crossings provisions of FAC Rule 17-604 and Ten States Standards shall apply. 6, WASTEWATER COLLECTION SYSTEM: 8. EROSION CONTROL MEASURES: Alt areas disturbed by construction shalt be sodded. The Contractor shall be Materials, construction methods, required tests, testing Jthods and construction tolerances for the responsible for establishing a stand of grass sufficient to prevent erosion, wastewater collection system shall conform to the requirements of the Florida Department of Environmental Silt fence shall be constructed in accordance with detail. Protection Agency, Ten State Standards and Indian River County Utility Specifications. Construction of the sanitary sewer system as detailed herin shalt not be deviated 9. STANDARD COLOR STAKING FOR U.G. UTULITIES SHALL BE ADHERED TO: from in any way without written authorization from the Engineer. YELLOW GAS, ❑IL, PETROLEUM AND OTHER HAZARDOUS LIQUIDS OR GASEOUS MATERIALS A. Gravity Sewers RED ELECTRONIC POWER LINE OR CONDUITS Alt gravity sewer lines shalt be constructed in accordance with FDEP and Indian River County Utilities Department Specifications. ORANGE CUMMUNICATI❑N LINES OR CABLES, INCLUDING BUT NOT LIMITED TO TELEPHONE, TELEGRAPH, FIRE SIGNALS, CABLE TV, CIVIL DEFENSE, AND ELECTRONIC CONTROLS AU sections of gravity sewer tines, which do not meet these Specifications, shall be repaired by the Contractor and retested at his expense to assure final compliance with these Specifications. BLUE WATER The repair method to be used shall be approved, in advance, by Indian River County Utilities, GREEN STORM AND SANITARY SEWERS INLUDING FORCE MAINS AND OTHER NON HAZARDOUS MATERIALS All visable leaks are to be corrected regardless of test results, LAVENDER IRRIGATION REVIEWED AND APPROVED BY: GORDON E, SPARKS, EL, P,E,# 23161 ReVISiOYI Date By NO. ReVISi0Y1 Date BY oum�1�0 INDIAN lbl Y 1J11, CCJtT1tiTTY DEPARTMENT Q� TECHNICAL BY: RB DATES JULY toolSEBASTIAN WATER ASSESSMENT SPECIFICATI0�1 SHEET DESIGNED BY: GS SCALE: N/A1840 25th STREET/ClSVERO BEACH, FLORIDA 32960 UTILITY �71_,l� `%IC CHECKED BY Gs ucP # C P D ETAI L (561) 567-8000 APPROVED BY: GS OF 0 i SUPPLEMENTARY C❑NDITI❑NS GENERAL Scope of Work The Contractor, shall furnish all materials, labor, equipment, tools, supervision, transportation and incidentals necessary to construct water and sewer improvements in accordance with the provision of these Specifications and the Drawings. Permits and Licenses: A water and wastewater permits shall be obtained by the Engineer -of -Record, for the Owner, Construction requirements of the project reflect constraints and conditions imposed by those permits. The Contractor shall perform all work and shall construct the project in accordance with those requirements. Additionally, the Contractor shall secure all other work permits, approvals or licenses required to perform the work, and he shall perform the work in accordance with those permits, approvals, or licenses. Reference To Ether Documents For brevity, reference may be made to other specifications or documents which will be used to specify or control the materials placed in the work, the construction methods to be used, the tolerances that will be acceptable, and contractual or legal obligations. The specifications or documents shall include; 1, 'Standord General. Conditions of the Construction Contract,' 1983 Edition, prepared by the Engineers' Joint Contract Documents Committee and published by the National Society of Professional Engineers, Reference shall be made: 'General Conditions.' 2, 'Florida Department of Transportation Standard Specifications for Road and Bridge Construction, 1991 edition, 'published by the Florida Department of Transportation. Reference shalt be made; 'FDOT Specifications.' 3, 'Florida Department of Transporation Roadway and Traffic Design Standards, January 1994 edition,' published by the Florida Department of Transportation. Reference shall be made, 'FDOT Index,' 4, 'Indian River County Utility Systems Department Standards', latest edition, published by indion River County Utilities Department, Reference shall be made; 'I,R,C. Utilities,' 5. 'American Water Works Association Standards,' 1988 edition, prepared by the American Water Works Association. Reference shall be made; 'AWWA Standards.' 6. 'American Society for Testing and Materials Specifications,' latest edition. Reference shall be made; 'ASTM', By reference, the documents cited above are made port of these Supplementary Conditions and Specifications. The Contractor shall have copies of each in his possession for use throughout this project work. Additionally, the work shall be performed in accordance with all other applicable local, regional, state and Federal laws, regulations and codes including, but not limited to, the Federal Occupational Safety and Health Act. THE DRAWINGS Errors or, 'Omissions in the Drawings or Specifications Prior, to initiation of the work, the Contractor shall check dimensions, grades and elevations shown on the Drawings and summary of estimated quantities to assure himself that they are correct and that the work can be accomplished as intended. The Contractor shall take no advantage of any apparent error or omission which he might discover, but shall immediately notify the Engineer -of -Record, who will then make such corrections and interpretations as he deems necessary for reflecting the actual spirit and intent of the Drawings and Specifications, Soil and Sub -Soil Conditions; It is the sole and exclusive responsibility of the Contractor to; 1, Place his own interpretation on any and all soil and sub -soil data portrayed on the Drawings. 2. Perform his own soil and sub -soil investigation to determine the nature, character, location and extent of all soil and sub -soil conditions that may affect his work, 0 3, Include in his contract price considerations for al[ work necessary to assure that the soil and sub- soil conditions will meet the requirements of the Specifications and the applicable regulations of Indian River County, THE WORK Pre -Construction Conference; The Engineer -of -Record (E,O.R) shall call a pre -construction conference prior to initiation of the work at a place designated by Indian River County to review the construction aspects of the project, The meeting shall be between the E.O,R„ Contractor, and the County, The Contractor shall present his tentative detailed working schedule for the project so that it may be reviewed by the E,O,R, Additionally, it will afford the Contractor an opportunity to have any questions he may have on the work clarified by the E,O.R. No work under the agreement shall be commenced until after the Notice to Proceed has been issued by the County, Commencement and Completion of the Work; The Contractor shall commence work under the Agreement within fifteen (15) calendar days after the day of receipt by him of the Notice to Proceed and shot[ complete the work ready for use not later than the time indicated in the Agreement. The time stated for completion shalt include final cleanup of the premises. Horizontal and Vertical Control; The Contractor shall construct the required improvements in the location shown on the Drawings, and shall if applicable, use as horizontal control points the parcel corners and benchmarks at the site for use in establishing the necessary elevations and grades, Guarontee; All materials and the installation thereof which are furnished and installed by the Contractor, under the terms of the Agreement, shalt be guaranteed by the Contractor against defective workmanship, mechanical and physical defects, leakage, breakage, and other' damages and failure under normat operation for a period of one (1) year from the date of acceptance by Indian River County Utilities and FDEP„ said date to constitute the commencement of the one (1) year warranty period, All materials and installations proving to be defective within the specified period of the guarantee shall be replaced, without cost to the Owner, by the manufacturer or the Contractor, The period of guarantee of each such replacement shall be from and after the date of installation thereof. Coordination of Work With Others; The Contractor shall coordinate his work with the work or improvements of others with regard to new construction, or for the need of removal, relocation or alteration of existing facilities, This includes, but is not limited to, Indian River County Utilities, Florida Power & Light Company, BellSouth, Adetphia Cable, other- utititie companies, and their contractors, subcontractors, or agents. E Power and Water All arrangements and costs for temporary power and water during construction shall be the responsibility of the Contractor. Observing the Work: At the election of the Owner, the progress and quality of the work may be observed by the Owner's Engineer or Engineer's appointed employee, No observer is authorized to change any provisions of the Specifications without written authorization of the Owner's Engineer, nor shall the presence nor absence of on observer relieve the Contractor from any requirements of the Drawings and Specifications, The Contractor shall give the Engineer a minimum of 48 hours notice prior to required inspections, and shall supply all equipment necessary to properly test and inspect the completed work, In addition to the inspection requirements stated in the Indian River County Specifications, the following minimum construction inspection checkpoints shall be adhered to, and the Contractor shall notify the Engineer for inspection, 1. Prior to any significant deviation from the Drawings, 2. Prior to backfiking trenches containing hydraulic conduits, so that jointing may be inspected. 3. Upon comptetion of subgrode compaction, 4. Upon delivery of base material. 5, Concrete placement for cast -in -place structures, sidewalks, curbing, ect, 6. Lamping and T.V. Inspection of tines for all sanitary conduits. 7. Pressure testing of conduit lines, 8. Upon completion of construction for final inspection with the Contractor or his Representative. Existing Utilities and Structures: Existing utilities, structures and facilities shown on the Drawings were located as accurately as possible from the records examined. No guarantee is made that all existing facilities are shown or that those shown are entirety accurate, The Contractor shalt assure himself of the actual location of the utilities, structures or facilities prior to performance of any work in the vicinity, The utility companies or utility agencies will co-operate with the Contractor in locating underground utilities that may be subject to damage or interruption of services during the Contractor's operations, Prior to start of the work, the Contractor shall request each utility agency to advise him of the location of their, facilities in the vincity, The Owner will assume no liability for damages sustained or cost incurred because of the Contractor's operation in the vicinity of existing ,utilities or structures, or to the temporary bracing and shoring of same. In the event that it is necessary to shore, brace or swing a utility, the utility company or, department affected should be contacted and their permission secured as to the method used for any such work, Restoration of Dariaged Structures or Utilities It shall be the responsibility of the Contractor to repair, rebuild or restore to its former condition, any and all portions of existing utilities, structures, equipment,appurtenances or facilities, other than those to be paid for under this Contract, which may be disturbed or damaged due to this construction operation, at no cost to the Owner, Final Cleanup Upon completion of the work but before final payment will be made, the Contractor shall clear, and remove from the project area, all folsework, equipment, surplus and discarded materials, rubbish and temporary structures which result from the work under this Agreement, and shall restore in an occeptable manner all property which has been damaged during the prosecution of the work, Record Information:' Upon completion of the work, but prior to submittal of the request for final payment, the Contractor shall obtoin and submit record information to the Owner, This information shalt include the following; 1. Water and Wastewater Systems a) Horizontal and Vertical location and size of all water mains, meters, services, valves, and hydrants b) Horizontal and Vertical location, size and type of all sanitary manholes; sewer main diameter, inverts and lengths, and services, The record information shall be certified by a Florida Professional Land Surveyor. Locations shalt be made by reference to centerline stationing and offset or by other means acceptable to the Owner. Elevations shall be according to National Geodetic Vertical Datum (NGVD), The information shot[ be submitted on 2 mytar and in AutoCad ret,14 (electronic formot). it CALL 48 H❑URS BEE❑RE 1-800-432-4770 Y❑U DICE IN EL❑RIDA IT'S THE LAW! SUNSHINE STATE ONE CALL OF FLORIDA, INC, DEWATERING CONSTRUCTION DEWATERING (WELL POINTS, SUMPS ETC...) MAY REQUIRE A DEWATERING PERMIT FROM S,F,W.M,D, THIS SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE. REVIEWED AND APPROVED BY: GDR -DON E, SPARKS, FL. P.E,# 23161 ReVlsion Date By NO, Revision Date BY �CRc� INDIAN RIVER COUNTY DEPARTMENT OF TECHNICAL BY: RB DATE: JULY 2001 SEBASTIAN WATER ASSESSMENT SHEET DESIGNED BY: GS 1840 25th STREET SUPPLEMENTARY SCALEt N/A •�CORI�P• vERO BEACH, FLORIDA 32960 UTILITY SERVICES CHECKED B GS u�P # U P DETAI T_ {561) 567-8000 APPROVED BY GS OF 0